- Addendum #1 and Addendum #2 for the Liberty County Development Authority Tradeport West Road projec
- Solicitation number
- PE-68915-NONST-2026-000000002
- Issued by
- Lee County, Georgia
About this file
This Addendum #2 document issued by the Liberty County Development Authority on April 30, 2026, addresses questions and clarifications for the Tradeport West Way Road Improvements project (T&H Project No. J-24765.0010). The project encompasses site development including road improvements along US Highway 17, storm drainage systems, sanitary sewer infrastructure, water distribution systems, parkway improvements with asphalt paving and signage, and miscellaneous demolition and restoration work. The scope includes clearing and grubbing of 19 acres, excavation of 46,700 cubic yards, fine grading of 90,000 square yards, installation of storm pipe (30" and 36" RCP), sanitary sewer pipe (12" PVC), water main pipe (12" PVC and 6" DIP), asphalt paving with multiple course types totaling approximately 26,000 square yards, curb and gutter installation, and thermoplastic pavement markings. Prospective bidders were required to submit questions by 12:00 PM on Friday, May 1, 2026, with proposals due on Monday, May 11, 2026. Site visits were available on April 30, 2026 from 10 AM to 2 PM. The project must be completed by December 15, 2026, with failure to meet this deadline subject to liquidated damages. Addendum #2 clarifies bid schedule items, resolves conflicts in construction drawings, and revises several plan sheets (CO, GDOT1.1-GDOT1.5) based on agency comments from GDOT.
The proposal evaluation includes multiple scoring categories: Related Experience (up to 30 points), Construction Management Capability (up to 35 points), Contract Price Provisions (up to 95 points), Operational Capability (up to 25 points), Adequacy and Ability of Professional Personnel (up to 15 points), Minority Employment Provisions (up to 40 points), and Local Preference (up to 10 points), with a minimum responsible offeror threshold of 645 aggregate points. Proposal security of 10 percent of the total proposal price is required. Key clarifications provided include: no on-site burning of clearing debris (chip and haul only), no requirement for Builder's Risk Insurance, no Buy American requirements, no Davis Bacon wage rates applicable, no contractor responsibility for third-party testing or water quality monitoring costs (Development Authority covers these), and no requirement for borrow or waste dirt materials on-site. The project was advertised on April 10, 2026, and bidders must acknowledge receipt of Addendum #2 on the proposal form or risk rejection as non-responsive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24765_0010 Addendum _1 with attachments.pdf | ||
| Delete event on GA Procurement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Z:\24765\24765.0010\Documents\Construction\Bid\Addenda\Addendum #2\24765.0010 Addendum #2.doc
TRADEPORT WEST WAY– ROAD IMPROVEMENTS
PREPARED FOR:
LIBERTY COUNTY DEVELOPMENT AUTHORITY
T&H PROJECT NO.
J–24765.0010
ADDENDUM NO. 2 April 30, 2026
GENERAL
This Addendum has been issued on behalf of Liberty County Development Authority. The following information should be considered by prospective bidders in preparation of their proposals and is hereby incorporated into the Proposal Documents. Bidders shall be responsible for acknowledging receipt of this addendum in the Proposal Form, Document 00313. Failure to do so will result in the proposal being considered non–responsive.
Questions and requests for information must be submitted no later than 12:00 PM, Friday, May 1, 2026.
PART I – QUESTIONS AND CLARIFICATIONS:
A. QUESTIONS:
1. Storm Drainage Section Bid Schedule- 4" subgrade drain is listed as a bid item with no quantity and not shown on construction drawings. Please clarify.
Response: Quantity has been added to the bid form.
2. Retrofit Slotted Board Dam - Retrofits are shown on the construction drawings however not shown on the bid schedule. Can a line item be added to the bid schedule?
Response: This has been updated in the plans to show only one RT-B.
3. Sanitary Sewer - 2" Force Main Tie into new Manhole. Construction drawings do not show this line item. Please clarify the location and if air release valves are required on this new line.
Response: This is shown on the plans see sheet C7.2.
4. Can clearing debris be burned onsite?
Response: No burning on site, chip and haul only.
5. Is the unit of measure correct for the Fine Grading line item on the bid schedule?
Response: The fine grading unit has been revised to SY.
6. SC-7 (c) states that the contract must have Builder’s Risk Insurance (Fire and
Extended Coverage). Will this be required? This is unusual to be required for a roadway project and can add unnecessary cost to the project.
Response: Builder’s Risk Insurance is not required.
7. There are no bid items for the Emergency Spillway, Slotted Board Dam, 40’ of 24”
RCP and (2) 24” FES. Will these be added?
Response: A line item has been added.
Liberty County Development Authority
Tradeport West Way– Road Improvements
Addendum #2
April 30, 2026
8. The ‘4” Subgrade Drain’ has a quantity of 0 in the bid schedule. Can you place a quantity on this item?
Response: See response to question 1.
9. The bid item for ‘2” Force Main Tie into New Manhole’ has a quantity of 13,400
LF? Should this quantity be 34’ instead?
Response: This has been revised to match the correct length.
