This is an Invitation for Bids (IFB) #LB 25-001 issued by the Genesee County Land Bank Authority (GCLBA) for abatement and demolition of residential and commercial structures in Flint and Genesee County, Michigan. The project involves the environmental abatement and disposal of asbestos and hazardous materials, followed by demolition and disposal of 96 structures (41 residential, 45 residential, and 10 commercial). The bid is due on Tuesday, April 29, 2025, at 3:00 pm EST, with a mandatory pre-bid meeting on Tuesday, April 8, 2025, at 11:00 am. The anticipated project schedule includes a Notice of Award around May 13, 2025, contract signing around May 20, 2025, and work starting around May 27, 2025. Final-grade, seed, and straw work must be completed by October 24, 2025. Only pre-qualified contractors on GCLBA's Bidder's List can submit proposals.
The project is funded through multiple sources, including the Michigan Land Bank, Local Fiscal Recovery Fund (SLFRF)/American Rescue Plan Act (ARPA), Charles Stewart Mott Grant Funding, and funding from the Genesee County Treasurer and Land Bank Authority. As a federally funded activity, successful bidders must comply with federal labor standards, including the Davis-Bacon Act and Copeland Anti-Kickback legislation, as well as federal equal opportunity requirements. The GCLBA encourages participation by Minority-Owned/Woman-owned/Disadvantaged (MBE/WBE/DBE) and Section 3 business enterprises. Bidders must meet specific insurance requirements, provide performance and payment bonds, and submit comprehensive documentation including work plans, health and safety plans, and various certifications. The project aims to eliminate blight and prepare properties for potential future development or sale.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Genesee County Land Bank Authority Blight Elimination Program
Invitation for Bids- Abatement & Demolition of Residential and Commercial Structures in Genesee County
BID NUMBER: 25-001
Abatement and demolition of properties by type:
☒Residential by List #:
1. 41 Residential
2. 45 Residential
3. 10 Residential
☐Commercial
Funding source
☒Federal ☒Non-federal
DUE DATE: Tuesday, April 29, 2025 at 3:00 pm EST
Genesee County Land Bank Staff Contact and labeling submittals:
BID 25-001, Due 04/29/2025 3:00 PM.
Jonathon Mateen, Demolition Program Manager Genesee County Land Bank Authority 452 S. Saginaw St. 2nd Floor Flint, MI 48502 Email: jmateen@thelandbank.org mailto:jmateen@thelandbank.org
Invitation for Bids – Abatement & Demolition of Residential and Commercial Structures 3/14/25 Page 2
Bid Number: LB 25-001
Table of Contents
INTRODUCTION
PROFESSIONAL SERVICE REQUIREMENTS
SELECTION PROCESS
EVALUATION CRITERIA AND SCORING
SUBMITTAL REQUIRMENTS
IMPORTANT DATES
QUESTIONS
ATTACHMENT A: BIDDER’S INSURANCE CHECKLIST
ATTACHMENT B: LIST OF REFERENCES
ATTACHMENT C: CERTIFICATION FORM NOTE
ATTACHMENT D: UNIT RATE PRICING BID COVERSHEET & BID TAB
ATTACHMENT E: SECTION 3 INFORMATION
ATTACHMENT F: CONFLICT OF INTEREST / NON-COLLUSION AFFIDAVIT
ATTACHMENT G: DEBARMENT/SUSPENSION CERTIFICATION
ATTACHMENT H: SUBCONTRACTORS
ATTACHMENT I: SUBCONTRACTOR PROCUREMENT & Outreach Report
ADDITIONAL INFORMATION- LISTING OF APPENDICES
1. SCOPE OF WORK (ABATEMENT & DEMOLITION)
2. EGLE/MDEQ – NESHAP PROGRAM AND NOTICES
3. MAP AND BOUNDARIES OF TARGET AREAS
4. SAMPLE CONTRACT, PAYMENT REQUEST PACKET, ATTESTATION FORM
5. FEDERAL LABOR STANDARDS AND WAGE DETERMINATIONS
6. PAYMENT REQUEST REQUIREMENTS
7. EXAMPLE ABATEMENT TRACKING SUMMARY SHEET
8. EXAMPLE BACKFILL & TOP SOIL SAMPLING AND CERTIFICATION FORMS
9. SAMPLE DOOR HANGER WITH PLACEMENT EXAMPLE
10. PRE-ABATEMENT AND PRE-DEMOLITION WALKTHROUGH FORM
11. REFERENCE CHECKLISTS
3/14/25 Page 3
INTRODUCTION
Overview
Demolition of residential and commercial structures is being undertaken as an approved eligible activity under the Genesee County Land Bank Authority (GCLBA) Demolition Program. GCLBA invites the submission of bids from pre-qualified contractors added to GCLBA’s Bidder’s List that are experienced and licensed to conduct the abatement, demolition and disposal of residential and commercial structures located in Genesee County.
“Bidders” means the companies or individuals that submit bids in response to this IFB.
“Contractor” means the Bidder whose bid submitted in response to this IFB is selected for award of a contract.
All Bidders and Contractors, their representatives, employees, and subcontractors are expected to maintain a friendly and professional demeanor whenever interacting with the public, Genesee County Land Bank, or any representative of an enforcement agency or regulatory authority. This includes interactions among Bidders and Contractors at bid openings and in the execution of any such work contracted by GCLBA. Bidders and Contractors that violate this code of conduct may be subject to consequences.
Nothing in this IFB shall be construed to create any legal obligation on the part of GCLBA or any Bidder. GCLBA reserves the rights, in its sole discretion, to amend, suspend, terminate, or re-issue this IFB in whole or in part, at any stage. In no event shall GCLBA be liable to Bidders for any cost or damages incurred in connection with the IFB process, including but not limited to, any and all costs of preparing a response to this IFB or any other costs incurred in reliance on this IFB.
