SOW-CISCO.docx

DOCX document 21 KB Posted

Attached to
D1 Network Connectivity-Pawnee Indian Health Center
Solicitation number
246-20-Q-0208
Issued by

View the file

Other files

File Type Posted
MB-BASEMENT-PAWNEE-FLOOR PLAN.pdf PDF
MB-1STFLOOR-PAWNEE-FLOOR PLAN.pdf PDF
Pawnee_Outdoor_Coverage_Map_Signal_Strength (002).png PNG image
Questions.Cisco.docx DOCX document
SOW-CISCO.docx DOCX document
sf 1449- CISCO FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of work Pawnee Indian Health Center September 2020 A. SERVICES: The Contractor shall provide D1 network connectivity to the Pawnee Indian Health Center so it integrates with existing network.

B. SPECIFICATIONS

Contractor shall provide:

1. Install 12 Cisco catalyst 9120AX Access Points & supporting hardware and brackets.

2. Install 4 Cisco 2.4 Ghz/5 Ghz 13 dBi Patch Antenna, 4 port & supporting hardware and brackets

3. Install 1 Cisco Catalyst 9800-L Wireless Controller Fiber Uplink & supporting hardware.

4. Install 1 SNTC-8X5WNBD Cisco Catalyst 9800-L Wireless Controller & supporting hardware.

5. Install/Run/terminate all applicable cabling infrastructure.

6. Configure Cisco hardware so it is fully functional with existing IHS network equipment.

7. Contractor will include 1 year Cisco licenses and agreements for all hardware installed.

8. Contractor will install applicable in designated IT room(s) in Pawnee Indian Health Center, provide patch panel cables from panel to switch and any additional power requirements if applicable. Will supply hardware and brackets during installation project. Will install wireless Access points at specified locations and insure extended wireless signal to the front of the building and north side and that it has strong enough usability for health center operations. Contractor will interface Wi-Fi to the existing network via existing fiber optic cable.

C. PERIOD OF PERFORMANCE: 30 days from the award date

D. WORK SCHEDULE: Contractor will perform installation of new hardware during normal operation hours 8:00AM-4:30PM CST Monday thru Friday. Unless prior approval is obtained from facility

E. QUALIFICATIONS:

1. Programming Certifications

2. Minimum of two years of experience with CISCO technologies