10. Is there anywhere on site to borrow or waste dirt material as needed?
Response: No
11. Will the Contractor be responsible to pay for all 3rd party testing?
Response: No, the Development Authority will handle this cost.
12. Will the Contractor be responsible for all water quality monitoring, inspections and sampling?
Response: No, the Development Authority will handle this cost.
14. For Fine Grading under the Sitework section, should this be in Square Yards or
Cubic Yards?
Response: Please see response to Question #5.
15. Is this a Buy American project for materials?
17 Is this a Davis Bacon wage rate project?
18. When can we go out and visit the site?
Response: Per Addendum #1, the site was opened on April 30th from 10am-2pm.
19. Based on the pre-proposal conference, this project must be completed by
December. Is December 15 the hard date or is by the end of December?
Response: The project must be completed by December 15, 2026.
29. Can I get the actual bid date? Bonding company needs this to process our bid bond. There were a couple of dates listed.
Response: This project was advertised on Friday, April 10, 2026. The RFP is due on
Monday, May 11, 2026.
Liberty County Development Authority
Tradeport West Way– Road Improvements
Addendum #2
April 30, 2026
PART II – CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS:
The Proposal Documents shall be changed in the following respects:
SECTION 00313 – PROPOSAL FORM
1. Section 00313 has been revised. Delete and replace with the attached Section 00313 –
“Proposal Form”.
2. Bidder must use the enclosed form. NO OTHER FORM SHALL BE ACCEPTED.
PART III – DRAWINGS:
Based on agency comments (GDOT), the drawings have been revised to include revisions to the following plan sheets. Delete and replace with the attached revised:
CO – Cover Sheet
GDOT1.1 – GDOT Plan – Highway 17
GDOT1.2 – GDOT Plan – Highway 17
GDOT 1.3 – GDOT Plan – Highway 17
GDOT 1.4 – GDOT Details
GDOT 1.5 – GDOT Details
All other aspects of the project remain unchanged.
THOMAS & HUTTON
Felipe I. Toledo, PE
Principal / Project Manager
End of ADDENDUM NO. 2
00313 – 1 Revised per Addendum #2 issued April 30, 2026
DOCUMENT 00313
PROPOSAL FORM
REVISED PER ADDENDUM #2
PROJECT IDENTIFICATION: Tradeport West Way Road Improvements
CONTRACT IDENTIFICATION
AND NUMBER: J – 24765.0010
THIS PROPOSAL IS SUBMITTED TO: Liberty County Development Authority
1. The undersigned OFFEROR proposes and agrees, if this Proposal is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the
Proposal Price and within the Proposal Times indicated in this Proposal and in accordance with the other terms and conditions of the Contract Documents.
2. OFFEROR accepts all of the terms and conditions of the Advertisement or Notice of
Proposal and Instructions to Offerors, including without limitation those dealing with the disposition of Proposal security. This Proposal will remain subject to acceptance for 60 days after the day of Proposal opening, or for such longer period of time that OFFEROR may agree to in writing upon request of OWNER.
3. In submitting this Proposal, OFFEROR represents, as more fully set forth in the Agreement, that:
(a) OFFEROR has examined and carefully studied the Plans and Specifications for the work and contractual documents relative thereto, and has read all Technical
Provisions, Supplementary Conditions, and General Conditions, furnished prior to the opening of Proposals; that OFFEROR has satisfied himself relative to the work to be performed.
(b) OFFEROR further acknowledges hereby receipt of the following Addenda:
ADDENDUM NO. DATE
(c) OFFEROR has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work.
(d) OFFEROR is familiar with and is satisfied as to all federal, state and local Laws and
Regulations that may affect cost, progress, performance and furnishing of the
Work.
(e) OFFEROR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or
00313 – 2 relating to existing surface or subsurface structure at or contiguous to the site
(except underground Facilities) have been identified in the Supplementary
Conditions. OFFEROR acknowledges that such reports and drawings are not
Contract Documents and may not be complete for OFFEROR’s purposes.
OFFEROR acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Proposal Documents with respect to Underground Facilities at or contiguous to the site. OFFEROR has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions
(surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by OFFEROR and safety precautions and programs incident thereto. OFFEROR does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Proposal for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Proposal Documents.
(f) OFFEROR is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Proposal is submitted as indicated in the Proposal Documents.
(g) OFFEROR has correlated the information known to OFFEROR, information and observations obtained from visits to the site, reports and drawings identified in the
Proposal Documents and all additional examinations, investigations, explorations, tests, studies and data with the Proposal Documents.
(h) OFFEROR has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that OFFEROR has discovered in the Proposal Documents and the written resolution thereof by ENGINEER is acceptable to OFFEROR. The Proposal
Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this
Proposal is submitted.
(i) This proposal is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation;
OFFEROR has not directly or indirectly induced or solicited any other Offeror to submit a false or sham Proposal; OFFEROR has not solicited or induced any person, firm or corporation to refrain from proposal; and OFFEROR has not sought by collusion to obtain for itself any advantage over any other Offeror or over
OWNER.
4. OFFEROR will complete the Work in accordance with the Contract Documents for those prices shown on the attached Addendum entitled Schedule of Prices (which must be completed and returned with this Proposal Form).
