2-Bid Spec - Matamoras Boro Bldg Reno 9-10-25.pdf

PDF 3 MB Posted

Attached to
Borough Building Renovation Project
Solicitation number
US.202054
Issued by
Philadelphia County, Marion Heights Borough, Pennsylvania

View the file

Other files

File Type Posted
1-Matamoras Borough Building Renovation Plans 9-10-25.pdf PDF
3-Addendum 1 9-19-25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID AND SPECIFICATION MANUAL

FOR

BOROUGH BUILDING RENOVATION

MATAMORAS BOROUGH, PIKE COUNTY, PA

PREPARED BY:

PREPARED FOR:

MATAMORAS BOROUGH

10 AVENUE I

MATAMORAS, PA 18336

September 10, 2025

Bid and Specification Manual

Matamoras Borough September 10, 2025

Borough Building Renovation

TABLE OF CONTENTS

A. Table of Contents …………………………………….2

B. Invitation to Bid………………………………………3

C. Instructions to Bidders………………………………..4

D. Scope of Work………………………………………..11

E. Bid Form for a Stipulated Sum ………………………12

F. Supplemental Bidder Information ……………………14

G. Non-Collusion Affidavit ……………………………..15

H. Non-Discrimination and Sexual Harassment Clause…18

I. Standard of Quality and Warranty Statement…………20

J. General Conditions……………………………………21

K. Supplemental General Conditions…………………….22

L. List of Drawings………………………………………26

M. Prevailing Wage Rates………………………………..Appendix “A”

INVITATION TO BID

FOR

CONSTRUCTION SERVICES

Matamoras Borough, Pike County, PA is soliciting bids for the renovation of the existing

Borough Building. A Prevailing Wage determination has been requested from the PA

Department of Labor and Industry and Prevailing Wage Rates apply to this project.

Bid packages including specifications, scope of services and bid documents may be obtained at no cost via PennBid

(https://pennbid.bonfirehub.com/portal/?tab=openOpportunities).

Proposals will be received electronically via PennBid until 2:00 PM on Tuesday, October

14, 2025. Bids will be publicly opened at the regularly scheduled Borough Council meeting, 10 Avenue I, Matamoras, PA at 7:30 PM on Tuesday, October 14, 2025. Bids may be held by Matamoras Borough for a period not to exceed five (5) days from the date of Bid Opening for the purpose of reviewing the Bids and investigating the qualifications of the Bidder, prior to the award of the Contract. Matamoras Borough will award the bid to the lowest responsible bidder, reserving the right to waive any informality and accept or reject any and all Bids.

A bid bond for 10% of the base bid amount shall be provided with the bid. A performance & payment bond in the amount of 100% of the contract amount shall be provided by the successful bidder within 20 days of the award.

Any questions regarding this solicitation shall be submitted via the “Questions” feature within PennBid no later than Tuesday, October 7, 2025 at 4:00 PM.

https://pennbid.bonfirehub.com/portal/?tab=openOpportunities

INSTRUCTIONS TO BIDDERS

ARTICLE 1 GENERAL INFORMATION

1.1 GENERAL INFORMATION

1.1.1 Work for this project will be performed under a single contract.

1.1.2 Contract bids will be accepted for all construction work as contained within the bidding/construction documents.

1.1.3 Invited bidders are requested to submit proposals as follows:

Bids Due: Tuesday, October 14, 2025 at 2:00 PM via PennBid

ARTICLE 2 BIDDER'S REPRESENTATIONS

2.1 OBLIGATION OF THE BIDDER

2.1.1 Each bidder must inform himself fully of the conditions relating to the project, work to be coordinated with other trades, and the employment of labor thereon.

2.1.2 At the time of the opening of bids, each bidder will be presumed to have visited the site to become familiar with field conditions affecting work under this contract, also to have read, and become thoroughly familiar with the bidding/contract documents. The failure or omission of any bidder to visit the site, examine any form, instrument or documents shall in no way relieve any bidder from any obligation to furnish all equipment, labor and materials necessary to carry out the provisions of his contract. Site visits must be coordinated with Matamoras Boro if building access is required.

2.1.2.1 PREBID MEETING

No pre-bid meeting will be held. However, bidders should visit the project site in order to become familiar with the project. Contact Matamoras Borough (Marianne Brown –

Borough Secretary; 570-491-2771; secretary@matamorasborough.com) to schedule a site visit.

2.2 LAWS AND REGULATIONS

2.2.1 The bidder's attention is directed to the fact that all applicable State Laws, Maintenance

Ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract thoroughly, and they will be deemed to be included in the contract the same as though herein written out in full. Bidders shall be responsible for including in their proposals the cost of obtaining all applicable permits, unless otherwise noted.