No Bidder shall be entitled to repayment from GCLBA for any costs, expenses or fees related to this IFB. All supporting documentation submitted in response to this IFB will become the property of the GCLBA. Bidders may also withdraw their interest in the IFB, in writing, at any point in time as more information becomes known. Bids offering less than thirty (30) days for acceptance by the Genesee County Land Bank from the date set for opening will be considered non-responsive and will be rejected.
Only firms/contractors that are pre-qualified and have been added to GCLBA’s Bidder List can respond to IFB’s issued by the GCLBA.
Not a pre-qualified contractor?
GCLBA accepts Pre-qualification Applications on a rolling basis. The only time there is a deadline associated with Pre-qualification submittals is when they are submitted with the intention of Pre-qualifying for a specific bid that has been let. For more information regarding Pre-qualification applications as they relate to specific bids, please visit GCLBA’s Contracts and Bids page: https://www.thelandbank.org/contracts_bids.asp.
Not sure if your firm is pre-qualified?
Please reach out to the GCLBA contact on the cover page to confirm.
https://www.thelandbank.org/contracts_bids.asp
3/14/25 Page 4
Project Funding
Funding sources for services to be provided under this solicitation include but are not limited to:
• Michigan Land Bank and Local Fiscal Recovery Fund (SLFRF)/American Rescue Plan Act (ARPA) Funding .
• Charles Stewart Mott Grant Funding
• Funding provide by the Genesee County Treasurer and Genesee County Land Bank Authority
This project is a federal funded activity authorized under the Corona Virus State And Local Fiscal Recovery Fund (SLFRF), 31 CFR Part 35, as amended. GCLBA uses the terms “Corona Virus State And Local Fiscal Recovery Fund” (SLFRF) and “American Rescue Plan Act” (ARPA) Funding interchangeably. All successful bidders must comply with the federal labor standards, including the Copeland Anti-Kickback legislation, and federal equal opportunity requirements.
Bidder Participation Goals GCLBA encourages participation by entities who are Minority-Owned/Woman-owned/Disadvantaged (MBE/WBE/DBE) and Section 3 business enterprises. Companies that are MBE/WBE/DBE or identify MBE/WBE/DBE subcontractors and include a plan to meet MBE/WBE/DBE goals may receive extra consideration in scoring and evaluation of their response.
If this project is federally funded, then there may be Section 3 contracting goals. As of publication, Section 3 contracting goals for funding received through the Department of Housing and Urban Development (HUD) are as follows:
HUD established nationwide benchmarks for work performed by tracking the labor hours. The two benchmarks are (1) twenty-five percent (25%) or more of the total number of labor hours worked on a Section 3 project is performed by Section 3 workers; and (2) five percent (5%) or more of the total number of labor hours worked on a Section 3 project is performed by Targeted Section 3 workers. The five percent is within the twenty-five percent. The labor hours reported must include any labor hour charged against the budget of the project.
For additional information on Section 3 please refer to Attachment E and the following links:
https://portal.hud.gov/hudportal/HUD?src=/program_offices/fair_housing_equal_opp/section3/section3 https://portal.hud.gov/hudportal/documents/huddoc?id=11secfaqs.pdf
Time of Completion
Any agreement awarded pursuant to this IFB solicitation shall be in accordance with the Scope of Work and compensation as outlined below, and, within a mutually agreed upon expedited timeframe.
Term of Contract
It is anticipated that the Bidder(s) will start work after the contract is executed and depending on the readiness of the projects. The anticipated project schedule can be found under the IMPORTANT DATES section of this IFB. Please note that some projects that may be awarded may later be cancelled prior to being issued a Notice to Proceed depending on various factors https://portal.hud.gov/hudportal/HUD?src=/program_offices/fair_housing_equal_opp/section3/section3 https://portal.hud.gov/hudportal/documents/huddoc?id=11secfaqs.pdf
3/14/25 Page 5 including changes in priorities, readiness of projects prior to grant deadlines, and available funding. GCLBA reserves the right to cancel any project(s) that has been issued on a bid or entered into a contract if GCLBA has deemed project(s) infeasible and is unable to proceed with the demolition. In the event a structure or structures itemized on this bid is destroyed or substantially destroyed by fire or other calamity beyond its present condition as determined by the GCLBA, or environmental hazards are found, at any time prior to actual demolition, GCLBA reserves the right to remove the structure from the bid; or in the event of bid award, to remove the structures(s) from the award and reduce the price by the Contractors’ bid for that structure(s). GCLBA also reserves the right to negotiate pricing.
Federal, State, and Local Regulations
This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (MIOSHA, EGLE/MDEQ, MDOT, and DCH), and any other or relevant local regulations and standards that may apply.
Genesee County Land Bank Authority (GLCBA) has compiled some helpful information around compliance for active contractors on the Contracts and Bids page that can be accessed with the following link: https://www.thelandbank.org/contracts_bids.asp. Under “Other Resources for Active Contractors” Bidders may find links to help with compliance with Soil Erosion permit/waiver applications, Tire Hauler licensing, dewatering requirements for the City of Flint, Genesee County Frost Laws and more.