TOTAL PROPOSAL FOR ALL ESTIMATED PRICES – BASE PROPOSAL
(use words) (figures)
00313 – 3
Unit Prices have been computed in accordance with paragraph 11.03.B of the General
Conditions.
Item Quantity Unit Price / Unit Price
General
Mobilization 1 LS $ -
Survey and Layout 1 LS $ -
Traffic Control 1 LS $ -
Total $ -
Sitework and Erosion Control
Clearing & Grubbing 19 AC $ -
Stripping/Respread/Export of 8" of
Topsoil
1 LS $ -
Insitu Excavation/Fill 46,700 CY $ -
Fine Grading 90,000 SY $ -
Silt Fence 12,150 LF $ -
Rip-Rap with Filter Fabric 100 SY $ -
Ditch Check Dam 20 EA $ -
Construction Entrance 1 EA $ -
Temporary Cover 19 AC $ -
Permanent Cover 12 AC $ -
Cover Fertilizer 19 AC $ -
Selective Watering 19 AC $ -
Concrete Washout 1 EA $ -
Temporary Sediment Basin 9 EA $ –
Outfall Structure Retrofit 1 EA
Total $ -
Storm Drainage
Storm Manhole 2 EA $ -
Storm Pipe - 30" RCP Class III 180 LF $ -
Storm Pipe - 36" RCP Class III 360 LF $ -
30" Flared End Section 4 EA $ -
36" Flared End Section 4 EA $ -
Concrete Flumes 2 EA $ -
4” Subgrade Drain 13500 LF $ -
Total $ -
Sanitary Sewer
Sanitary Sewer Manhole (4' Dia.) 3 EA $ -
Sanitary Sewer Pipe - 12" PVC SDR-26 1,100 LF $ -
2” Force main Demo 1,210 LF $ -
2” Force main 36 LF $ -
2” Force main Tie into New Manhole 1 EA $ -
Total $ -
Water Distribution
Water Main Pipe - 12" PVC C900 300 LF $ -
Water Main Pipe - 6" DIP CL250 18 LF $ -
12" x 12" Tapping Sleeve 2 EA $ -
Water Main Tees, Fittings & Restraints 1 LS $ -
Fire Hydrant Assembly 2 EA $ -
12" Gate Valve and Box 1 EA $ -
Total $ -
Parkway Signage, Striping and Paving
Item Quantity Unit Price / Unit Price
2" Asphalt Surface Course - 12.5MM
SuperPave (Type G)
24,000 SY $ -
4" Asphalt Intermediate Course - 19
MM SuperPave (Type G)
24,000 SY $ -
12.5 MM Super Pave 165 LB/S (1.5”) 1,000 SY $ -
19MM Super Pave 220 LB/S (2”) 1,000 SY $ -
25 MM Super Pave 550 LB/S (5”) 1,000 SY $
10" Aggregate Base Course 1,000 SY $
8" Aggregate Base Course 24,000 SY $ -
4" Aggregate Base Course 700 SY $ -
Tack Coating 31,250 SY $ -
Prime Coating 31,250 SY $ -
30" Curb & Gutter 780 LF $ -
6" Concrete for Parkway Islands and
Medians
200 SY $ -
8" Concrete Pavement - 4000 PSI w/Dowel Baskets
700 SY $ -
Proof Roll 1 LS $ -
6" White Solid Lines (Pvt. Edge Lines)
Thermo
15,450 LF $ -
6" Double Yellow Solid Lines (Pvt. Edge
Lines) Thermo
14,350 LF $ -
6" White Skip Lines (Gaps Excl.)
Thermoplastic
1,210 LF $ -
10" White Solid Lines (Pvt. Edge Lines)
Thermo
515 LF $ -
10" Yellow Solid Lines (Pvt. Edge Lines)
Thermo
850 LF $ -
12" White Solid Lines (DIAG/CHEV
Lines)- Thermo
725 LF $ -
24" White Solid Lines (STOP Lines)-
Thermo
36 LF $ -
24" Yellow Solid Lines (DIAG/CHEV
Lines)- Thermo
1,400 LF $ -
White Single Arrows (LT, STRGHT, RT)
Thermo.
16 EA $ -
Permanent Traffic Signage 1 LS $ -
Miscellaneous
2” Mill and Over-layment of Existing
Asphalt Pavement to Proposed Grade for Speedway Driveway
4,600 SY $ -
Sawcut Existing Driveway Pavement
Edge for Speedway Driveway
2,380 LF $ -
Demolish and Replace Existing Curb and Gutter to Proposed Grade
190 LF $ -
Total Cost
OFFEROR acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparing Proposals, and final payment for all Unit Price Proposal items will be based on actual quantities determined as provided in the Contract Documents.
5. COMPLETION
5.1 Tradeport West Way Road Improvements must be completed by December 15, 2026.
6. OFFEROR accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.
7. The following documents are attached to and made a condition of this Proposal:
(a) Required Proposal Security in the form of l0% of the Proposal Total Price.
(b) The Addendum attached hereto and entitled Addendum to Proposal Form –
Additional Evaluation Factors, and all data, materials and information supporting the same.