2.2.2 Provisions for the Use of Steel and Steel Products Made in the U.S.:

In accordance with Act 3 of the 1978 General Assembly of the Commonwealth of

Pennsylvania, if any steel or steel products are to be used or supplied in the performance of the contract, only those produced in the United States as defined therein shall be used or mailto:secretary@matamorasborough.com supplied in the performance of the contract or any subcontracts thereunder.

In accord with Act 161 of 1982, cast iron products shall also be included and produced in the United States. Act 141 of 1984 further defines "steel products" to include machinery and equipment. The act also provides clarifications and penalties

ARTICLE 3 BIDDING DOCUMENTS

3.1 DOCUMENTS

3.1.1 Bidding/Contract Documents obtained by bidders for the purpose of bidding are not to be used for any other purpose other than bidding and construction of the specific project for which they were issued, unless authorized in writing by Kiley Associates, LLC.

3.1.2 Bids are to be based on complete sets of Bidding/Contract Documents and neither the

Owner nor the Engineer assumes responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding/Contract Documents.

3.1.3 Bidding/Contract Documents will not be issued directly to sub-bidders.

3.2 INTERPRETATION OR CORRECTIONS OF BIDDING/CONTRACT DOCUMENTS

3.2.1 Any conflicts in, or questions pertaining to, the Bidding/Contract Documents should be immediately brought to the Engineer's attention. If the Bidder, prior to the submission of his Bid, fails to call the attention of the Engineer to the existence of any apparent ambiguity, inconsistency, or error in the Bidding/Contract Documents, his Bid will be conclusively presumed to have been based upon the interpretation of such ambiguity or inconsistency, or the directions correcting such error, which may subsequently be given by the Engineer.

3.2.2 Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which shall reach the Engineer at least seven (7) days prior to the date for receipt of Bids.

3.2.3 Interpretations, corrections and changes of the Bidding/Contract Documents will be made by Addendum. Interpretations, corrections and changes of the Bidding Contract

Documents made in any other manner will not be binding, and Bidders shall not rely upon them.

3.3 SUBSTITUTIONS

3.3.1 The Contract, if awarded, will be on the basis of material and equipment specified on the

Bidding/Contract Documents without consideration of possible substitute items. It is indicated on the Bidding/Contract Documents those specific "or equal/equivalent" materials or equipment which may be furnished or used by the Bidder.

3.3.2 If a Bidder wishes to use unspecified products, which in his opinion are the equivalent of specified products and if substitutions are not prohibited by the Contract Documents, he shall submit a request for such use to the Engineer at least fourteen (14) days prior to the bid opening. The request shall include all technical and dimensional data necessary to demonstrate the equivalency and compatibility of the product. If the Engineer determines that the product can be included in the bid, a written Addendum will be issued to all

Bidders on record indicating the product’s acceptability.

3.4 ADDENDA AND INTERPRETATIONS

3.4.1 No interpretation of the meaning of the Bidding/Contract Documents will be made to any bidder orally.

3.4.2 Every request for such interpretation should be in writing, addressed to Kiley Associates, LLC, 240 Main Avenue-Lower Level, PO Box 317, Hawley, PA 18428 via email:

jdhudak@kileyassoc.com, and to be given consideration must be received at least seven

(7) working days prior to the date fixed for the opening of bids.

3.4.3 Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Bidding/Contract Documents which, if issued, will be transmitted to all prospective bidders (at the respective addresses furnished for such purposes), not later than five (5) days prior to the date fixed for the opening of bids.

3.4.4 Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Bidding/Contract Documents.

3.4.5 In submitting a bid, the bidder acknowledges that he has checked with the Engineer and determined that he is in receipt of addenda which have been issued by the Engineer, and that the requirements of any such addenda are reflected in his bid.

ARTICLE 4 BIDDING PROCEDURES

4.1 PREPARATION OF BIDS

4.1.1 Each bid must be submitted on the prescribed forms included with the Bidding/Contract

Documents. Bidders may submit a bid for any or all of the trades.

4.1.2 All blanks on the bid form shall be legibly executed in a non-erasable medium.

4.1.3 Sums shall be expressed in both words and figures. In case of discrepancy, the amount written in words shall govern.

4.1.4 Interlineations, alterations and erasures must be initialed by the signer of the Bid.

4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter "No

Change".

4.1.6 Where two or more Bids for designated portions of the Work have been requested, the

Bidder may, without forfeiture of the bid security, state the Bidder's refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall make no additional stipulations on the bid form nor qualify the Bid in any other manner.