By way of example, but not exhaustive, all work must comply with the following regulatory requirements:
1. Federal Laws and Regulations:
a. 2 CFR 200 Uniform Administrative Requirements, Cost Principles, and Audit
Requirements for Federal Awards
b. 40 CFR Protection of the Environment including but not limited to parts:
i. Parts 239 through 282 - Resource Conservation and Recovery Act (RCRA), as amended
ii. Part 260 - Construction Hazardous Waste Management Systems
iii. Part 261 - Identification and Listing of Hazardous Wastes
iv. Part 262 - Standards Applicable to Generators of Hazardous Wastes
v. Part 263 - Standards Applicable to Transporters of Hazardous Wastes
vi. Part 264 - Standards for Hazardous Wastes TSDF SLBAs and Operators
vii. Part 265 - Interim Standards for Hazardous Wastes TSDF SLBAs and
Operators
viii. Part 270 – Hazardous Waste Permits
ix. Part 763- Asbestos
c. 41 CFR Public Contracts and Property Management, including but not limited to parts:
i. Part 60
d. 29 CFR Part 5 – Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction
e. OSHA 29 CFR 1910 – Occupational Safety and Health Standards
f. OSHA 29 CRF 1926- Construction Industry Standards https://www.thelandbank.org/contracts_bids.asp https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200
3/14/25 Page 6
g. Federal Labor Standards and Provisions (Form HUD-4010) as applicable
2. State Laws and Regulations:
a. Michigan Public Act 135 – Asbestos Abatement Contractors Licensing Act
b. Michigan Public Act 451 Natural Resources and Environmental Protection Act, including but not limited to the following parts:
i. Part 91 – Soil Erosion and Sedimentation Control, as amended
ii. Part 111 - Hazardous Waste Management, as amended
iii. Part 115 - Solid Waste Management as amended
iv. Part 121 - Liquid Industrial By-Products
v. Part 169 – Scrap Tires, as amended
vi. Part 201 - Environmental Remediation, as amended
c. Michigan Public Act 154 - Michigan Occupational Safety and Health Act (MIOSHA)
d. MIOSHA Part 602 Asbestos Standards for Construction, as amended
e. MIOSHA Part 603 Lead Exposure in Construction, as amended
f. Michigan Public Act 174, Miss Dig Underground Facility Damage Prevention and
Safety Act
g. Michigan Public Act 299 – Occupational Code Article 24
h. Michigan Public Act 440 of 1988 "Asbestos Workers Accreditation Act"
3. Local Laws:
a. Genesee County and any applicable municipality in which the Work is to take place
4. Other rules and regulations:
a. Executive Orders 11246 as amended
b. HUD Section 3 as applicable with HUD Funded Projects
PROFESSIONAL SERVICE REQUIREMENTS
Scope of Work
The purpose of this project is to provide abatement, demolition, waste disposal, and site protection and restoration of blighted and/or dangerous structures located in the City of Flint and Genesee County. Bidders can respond to the bid/ scope of services described below (the complete scope of work is available in Appendix 1A and Appendix 1B.
Note: Change orders will not be approved for this project. Any material change to the overall scope of the Contract requires prior approval by the GCLBA and must be requested prior to the start of work.
Each Bidder must sign and submit the Certification of Site Visit Form as supplied in Attachment D, verifying that, if successful, any material missed by the Bidder in preparation of bid will be the responsibility of the successful Bidder to remove in compliance with all relevant rules and regulations at no additional cost.
During the contract period, GCLBA anticipates the abatement and disposal of environmentally hazardous materials from specified structures prior to demolition of the structure(s). Abatement must occur prior to demolition; with no exceptions. These activities are to be performed in compliance with all relevant rules and regulations and specifications attached hereto.
3/14/25 Page 7
We utilize www.box.com to share information with and receive information from bidders and/or contractors. Prospective bidders will want to create an account with Box to be able to review pertinent data regarding bids, such as environmental reports. It is anticipated that a free individual account should suffice. We do not require bidders or contractors to purchase a plan through Box.com.
In order to prepare a responsive bid, bidders must review Environmental Site Assessments and Pre-demolition surveys. To gain access to these files e-mail the request to the GCLBA representative identified on the cover sheet, or the “Submittal Due Date.” Bidders will be invited to review information via Box.com.
Contractors are encouraged to conduct outreach to minority-, women- and disadvantaged business owners to achieve any of the work outlined in the scope of work. For each proposed subcontractor, bidder should complete “Subcontractor Procurement and Outreach Report” for each scope subcontracted. Additionally, GCLBA must be provided proof of appropriate certifications and insurances along with the prime contractor’s request for subcontractor approval. Contractors are expected to manage their subcontractor(s) to fulfill the indicated scope. Contractor(s) will be held responsible for all work performed by their subcontractor.
Contractors will be required to use the GCLBA designated file sharing program to upload all required documentation and payment packets.
Due to time constraints of the blight elimination program GCLBA does not anticipate allowing for any contract extensions. Bidders should review the timeline and confirm they have the capacity to complete the abatements and demolitions according to the schedule in this IFB.
SELECTION PROCESS
A Review Team selected by GCLBA will review qualifications in accordance with the evaluation criteria set forth herein. Bids that are submitted on time and comply with the mandatory requirements of the Invitation For Bids (IFB) will be evaluated in accordance with the terms of the IFB.
Any contract resulting from this IFB will not necessarily be awarded to the Bidder with the lowest price. Instead, contract(s) shall be awarded to Bidder(s) whose proposal(s) is the most responsive, responsible and offers the best service to the GCLBA in accordance with criteria set forth in IFB.
EVALUATION CRITERIA AND SCORING
Beginning with the lowest cost proposal, the Review Team will evaluate bids received and identify the submittals that are the most responsive, responsible and offer the best service to the GCLBA.
Additional proposals will only be evaluated if the award is not made to one of the three lowest cost proposals. The GCLBA will consider Bidder qualifications, financial viability, project references, experience with comparable projects, and current and future capacity based on projects with concurrent timelines. Specifically, each IFB package will be reviewed based on the submittal requirements defined below. Submittals that do not meet the defined criteria may be rejected.
https://www.box.com/home https://www.thelandbank.org/downloads/box_page_1.pdf https://www.thelandbank.org/downloads/box_page_1.pdf
3/14/25 Page 8
The work under this solicitation and any resulting contract IS NOT covered by Section 3, though GCLBA wishes to encourage the utilization of Section 3 businesses and residents.