(c) That document entitled Minority Employment Provisions and all schedules, lists, certifications, forms and documents made a part thereof, as well as all data, materials and information supporting the same.
(d) All other forms, documents, materials, and other information required to be made a part of this Proposal Form, as indicated herein or in the Instructions to Offerors.
8. The undersigned further agrees that in case of failure on his part to execute the said contract and the Bond within fifteen (15) consecutive calendar days after written notice being given of the award of the contract, the check or proposal bond accompanying this proposal, and the monies payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure, otherwise, the check or proposal bond accompanying this proposal shall be returned to the undersigned.
9. Communications concerning this Proposal shall be addressed to:
Thomas & Hutton
50 Park of Commerce Way
Savannah, GA 31405
Attn: Felipe Toledo, PE toledo.f@tandh.com mailto:toledo.f@tandh.com
00313 – 2
Terms used in this Proposal which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions or Instructions.
SUBMITTED on , 2026.
OFFEROR’S NAME
BY: ________
NAME: _____________________________
TITLE: _____________________________
ADDRESS:
GA Contractor License No. ___
_____________________________ GA Utility Contractor License No. __
Telephone: ____________________
Facsimile: _____________________
Email: _______________________
00313 – 3
ADDITIONAL EVALUATION FACTORS
PROJECT IDENTIFICATION: Tradeport West Way Road Improvements
CONTRACT IDENTIFICATION
AND NUMBER: J – 24765.0010
THIS PROPOSAL IS SUBMITTED TO: Liberty County Development Authority
All Offerors are required to provide written statements in response to each of the following areas of inquiry. Offerors are encouraged to provide as much information as will allow Owner to make an informed decision in evaluating each such evaluation factor. Points will be awarded to each response provided as indicated in the Instructions to Offerors. Responses are not limited to the space furnished, but may be supplemented by additional response pages, information and materials. Any and all such additional pages, information and materials should be attached to and otherwise made a part of this form.
A. RELATED EXPERIENCE (up to 30 points) (please identify previous projects comparable in scope, nature, and complexity, as well as whether such projects were timely and successfully completed, including reference contact information; also identify projects undertaken for governmental agencies within the last three (3) years):
B. CONSTRUCTION MANAGEMENT CAPABILITY (up to 35 points) (please describe management efforts proposed to be undertaken so as to ensure efficient, cost–effective, safe and timeliness, to include, without limitation, analysis of personnel/trade/contractor/material availability in the market, quality control process, method of supervision, and warranty; please describe, without limitation, your present workload and what resources are to be made available or additional efforts undertaken to ensure such timely delivery, to include, without limitation, measures which may minimize dispute or aid in dispute resolution):
C. CONTRACT PRICE PROVISIONS (up to 95 points)
D. OPERATIONAL CAPABILITY (up to 25 points) (please describe your current financial capacity and resources; Offeror should be prepared to furnish materials in support of the same upon request
(e.g. certificates of accountants or bankers, financial statements, etc.):
E. ADEQUACY AND ABILITY OF PROFESSIONAL PERSONNEL (up to 15 points) (please describe your current key personnel (and in particular those key personnel assigned to the Project) and any and all appropriate data regarding the same (e.g. education, certifications, professional licenses, experience, etc.) and well as any organizational qualifications which may be relevant.
00313 – 4
F. MINORITY EMPLOYMENT PROVISIONS (up to 40 points) (please provide evidence regarding minority and female business participation goals; NOTE: Section 00900 regarding Minority
Employment Provisions and all certifications and forms made a part of said document must be completed and submitted as a part of the sealed proposal.
G. LOCAL PREFERENCE (up to 10 points) (for qualifications and evaluation criteria see Form G) Documentation must be submitted.
TOTAL POINTS
NOTE: The spaces provided above are not intended to limit the offeror’s response, and attachments for the purpose of providing a more detailed response are welcomed.
AUTHORIZATION TO INVESTIGATE: Offeror consents to and authorizes the full investigation of the information given herein or in such other forms completed in connection with this proposal and consents to representatives of Liberty County, Georgia contacting the named references, named financial institutions, and such other persons as may be needed to confirm such information, and waives any right offeror may have for such information to remain confidential.
The furnishing of false or misleading information or the intentional withholding of material facts
(as determined by the Authority in its sole discretion), shall be a reason for rejection of the proposal.
Elimination of Offerors Not Responsible. The Offeror is/is not (circle one) “responsible” as such term is defined in O.C.G.A. § 36–91–2(11). Without limiting the foregoing, the offeror shall not be deemed “responsible” if an aggregate score of at least 645 under the above “Evaluation
Factors” is not assigned. If not “responsible,” indicate reasons for such determination (which need not be inclusive or exhaustive):
Adjustments Following Negotiations. In the event negotiations are undertaken with responsive and responsible offerors, please indicate the adjustment, if any, to the Total Points assigned to the Proposal and a brief explanation of the same. The Proposal is hereby adjusted by increasing/decreasing (circle one) the Total Points assigned to the Proposal by Points.
