This document is a Single Source Justification (Simplified Acquisition) for the purchase of a Trane cooling tower to maintain operations at the 45th SW Theater and 45th SW Chapel at facility 431 on Patrick Space Force Base.
The cooling tower is an essential component of the Trane chiller system that provides necessary equipment and climate control for the facility. The justification states that all chillers on the base are Trane and the Tower Tech cooling tower is engineered and designed specifically for the Trane chiller system. The contracting officer has determined that Trane is the only reasonably available source for the required cooling tower under simplified acquisition procedures. The estimated cost for the cooling tower is $0.00. The related federal contract opportunity is Solicitation FA252124QB051 for the Patrick Space Force Base Cooling Tower requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24QB051 - Combined Synopsis Solicitation.pdf | ||
| 24QB051 - Clause Set.pdf | ||
| 24QB051 - Salient Characteristics.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Single Source Justification (Simplified Acquisition)
FOUO FOR OFFICAL USE ONLY
November 2018 FOUO FOR OFFICAL USE ONLY Page 1 of 1
Section A: General Contract Information
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Contracting Activity: 45 CONS/PKB
Project/Program Name: Trane Tower Tech Cooling Tower
Purchase Request / Local ID Number: TBD
Estimated Contract Cost (including Options): $0.00
Section B: Description of the Supplies/Services Required
The request for a cooling tower is required to maintain operations for the 45th SW Theater and 45th SW Chapel at facility 431. The cooling tower is an essential part of the chiller system that provides necessary equipment and comfort cooling. All equipment in the facility must have and maintain a 65°F-70°F +/- 2°F degree condition space as well as a 20-30% relative humidity.
Section C: Justification for Soliciting from a Single Source or Brand Name
All Chillers on Patrick AFB are Trane Chillers. The cooling tower is part of the Trane Chiller system. Tower Tech cooling tower is engineered and designed for Trane Chiller system. The Tower Tech Cooling Tower is needed for the operational status of the Trane Chiller in maintaining 120 GPM, Hot/Cold water temperature of 95 deg.F/ 85 deg.F, 8848.36 CFM, Tower pump head at 5.12 psi.
Section D: Efforts to Obtain Competition
Trane is a distributor of Tower Tech Cooling Tower.
Section E: Steps to Preclude Future Single Source or Brand Name Awards
The HVAC Chiller System Standardization, Single Manufacturer Selection (Sept, 2019) was approved for Patrick AFB to purchase / standardizaed all chiller systems to Trane.
Section F: Contracting Officer's Determination
I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
Date
12-Mar-2024
Typed Name and Rank/Grade of Contracting Officer
Cynthia Whittaker, NH III
Signature of Contracting Officer
Single Source Justification (Simplified Acquisition) November 2018 Page of Section A: General Contract Information Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Section B: Description of the Supplies/Services Required Section C: Justification for Soliciting from a Single Source or Brand Name Section D: Efforts to Obtain Competition Section E: Steps to Preclude Future Single Source or Brand Name Awards Section F: Contracting Officer's Determination I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
9.0.0.2.20120627.2.874785
| security_markings: FOUO FOR OFFICAL USE ONLY |
| CurrentPage: |
| PageCount: |
| Yes: |
| No: |
| Contract_Activity: 45 CONS/PKB |
| Project_Name: Trane Tower Tech Cooling Tower |
| PR-ID_Number: TBD |
| Estimated_Cost: $0.00 |
| Text: |
| Date: 12-Mar-2024 |
| Name: Cynthia Whittaker, NH III |
| Signature: |