Additional Questions/Answers

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment to IFB/2462013C0017, Sasakwa RWD Improvements Sasakwa Rural Water District Improvements (Pump house and Distribution Line Construction): Contractors On-Site Pre-Bid Construction Meeting on Wednesday, July 10th, 2013 at Sasakwa City Hall.

Contractor Questions Asked Since Pre-Bid Construction Meeting on July 10th, 2013

1. Q (Contractor): What is the size and height of the pump house?

A (IHS): The size of the pump house is 16ft x 24ft and the ceiling height of the pump house is 8ft.

2. Q (Contractor): What are the current water operator and assistant water operator’s phone number?

A (IHS): Abe Davis: 405-777-8801 davisabe44@yahoo.com Dexter Postoak: 405-584-1943 dexterpostoak@yahoo.com

3. Q (Contractor): Can you recommend at Pump House Builder and Electrical Contractor?

A (IHS): No, we cannot recommend a Pump House Builder or Electrical Contractor.

4. Q (Contractor): In Section 1.01, 3, a (page 194) of the specifications it states “Provide a minimum of 30 GPM with a discharge pressure of 50 psi at the total dynamic head of the system.” What is the TDH?

A (IHS): The Total Dynamic Head (TDH) is 460ft.

5. Q (Contractor): In Section 2.01, S, (pages 218-219) of the specifications the flow meter is listed. Is it a turbine meter or an ultrasonic meter?

A (IHS): The flow meter is a Turbine Meter.