Questions.Cisco.docx
DOCX document 13 KB Posted
- Solicitation number
- 246-20-Q-0208
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MB-BASEMENT-PAWNEE-FLOOR PLAN.pdf | ||
| MB-1STFLOOR-PAWNEE-FLOOR PLAN.pdf | ||
| Pawnee_Outdoor_Coverage_Map_Signal_Strength (002).png | PNG image | |
| SOW-CISCO.docx | DOCX document | |
| SOW-CISCO.docx | DOCX document | |
| sf 1449- CISCO FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions
1. Do you have building plans with the requested AP locations?
I have floor plans with the outside designated, the internal that’s up to the vendor for placement and to attenuate / increase signal with number of access points listed. (see attached pics)
1. I also would like a clarification on the SOW. Will we need to provide and install all of the equipment? Or are you requesting installation and integration services only?
provide all hardware, installation and interfacing with our current network configuration.
File details come from the government source that posted it. Updated .