The reason for such adjustment is as follows:
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
REV. NO. REVISION
REVISION HISTORY
BY DATE
A PER AGENCY COMMENTS MWE 02.13.2026
B PER AGENCY COMMENTS LOC 03.19.2026
C PER AGENCY COMMENTS LOC 04.14.2026
D PER AGENCY COMMENTS LOC 04.28.2026
J-
5.
TR
A
D
EP
O
RT
W
ES
T W
A Y
- P
HA
SE
SITE DEVELOPMENT PLAN
OF
TRADEPORT WEST WAY - PHASE 1
LIBERTY COUNTY, GEORGIA
PREPARED FOR:
LIBERTY COUNTY DEVELOPMENT
AUTHORITY
425 W OGLETHORPE HIGHWAY
HINESVILLE, GEORGIA 31313
DECEMBER 12, 2025
LATEST REVISION DATE : 04.28.2026
TM# 214-008, 216-001
J-24765.0010
VICINITY MAP
SCALE: 1" = 4000'
PREPARED BY:
50 Park of Commerce Way Savannah, GA 31405 p.912.234.5300 www.thomasandhutton.com
SITE
US
H
IG
HW
AY
(C
O
AS
TA
L H
IG
HW
AY
US HIGHWAY 84 (OGLETHORPE HIGHWAY)
IN
TE
RS
TA
TE
CAY
C
RE
EK
R O
AD
OAK CREEK ROAD
EXIT 76
Know what'sbelow.
before you dig.Call
R
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
CO COVER SHEET
G0.1 GENERAL NOTES
EX1.0 OVERALL EXISTING CONDITIONS & DEMOLITION PLAN
EX1.1 - EX1.5 EXISTING CONDITIONS & DEMOLITION PLAN
C1.0 OVERALL LAYOUT, SIGNAGE, AND STRIPING PLAN
C1.1 - C1.4 LAYOUT, SIGNAGE, AND STRIPING PLAN
C2.0 OVERALL PLAN & PROFILE
C2.1 - C2.9 PLAN & PROFILE
C3.1 - C3.2 HIGHWAY 17 CROSS SECTIONS
C4.1 - C4.13 TRADEPORT WEST WAY CROSS SECTIONS
C5.1 DRAINAGE PROFILES
C6.1 - C6.2 SITE DETAILS
C7.0 OVERALL WATER & SEWER PLAN
C7.1 - C7.4 WATER & SEWER PLAN
C7.5 SEWER PROFILE
C8.1 - C8.2 WATER DETAILS
GDOT1.0 OVERALL GDOT PLAN - HIGHWAY 17
GDOT1.1 - GDOT1.3 GDOT PLAN - HIGHWAY 17
GDOT1.4 - GDOT1.5 GDOT DETAILS
EC0.1 - EC0.4 EROSION CONTROL NOTES
EC1.0 OVERALL EROSION CONTROL PLAN - INITIAL
EC1.1 - EC1.5 EROSION CONTROL PLAN - INITIAL
EC2.0 OVERALL EROSION CONTROL PLAN - INTERMEDIATE
EC2.1 -EC2.5 EROSION CONTROL PLAN - INTERMEDIATE
EC3.0 OVERALL EROSION CONTROL PLAN - FINAL
EC3.1 - EC3.5 EROSION CONTROL PLAN - FINAL
EC4.1 - EC4.3 EROSION CONTROL DETAILS
http://www.thomasandhutton.com
W W
W
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG
N/F
WORKMAN, CHARLES L
PIN: 187D-032
US HIGHWAY 17 (SOUTH COASTAL HIGHWAY)
POSTED SPEED LIMIT: 55 MPH
130' RIGHT OF WAY
EXISTING
OVERHEAD
POWER
EXISTING
UNDERGROUND
GAS LINE
EXISTING OVERHEAD POWER
EXISTING POWER POLE
EXISTING WATER LINE
N/F
LIBERTY COUNTY INDUSTRIAL AUTHORITY
PIN: 214-008
N/F
TZEN, JOHN
PIN: 187D-035
N/F
BROWN, SAMUEL
PIN: 187D-034
THERMOPLASTIC PAVEMENT
MARKING ARROW
TYPE 2 WHITE (TYP.)
PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT
MARKING ARROW
TYPE 2 WHITE (TYP.)
PER GDOT DETAIL T-12A
0+
1+
2+
12' 12'
12'
12' 12'
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
250' FULL WIDTH STORAGE
6" SOLID DOUBLE YELLOW
(GDOT DETAIL T-14)
6" SOLID DOUBLE YELLOW
(GDOT DETAIL T-14)
24" SOLID YELLOW
(GDOT DETAIL T-14)
6" SKIP WHITE
(2' SEGMENT, 6' GAP)
PER GDOT DETAIL T-11A
6" SOLID WHITE
PER GDOT DETAIL T-11A
6" SOLID WHITE
PER GDOT DETAIL T-11A
130'
BEGIN GDOT
ROAD WIDENING
100' TAPER
PLEASE SEE SHEET C2.0 - C2.8
AND C3.1 - C3.2 FOR PROPOSED
GRADING / CROSS SECTIONS
OF HIGHWAY 17
1" = 20'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
5.