4.1.7 Each copy of the Bid shall state the legal name of the Bidder and the nature of legal form of the Bidder. The Bidder shall provide evidence of legal authority to perform within the jurisdiction of the Work. Each copy shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further give the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached certifying the agent's authority to bind the Bidder.

4.2 BID SECURITY

4.2.1 A 10% Bid Bond or Certified Check is required with the bid submission.

4.3 SUBMISSION OF BIDS

4.3.1 All copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be submitted via PennBid.

4.3.2 Bids shall be deposited at the designated location described in Article 1 General

Information prior to the time and date for receipt of Bids. Bids received after the time and date for receipt of Bids will be returned unopened.

4.3.3 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.

4.3.4 Oral, telephonic, telegraphic, or facsimile transmitted bids will not be considered.

4.4 MODIFICATION OR WITHDRAWAL OF BID

4.4.1 A Bid may not be modified, withdrawn or canceled by the Bidder within ninety (90) days following the time and date designated for the receipt of Bids, and each Bidder so agrees in submitting a Bid.

4.4.2 Prior to the time and date designated for receipt of Bids, a Bid submitted may be modified or withdrawn by notice to the party receiving Bids at the place designated for receipt of

Bids. Such notice shall be in writing over the signature of the Bidder. Written confirmation over the signature of the Bidder shall be received, and date- and time-stamped by the receiving party on or before the date and time set for receipt of Bids. A change shall be so worded as not to reveal the amount of the original Bid.

4.4.3 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of

Bids provided that they are then fully in conformance with these Instructions to Bidders.

4.4.4 Bid security, if required, shall be in an amount sufficient for the Bid as resubmitted.

ARTICLE 5 CONSIDERATION OF BIDS

5.1 OPENING OF BIDS

5.1.1 Properly identified Bids received on time will be opened and the results tabulated.

5.2 REJECTION OF BIDS

5.2.1 The Owner shall have the right to reject any or all Bids. A Bid not accompanied by a required bid security or by other data required by the Bidding Documents, or a Bid which is in any way incomplete or irregular is subject to rejection.

5.2.2 Any bid received after the time and date specified may not be considered.

5.3 ACCEPTANCE OF BID (AWARD)

5.3.1 It is the intent of the Owner to award one (1) Contract for all work to the lowest qualified

Bidder provided the Bid has been submitted in accordance with the requirements of the

Bidding Documents and does not exceed the funds available. The Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner's judgment, is in the Owner's best interests.

5.3.2 The Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the low Bidder on the basis of the sum of the Base Bid and Alternates accepted.

ARTICLE 6 POST-BID INFORMATION

6.1 CONTRACTOR'S QUALIFICATION STATEMENT

Bidders to whom award of a Contract is under consideration shall submit to the Engineer, upon request, a properly executed AIA Document A305, Contractor's Qualification

Statement, or equivalent, unless such a Statement has been previously required and submitted as a prerequisite to the issuance of Bidding Documents.

6.2 OWNER'S FINANCIAL CAPABILITY

The Owner shall, at the request of the Bidder to whom award of a Contract is under consideration and no later than seven (7) days prior to the expiration of the time for withdrawal of Bids, furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner's obligations under the Contract. Unless such reasonable evidence is furnished, the Bidder will not be required to execute the Agreement between the Owner and Contractor.

6.3 SUBMITTALS

6.3.1 The Bidder shall within ten (10) days after notification of selection for the award of a

Contract, furnish to the Owner through the Engineer in writing:

1. A designation of the Work to be performed with the Bidder's own forces;

2. Names of the manufacturers, products, and the suppliers of principal items or systems of materials and equipment proposed for the Work; and

3. Names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the

Work,

4. A proposed project progress/completion schedule, outlining how the work will be completed.

5. A submittal register.

6.3.2 The Bidder will be required to establish to the satisfaction of the Engineer and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.

6.3.3 Prior to the execution of the Contract, the Engineer will notify the Bidder in writing if either the Owner or Engineer, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Engineer has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder's option, (1) withdraw the Bid or (2) submit an acceptable substitute person or entity with an adjustment in the Base Bid or Alternate Bid to cover the difference in cost occasioned by such substitution. The

Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.

6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Engineer have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Engineer.

6.4 LIEN STIPULATIONS

6.4.1 The successful bidder must waive the right of liens, and, at the time of signing of Contract, shall sign a stipulation against liens as a part of said Contract, said stipulations will be prepared by the Contractor, and returned to the Owner who shall be responsible for recording it in the Prothonotary's Office. Contractor shall not perform any work on job site until he has received formal notification of such recording.

6.5 CONTRACTOR INSURANCE REQUIREMENTS

6.5.1 Each Contractor shall secure and maintain the insurance coverage for this project as stated in

Section 3 of the General Conditions.