SUBMITTAL REQUIRMENTS
Information for Bidders
Important Dates Responses to this IFB are due no later than indicated under IMPORTANT DATES.
It is important for bidders to plan appropriately so that bids will be received at the office prior to the due date and time. Late bids will not be accepted.
A public bid opening will be held immediately following the due date and time, unless otherwise noted in bid documents.
Questions and GCLBA Contact: All communications, any modifications, clarifications, amendments, questions, responses or any other matters related to this IFB, shall be made by and through the contact referenced in this solicitation. No contact regarding this solicitation made with other GCLBA employees is permitted. Any violation of this condition may result in the immediate rejection of application.
Terms and Conditions: The GCLBA “Request for Applications for Demolition/Abatement Contractor Pre-qualification” and bidders submittals are an integral part of the bidding process.
Being pre-qualified, it is assumed that Bidders have read, understood, and accepted the Terms and Conditions contained therein. Follow this link for more info:
https://www.thelandbank.org/contracts_bids.asp
Bidder’s Insurance: The GCLBA requires a signed Bidders Insurance Checklist (Attachment A) with each proposal submitted. Insurance coverage required per the specifications governing work must be provided prior to any contract starting date and kept in full effect and compliance during the entire contract period. GCLBA must be listed as additionally insured. Failure to comply with these provisions will cause termination of the contract.
Bid Modifications: Prospective bidders shall be responsible for routinely checking the Genesee County Land Bank website at http://www.thelandbank.org for issued addendum and other relevant information. GCLBA shall not be responsible for the failure of a prospective bidder to obtain addenda and other information issued at any time related to this Invitation for Bids.
Bidders agree to be responsible for any loss or damage to property or persons due to the performance of services described in IFB, and if contracted further agree to protect and defend the Genesee County Land Bank Authority against all claims or demands whatsoever, and to hold the GCLBA harmless from any loss or damage resulting therefrom.
Bidder’s Withdrawal: Bidders may, without prejudice to himself/herself, withdraw Bid/Tender after it has been submitted, provided the request for such withdrawal is received in writing before the time set for opening. Verbal communication is not acceptable. After opening, no Bid/Tender may withdraw for period indicated.
Review of site surveys and site inspections: Before submitting a bid, each Bidder shall review environmental surveys and reports and inspect the site(s) of the proposed work to arrive at a clear understanding of the conditions under which the work is to be done. They will be held responsible for having compared the premises with drawings, available information, and https://www.thelandbank.org/contracts_bids.asp http://www.thelandbank.org/
3/14/25 Page 9 specifications, and to have satisfied themselves as to all conditions affecting the execution of the work.
Changes to Prequalification Information: If there are any changes with the documents or renewals, it is the Bidders’ responsibility to submit the correct documents to the GCLBA in a timely manner. If the Bidder does not submit all required documents with the bid response, the documents may be considered missing, which may result in the bid response being considered as non-responsive.
The GCLBA reserves the right to reject any or all bids and to waive irregularities or informalities as may be deemed in the GCLBA’s interest. It is GCLBA’s intent to award the contract to the Bidder(s) whose bid(s) is the most responsive, responsible and offers the best service to the GCLBA in accordance with criteria set forth in IFB. The GCLBA may choose to enter into multiple contracts for the same scope of services to ensure that there is enough capacity to complete the work in a timely manner, as required by the funding sources identified. GCLBA reserves the right to seek additional information to clarify responses to this IFB. All submittals become the property of the Genesee County Land Bank Authority (GCLBA).
SUBMITTAL FORMAT
Each Bidder is responsible for labeling the exterior of the sealed envelope containing the bid response with the bid number, bid name, bid due date and time and firm’s name.
The following items must be included in the sealed envelope:
• One (1) completed hard copy of each of the following:
o Bidder's checklist o Original Attachment C - Certification Form Note with original signature o Completed and printed Attachment D with original signatures– included printed bid tabs
• One flash drive with ALL required documents in legible and readable in a clear, legible, 12-point font, and 8.5 by 11-inch format.
• The bid tab file on the flash drive should be in Excel or a similar spreadsheet format.
All of the following components must be included in the flash drive:
1. Evidence of GCLBA Pre-qualification Approval: Bidders must include documentation showing that the respondent is pre-qualified by GCLBA and added to the Bidder’s List in order to be considered for potential contract. Evidence or Pre-qualification must not be more than one year old.
2. Letter of Interest: Provide a Letter of Interest stating your interest in completing the Work represented in the bid documents and verifying whether there have been any changes in organizational structure from date of most recent pre-qualification. Explain any changes, including staffing changes, as necessary and ensure GCLBA has updated submittals. State your understanding of the work to be undertaken, to include requirements to be followed specific to the funds paying for the project. Please explicitly state the funding source and
3/14/25 Page 10 any identified funding regulations in your statement of understanding. Every IFB states funding sources in the Overview Section.
3. Bidding Checklist: Provide a complete Bidding Checklist indicating page numbers for submittals. Checklist can be found on pages 13 and 14.
4. Evidence of Insurance: The Bidder must have Commercial General Liability with limits not less than: Premises/operations $1,000,000 per occurrence with $2,000,000 aggregate;
Workers Compensation Statutory limits of Michigan; Employers Liability with limits $100,000 accident/disease, $500,000 policy limit, disease; Automobile Liability with limits not less than $1,000,000 combined single limit each accident-Owned, hired, non-owned;
and, for Professional Services Professional Liability with limits not less than $1,000,000 including errors & omissions $200,000 per occurrence. The Bidder must also have Pollution Liability insurance for projects potentially involving the removal and disposal of waste or storage tanks or impacted soils. Contractor shall maintain limits no less than $1,000,000 per loss/$1,000,000 aggregate. A certificate of insurance must be included with submission of qualifications. (See Attachment A for Bidder’s Insurance Checklist) GCLBA must be listed as an additional insured for all contracts.