G
D O
T-
PL
-P R.
D W
G
A pr
8,
- 8
:5
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GDOT PLAN - HIGHWAY 17
GDOT1.1
24765.0010
NAD83 NAVD88
LIBERTY COUNTY DEVELOPMENT AUTHORITY
12.12.2025
JAB
MWE
EMD
FIT
A 02.13.2026
Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com
PER AGENCY COMMENTS MWE
GRAPHIC SCALE:
1 INCH =
20 FEET
20 10 20
M A
TC
H
LI
N
E
- S
EE
S
HE
ET
G
DO
T1 .2
PAVEMENT LEGEND
RAISED CONCRETE ISLAND
HEAVY DUTY CONCRETE - (8" CONCRETE / 4" GAB)
2" MILL AND INLAY
GDOT PAVEMENT SECTION (HIGHWAY 17)
1. ASPHALTIC CONCRETE AND BASE COURSE MATERIALS SHOULD CONFORM TO GDOT MATERIAL SPECIFICATIONS.
** SECTION 815 FOR GRADED AGGREGATE
** SECTION 828 FOR HOT MIX ASPHALTIC CONCRETE MIXTURE.
** SURFACE COURSE MAY USE 12.5 MM SUPERPAVE FOR SMOOTH SURFACE. 1
** 19 MM AND/OR 25 MM SUPERPAVE RECOMMENDED FOR THE INTERMEDIATE COURSE.
HEAVY DUTY ASPHALT - (2" SURFACE / 4" INTERMEDIATE / 8" GAB)
2. REFER TO TERRACON GEOTECHNICAL ENGINEERING REPORT.
** TERRACON PROJECT NO.
** PROVIDED BY TERRACON CONSULTANTS, INC.
1,2
3. PER GDOT PAVING SPECS ON D.O.T. R/W - PROVIDED BY GDOT - SEE GDOT PAVING SPECS LEGEND
PAVING SPECS ON D.O.T. RIGHT OF WAY
1.50"
2.00"
5.00"
10.00"
ASPHALTIC CONCRETE DOT TYPE
12.5 MM SUPERPAVE 165 LBS/SY
ASPHALTIC CONCRETE DOT TYPE
19 MM SUPERPAVE 220 LBS/SY
ASPHALTIC CONCRETE DOT TYPE
25 MM SUPERPAVE 550 LBS/SY
GDOT PAVEMENT SECTION
GRADED AGGREGATE BASE
A
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG UGG
W W
W W
2''FM2''FM2''FM2''FM
2''FM
SS SS
SS
SS
8''W 8''W
8''W 8''W
8''W
EXISTING POWER POLE
EXISTING POWER POLE
N/F
LIBERTY COUNTY INDUSTRIAL AUTHORITY
PIN: 214-008
LIBERTY COUNTY EMS STATION #2
N/F
LIBERTY COUNTY INDUSTRIAL AUTHORITY
PIN: 214-008
N/F
LECONTE, ANGELA
PIN: 187B-019
PROPOSED DRIVEWAY CENTERLINE
STA: 104+58.32
N: 651,851.65 E: 883,914.75
100'R
2'R 3'
R
2'R
3'R 2'R
APPROXIMATELY 0.7 MILES FROM
HIGHWAY 84 (OGLETHORPE HIGHWAY)
APPROXIMATELY 0.5 MILES
FROM BACONTOWN ROAD
THERMOPLASTIC PAVEMENT MARKING ARROW
TYPE 2 WHITE (TYP.) - PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT
MARKING ARROW
TYPE 2 WHITE (TYP.)
PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT
MARKING ARROW
TYPE 2 WHITE (TYP.)
PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT MARKING ARROW
TYPE 2 WHITE (TYP.) - PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT MARKING ARROW
TYPE 2 WHITE (TYP.) - PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT MARKING ARROW
TYPE 2 WHITE (TYP.) - PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT MARKING ARROW
TYPE 1 WHITE (TYP.) - PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT MARKING ARROW
TYPE 1 WHITE (TYP.) - PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT
MARKING ARROW
TYPE 2 WHITE (TYP.)
PER GDOT DETAIL T-12A
THERMOPLASTIC PAVEMENT
MARKING ARROW
TYPE 2 WHITE (TYP.)
PER GDOT DETAIL T-12A
2+
3+
4+
5+
6+
7+
12' 14' 12' 12' 16.41'
310' FULL WIDTH STORAGE
12' 12'
12'
12' 12'
12'
12' 12'
12'
12' 12'
12'
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
250' FULL WIDTH STORAGE
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
10'
4' 4'
4'
10'
4'
RAISED
CONCRETE
ISLAND
RAISED
CONCRETE
ISLAND
24" SOLID YELLOW
(GDOT DETAIL T-14)
10" SOLID YELLOW
(GDOT DETAIL T-14)
24" SOLID YELLOW
(GDOT DETAIL T-14)
10" SOLID YELLOW
(GDOT DETAIL T-14)
10" SOLID WHITE (TYP.)