6.5.2 Matamoras Borough shall be the Certificate Holder; the Commonwealth of Pennsylvania

Commonwealth Financing Authority, Kiley Associates, LLC shall be named Additional

Insured.

ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND

7.1 BOND REQUIREMENTS

7.1.1 The Bidder shall provide price to furnish bonds covering the faithful performance of the

Contract and payment of all obligations arising thereunder.

7.1.2 The cost of furnishing of such bonds shall be included in the Base Bid.

7.2 TIME OF DELIVERY AND FORM OF BONDS

7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three (3) days following the date of execution of the Contract. If the Work is to be commenced prior thereto in response to a letter of intent, the Bidder shall, prior to commencement of the

Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Subparagraph 7.2.1.

7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond. Both bonds shall be written in the amount of the

Contract Sum.

7.2.3 The bonds shall be dated on or after the date of the Contract.

7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of the power of attorney.

7.2.5 The surety must be listed in the most current edition of the Department of Treasuries List of Approved Sureties, Department Circular 570.

ARTICLE 8 FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR

8.1 The Agreement for the Work will be written on AIA Document A105-2017 Edition, Standard Short Form of Agreement between Owner and Contractor where the basis of payment is a stipulated sum, or on a form acceptable to the Owner.

ARTICLE 9 PROJECT SCHEDULE

9.1 Project Schedule:

A. Sealed bids received via PennBid on Tuesday, October 14, 2025 by 2:00 PM.

B. Bid opening at Matamoras Borough on Tuesday, October 14, 2025 at regularly scheduled meeting.

C. Contract award on or before October 19, 2025.

D. Estimated project start date on Notice To Proceed (NTP) issued by the Engineer

ARTICLE 10 TIME OF COMPLETION

10.1 SUBSTANTIAL COMPLETION

10.1.1 Substantial completion date shall be June 15, 2026.

--End of Section—

S C O P E O F W O R K

The following Scope-of-Work is intended to supplement the project documents as prepared by

Kiley Associates, LLC. This bid package includes construction work for renovation of the existing

Borough Building. It also includes administrative and coordination responsibilities. All work indicated in the project documents is to be completed as in-scope without exception and includes, but is not limited to, the following:

• Contractor is responsible for cleaning their work area of all debris which is generated because of their work on a daily basis. Debris removal is the responsibility of the contractor.

• Provide all specified products and materials.

• Coordination all work with other Contractor’s working on site.

• Protection of surrounding areas and existing items to remain.

• All unloading/loading as required to complete this scope of work.

• All deliveries and staging area shall be coordinated with the Owner so as not to disrupt the

Owner’s ongoing use of the premises.

• Final cleaning of bid package work by each Contractor.

• All building renovation work, as indicated in the contract documents. Work shall include the furnishing of all labor, equipment, tools, and materials required for renovation of the existing

Borough building as required, all conforming to lines, grades, width and depth, indicated in the contract documents.

• Pennsylvania state sales tax.

• Comply with Public Work Contractor’s Bond Law and Trade Practices Act.

• Protection of surrounding area and existing items to remain by each Contractor.

• Provide all accessories, supports and materials necessary to complete the intended work within this bid package and/or respective work scope.

• Contractor is responsible for providing and paying for all temporary utilities

• Contractors are responsible for the security of their own materials, equipment, and tools throughout the duration of the project

• Each successful bidder will be required to comply with all Pennsylvania Prevailing Wage Act regulations including providing payroll certification.

--End of Section—

BID FORM FOR A STIPULATED SUM

Matamoras Borough Building Renovation

Date: ____________________

Proposal of: ____________________________________________________________________

(Hereinafter called "Bidder") *a Corporation, organized and existing under the laws of the State of

_________________________________ a Partnership, or an Individual, doing business as:

To: Matamoras Borough, Pike County, PA (hereinafter called “Owner”)

The Bidder, having examined the plans and specifications with related documents, and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project, including the availability of materials and supplies, agrees to perform all phases of the work in strict accordance with the Contract Documents, for the Stipulated Sum stated herein. This sum is to cover all expenses incurred in performing the work required under the

Contract Documents, of which this Proposal is a part.

STIPULATED SUM PROPOSAL: Bidder agrees to perform all of the work (including purchase and delivery, where applicable) defined on the Bid Forms and further defined on the Plans, complete for Matamoras Borough, Pike County, PA for the Stipulated Sum of:

(Base Bid – Building Renovation):

Amounts shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.

Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding.

The Bidder agrees that this bid shall be good and may not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving bids.

Upon receipt of written notice of the acceptance of this bid, Bidder will execute the Owner's formal contract within the ten (10) days as required by the Owner.