5. References – Complete Attachment B. Do not provide alternative listing of references.
References listed in Attachment B should be for work completed within the last 5 years and should be for work that exemplifies bidder capacity to complete work of a similar scope and scale within a similar timeframe.
6. Certification Form Note- Attachment C (with original signature).
7. Bid Tender and Attachments: Bidders must complete and submit all IFB/RFP Attachments.
Bids submitted with incomplete or misleading information may be rejected. Ensure your Bid Tender Summary Total on Attachment D and itemized breakdown per structure totals match.
8. Section 3 Information and Acknowledgement (Attachment E)
9. Conflict of Interest State & Supporting Documentation (Attachment F)
10. Debarment Certification (Attachment G)
11. Subcontractors (Attachment H)
12. Subcontractor Procurement & Outreach Report (Attachment I)
13. Bid, Performance and Payment Bond: Bidders must have the ability to secure a Bid Bond in the amount of five (5%) of their bid amount and a Performance Bond and Payment Bond, if awarded, in an amount equal to one hundred percent (100%) of the total contract amount. Surety on such bonds shall be by a bona fide company authorized to do business in the State of Michigan. Bond requirement shall be increased consistent with any contract amount increase.
14. Current Certificate of Good Standing (Corporation) or Certificate of Existence: The Bidder shall provide a Certificate of Good Standing (Corporation) or Certificate of Existence (Limited Liability Company) issued by the Michigan Department of Licensing and Regulatory Affairs Corporations, Securities & Commercial Licensing Bureau. If Bidder is a
3/14/25 Page 11 joint venture, a Certificate of Good Standing or Certificate of Existence, as applicable, must be submitted for each entity comprising the joint venture. Certificates must be issued by LARA (webpage printouts are not acceptable), and they must be as recent as possible, and no older than one year.
15. Active Sam.gov Registrations/ UIE number: Some federal funding sources require successful bidders to be actively registered- and not excluded- with SAM.gov. On April 4, 2022, the unique entity identifier used across the federal government changed from the DUNS Number to the Unique Entity ID (generated by SAM.gov). When indicated on the Submittal Requirements Checklist, documentation of active registration and non-exclusion must be submitted with bid documents for bids to be considered for award.
16. Verification that Pre-qualification documents on file with GCLBA are up to date: For each of the following items, indicate that last date of submittal and expiration date:
• Evidence of Financial Stability
• Michigan Builders or M&A – Home Wrecking License for Company
• Qualifying Officer’s Michigan Builders or M&A –Home Wrecking License
• Company Asbestos License & Certificate
17. Staffing and Other State License and or Certification: Be sure to thoroughly complete tables in Attachment D. List staff certifications and expiration dates. Copies of Certifications must be provided within 3 business days of Notice of Award, or GCLBA reserves the right to move on to the next bidder.
18. Work Plan: Bidder is to supply a work plan appropriate to scope of work to show that the scope is understood. The work plan must identify the properties that will be demolished with asbestos containing materials (ACM) remaining in place and which of these require Alternate Work Plans as defined in OSHA Construction Safety Standards 1926.1101(g)(6).
Bids that do not identify properties to be demolished as asbestos-containing and those that require alternate work practices may be rejected. All concrete materials from ACM demolition projects MUST be disposed of at a Type II landfill as ACM and manifested as concrete. Successful bidders will identify the destination for any concrete that is not disposed of at a landfill and ensure that the destination is sufficiently permitted for recycling concrete. The successful bidder will supply a contract/project specific work plan as required in the scope of work prior to contracting.
19. Health and Safety Plan (HASP): Bidder is to supply a written Health and Safety Plan prepared to comply with federal, state and local requirements. Bidders may request GCLBA to maintain general HASP on file so it does not have to be submitted with every RFP/IFB. It is the responsibility of the bidder to ensure GCLBA has an updated HASP on file. Some projects with additional environmental concerns may require additional considerations. In addition to the general HASP, the successful bidder will supply a contract/project specific HASP as required in the scope of work prior to contracting.
20. Special Conditions: Bidder shall have requested access to and reviewed all available environmental information pertaining to the bid. Additionally, should there be any other additional considerations, bidder shall have completed the necessary attachments and acknowledged such considerations. These considerations could include, but are not
3/14/25 Page 12 limited to acknowledgment of: coordination with GCLBA designated Qualified Environmental Professionals (QEP), HUD Section 3 requirements, MBE/WBE/DBE goals and good faith compliance efforts, Environmental Construction Management Plans, Due Care Plans, etc.
If bidder does not convince the Genesee County Land Bank Authority (GCLBA) that it possesses the above minimum qualifications with the bid response/submittals, the GCLBA may deem the bidder not qualified and the bidder may not be considered for contract award.
IMPORTANT DATES
Questions Due No later than Tuesday, April 22, 2025 by
3:00 pm Question Responses GCLBA will post by Friday, April 25 by
6:00pm Mandatory Pre-bid Meeting Tuesday, April 8, 2025 at 11:00am Pre-bid Meeting Link Microsoft Teams Virtual Meeting Link Bids Due Tuesday, April 29, 2025 by 3:00 pm
Notice of Award On or around Tuesday, May 13, 2025
Contract Signed On or around Tuesday, May 20, 2025
Start Work On or around Tuesday, May 27, 2025
Winter-grade work completed and paper work submitted
Not applicable
Final-grade, seed and straw work completed and paperwork due
On or before Friday, October 24, 2025
NOTE: GCLBA PROVIDES ITS BEST ESTIMATE OF THE TIMING. Bidders should ensure they have capacity to meet the timing outlined above.
