Summary: Invitation for Bid 25-0132
This Invitation for Bid (IFB) from the California Department of Food and Agriculture (CDFA) seeks a contractor to provide foliar pesticide application treatment services for spongy moth in Monte Nido, Los Angeles County, using Thuricide Bt as the primary treatment chemical. The contractor must supply all necessary equipment including spray trucks with minimum 150-gallon capacity tanks, bucket lifts and scissor lifts for trees exceeding 60 feet, mixing and loading facilities, and qualified personnel including a licensed Pest Control Advisor and applicators with current pesticide safety certifications. The contract commences February 1, 2026, or upon final Department of General Services approval (whichever is later) and extends through May 31, 2026, with CDFA holding the option to renew for two additional one-year periods based on funding availability and performance. Written questions must be submitted by January 15, 2026, with responses posted by January 20, 2026. Sealed bids must be received via email by January 23, 2026 at 2:00 PM PT, with cost proposal opening on the same date. Award notification shall occur within five business days of cost proposal opening.
The contract specifies a cost proposal structure including per-gallon application rates or team/property per-day rates, pesticide unit pricing, daily bucket lift operation rates, and hourly rates for Pest Control Advisor recommendations. No minimum treatment hours or pesticide volumes are guaranteed. The CDFA requires a three percent Disabled Veteran Business Enterprise (DVBE) participation commitment for bid responsiveness, with a DVBE incentive available for qualifying bidders. Contractor insurance requirements include Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Automobile Liability ($1,000,000 combined single limit), Workers' Compensation with $1,000,000 employer's liability limits, and Pollution/Environmental Liability ($1,000,000 per incident/$2,000,000 aggregate). The contractor bears all operational costs including equipment maintenance, pesticide spill cleanup and disposal, hazardous waste disposal, and medical/first-aid requirements. Liquidated damages of $1,000 per day per spray truck apply for failure to report on the official start date or for operational delays, and the contractor is liable for all property damage and lost/stolen items in their custody.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-0132_Cost_Proposal.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised 10/23/2025
January 6, 2026
INVITATION FOR BID (IFB)
IFB No.: 25-0132 Title: Treatment Services for Spongy Moth Type of Contract: Personal Services
NOTICE TO PROSPECTIVE PROPOSERS:
You are invited to review and respond to this Invitation for Bid (IFB). In submission of your proposal, you must comply with the instructions and requirements found herein.
Note that all agreements entered into with the State of California will include by reference General Terms and Conditions.
Questions about this solicitation must be submitted to the Contracts Unit email address below with the IFB number in the Subject line. Responses to all questions received will be posted as an official addendum to this solicitation. Reference Page 1 for all Key Action Dates.
Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an official addendum.
Contracts Unit Office of Grants Administration Administrative Services Division CDFA.Contracts@cdfa.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language?search=general%20terms mailto:CDFA.Contracts@cdfa.ca.gov
Table of Contents Key Action Dates Questions and Answers Term of Contract
Option to Renew Description of Services Contractor Responsibilities CDFA Responsibilities Invoicing
Cost Proposal Generative Artificial Intelligence (GenAI) Disclosure Notification Clause Submission of Bid Evaluation and Selection Award and Protest Disposition of Bids Agreement Execution and Performance Termination Preference and Incentive Programs
CALIFORNIA DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) - PROGRAM
REQUIREMENTS - FOR NON-IT SERVICES
REQUIRED DOCUMENTS
SAMPLE CONTRACT - STD 213
EXHIBIT A
EXHIBIT B
EXHIBIT D
EXHIBIT E
CONTRACT AND SUBCONTRACT COMPLIANCE REQUIREMENTS
UNFAIR PRACTICES ACT
EXECUTIVE ORDER N-6-22 – RUSSIA SANCTIONS
CONFLICT OF INTEREST
LICENSE AND PERMIT REQUIREMENTS
INSURANCE REQUIREMENTS
General Provisions Applying to All Policies Contractor Insurance Requirements
LIABILITY AND DAMAGES
CHEMICAL APPLICATIONS
QUALIFICATIONS
MULTIPLE CONTRACTORS
SUBCONTRACTORS
POTENTIAL SUBCONTRACTORS
SUBSTITUTION OF SUBCONTRACTORS
DVBE SUBCONTRACTOR REPORTING
RIGHT TO BAR
STAFF EXPENSES
PUBLICITY AND ACKNOWLEDGEMENT
WELFARE AND INSTITUTION CODE SECTION 19404 PROVISIONS
FORCED, CONVICT, AND INDENTURED LABOR
PRIORITY HIRING CONSIDERATIONS
WORK ORDERS
FORCE MAJEURE
AMERICAN DISABILITIES ACT
NATIONAL LABOR RELATIONS CERTIFICATION
AGREEMENT EXECUTION
Key Action Dates All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.
Release of IFB.................................................................................. January 6, 2026 Written questions must be received by 5:00 PM PT ....................... January 15, 2026 Questions and Answers will be posted by 5:00 PM PT .................. January 20, 2026 Emailed bids must be complete and received no later than 2:00 PM PT ............................................................... January 23, 2026 Estimated Opening of Cost Proposal ............................................. January 23, 2026
Notice of Proposed Award Date to occur within five (5) business days after “Opening of Cost Proposal.” Bidders interested in observing the bid opening must email the Contracts Unit at CDFA.Contracts@cdfa.ca.gov. Bid openings will be held virtually.