The undersigned agrees that if written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the undersigned within thirty (30) days after the opening thereof, or at any time thereafter before this bid is withdrawn, the undersigned agrees to execute and deliver a Contract in the prescribed form within five (5) days after the Contract is presented to him for signature.

The undersigned hereby certifies that this proposal is genuine and not a sham or collusive or made in the interest or in behalf of any person, firm or corporation not herein named; that the undersigned has not directly or indirectly induced or solicited any bidder to refrain from bidding and the undersigned has not, in any manner, sought by collusion to secure for himself/herself an advantage over any other bidder.

Bidder acknowledges receipt of the following Addenda:

Submitted on: , 20___.

(Name of Bidder)

Official Address (Including ZIP Code):

By: _________________________________________________________________________

Title: ________________________________________________________________________

Federal Employer's Identification Number: __________________________________________

Telephone Number: __________________________ Email: ___________________________

If a Corporation, State of incorporation: _____________________________________________

END OF SECTION

SUPPLEMENTAL BIDDER INFORMATION FORM

Each bidder is required to fill out and submit with his proposal this form which provides additional information on the bidder.

A. List three (3) comparative projects and respective construction cost, which the bidder has successfully completed within the last five (5) years. List references for each:

Project Name Construction Cost Reference

1._____________________________________________________________________________

2._____________________________________________________________________________

3._____________________________________________________________________________

B. List the bidder's total bonding capacity:

NON-COLLUSION AFFADAVIT

1. This Non-Collusion Affidavit is material to any contract awarded pursuant to this bid. According to the Pennsylvania Anti Bid-Rigging Act, 73 P.S. 1611 et seq., governmental agencies may require Non-Collusion Affidavits to be submitted together with bids.

2. This Non-Collusion Affidavit must be executed by the member, officer or employee of the bidder who makes the final decision on prices and the amount quoted in the bid.

3. Bid rigging and other efforts to restrain competition, and the making of false worn statements in connection with the submission of bids are unlawful and may be subject to criminal prosecution. The person who signs the Affidavit should examine it carefully before signing and assure himself or herself that each statement is true and accurate, making diligent inquiry, as necessary, of all other persons employed by or associated with the bidder with responsibilities for the preparation, approval or submission of the bid.

4. In the case of a bid submitted by a joint venture, each party to the venture must be identified in the bid documents, and an Affidavit must be submitted separately on behalf of each party.

5. The term "complementary bid" as used in the Affidavit has the meaning commonly associated with that term in the bidding process and includes the knowing submission of bids higher than the bid of another firm, any intentionally high or noncompetitive bid, and any other form of bid submitted for the purpose of giving a false appearance of competition.

6. Failure to file an Affidavit in compliance with these instructions will result in disqualification of the bid.

NON-COLLUSION AFFADAVIT

State of ________________________:

: ss

County of______________________:

I state that I am _________________of ________________________________ (Title) (Name of my firm) and that I am authorized to make this affidavit on behalf of my firm, and its Owners, directors, and officers. I am the person responsible in my firm for the price(s) and the amount of this bid.

I state that:

(1) The price(s) and amount of this bid have been arrived at independently and without consultation, communication or agreement with any other Contractor, bidder or potential bidder.

(2) Neither the price(s) nor the amount of this bid, and neither the approximate price(s) nor approximate amount of this bid, have been disclosed to any other firm or person who is a bidder or potential bidder, and they will not be disclosed before bid opening.

(3) No attempt has been made or will be made to induce any firm or person to refrain from bidding on this contract, or to submit a bid higher that this bid, or to submit any intentionally high or noncompetitive bid or other form of complementary bid.

(4) The bid of my firm is made in good faith and not pursuant to any agreement or discussion with, or inducement from, any firm or person to submit a complementary or other noncompetitive bid.

(5) , its affiliates, (Name of Firm) subsidiaries, officers, directors and employees are not currently under investigation by any governmental agency and have not in the last four years been convicted or found liable for any act prohibited by State or Federal law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract, except as follows:

I state that____________________________________________ understands and

(Name of Firm) acknowledges that the above representations are material and important, and will be relied on by____________________________________________________________

(Name of Public Entity)

In awarding the contract(s) for which this bid is submitted. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as fraudulent concealment from

(Name of Public Entity)

To the true facts relating to the submission of bids for this contract.

(Name & Company Position)

SWORN TO AND SUBSCRIBED

BEFORE ME THIS _ DAY

OF , 20

My Commission Expires

NONDISCRIMINATION AND SEXUAL HARASSMENT CLAUSE

1. Representations. The Grantee represents that it is presently in compliance with and will remain in compliance with all applicable federal, state, and local laws, regulations, and policies relating to nondiscrimination and sexual harassment for the term of the agreement. The Grantee shall, upon request and within the time periods requested by the Commonwealth, furnish all necessary employment documents and records, including EEO-1 reports, and permit access to its books, records, and accounts by the Commonwealth for the purpose of ascertaining compliance with provisions of this Nondiscrimination/Sexual Harassment Clause.

2. Nondiscrimination/Sexual Harassment Obligations. The Grantee shall not:

a. in any manner discriminate in the hiring of any employee(s) for the performance of the activities required under this agreement or any subgrant agreement, contract, or subcontract, by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the Pennsylvania Human Relations Act (“PHRA”) and applicable federal laws, against any citizen of this Commonwealth who is qualified and available to perform the work to which the employment relates.

b. in any manner discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the PHRA and applicable federal laws, against or intimidate any of its employees.

c. in any manner discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the PHRA and applicable federal laws, in the provision of services under this agreement or any subgrant agreement, contract, or subcontract.

d. in any manner discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of PHRA and applicable federal laws, against any subgrantee, contractor, subcontractor, or supplier who is qualified to perform the work to which this agreement relates.

e. in any manner discriminate against employees by reason of participation in or decision to refrain from participating in labor activities protected under the Public Employee Relations

Act, Pennsylvania Labor Relations Act, or National Labor Relations Act, as applicable, and to the extent determined by entities charged with the Acts’ enforcement and shall comply with any provision of law establishing organizations as employees’ exclusive representatives.

3. Establishment of Grantee Policy. The Grantee shall establish and maintain a written nondiscrimination and sexual harassment policy that complies with the applicable law and these Nondiscrimination/Sexual Harassment provisions and shall inform its employees in writing of the policy. The policy must contain a provision that states that sexual harassment will not be tolerated and employees who practice it will be disciplined. For the entire period of this agreement, the Grantee shall: (1) post its written nondiscrimination and sexual harassment policy or these Nondiscrimination/Sexual Harassment provisions conspicuously in easily accessible and well-lighted places customarily frequented by employees at or near where the grant activities are performed; or (2) provide electronic notice of the policy or this clause to its employees not less than annually.

4. Notification of Violations. The Grantee’s obligations pursuant to these provisions are ongoing from the effective date and through the termination date of the agreement. Accordingly, the

Grantee shall notify the Commonwealth if, at any time during the term of this agreement, it becomes aware of any actions or occurrences that would result in violation of these provisions.

5. Cancellation or Termination of Agreement. The Commonwealth may cancel or terminate this agreement and all money due or to become due under this agreement may be forfeited for a violation of the terms and conditions of these Nondiscrimination/Sexual Harassment provisions. In addition, the granting agency may proceed with debarment or suspension and may place the Grantee in the Contractor Responsibility File.

6. Subgrant Agreements, Contracts, and Subcontracts. The Grantee shall include these

Nondiscrimination/Sexual Harassment provisions in its subgrant agreements, contracts, and subcontracts with all subgrantees, contractors, and subcontractors providing goods or services under this agreement. The incorporation of these provisions in the Grantor’s subgrants, contracts, or subcontracts does not create privity of contract between the Commonwealth and any subgrantee, contractor, or subcontractor, and no third-party beneficiaries are created by those provisions. If the Grantee becomes aware of a subgrantee’s, contractor’s, or subcontractor’s violation of these provisions, the Grantee shall use its best efforts to ensure the subgrantee’s, contractor’s, or subcontractor’s compliance with these provisions.

Signature: ____________________________________

Print Name: __________________________________

Date: ________________________________________

STANDARD OF QUALITY AND WARRANTY STATEMENT

GENERAL CONSTRUCTION

STANDARD OF QUALITY: The various materials and products specified in the specifications by name or description are given to establish a standard of quality and of cost for bid purposes. It is not the intent to limit the bidder, the bid, or the evaluation of the bid to any one material or product specified but rather to describe the minimum standard. When proprietary names are used, they shall be followed by the words "or alternatives of the quality necessary to meet the specifications." A bid containing an alternative, which does not meet the specifications, may be declared non-responsive. A bid containing an alternative may be accepted but, if an award is made to that bidder, the bidder will be required to replace any alternatives which do not meet the specifications.

Contractors Warranty Statement: For a period of one year, following completion Contractor shall warranty all materials and workmanship for the Owner. Any defective materials or workmanship shall be repaired/replaced at no cost to the Owner. Contractor shall also furnish all product warranty information to the Owner upon completion of project.

Signature: ____________________________________

Print Name: __________________________________

Date: ________________________________________

GENERAL CONDITIONS

The General Conditions of this Contract and the corresponding Supplementary General Conditions, are the American Institute of Architects' Document A201/CMA 2017, THE GENERAL

CONDITIONS OF THE CONTRACT FOR CONSTRUCTION, 2017 edition, hereinafter referred to as the "General Conditions". This document is hereby specifically made a part of the Contract

Documents with the same force and effect as though set forth in full herein.

References to the "Contractor", as in Article 3 of the General Conditions or in any other portions of the contract documents, shall be defined as the Prime.

Reference to "Subcontractor" shall be defined as suppliers, installers, or any parties performing work for the Prime Contractor related to the project.

SUPPLEMENTARY GENERAL CONDITIONS

THE GENERAL CONDITIONS:

The General Conditions of this Contract is the American Institute of Architects' Standard Document

No. A 201, "General Conditions of the Contract for Construction", 2017 Edition, herein after referred to as the "A.I.A. General Conditions", which document is hereby specifically made a part of the contract Documents with the same force and effect as though set forth in full. Copies of the

General Conditions of the Contract, if not attached hereto, are on file and may be referred to at the office of the Engineer.

THE SUPPLEMENTARY GENERAL CONDITIONS:

The following supplements modify, change, delete from, or add to the “General Conditions of the

Contract for Construction", A.I.A. Document A 201, 2017 Edition. Where any article of the General

Conditions is modified or any paragraph, sub paragraph or clause thereof is modified or deleted by these supplements, the unaltered provisions of that article, paragraph, sub paragraph or clause shall remain in effect.

2.2 Information and services required of the Owner.

2.2.5 Delete in its entirety and substitute the following:

2.2.5 The successful Contractor will be furnished free of charge one (1) set of drawings and one (1) copy of the project manual. Any additional drawings or project manuals shall be paid for by the General Contractor, including all shipping & handling costs with no additional costs to the Owner.

8.2 Progress and Completion

8.2. Add the following clause:

8.2.4 It is mutually agreed by and between the parties hereto that time shall be an essential part of this contract and that in case of the failure on the part of the Contractor to complete the contract within the time specified and agreed upon, the Owner will be damaged thereby;

and the amount of said damages, inclusive of expenses for inspection, superintendence and necessary traveling expenses, being difficult if not impossible of definite ascertainment and proof, it is hereby agreed that the reasonable amount of such damages shall be $500.00 for each and every working days' delay in finishing the work in excess of the number of working days prescribed in the Contract Documents; and the Contractor hereby agrees that said sum shall be deducted from monies due the Contractor under the Contract or if no money is due the Contractor, the Contractor hereby agrees to pay to the Owner as liquidated damages, and not by way of penalty, such total sum as shall be due for such delay.

9.3 Application for payment.

9.3.3 Add the following clause:

9.3.1.3 10% cumulative retainage will be withheld through 50% completion. Thereafter, additional retainage will not be held for properly completed and billed work. No refund of retainage will occur at 50% completion.

9.6 Progress Payments

9.6.1 Add the following clause:

9.6.1.1 Owner shall make payment to the Contractor upon release of funds from grant agency. Payment is expected within 45 days of payment certification.

11.1 Contractor's Liability Insurance.

11.1.2 Add the following clause:

11.1.2.1 The Insurance required by sub paragraph 11.1.1 shall be written for not less than the following, or greater if required by law: For the duration of the Contract, the Contractor and each Sub-Contractor shall, at their own expense, purchase and maintain in a company or companies licensed to do business in the Commonwealth of Pennsylvania, Statutory

Workmen's Compensation, including Occupational Disease as required by the laws of the

Commonwealth of Pennsylvania and also Employer's Liability Insurance with limits not less than the following:

1. State - Statutory - Amounts and coverage as required by the laws of the

Commonwealth of Pennsylvania.

2. Applicable Federal - (e.g. Longshoreman's) - Statutory

3. Employer's Liability - $1,000,000.00 each accident.

For the duration of this contract, the Contractor and each Sub-Contractor, at their own expense, purchase and maintain in a company or companies licensed to do business in the Commonwealth of Pennsylvania, Personal Injury Liability Insurance, including coverage for False Arrest, Libel and

Wrongful Eviction, with limits not less than the following:

Personal Injury Liability:

$1,000,000.00 each occurrence;

$1,000,000.00 aggregate.

For the duration of this Contract, the Contractor and each Sub-Contractor shall, at their own expense, purchase and maintain in a company or companies licensed to do business in the

Commonwealth of Pennsylvania, Comprehensive Automobile Liability Insurance, including coverage for accidents related to operation of motor vehicles owned, non-owned, or leased, with limits not less than the following:

Bodily Injury Liability:

$1,000,000.00 each person;

$1,000,000.00 each accident.

$1,000,000.00 each occurrence.

Property Damage Liability: $ 500,000.00 each accident.

Bodily Injury & Property Damage (Combined Single Limit):

Each Accident - $1,000,000.00

Builders Risk Insurance

Total value of the project on a replacement cost basis

For the duration of this contract, the Contractor and each Sub-Contractor shall, at their own expense, purchase and maintain in a company or companies licensed to do business in the

Commonwealth of Pennsylvania, Comprehensive General Liability Insurance (including Premises

Operations, Builders Risk, Independent Contractors Protective, Products Stored on Site and

Completed Operations, Broad Form Property Damage, including coverage for Explosion, Collapse, and Underground; Owner’s and Contractors Protective adding the Owner, Engineer and their representatives as additional insured; Blanket Contractual; and Personal Injury, Contractual

Liability shall Hold Harmless the Owner in the event of claims arising out of the construction work) with limits not less than the following:

Bodily Injury Liability:

Each Person: $ 1,000,000.00

Each Occurrence: $ 1,000,000.00

Each Accident: $ 1,000,000.00

Annual Aggregates: $ 1,000,000.00 - Products & Completed Operations

Personal Injury: (with Employment Exclusion Deleted)

Annual Aggregates: $ 1,000,000.00

Bodily Injury, Personal Injury and Property Damage (Combined Single Limit):

Each Occurrence: $ 1,000,000.00

Annual Aggregates: $ 1,000,000.00

Contractual Liability: Same limits as above.

Public Utility Insurance:

Broad Form Property Damage Liability- To include "XCU" coverage:

x- Explosion, c-Collapse, u-underground

Completed Operations Products Liability:

Same limits as above and continue coverage in force for (1) year after issuance of final Certificate for Payment. The Contractor shall furnish evidence of continuation of such insurance to the Owner.

The Contractor shall carry additional insurance on his Comprehensive General Liability policy to cover the Owner, Engineer and their representatives, at limits of the policy.

The Comprehensive General Liability and Automobile Liability may be covered by individual policies for the full limits or for lower primary coverage limits with the remaining limits provided by an excess umbrella liability policy.

Any insurance policy provided by the Contractor shall carry the provisions of no cancellation without 30 days written notice. In the event that the policy is canceled, the Contractor shall provide the Owner evidence of continued coverage under a new policy before work will be allowed to continue. No additional compensation will be paid to the Contractor nor contract time allowed for delays or additional costs incurred in providing new policies.

Any policies which expire during the Contract period shall be renewed through at least the Contract period and evidence of the renewal shall be provided to the Owner.

Before commencing with any work, the Contractor shall submit evidence of coverage required above to the Engineer & Owner for review and approval.

11.3 Property Insurance.

11.3.6 Amplify the paragraph by adding the following: "The policies shall be endorsed to include such waivers of subrogation".

14.2 Termination by Owner.

14.2.1 Delete the following words: "is adjudged a bankrupt, or if he makes a general assignment for the benefit of his creditors, or if a receiver is appointed on account of his insolvency, or if he"

Add a new Article after Article 14 of the General Conditions which is to be read as follows:

Article 15 Applicable Laws and Regulations:

15.1 General:

Compliance with the following laws and regulations are mandatory on this project.

15.2 Federal Occupational Safety and Health Act of 1970:

The Contractor shall comply with the current regulations of this Act, and perform all reporting and recording requirements.

15.3 Pennsylvania Act 38 (1991):

This act requires each Contractor who intends to perform excavation or demolition on this project in a site within a political sub-division to ascertain the location and type of utility lines and pipes at each site notify the utility companies within a minimum of three (3) working days in advance of performing any excavation or demolition.

LIST OF DRAWINGS

T-1 Title Sheet

G100 Typical Elevations

A000 Removal Floor Plan

A100 Partial First Floor Plan and Details

A400 Door and Window Types

A600 Furniture Plans and Elevations

A701 Finish Floor Plans

A800 Ceiling Plans

P-0 Plumbing Cover Sheet

P-1 Plumbing Floor Plans & Schedules

M-0 Mechanical Cover Sheet

M-1 Mechanical Floor Plans

M-2 Mechanical Schedules & Schematics

M-3 Mechanical Details

E-0 Electrical Cover Sheet

E-1 Electrical Demolition Plan

E-2 Electrical Power And Lighting Plan

E-3 Electrical One-Line Diagram

E-4 Electrical Schedules

E-5 Electrical Details

E-6 Electrical Details

Appendix A

Prevailing Wage Rate Schedule

File details come from the government source that posted it. Updated .