QUESTIONS
Questions regarding this IFB should be submitted by no later than indicated date above and in writing via email to staff identified on cover sheet.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_MGFmMzc0YzItOWE2Ni00YmE1LTgwOGEtNmI5N2FiZTUyM2Vh%40thread.v2/0?context=%7b%22Tid%22%3a%2203bbeb00-e22d-4218-b8d5-b61580f8deaa%22%2c%22Oid%22%3a%22e5e48ad1-aef8-4e15-9c3f-128d3cac650c%22%7d
3/14/25 Page 13
BIDDING CHECK LIST
For GCLBA Use (PASS/
FAIL)
For Contractor Use (Page Number)
Expiration Date
Please note that a Genesee County Land Bank Authority (GCLBA) determination of FAIL may result in bid being rejected.
Submittal Requirements followed: Complete with date, time, and required number and format of submittals.
Evidence of Pre-qualification with GCLBA supplied (must be within one year of submittal date)
Letter of Interest as defined under Submittal Requirement
Completed Bidding Checklist
Evidence of Insurance meeting Bidders Insurance Checklist Requirements (Attachment A)
References (Attachment B)
Certification Form Note (Attachment C)
Capacity & Unit Rate Pricing Bid Tab/Pricing Proposal (Attachment D)
Section 3 Information and acknowledgement (Attachment E)
Conflict of Interest Statement & Supporting Documentation (Attachment F)
Debarment Certification (Attachment G)
Subcontractors (Attachments H)
Subcontractor Procurement & Outreach Report (Attachment I)
Bid Bond
Current Certificate of Good Standing
SAM registration printout proving active status and UEI
Michigan Builders License or Maintenance and Alterations license with House Wrecking* o Issued to: _________________________ o Q. O.: _____________________________
Michigan Accredited Asbestos Certification for Company*
EGLE/MDEQ Scrap Tire Hauler Registration
Work Plan- with site specific information.
Health and Safety Plan*
Acknowledgment of special requirements (ECMP, Coordination with QEP or other professional, additional special instructions). List:
3/14/25 Page 14 o ______________________________________ o ______________________________________ o ______________________________________ o ______________________________________
Any other State License and/or Certification that is deemed necessary or applicable and is relevant to work completed within Genesee County
Bidder requested access to Box.com to review pertinent data associated with completion of this project
Bidder attended mandatory Pre-bid Meeting
Received Addendums:___________________________
3/14/25 Page 15
ATTACHMENT A: GENESEE COUNTY LAND BANK BIDDER’S INSURANCE
CHECKLIST
Coverages Required Limits (Figures denote minimums) X 1. Workers’ Compensation Statutory limits of Michigan
X 2. Employers Liability $100,000 accident/disease $500,000 policy limit, disease
X 3. General Liability
Including Premises/operations $1,000,000 per occurrence with $2,000,000 aggregate
4. Professional liability
$1,000,000 including errors & omissions $200,000 per occurrence $600,000 in aggregate for Medical Malpractice
5. Products/Completed operations
$1,000,000 per occurrence with $2,000,000 aggregate
6. Contractual liability $1,000,000 general aggregate (gen. agg.)
7. Explosion, Collapse, Subsidence Excess Policy with limits at least $2,000,000
X 8.
Automobile liability Owned, hired, nonowned
$1,000,000 combined single limit each accident-Owned, hired, nonowned
9.
Pollution Liability for contracts involving removal and disposal of waste or storage tanks
$1,000,000 per loss $1,000,000 aggregate
10. Authority’s and Contractors Protective
X 11.
Genesee County named as an additional insured on other than workers' compensation via endorsement. A copy of the endorsement must be included with the certificate.
X 12.
Cancellation notice is to read:
Should any of the above described policies be cancelled before the expiration date thereof, the issuing insurer will mail 30 days written notice to the certificate holder named to the left or 10 day notice for non-payment of premium.
X 13. The certificate must state bid number and title
A copy of the insurance certificate with the Genesee County Land Bank listed as a certificate holder is required and must be attachment to the response to this proposal.
Bidder’s Statement I understand the insurance requirements and will comply in full if awarded the contract.
Bidder Signature
3/14/25 Page 16
ATTACHMENT B: LIST OF REFERENCES
Complete this form in its entirety. Provide References for projects completed in the past 3 to 5 years that are similar in scope and scale to project(s) described in the IFB. Describe the specific scope completed by Bidder. Explain how it is relevant to this IFB, attach additional sheets as necessary.
Reference #1: Company/Municipality: ______________________________________________
Contact Person: ______________________________ Title: _____________________________
Address: ______________________________________________________________________
City: ___________________________ State: ____________ Zip: _________________________
Telephone: ___________________________ Fax:_____________________________________
Email: ____________________________________Project Timeline (Dates):_______________
Type of Project/ Scope Completed by Bidder/Budget:___________________________________
Reference #2: Company/Municipality: ______________________________________________
Contact Person: ______________________________ Title: _____________________________
Address: ______________________________________________________________________
City: ________________________ State: ____________ Zip: ____________________________
Telephone: _____________________________ Fax:___________________________________
Email: ___________________________________Project Timeline (Dates):_________________
Type of Project/ Scope Completed by Bidder/Budget:___________________________________
Reference #3: Company/Municipality: ______________________________________________
Contact Person: _______________________________ Title: ____________________________
Address: ______________________________________________________________________
City: ________________________ State: ____________ Zip: ____________________________
Telephone: __________________________ Fax:______________________________________
Email: ____________________________________Project Timeline (Dates):________________
Type of Project/ Scope Completed by Bidder/Budget:___________________________________
3/14/25 Page 17
ATTACHMENT C: CERTIFICATION FORM NOTE
THIS PAGE MUST BE COMPLETED AND INCLUDED WITH THE SUBMITTAL CERTIFICATION.