Avoid late submittals due to computer glitches or other technical issues that may arise by submitting documents early.
Questions and Answers To maintain fairness during the bidding process, all questions must be submitted in writing and sent to the Contracts Unit email (CDFA.Contracts@cdfa.ca.gov) only. The subject line of the email must contain the Bid Number. Bidders must not contact any program staff during the bidding process as this could result in disqualification.
Answers to questions received prior to the submission deadline listed above, will be provided via a formal addendum and will be posted to the contract advertisement on Cal eProcure.
Term of Contract The term of this contract is February 1, 2026, or upon final/Department of General Services/Office of Legal Services (DGS/OLS) approval, whichever is later, through May 31, 2026.
Option to Renew The CDFA reserves the right to renew this agreement for an additional two (2) one year options to renew, if needed, with the successful bidder at the end of the agreement term, provided funding to do so is appropriate for this purpose in subsequent budgets. Proposed renewals are assessed annually for approval by the California Department of General Services and CDFA according to program direction, funding, consistency of price and scope of work continuity.
Description of Services This is an Agreement in which the Contractor shall provide Treatment services with the use of bucket lifts, in the community of Monte Nido, an unincorporated community in western Los Angeles County. The Contractor will be compensated for the services in accordance with the rate(s) specified in Exhibit B - Attachment 1, budget display, which shall include all labor, equipment, parts, devices, materials, tools, licenses, permits, supervision, inspection, insurance, transportation, travel and per diem, and every other item of expense necessary for the California Department of Food and Agriculture’s (CDFA) Pest Detection and Emergency Projects located at 403 W Ave 33, Lincoln Heights (work area is located in Monte Nido, Calabasas).
Contractor Responsibilities The Contractor will perform foliar applications to shrubs and tall trees, using Thuricide Bt, at approximately thirty (30) properties in Monte Nido, Los Angeles County. The Contractor must have stand-by availability of all necessary pesticide application equipment and trucks, secure a water source for refilling tanks, provide specialized bucket lift and/or scissor lift, and tall tree hand sprayers to access canopies of tall trees, pesticide and materials, and personnel to ensure immediate availability of these resources.
The Contractor shall:
1. Provide Thuricide Bt for foliar applications.
2. Ensure Contractor’s personnel are qualified to proficiently mix, load, and apply pesticides per the pesticide manufacturers labeling requirements.
3. Mixing each day, at locations agreed upon, the amount of pesticide(s) needed for the scheduled operations. Mixed pesticide must be agitated frequently to prevent the pesticide concentrate from settling in the tank. This may require that the tanks be agitated or brushed multiple times throughout the day. Emptying all spray tanks upon completion of the day’s work and properly disposing of any unused pesticides, if any, and properly clean equipment.
4. Properly decontaminate and dispose of excess materials and clean tanks and equipment every day.
5. Have on standby or locally source spray equipment parts and tools necessary for timely repair and replacement of broken equipment throughout the day.
6. Provide support services to include, but not limited to, writing application recommendations, calibration fill sheets, Notice of Intent (NOI) forms, and Pesticide Use Reports (PUR).
7. Lead staff must possess Qualified Applicator Certificate (QAC) and applicators must be current on annual pesticide safety trainings.
8. Provide all equipment necessary to apply foliar treatment to tall trees and shrubs utilizing truck mounted tanks with a minimum volume of 100 gallons and retractable spray hose reels that reach a minimum of 300 ft throughout properties. All equipment must meet contract requirements and be secured at the Contractor’s work yard.
9. Utilization of pressurized tall tree hand sprayers and low presser spray equipment for small hosts. The resultant pesticide application must ensure thorough coverage of canopies of tall trees, shrubs, and smaller host plant(s).
10. Provide mechanical bucket lifts and/or scissor lifts, as necessary, to reach canopies of extremely tall trees (more than 60 feet).
11. Secure a water source for refilling spray tanks in the field throughout the day.
12. Be prepared to conduct/divert traffic breaks and/or portable lighting to perform treatment activities during non-standard times when/if necessary.
13. Obtain required licenses, bonds, and insurance prior to contract execution.
14. Obtain all necessary permits and certifications to legally apply pesticides in the designated areas prior to the starting date.
15. Make lead personnel available for review of CDFA’s program guidelines to provide necessary staff training prior to program start date and become proficient in the pesticides used, program guidelines, and application methods.
16. Follow all pesticide and supplemental labels, personal protective equipment (PPE) requirements and pesticide safety laws.
17. Ensure professional and courteous conduct of the Contractor and Contractor’s personnel and adherence to CDFA’s instructions
18. Ensure the safe use of pesticides, taking precautions to protect outdoor articles, pools, etc. from being sprayed and using shields and tarps to prevent drift to the neighboring homes and/or accidental spraying of pets and/or humans at the adjacent properties.
19. Ensure Contractor’s personnel report to work on agreed time each day and remain on the job site until officially released. Contractor shall adhere to scheduled work hours, days of work, breaks and lunch hour.