12" SOLID WHITE
(GDOT DETAIL T-14)
24" THERMOPLASTIC
STOP BAR
6" SOLID DOUBLE YELLOW
(GDOT DETAIL T-14)
6" SOLID DOUBLE YELLOW
(GDOT DETAIL T-14)
24" SOLID YELLOW
(GDOT DETAIL T-14)
6" SOLID WHITE
PER GDOT DETAIL T-11A
6" SOLID WHITE
PER GDOT DETAIL T-11A
6" SOLID WHITE
PER GDOT DETAIL T-11A
10" SOLID WHITE (TYP.)
10" SOLID WHITE (TYP.)
12" SOLID WHITE
(GDOT DETAIL T-14)
6" SOLID WHITE
PER GDOT DETAIL T-11A
6" SOLID WHITE
PER GDOT DETAIL T-11A
6" SOLID DOUBLE YELLOW
(GDOT DETAIL T-14)
6" SOLID WHITE
PER GDOT DETAIL T-11A
6" SKIP WHITE
(2' SEGMENT, 6' GAP)
PER GDOT DETAIL T-11A
6" SKIP WHITE
(2' SEGMENT, 6' GAP)
PER GDOT DETAIL T-11A
LEFT
TIE EQUALITY
STA:104+58.32 (HYW 17)
STA:100+00 (TPW)
20'
24" THERMOPLASTIC
STOP BAR
10" SOLID YELLOW
(GDOT DETAIL T-14)
6" SKIP WHITE
(2' SEGMENT, 6' GAP)
PER GDOT DETAIL T-11A
10" SOLID YELLOW
(GDOT DETAIL T-14)
6" SKIP WHITE
(2' SEGMENT, 6' GAP)
PER GDOT DETAIL T-11A
US HIGHWAY 17 (SOUTH COASTAL HIGHWAY)
POSTED SPEED LIMIT: 55 MPH
130' RIGHT OF WAY
76 LF OF EXISTING
30" RCP @ 0.7 %
75 LF OF EXISTING
30" RCP @ 0.4 %
INVERT: 4.25
INVERT: 4.40
151 LF OF EXISTING
30" RCP @ 0.2 %
158 LF OF EXISTING
30" RCP @ 0.2 %
INVERT: 3.55
PLEASE SEE SHEET C2.0 - C2.8
AND C3.1 - C3.2 FOR PROPOSED
GRADING / CROSS SECTIONS
OF HIGHWAY 17
275'R
50'R
100'R
'R
1" = 20'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
5.
G
D O
T-
PL
-P R.
D W
G
A pr
8,
- 8
:5
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GDOT PLAN - HIGHWAY 17
GDOT1.2
NAD83 NAVD88
LIBERTY COUNTY DEVELOPMENT AUTHORITY
MWE
EMD
FIT
A 02.13.2026
B 03.19.2026
D 04.28.2026
PER AGENCY COMMENTS
PER AGENCY COMMENTS
PER AGENCY COMMENTS MWE
LOC
LOC
20 FEET
20 10 20
M A
TC
H
LI
N
E
- S
EE
S
HE
ET
G
DO
T1 .1
M A
TC
H
LI
N
E
- S
EE
S
HE
ET
G
DO
T1 .3
PAVEMENT LEGEND
RAISED CONCRETE ISLAND
HEAVY DUTY CONCRETE - (8" CONCRETE / 4" GAB)
2" MILL AND INLAY
GDOT PAVEMENT SECTION (HIGHWAY 17)
1. ASPHALTIC CONCRETE AND BASE COURSE MATERIALS SHOULD CONFORM TO GDOT MATERIAL SPECIFICATIONS.
** SECTION 815 FOR GRADED AGGREGATE
** SECTION 828 FOR HOT MIX ASPHALTIC CONCRETE MIXTURE.
** SURFACE COURSE MAY USE 12.5 MM SUPERPAVE FOR SMOOTH SURFACE. 1
** 19 MM AND/OR 25 MM SUPERPAVE RECOMMENDED FOR THE INTERMEDIATE COURSE.
HEAVY DUTY ASPHALT - (2" SURFACE / 4" INTERMEDIATE / 8" GAB)
2. REFER TO TERRACON GEOTECHNICAL ENGINEERING REPORT.
** TERRACON PROJECT NO.
** PROVIDED BY TERRACON CONSULTANTS, INC.
1,2
3. PER GDOT PAVING SPECS ON D.O.T. R/W - PROVIDED BY GDOT - SEE GDOT PAVING SPECS LEGEND
PAVING SPECS ON D.O.T. RIGHT OF WAY
1.50"
2.00"
5.00"
10.00"
ASPHALTIC CONCRETE DOT TYPE
12.5 MM SUPERPAVE 165 LBS/SY
ASPHALTIC CONCRETE DOT TYPE
19 MM SUPERPAVE 220 LBS/SY
ASPHALTIC CONCRETE DOT TYPE
25 MM SUPERPAVE 550 LBS/SY
GDOT PAVEMENT SECTION
GRADED AGGREGATE BASE
D
OHP OHP OHP OHP OHP OHP OHP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
US HIGHWAY 17 (SOUTH COASTAL HIGHWAY)
POSTED SPEED LIMIT: 55 MPH
130' RIGHT OF WAY
N/F
LIBERTY COUNTY INDUSTRIAL AUTHORITY
PIN: 214-008
N/F
LIBERTY COUNTY INDUSTRIAL AUTHORITY
PIN: 214-008
N/F
FELDER, HAROLD C & FELDER, TINA MARIE
PIN: 214-005
THERMOPLASTIC PAVEMENT
MARKING ARROW
TYPE 2 WHITE (TYP.)
PER GDOT DETAIL T-12A
7+
8+
9+
0+
1+
1+
.8
100' BAY TAPER
330' APPROACH & DEPARTURE TAPER
310' FULL WIDTH STORAGE
12'
12' 12'
12'
12'
12' 12'
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
2' PA
V
ED
SHO
ULD
ER
6" SOLID WHITE
PER GDOT DETAIL T-11A
6" SOLID DOUBLE YELLOW
(GDOT DETAIL T-14)
6" SOLID WHITE
PER GDOT DETAIL T-11A 6" SOLID DOUBLE YELLOW
(GDOT DETAIL T-14)
6" SOLID DOUBLE YELLOW
(GDOT DETAIL T-14)
6" SKIP WHITE
(2' SEGMENT, 6' GAP)
PER GDOT DETAIL T-11A 24" SOLID YELLOW
(GDOT DETAIL T-14)
6" SOLID WHITE
PER GDOT DETAIL T-11A
6" SOLID WHITE
PER GDOT DETAIL T-11A
130'
PLEASE SEE SHEET C2.0 - C2.8
AND C3.1 - C3.2 FOR PROPOSED
GRADING / CROSS SECTIONS
OF HIGHWAY 17
1" = 20'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
5.
G
D O
T-
PL
-P R.
D W
G
A pr
8,
- 8
:5
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GDOT PLAN - HIGHWAY 17
GDOT1.3
NAD83 NAVD88
LIBERTY COUNTY DEVELOPMENT AUTHORITY
MWE
EMD
A 02.13.2026
PER AGENCY COMMENTS MWE
20 FEET
20 10 20
M A
TC
H
LI
N
E
- S
EE
S
HE
ET
G
DO
T1 .2
PAVEMENT LEGEND
RAISED CONCRETE ISLAND
HEAVY DUTY CONCRETE - (8" CONCRETE / 4" GAB)
2" MILL AND INLAY
GDOT PAVEMENT SECTION (HIGHWAY 17)
1. ASPHALTIC CONCRETE AND BASE COURSE MATERIALS SHOULD CONFORM TO GDOT MATERIAL SPECIFICATIONS.
** SECTION 815 FOR GRADED AGGREGATE
** SECTION 828 FOR HOT MIX ASPHALTIC CONCRETE MIXTURE.
** SURFACE COURSE MAY USE 12.5 MM SUPERPAVE FOR SMOOTH SURFACE. 1
** 19 MM AND/OR 25 MM SUPERPAVE RECOMMENDED FOR THE INTERMEDIATE COURSE.
HEAVY DUTY ASPHALT - (2" SURFACE / 4" INTERMEDIATE / 8" GAB)
2. REFER TO TERRACON GEOTECHNICAL ENGINEERING REPORT.
** TERRACON PROJECT NO.
** PROVIDED BY TERRACON CONSULTANTS, INC.
1,2
3. PER GDOT PAVING SPECS ON D.O.T. R/W - PROVIDED BY GDOT - SEE GDOT PAVING SPECS LEGEND
PAVING SPECS ON D.O.T. RIGHT OF WAY
1.50"
2.00"
5.00"
10.00"
ASPHALTIC CONCRETE DOT TYPE
12.5 MM SUPERPAVE 165 LBS/SY
ASPHALTIC CONCRETE DOT TYPE
19 MM SUPERPAVE 220 LBS/SY
ASPHALTIC CONCRETE DOT TYPE
25 MM SUPERPAVE 550 LBS/SY
GDOT PAVEMENT SECTION
GRADED AGGREGATE BASE
A
N.T.S
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
5.
G
D O
T- D
T.
D
W G
A pr
8,
- 8 :5
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GDOT DETAILS
GDOT1.4
NAD83 NAVD88
LIBERTY COUNTY DEVELOPMENT AUTHORITY
MWE
EMD
D 04.28.2026
PER AGENCY COMMENTS LOC
D
1" = 1'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
5.
G
D O
T- D
T.
D
W G
A pr
8,
- 8 :5
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GDOT DETAILS
GDOT1.5
NAD83 NAVD88
LIBERTY COUNTY DEVELOPMENT AUTHORITY
MWE
EMD
| 24765.0010 - Tradeport West Way Revised Plans per Addendum #2.pdf |
| Sheets and Views |
| CO COVER SHEET |
| GDOT1.1 GDOT PLAN - HIGHWAY 17 |
| GDOT1.2 GDOT PLAN - HIGHWAY 17 |
| GDOT1.3 GDOT PLAN - HIGHWAY 17 |
| GDOT1.4 GDOT DETAILS |
| GDOT1.5 GDOT DETAILS |
File details come from the government source that posted it. Updated .