The undersigned hereby certifies, on behalf of the Bidder named in this Certification (the “Bidder”), that the information provided in this RFQ submittal to GCLBA is accurate and complete and I am duly authorized to submit the same. I hereby certify that the Bidder has reviewed this RFQ in its entirety and accepts its terms and conditions.
(Name of Bidder)
____ Will be responding to this RFP.
____ Will not be responding to this RFP, but to remain on the Genesee County Land Bank approved contractors list. (Please return only this form.)
(Signature of Authorized Representative)
(Typed Name of Authorized Representative)
(Title) (Date)
Email:_________________________________ Phone:________________________________
Federal Identification Number: _____________ License Number: _______________________
NAME OF AUTHORIZED REPRESATIVES FOR SUBCONTRACTORS:
(Typed Name of Subcontractor’s Authorized Representative) (Title)
(Typed Name of Subcontractor’s Authorized Representative) (Title)
(Typed Name of Subcontractor’s Authorized Representative) (Title)
3/14/25 Page 18
ATTACHMENT D: UNIT RATE PRICING BID COVERSHEET & BID TAB
Please note that an incomplete Attachment D may result in rejection of submittals. Please flag this page in your submittal for ease of reading at bid opening.
Company Name: ________________________________________________________________
DBA: ________________________________________________________________________
BID TENDER SUMMARY
Bidders may opt to omit bid lists they do not have the capacity to complete or are not interested in completing. Please indicate “No Bid” if opting to omit a response to a specific list.
Bidders must supply a quote for each structure on a list in order to be eligible for a potential contract for that list. Bidders may be awarded multiple lists if they possess the capacity to complete multiple lists.
BID LIST# LB 25-001-1 LB 25-001-2 LB 25-001-3
BID
AMOUNT
REQUIRED
CAPACITY
(in whole units) 2/week 3/week 1/week
Statement of Experience
Primary Contact:
Name Title Telephone Email
Change since pre-qualification or annual update Has the address in the principal place of business changed?
☐Yes (Note new address): _______________________________________________ ☐No
Have the principals of the bidder changed?
(Principals refer to those persons with an ownership interest in the bidding entity)
☐Yes (List all new principals): ______________________________________________ ☐No
Does bidder qualify as any of the following business enterprises?
Attach supporting certifications as necessary. Check all that apply:
☐Section 3 ☐MBE ☐WBE ☐DBE
3/14/25 Page 19
Is this a Section 3 covered contract?
☐Yes ☐No
In the tables below, list staff expected to be assigned, if this project is awarded.
Include documentation for licenses and certifications as necessary on flash drive:
Role Name Professional and Educational Experience Asbestos Competent Person
Field Oversight Person
Alternate Work Practices
Enter name of staff expected to be assigned if this project is awarded.
List the date the certification expires. Current certs and license must be supplied after Notice of Award.
Name Lead cert Asbestos Cert
HAZWOPER Other Cert (list) Years of Experience
Any relevant additional Licenses, Certificates, Accreditations held by firm and/or employees not listed above should be listed separately and included on the flash drive.
Has bidder reviewed Wage Determinations and incorporated appropriate wages into bid?
☐No
3/14/25 Page 20
Capacity and Timeline List timelines for concurrent projects (within the same timeframe as) as the schedule for this bid. Please include work from GCLBA and other current or potential contracts.
Name of project & Location
Timing (e.g. Jan. 2025 to Aug. 2025)
Type of work (E.g. Demo and abatement)
# of Staff assigned
Can Bidder complete abatement, demolition and disposal within the time frame identified in this Invitation For Bids?
☐Yes ☐No. If no, explain below:
Describe how the bidder will balance existing commitments, and crews to complete demolition and abatement according to the timeline provided: ___________________________________
Number of Bidder’s employees: ___________
Has equipment list changed since submittal of Pre-qualification Application/Annual Update?
☐Yes ☐No
If yes - please describe:__________________________________________________________
3/14/25 Page 21
How many appropriately licensed and sufficiently equipped crews does bidder have for:
Abatement? ________
Demolition? ________
How many projects/week did bidder indicate firm could complete in pre-qualification application/ how many can bidder complete per week currently? ___________/_____________
Please describe a project bidder successfully completed with weekly capacity indicated above:
Describe the steps you will take to oversee environmental abatement work (staff or subcontractors) to ensure that the work is completed in compliance with all applicable state and federal regulations. _________________________________________________________
Landfills: List the landfills and disposal sites the bidder intends to utilize for this bid:
Water for fugitive dust suppression during demolition.
What or who will Contractor use to acquire and apply the water to the demolition?
☐City of Flint ☐Other Municipality ☐Other:____________________
☐Water truck ☐Hydrant ☐Dust Control Canon ☐Hoses
3/14/25 Page 22
Identify the business that will be conducting ambient air monitoring:
Identify the business that will be conducting water removal and how/where water will be disposed:
All concrete- including foundations and footings- from demolitions with known or suspect Regulated Asbestos Containing Material (RACM) remaining in place must be manifested and disposed of as asbestos containing material. This material cannot be recycled. Provide a listing of properties you acknowledge foundations and footings will be disposed of as asbestos containing material. Acknowledge here that you have attached this documentation: ______
Subcontractor(s): List scopes for which you plan to utilize subcontractors. For each subcontractor, complete Attachment H: SUBCONTRACTORS and Attachment H: Subcontractor Procurement & Outreach Report Scope Company Attach I
Complete Attach J Complete
Do you understand that the successful bidder will be held accountable for the performance of subcontractors?