20. Report on the scheduled date as directed and providing all required equipment and personnel.
21. Avoid repeated delays that affect the total overall length of time in performing the contract such as those caused by equipment malfunction and delays in loading/mixing pesticides between the mixing location and the treatment site
22. Perform the work utilizing and promoting safety and professional employee appearance while on the job. All employees must wear and display the proper identification and PPE.
23. Treat all host plants up to a height where drift is not a hazard per the pesticide manufacturers labeling requirements.
24. Ensuring Contractor’s personnel do not treat areas that the PR determines hazardous or unsafe to treat and assess safety of a property and overhanging trees to neighboring properties before initiating spraying.
25. Report to the PR any unusual situations or damage to property while performing the duties of this contract. Incidents of this nature must be reported via telephone or in person immediately to the PR after the incident occurred. A written incident report must be submitted to the PR within 48 hours of the incident. The PR will determine which entity will pay for the damaged property.
26. Supply to the PR a written report of all work completed, including amount of pesticide mixed and applied; number of properties treated, and the amount of pesticide applied to each property; number of personnel and hours worked;
and notations of any unusual events. This report is to be submitted daily.
27. Complete and submit PUR at the end of each calendar month for each project to the appropriate County Agricultural Commissioner’s Office. Provide a copy of the PUR to CDFA with the monthly billing.
28. Post the required signage for pesticide re-entry period, according to DPR laws and regulations.
29. Ensure that all activities are performed following CDFA’s management practices and any necessary mitigation measures required are consistent with CDFA’s checklist (attachment A). Complete the checklist prior to conducting spray activities and mark any mitigation measures as required for each specific activity. A checklist for each project will be issued prior to the implementation of the project. Upon completion of the project, the Contractor shall date and sign the checklist and submit it to CDFA with the final billing to signify that CDFA’s management practices and mitigation measures were implemented.
30. Assist the PR or DPR in tank sample collection and or equipment inspections.
At the end of the contract program, the PR will submit to CU at CDFA a written evaluation on the Contractor based off the Operating Performance Standards. This report and other documentary evidence will be used in considering a Contractor’s responsibility and performance for future contracts.
All application equipment used for this contract shall be tested by CDFA prior to use and found free from contamination by other pesticides, herbicides, or other chemicals considered contaminants by the California Department of Pesticide Regulation (DPR).
DPR has set the detection limit of any contaminates at one part per million. Other contaminants include, for example, algae, mold, fungus, and bacteria. CDFA may disallow any equipment that does not meet these criteria to be used in the performance of this contract. All equipment tested and approved for use must be identified by documenting the license plate number or equipment number and dedicated solely to the specified program to prevent contamination with other pesticides or unwanted materials.
Additionally, all equipment approved for use must be secured (tamper-proof) in a manner prescribed by CDFA staff. The Contractor shall replace all equipment that is not free of contaminants. Following a failed test, all equipment shall be retested to ensure that it is free of any contaminants. All fees incurred due to retesting shall be the responsibility of the Contractor.
The Contractor shall provide properly trained personnel necessary for safe and efficient treatment activities. The Contractor shall assign a licensed Pest Control Advisor (PCA) to a project. The PCA shall be experienced in writing application recommendations, calibration fill sheets, and NOI forms. The PCA shall be certified by DPR with the appropriate licenses to apply pesticides and write the necessary recommendations for special site-specific applications as requested by CDFA.
The Contractor shall maintain replacement parts and tools to make basic repairs of equipment to avoid operational delays. Repeated operational delays will be considered a breach of contract and reported to CDFA’s Contracts Unit (CU).
The Contractor shall provide adequate staff to safely conduct the treatment activities, never less than two (2) or more than three (3) crewmembers to operate each spray truck and/or crew assigned to the project. When the spray truck and/or crew is in use, the spray truck and /or crew and all equipment must be under the direct control of a contractor crew member. Additional spray trucks and/or crews may be needed to accomplish the work in the time frame set by CDFA’s Program Representative (PR) or to direct street traffic (flag persons) around treatment activities. CDFA’s PR shall provide verbal notification to the Contractor of the number of spray trucks and/or crews required daily. As additional spray trucks and/or crews become necessary, the Contractor shall supply them within 24 hours of the request.
The Contractor shall provide a cost proposal that includes all expenses, to include at a minimum:
1. A price for pesticide application (application rate set by the product label and/or special local need (SLN) label), when applied from a spray truck, on a per-gallon basis
OR
2. A price for pesticide application (application rate set by the product label and/or SLN label), when applied from a spray truck, on a team per day or property per day basis.
3. A price per unit of pesticide, of the chemicals that may be used on this project.
4. A unit price per day to provide and operate bucket lifts and/or scissor lifts for accessing tall trees.
5. A price per written recommendation provided by the PCA, on an hourly rate basis.
A. Treatment Actions The treatment area shall be determined by CDFA PR for each find site. As new sites are found, the area shall expand as necessary according to established CDFA protocols.
The treatment schedule is dependent upon the pesticide CDFA uses. Issues to consider when developing the treatment schedule are the pesticides used (the pesticide label will determine when to retreat, if necessary), level of pest presence, size of the treatment area, and CDFA’s prioritization of activities within the area.
B. Period of Contract and Treatment Items Contractor shall perform the treatment actions described herein on a stand-by basis. The treatment locations will be in Monte Nido, an unincorporated community in western Los Angeles County, but may be extended to include other areas as determined by CDFA.
The treatment areas may be in urban, rural residential, natural environment and agricultural settings. The contract is to commence upon approval by the Department of
General Services, Office of Legal Services. There will be no guaranteed minimum treatment hours or gallons of pesticide applied under the terms of this contract.
C. Program Representative CDFA shall designate a member of its staff as the Contracting Officer’s PR, who will have the authority to secure the orderly management of this contract. The PR shall not have the authority to change the basic terms of the contract.
D. Reporting and Starting Dates The PR shall give the Contractor a minimum of five (5) calendar days advance notice to report and start on the official start date unless a shorter interval is mutually agreed upon.
Following the initial notice of the start date, if additional trucks and/or crews are needed, the Contractor shall provide the additional trucks and/or crews within 24 hours of notice from CDFA.
The actual reporting date shall be specified by the PR. The number of days prior to the official start date may vary depending on the number of trucks and/or crews involved; time required to brief crews on the program and areas to be sprayed; and completing all preliminary arrangements to start the program on time. A Contractor who does not report on the official reporting day may, at the discretion of the PR, be charged liquidated damages as outlined under Contractor Administration, G. Liquidated Damages, in this Scope of Work. At the discretion of the PR, the Contractor may be terminated for default and be charged liquidated damages. Liquidated damages shall be charged for that day and for each day thereafter until the Contractor, or in the event of termination, a new contractor reports for duty.
A Contractor who does not fully qualify for acceptance on the official start date may, at the discretion of the PR, be charged liquidated damages. At the discretion of the PR, the Contractor may be terminated for default and be charged liquidated damages.
Liquidated damages shall be charged for that day and for each day thereafter until all requirements are met. The amount charged shall be the daily liquidated damage rate for each truck and/or crew specified to report, even though one or more trucks may have been qualified and accepted. The Contractor shall have assembled at the reporting location all required trucks, crews, personnel, and facilitating equipment, and be ready to begin spraying on the official starting date at the time specified by the PR. This includes the specified category and number of trucks and/or crews, each meeting the contract requirements; all personnel, each fully qualified; and all treatment product applications and facilitating equipment. No payment for spraying shall be permitted until all these requirements are met, and services rendered, by the Contractor.
E. Operational Hours The applications shall be made at a time that will optimize the effectiveness of the application. Applications may occur at dawn or during night hours. The sequence of areas to be treated and all pesticide applications shall begin and end at the discretion of the PR.
The Contractor, or the Contractor’s Representative (CR) shall be at the meeting location at the time designated by the PR.
F. Areas Not to be Sprayed No spraying shall occur over specified sensitive areas or designated buffer areas.
Sensitive areas include, but are not limited to, bodies of water, endangered species habitats, specific plants, and/or specific locations within a property. Such areas shall be designated by the PR in advance of the treatment. The PR shall attempt to notify the CR a minimum of 24 hours in advance of the treatment; however, in some situations, notification may occur on the day of the treatment. The notification shall be in writing via e-mail or verbal via telephone and in person while in the field. Each applicator shall be briefed thoroughly regarding such areas, and every effort must be made to avoid spraying such areas. All fines and required clean-up are the Contractor’s responsibility.
G. Spray Trucks and Spraying Systems The Contractor shall supply all spray trucks and supporting ground equipment (including pesticide mixing equipment), backpack sprayers, specified pressurized hand sprayers necessary for different tree heights, personnel, fuel, maintenance, and other materials necessary to apply pesticide sprays by ground, in an efficient and professional manner in accordance with all pertinent laws and regulations.
For each project, the Contractor shall make available for use two to five (2-5) spray trucks and crews and an additional two (2) stand-by spray trucks and/or crews, as needed by CDFA. The number of spray trucks/crews needed per project shall be determined by the PR. The PR shall give the Contractor a 24 hours notice via e-mail or telephone of the required number of additional spray trucks and/or crews needed, if any.
The spray trucks and equipment used on this project shall be used only on this project and may not be used for other pesticide applications outside of this project.
The Contractor shall provide the required number of spray trucks equipped as follows:
1. Spray truck(s) with a minimum volume of 150 gallon spray tank.
2. Digital flow meters must be used for all pesticide applications.
3. A pesticide dispersal system that has been cleaned and made free of any pesticides or other contaminants. The PR shall designate a CDFA employee to obtain tank samples for chemical analysis of all equipment used prior to use on the project. The pesticide dispersal system must be free of all cleaning residue prior to testing. Following tank sample testing, if pesticide mix does not contain the correct amount of active ingredient, the Contractor must replace the agitators so that thorough mixing of the pesticide is occurring at all times.
4. All equipment shall meet the criteria to be used on the project.
5. All equipment tested and approved for use on a project shall be dedicated solely to the project for the duration of the project to prevent contamination with other pesticides or unwanted materials. Following a failed test, all equipment shall be retested for contamination. All fees incurred as a result of retesting shall be at the cost of the Contractor.
6. Leak proof, non-ferrous pesticide tanks with a 150-gallon minimum capacity and a spray system made of corrosion-resistant materials. Tanks must allow for complete mixing and agitation of the pesticide(s) at all times.
7. The tanks on each truck shall be installed to ensure full flow to the pump.
8. Sight gauges/tubes are required on each tank to determine the volume of pesticides in each tank. The sight gauges must be calibrated to 0.5- 1.0gallon increments. Volume increments impregnated onto the tank are not acceptable.
9. A positive on/off system that will prevent dripping from the nozzles.
10. A positive emergency shut-off valve between the tanks and the pump, as close to the tank as possible.
11. New valves, hoses, nozzles, and other fittings prior to the initial chemical analysis. Following clearance of the pesticide screen, this equipment must remain with the assigned spray truck until either replaced with new equipment or the end of the project.
12. Spray gun and nozzle type, size, and configuration shall be as follows:
a) The type and size shall be specified by the PR in email or by telephone prior to (generally two weeks in advance of any treatment) and during the treatment, as needed.
b) High pressure tall tree guns for thorough coverage of tree canopy and low pressure sprayer settings for smaller host plants.
c) Spray gun and nozzle tips for all pesticide applications shall be made of stainless steel or other corrosive-resistant material.
d) Operating pressure shall be specified by the PR prior to the treatment and during the treatment as needed.
H. Pesticides The Contractor shall purchase, procure, and safely store all pesticides designated for use on the specified project. The pesticide used for the Spongy moth is Thuricide Bt.
Changes to the pesticides used may occur. The PR shall give the Contractor a minimum of ten (10) calendar days advance notice in writing to purchase the required pesticides unless a shorter interval is mutually agreed upon. The Contractor is responsible for the inherent quality of the pesticide.
I. Calibration of Equipment To ensure proper coverage and uniformity of application, calibration of the equipment shall be conducted prior to the start of the program. Plus, or minus five percent of the desired flow rate will be acceptable. The determination of the PR shall be conclusive. The PR shall retain the right to check all spray equipment for calibration at any time.
J. Communication with Project Staff The Contractor shall provide each treatment crew with a cellular telephone or other means of communication with the PR and treatment leads.
K. CDFA Furnished Equipment CDFA-furnished equipment shall be returned immediately, the same day upon agreement expiration or completion of the contract, whichever comes first. If equipment is not returned, CDFA will withhold final payment in the amount of the cost of the equipment. Excessive wear and/or damage to equipment, and lost equipment, must be replaced by the Contractor. Excessive wear will be determined by historical experience on the use of the same equipment.
L. Certification The Contractor shall obtain all certifications, approvals, permits, and/or licenses required by applicable State and local laws and regulations.
1. Immediately upon Notice of Award of a contract, the Contractor shall contact the appropriate offices to identify all State requirements for the necessary certifications. Insurance and other requirements, including pesticide application certifications that apply, shall be in effect prior to starting operations.
2. The Contractor shall register in each county where engaged in business and shall be responsible for knowing and following all permit conditions.
3. The Contractor shall ensure that all safety rules and procedures are followed.
4. The Contractor shall implement and comply with all existing and new laws and regulations.
M. Personnel The Contractor shall provide the following:
1. The Contractor or the CR shall be present at each treatment location. The CR shall have full authority to make decisions for the Contractor and direct the Contractor’s operations. The CR shall be present at the treatment location for the duration of the treatment and available for consultation at all times as requested by the PR, including non-standard work hours.
2. Each spray truck/ crew shall be staffed with the adequate number of staff to safely conduct the treatment activities, never less than two (2) or more than three (3) crewmembers, all trained on pesticide application. Spray truck staff will have the following roles: application, hose pulling and spray truck tending. Spray crew staff will have the following roles: application and host identification.
3. Trained personnel and the appropriate equipment to mix, load and service each spray truck and operate bucket and scissor lifts.
N. Additional Spray Truck or Treatment Crews If additional spray trucks or treatment crews are required for the project, the number of spray trucks/crews required shall be determined by the PR. The PR shall provide the Contractor 24-hour notice via email or by telephone of the number of spray trucks and/or crews needed. All additional spray trucks/crews shall meet all contract requirements.
Each project area must have the required number of spray trucks and/or crews at all times unless a different arrangement is agreed upon by the PR.
O. Withdrawal or Substitution of Spray Trucks or Personnel The Contractor shall notify the PR immediately in writing of any withdrawal or substitution of spray trucks or personnel. Substitute spray trucks must meet all contract requirements.
P. Mixing/Loading Facilities and Equipment Contractor shall provide at least two (2) employees and the equipment to mix and load all spray trucks efficiently. Cost proposal shall include all costs for such equipment and personnel. All mixing and loading operations and equipment shall conform to all laws and regulations pertaining to the category of pesticides used.
1. The Contractor shall mix pesticides at a location specified by the PR.
2. The Contractor shall provide the mixing/loading equipment including:
a. All hoses shall be new at the start of the project and shall be in good condition through the duration of the project. All hoses shall be resistant to all agricultural chemicals and free of algae and other contaminants and should be a minimum of 300 feet.
b. The Contractor is required to obtain a local and dependable water source for mixing and loading that meets the operational needs of the program.
This may require additional equipment such as a hydrant meter, loading station or water truck/trailer. All equipment is subject to CDFA testing and tracking requirements. The Contractor is responsible for the cost of the water.
c.To reduce the risk of accidents two employees are required while mixing.
Q. Pesticide Spills The Contractor shall provide tools and materials required by the manufacturers’ product labeling and as required by federal and state laws to clean-up pesticide spills at the project site.
The Contractor shall be responsible for the clean-up, transportation, and disposal of pesticide spilled during the project and caused by the Contractor. The clean-up, transportation, and disposal of spilled pesticide shall comply with all laws and regulations.
The Contractor shall be liable for all damages and costs incurred as a result of a pesticide spill.
R. Hazardous Waste Disposal Contractor is responsible for the disposal of all hazardous waste generated as a result of the routine operations under this contract pursuant to all federal, state, and local laws and regulations.
S. Medical and First-Aid Requirements Medical supervision and pesticide safety training of Contractor’s personnel shall be provided by the Contractor as required by the category of the pesticide used. Contractor shall provide at each site eye wash, water, first aid kit and medical facilities as necessary to supply first-aid service to employees who may be injured in connection with the work. The Contractor is responsible for preventing work injuries and shall inform the PR immediately of a work injury occurrence.
CDFA Responsibilities A. Maps and Briefing Information The PR shall provide the Contractor with maps and briefing information of the areas to be sprayed within 24 hours of any application.
B. Pesticides CDFA assumes all responsibility and liability for the pesticides selected.
C. Environmental Monitoring
The PR shall:
1. Arrange with the Contractor for the testing of all equipment for contaminants prior to the initial use of the equipment.
2. Submit all tank samples for chemical analysis.
3. Inform the Contractor of the tank samples results. Any contaminants detected shall require the Contractor to clean and/or replace the contaminated equipment at the discretion of the PR.
4. Provide environmental monitoring activities as prescribed by the laws and regulations of DPR.
5. Notify the Contractor in writing of any environmental concerns prior to each treatment at all locations in each city.
6. Notify the Contractor in writing of any negative environmental monitoring results when they become available. Mitigations will be implemented immediately.
7. Inform the Contractor in writing of any changes necessary to mitigate any negative impacts on the environment.
8. Inform the Contractor of the meeting location for each day and at least eight
(8) hours prior to the reporting time. Notification may be made in writing, either via electronic mail (e-mail) or Short Message Service (text message), verbally by telephone, or in-person.
D. Treatment Activities
The PR shall:
1. Review CDFA’s management practices and mitigation measures at least one (1) week prior to implementation of a treatment project.
2. Review treatment requirements and program guidelines before treatment activities commence with Contractor’s lead personnel.
3. Determine the work schedule (work hours and days of work). The work schedule may include non-standard work hours or days (including weekends).
The work schedule is subject to change on short notice due to inclement weather or special circumstances.
4. Observe all mixing and loading operations.
5. Provide field oversight in each treatment area. A CDFA representative shall be available prior to and during treatment activities to provide general oversight, as needed.
6. Hand deliver notification to property owners of upcoming treatment activities before each scheduled treatment. PR will also provide pesticide fact sheets with the pre-treatment notice.
7. Hand deliver post-treatment notices to property owners following each treatment to inform them of any precautions they must follow.
8. Notify all property owners via personal contact or if not home, with a written notice, upon arrival for treatment activities.
9. Assess each property to identify hazards, areas to avoid, and items that must be covered with a protective tarp prior to each treatment. The Contractor may not begin treatments on any property without approval from the PR.
10. Assure all necessary objects are tarped either by the contractor or CDFA staff prior to pesticide application.
11. Assure that the property is returned to its pretreatment condition upon completion of the treatment.
12. Investigate all homeowner complaints, concerns, and/or property damage.
The results of the investigation will be discussed with the Contractor to prevent future incidents of the same nature.
13. Review the quality and quantity of the Contractor’s work performed. This quality control report will state accomplishments and any problems encountered, resolution of problems, and problems to be resolved. Any problems will be discussed between the PR and the Contractor at the end of each day.
14. Direct all public information and media questions and/or events to CDFA’s
Public Affairs Office.
15. Pre-approve any deviation from normal operations. These include plans that require interruption in street traffic or the movement and use of special equipment (such as person lifts).
16. Perform written evaluation on the Contractor based on the Operating Performance Standards at the end of the contract program. This report and other documentary evidence will be used in considering a Contractor’s responsibility and performance for future contracts.
E. Addition, Substitution, or Deletion of Pesticides CDFA reserves the right to add to, delete from, or substitute pesticides as the PR deems advisable for the success of the program. In such event, the Contractor may, within ten
(10) working days of written notification of such a change, request the program office to establish an equitable price adjustment for such change and for unused pesticides that cannot be returned to the vendor.
The PR shall thereafter make such an equitable price adjustment or deny said request.
The decision of the PR shall be conclusive unless the Contractor presents sufficient evidence to the contrary.
If price adjustments are approved, adjustment shall be retroactive to time of application rate change.
F. Daily Recordkeeping The PR shall provide and maintain an accurate daily treatment log. The log shall include the amount of pesticide used, mixed, number of properties treated, the amount of pesticide applied to each property, number of personnel and hours worked, and narrative summary to document any unusual events or circumstances.
1. At the end of each workday, it is mandatory that the Contractor or CR meet with the PR to review the treatment log for that day.
2. The Contractor or CR and PR, after reviewing the treatment log and agreeing to the same, shall sign the treatment log.
3. Discrepancies in the number of gallons applied due to faulty equipment will be resolved by using the sight gauge on the tank.
G. Tank Samples
1. The need and frequency of pesticide tank samples shall be determined by the
PR.
2. Tank samples may be taken at any time to ensure the pesticide mix has the correct amount of active ingredient and is free of other contaminants.
3. Pesticide mix that does not contain the correct amount of active ingredient may be grounds for disapproval of invoice payment for that day(s).
4. The PR shall provide all personnel and equipment necessary to perform sampling of pesticide spray tanks.
H. Emergency Response Plan CDFA, with the assistance of the Contractor, shall develop an emergency response plan prior to any treatment.
Contractor Administration
1. Rejection of Spray Equipment
CDFA may reject, at any time, spray equipment deemed unsafe or equipment that does not comply with all contract specifications. The Contractor shall repair or replace defective or inoperable equipment the same day and conform to all inspection requirements.
Qualifying tests of the spray equipment may be conducted by CDFA to assure that contract requirements are met.
The PR must approve in writing the inclusion of any equipment that was previously rejected from use on the program.
2. Rejection of Personnel
CDFA may reject, at any time, the CR or any applicator found unqualified or incompetent who operates equipment in an unapproved manner or otherwise fails to perform satisfactorily. Should any personnel perform their assignment in a manner that is considered unsafe or incomplete to CDFA, CDFA shall have the right to require their replacement within the time specified by the PR, which may be within 12 hours. Such a determination by the PR shall be final.
The PR shall have the right to remove any equipment operator or applicator when, in their opinion, the conduct or condition in question violates contract provisions and shall have such right when equipment or operation is believed by the PR to be unsafe or otherwise unsatisfactory (i.e., work does not meet pesticide application standards).
The Contractor shall not restore any equipment or personnel to an active status until they have demonstrated to the PR that the equipment or personnel in question can perform and meet contract requirements or pesticide application standards.
The removal of equipment or personnel shall not relieve the Contractor from performing the services under the contract. The removal of equipment or personnel shall not be a basis for imposing any contractual or other liability upon CDFA. Failure to remove equipment or personnel for any reason does not make CDFA negligent or liable.
3. Suspending of Operations The PR shall have authority to suspend spraying operations on all or any part of the project areas at any time when, in the opinion of the PR, conditions are not favorable for carrying on such spraying operations.
4. Respraying Requirements The PR may require the respraying of any area which has not been adequately sprayed.
Where such spraying is due to unsatisfactory performance by the Contractor, CDFA shall supply, and may charge the Contractor for, the spray material necessary to respray the specified area and will not pay for the reapplication. The decision of the PR shall be conclusive unless the Contractor presents sufficient evidence to the contrary.
5. Sequence of Spraying The PR shall determine the time and sequence of spraying individual areas based on the pesticide manufacturers labeling requirements and CDFA management practices, and the time to start and stop spraying each day. In addition, if the PR is not in the treatment area and is unaware of deteriorating weather conditions, the Contractor or CR is responsible for voluntarily stopping work to avoid possible liquidated damages.
6. Program Progress – Additional Spray Equipment If the PR determines that the Contractor has not completed spraying 40 percent of the pesticide to be applied within 40 percent of the operational hours allowed, the contractor will be required to furnish additional spray trucks/crews within 24 hours when notified by the PR. Spray trucks shall be of the same category as those specified in the statement of work description; shall meet all contract requirements, including qualified applicators to operate the equipment; and shall be fully operational within 24 hours. No adjustment will be made in the contract price for furnishing such additional spray truck(s).
7. Liquidated Damages All charges assessed in the following subparagraphs shall be paid to the CDFA as fixed, agreed and liquidated damages, not as a penalty.
• Should the Contractor delay the program for any reason, a charge or deduction from payment of $1,000 per day for each spray truck shall be assessed to the Contractor.
• The rate above will be charged for:
• Each spray truck/crew that fails to report on the official reporting date.
• Each spray truck/crew that fails to spray on the designated treatment date, provided it is an operational day and for each operational day thereafter, until it begins spraying operations. However, when a spray truck and/or crew fails to spray for more than one reason on a day for which liquidated damages are charged, no more than the daily liquidated damage rate for the spray truck shall be charged for that day.
8. Delays Beyond the Control of the Contractor The Contractor shall not be liable for delays or failures caused by CDFA or reasons beyond the control of the Contractor.
9. Cost of Lost, Jettisoned, Spilled, or Improperly Dispensed Pesticide An estimate of the amount of pesticide that is jettisoned for any reason or improperly applied, will be made by the PR, and the cost thereof may be deducted from any amounts due to the Contractor. A report shall be prepared by the PR identifying the amount of pesticide lost due to negligence (including, but not limited to spillage, overflowing tanks and leakage of tanks) on behalf of the Contractor’s personnel. The cost thereof may be deducted from amounts due the Contractor under this contract.
Invoicing The Contractor shall submit signed, monthly invoices to CDFA. If the invoice carries a signature block, the block must be signed. Invoices with blank signature blocks cannot be processed.
Contractor shall submit separate, monthly invoices for the Citrus Pest and Disease Prevention Program and the Plant Health and Pest Prevention Services Division. Submit signed, monthly invoices by postal mail:
CDFA, PD/EP Branch 1220 N Street Sacramento, CA 95814
Payment shall be on the basis of the contract rate of gallons applied or teams per day, bucket and scissor lift utilized and the amount of pesticide purchased and used.
Payment shall be in accordance with gallons acceptably sprayed or teams provided as shown on CDFA’s daily treatment logs and/or signed work order.
Payment under the contract shall be made monthly, in arrears, upon receipt of approved itemized invoices with copies of all daily treatment logs and PURs.
Cost Proposal Contractor shall include the cost of providing rights under Labor Code, Unemployment Insurance Code, and Industrial Welfare Commission Order in their proposed budgets.
The Employment Development Department’s (EDD) “2024 California Employer’s Guide” at https://edd.ca.gov/pdf_pub_ctr/de44.pdf and the Department of Industrial Relation’s website are two references that Contractors can access for assistance with determining the costs and methods of paying for these benefits to include in their proposal.
Travel costs shall be reimbursed at the rates in effect at the time of travel as established by the California Department of Human Resources (CalHR) rates, which can be accessed at:
http://www.calhr.ca.gov/employees/Pages/travel-reimbursements.aspx https://edd.ca.gov/pdf_pub_ctr/de44.pdf https://www.dir.ca.gov/ http://www.calhr.ca.gov/employees/Pages/travel-reimbursements.aspx
Generative Artificial Intelligence (GenAI) Disclosure Notification Clause
The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
Bidder / Offeror must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) §
4986.2 Definitions for GenAI.
Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
Submission of Bid
1. Bids must be submitted via email to CDFA.Contracts@cdfa.ca.gov. The subject line of the email must read as follows: Bid Number, Your Organization’s Name. All bid documents must be in PDF format. As the identified point of contact, please obtain acceptable e-signature(s) from your company’s authorized representative. Acceptable forms of e-signature include:
a. Scanned “Wet” Signature: Print and sign document(s) in ink, then scan an electronic copy in PDF format.
b. “Typed” Signature: If the signature field of the document is editable (e.g., the signature feature in Adobe Acrobat), then a typed signature is acceptable.
No late submittals will be accepted.
2. Bids will not be accepted from Expatriate Corporations, and bids from primes subcontracting with Expatriate Corporations.
3. If the bid is made under a business title (dba), the actual legal business name of the proposer must be provided.
4. All bids shall include the documents identified on the attached checklist entitled “Required
Documents.” Proposals not including the required documents shall be deemed non-responsive.
5. Bids must be submitted for the performance of all the services described herein. Any deviation from the work specifications will not be considered and will cause a bid to be rejected.
6. A bid may be rejected if it is conditional or incomplete, or if it contains any alterations of form or other irregularities of any kind. The CDFA may waive any immaterial deviation in a bid. The waiver of immaterial defect shall in no way modify the IFB document or excuse the bidder from full compliance with all requirements, if awarded.
7. The CDFA does not accept alternate contract language from a prospective contractor. A proposal with such language will be considered a counter proposal and will be rejected.
The State’s General Terms and Conditions are not negotiable.
8. Costs incurred for developing bids and in anticipation of award are entirely the responsibility of the bidder and shall not be charged to the CDFA.
9. A bidder may modify a bid after its submission by withdrawing its original bid and resubmitting a new bid prior to the bid submission deadline. Bidder modifications offered in any other manner, oral or written, will not be considered.
10. A bidder may withdraw its bid by submitting a written request to the CDFA, signed by the bidder or an authorized agent of their firm. Bids may not be withdrawn without cause after the bid submission deadline.
11. The CDFA may modify this IFB prior to the bid’s submission due date by posting an addendum with the original advertisement on Cal eProcure.
12. The CDFA reserves the right to reject all bids. The CDFA is not required to award an agreement.
13. Before submitting a response to this solicitation, bidders should review, proofread and confirm compliance with the IFB requirements.
14. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the agreement amount will be made due to a lack of careful examination of work sites and specifications.
15. No oral understanding or agreement shall be binding on either party.
Evaluation and Selection
1. At the time of bid opening, each bid will be checked for the presence or absence of required information in conformance with the submission requirements.
2. The CDFA will evaluate each bid to determine its responsiveness to the published requirements.
3. Bids that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, may be rejected.
4. Award, if made, will be to the lowest responsive and responsible bid.
Award and Protest
1. Whenever an agreement is awarded under a procedure which provides for competitive bidding, but the agreement is not to be awarded to the low bidder, the low bidder shall be notified by email five (5) business days prior to the award.
2. Upon written request by any bidder, notice of the proposed award shall be posted in a public place in the lobby of the CDFA Headquarters at least five (5) business days prior to awarding the agreement.
3. If any bidder, prior to the award,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .