Supplement to the Statement of work.docx

DOCX document 13 KB Posted

Attached to
Remove and replace AHU, humidity control, temperature & pressure relationships in accordance with the statement of work
Solicitation number
246-22-Q-0047
Issued by

About this file

This solicitation is for the removal and replacement of an air handling unit and associated humidity control and temperature and pressure systems at the Claremore Indian Hospital in accordance with the attached statement of work. The contractor shall replace air handling unit 2A to properly control humidity and maintain temperature and pressure relationships in a sterile supplies storage area. The period of performance is 90 calendar days from notice to proceed. A site visit is scheduled for February 4th, 2022 and questions are due by February 11th. Quotes are due by February 25th. The solicitation is set aside for small businesses with a NAICS code of 238220 and size standard of $16.5 million. The quote shall include a firm fixed price, technical specifications meeting the statement of work, past performance examples, and bid bonds if over $35,000. Award will be made to the responsible, responsive offeror providing the lowest reasonable price and meeting all technical requirements. The solicitation is issued by the Department of Health and Human Services Indian Health Service.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supplement to the Statement of work.

1) It appears from prints that there are 2”, 1 1/2”, 1 ¼”, and ½” domestic cold water pipes in Dietary above the hard ceiling directly west of the AHU locations from which to get water for the humidifiers. There may be branch lines in the corridors that are closer, but the print isn’t clear.

2) It is roughly a 55-60ft run from west to east for that water. This does not include any vertical runs.

3) After reviewing the CADs, it appears that the worst case total piping length from the main heating water headers to AHU2A is approximately 70 – 75 ft. A 41 ft run from header to the south, intersecting with the centerline of the air handlers and then 27 ft east to the west face of AHU2A.