☐No
3/14/25 Page 23
INSPECTIONS AND VIOLATIONS
Does Contractor or subcontractor have any EPA, EGLE/MDEQ, or OSHA/MIOSHA active or open inspections or investigations? If yes, please give dates, describe visit or incident and any changes to your policies and procedures taken to prevent a reoccurrence. Use additional sheets as necessary.
Has the Contractor or subcontractor been the recipient of any EPA, EGLE/MDEQ, or OSHA/MIOSHA violations or fines in the past five (5) years? If yes, please give dates, describe incident, and any changes to your policies and procedures taken to prevent a reoccurrence. Use additional sheets as necessary.
I certify that I have the necessary equipment and staffing available in order to complete the Scope of Work outlined in this bid. I certify that I have read the Scope of Work included in this bid.
Signed this day of , (Name of Contractor/ Authorized Representative)
(Signature of Contractor /Authorized Representative)
(Contractor Address)
(Phone) (Email)
3/14/25 Page 24
BID/TENDER FORM #LB 25-001
SUBMITTED TO: Genesee County Land Bank 452 S. Saginaw Street 2nd Floor Flint, Michigan 48502
FOR: Invitation to Bid #LB 25-001 Abatement & Demolition of Residential and Commercial
Structures in Genesee County:
DATE:
NAME OF
BIDDER:
ADDRESS
TELEPHONE:
TO: Genesee County Land Bank Authority (hereinafter called “GCLBA”)
To Whom It May Concern:
The Bidder, in compliance with your invitation for bids for the environmental abatement and demolition and disposal of Residential and Commercial Structures having examined Bid #LB: 25- 001 prepared by the Genesee County Land Bank, and other related documents and being familiar with site of proposed work, and with all conditions surrounding demolition of the listed property(ies) including availability of materials and labor, hereby propose to furnish all labor, materials, tools, equipment, machinery, equipment rental, transportation, superintendence, perform all work, provide all services, and to perform all work in accordance with Bid #LB: 25- 001, within time set forth herein, at prices stated below. These prices are to cover all expenses incurred in performing work required under Scope of Work, of which this Bid/Tender is a part.
Successful Bidder agrees to provide performance and payment bonds written by surety acceptable to GCLBA; made in favor of GCLBA as obligee. The Bidder recognizes that the GCLBA may award the bid packages separately and not as a total contract.
Adjustments to bid- In the event a structure or structures itemized on this bid is destroyed or substantially destroyed by fire or other calamity beyond its present condition as determined by the GCLBA, or environmental hazards are found, at any time prior to actual demolition, the Authority reserves the right to remove the structure from the bid; or in the event of bid award, to remove the structures(s) from the award and reduce the price by the Contractors’ bid for that structure(s).
GCLBA reserves the right to cancel any project(s) that has been issued on a bid or entered into a contract if GCLBA has deemed project(s) infeasible and is unable to proceed with the demolition.
ATTENTION:
This section highlights information that has been overlooked or resulted in confusion for previous bidders. Please be sure to take the following under advisement prior to completing your bid.
• Where surveys are incomplete due to mitigatable conditions (blocked stairwells, debris, flooded basements, etc.), GCLBA is requesting bidders to provide pricing to address conditions so that a thorough survey can be made prior to demolition. Bidders are to include cost to address conditions and coordinate completing survey with Genesee County Land Bank Authority (GCLBA) and surveyor BEFORE completing ANY abatement activities. GCLBA may not reimburse contractor for universal or asbestos abatement activity undertaken prior to a thorough survey being completed. Debris removal should be undertaken with the oversight of an asbestos competent person. Non-contaminated debris is to be removed to a dumpster and disposed of in a landfill. GCLBA is to be notified if suspect material is encountered during debris removal. It is anticipated that bidders are including costs to address existing conditions for abatement/demolition as necessary where through surveys have been completed. Change Orders will not be accepted on these properties for access mitigation activities.
• Dewatering must be completed per municipal requirements. In the City of Flint, dewatering for any reason will be undertaken by the contractor their own cost under GCLBA’s permit with the City of Flint. Requirements for testing and requesting a variance within the City of Flint can be found on GCLBA’s website on the Contracts and Bids page under “Other Resources for Active Contractors.”
• Some of the properties contain vermiculite and bidders are to use caution during demolition and remain vigilant for fugitive vermiculite. Quantities listed in surveys are only estimates.
Contractors are to satisfy themselves as to actual quantities prior to submitting a bid.
• GCLBA does not test for the presence of lead in structures to be demolished. Contractors are to assume lead is present and are to take all necessary measures to protect human health and safety in performance of the work.
• Regulatory exemptions exist for the removal and disposal of environmental hazardous materials from residential structures. Regardless of any regulatory exemption, the GCLBA has decided to divert certain waste from landfill disposal and therefore will identify select materials during the pre-demolition survey, which will require manifesting and
Please be advised that flat rate bids may be rejected. Bids must be based upon actual costs.
Should Bidder submit flat rates for the for any portion of the scope, please include a short narrative explaining the methods used to reach the amounts bid (i.e. if using a percentage of demolition costs, how did Bidder arrive at the percentage calculation? What is the percentage being used?). Bidders should be prepared to demonstrate reasonableness of bid with supporting documentation upon request.
Invitation for Bids – Environmental Abatement, Demolition & Disposal of Residential and Commercial Structures 3/14/25 Page 26
Bid Number: 25-001 transportation to a licensed treatment, storage, or disposal facility or other appropriate disposal location. A site specific Pre-Demolition Hazardous Materials Survey has been prepared by others and is available via a GCLBA designated file sharing service upon request.
• It is the policy and practice of the GCLBA to abate what can feasibly be abated despite the condition of the structure, whether or not a structure will ultimately be demolished as asbestos containing. Conditions inhibiting the abatement of identified materials must be thoroughly documented and explained.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .