FW: Pawnee IHC - X-Ray Modification for CT on Mech & HVAC SOW
| From |
| Gonzalez, Hugo (IHS/OKC) |
| To |
| Wallace, Joseph W. (IHS/OKC) |
| Cc |
| Perkins, Judy A (IHS/OKC) |
| Recipients |
| Joseph.Wallace@ihs.gov; Judy.Perkins@ihs.gov |
Joe
Re-sending to your IHS e-mail because I accidently sent to your personal e-mail.
Hugo Gonzalez, M.S., P.E.
CDR, USPHS - Engineer
Division of Facilities Management
Office of Environmental Health & Engineering
Oklahoma City Area Indian Health Service
701 Market Drive Oklahoma City, OK 73114
Work: (405) 951-3857 Fax: (405) 951-3932 hugo.gonzalez@ihs.gov
From: Gonzalez, Hugo (IHS/OKC) Sent: Friday, August 17, 2012 12:52 PM To: Perkins, Judy A (IHS/OKC); Joe Wallace Wallace (joew@sbcglobal.net) Cc: Standingwater, Robert (IHS/OKC); Santiago, Michael (IHS/OKC); Wilson, Steven J (IHS/OKC); Gonzalez, Bobbie (IHS/OKC) Subject: Pawnee IHC - X-Ray Modification for CT on Mech & HVAC SOW
Judy and Joe, Attached is the SOW for the Pawnee IHC - X-Ray Modification (CT) for the Mechanical & HVAC SOW.
The approved UFMS REQ is # IHS1178528 for $50K.
Thanks for your support, Hugo Gonzalez, M.S., P.E.
CDR, USPHS - Engineer
Division of Facilities Management
Office of Environmental Health & Engineering
Oklahoma City Area Indian Health Service
701 Market Drive Oklahoma City, OK 73114
Work: (405) 951-3857 Fax: (405) 951-3932 hugo.gonzalez@ihs.gov
Pawnee X-Ray Modification (CT) Mech & HVAC SOW.doc Pawnee X-Ray Modification (CT) Mech & HVAC SOW.doc
Oklahoma City Area
Indian Health Service
OEHE - Division of Facilities Management
701 Market Drive
Oklahoma City, Oklahoma 73114
Phone: (405) 951-3857 Fax: (405) 951-3932
SCOPE OF WORK
Indian Health Service (IHS)
Pawnee Indian Health Center
Project # OK1PAS01C6
X-Ray Area Modification – Mechanical & HVAC
Pawnee, Oklahoma
I.
GENERAL:
A. The contractor shall provide mechanical HVAC services for modification of the existing mechanical HVAC systems inside the X-Ray and Lab department at the Pawnee Indian Health Center located in Pawnee, Oklahoma. An existing room G407 will be modified and converted in to two enclosed procedure rooms. Due to this, the existing HVAC system will have to be modified to account for the increased Cooling Load requirements with the installation of a CT Scanner system. The existing HVAC duct work layout and geothermal heat pump tonnage unit size will have to be modification due to these room layout design changes to account for the cooling load increases and end usage changes.
B. The contractor shall provide mechanical plumbing services for the installation of a fully operational sink unit (2ft x 2ft) inside a new G407A CT Scanner room.
C. Highly recommended that the contractor perform an initial on-site visit. The contractor is solely responsible for reviewing verifying the scope of work.
D. Work shall be done while the health center is occupied and operational. Work may be required to be performed during and after normal working hours. Normal working hours are Monday-Friday from 8:00 a.m. to 5:00 p.m. Coordination and scheduling of work is critical in this health center environment and should be coordinated with the IHS COTR and Facility Manager.
E. The contractor is fully responsible for verifying and validating all information contained within this scope of work. Contractor must fully evaluate the condition of the existing conditions prior to the start of any work.
F. Contractor shall abide by all Safety, Security and Infection Control Policies and Procedures of the Pawnee Indian Health Center. Before any work is to be performed a Start of Construction letter notice shall be provided to the assigned IHS COTR at least 7 days in advance for review and approval.
G. When egress corridors, fire alarm detection and suppression systems are impaired during construction, the Contractor shall inform the Facility Manager to ensure that an Interim Life Safety Measure is conducted in coordination with the IHS COTR, Pawnee Indian Health Center Safety Office and Facility Manage & Engineer.
H. The Pawnee Indian Health Center is a tobacco free campus. No smoking is permitted in the health center and grounds. The contractor is responsible for their subcontractors to obey and be in compliance of the IHS tobacco free campus.
I. Signing in/out and scheduling of contractors and sub-contractors must be coordinated with the Pawnee Indian Health Center Facilities Management Department in order to maintain traffic-flow, parking, access to building and locked areas.
J. All applicable documents shall be distributed as follows:
Project Officer / IHS COTR
Hugo Gonzalez, P.E.
Senior Staff Engineer, Mechanical Engineer
IHS - Oklahoma City Area Office
Phone: (405) 951-3857 Fax: (405) 951-3932
Hugo.Gonzalez@ihs.gov
OCAO Contracting
Joe Wallace, Contract Specialist
IHS - Oklahoma City Area Office
Phone: 405-951-3929
Joseph.Wallace@ihs.gov
Facility Manager:
Joe Jones, Facility Manager
Pawnee Indian Health Center
1201 Heritage Circle
Pawnee, OK 74058
Phone:
(918) 762-6711
Joseph.Jones@ihs.gov
K. All work must conform to, and comply with, the latest edition/version of ALL applicable OSHA, NFPA, BIC, BOCA, AMSE, SMACNA, NEC and any other required federal, state, and local laws, rules, regulations, codes, and standards.
L. Contractor shall use Energy efficient equipment and material when replacing defective government equipment and materials.
M. Upon completion of work, Contractor shall provide training on the cleaning and maintenance of new equipment that is installed.
N. All new materials and equipment shall be furnished with an owner’s manual, parts list, local authorized dealer contact information, and warranty ending date.
O. All new materials and equipment shall meet specifications listed below and shall have approved certificates of installation if required by ALL applicable federal, state, and local codes, standards, or regulations.
P. All construction produced waste and shipping containers shall be disposed of at an offsite suitable landfill or be recycled per federal regulations..
Q. The photos and drawings provided are for reference only. An investigation and verification of all the existing construction areas are to be verified and validated by the contractor.
R. Contractor shall conduct periodic project meeting with the Contract Specialist, Facility Engineer, and IHS COTR. Contractor shall provide approved engineering designs and construction documents and specifications of all material used during construction for approval or disapproval..
S. Contractor shall provide manufacture warranties on the manufacturer’s standard form as required.
T. Contractor shall provide written quality assurance reports to the IHS COTR for review and approval by the COTR. The reports shall address all work in progress during construction.
U. Contractor shall provide any applicable technical care training to the Pawnee Indian Health Center facility technician staff and engineering for maintenance and preventive maintenance.
WORK PLAN
SERVICES TO BE PERFORMED BY THE CONTRACTOR
Before any services are to start within a healthcare facility, all Safety and Infection Control Measures are to be put in place and approved by IHS COTR. Implementing all Safety and Infection Control Measures is the sole responsibility of the Contractor to ensure these measures meet OSHA & NFPA Codes and ASHRE & Joint Commission Standards.
General Mechanical HVAC Services Requirements:
· This work plan is for Mechanical HVAC services consisting of making modification to the existing HVAC system servicing both the X-Ray and Lab Department which are side by side connected departments. For additional detail reference Appendix A.
· The mechanical contractor in order for IHS to ensure the contractor is following good mechanical trade practices and to ensure quality workmanship is to follow all current ASHRE, SMACNA, ANSI, ASME Standards and Guidelines.
· Original 2004 Mechanical drawings are in metric units. These are being provided as references to the Mechanical contractors with easy to find color highlighted key areas for their full review and reference. Sole responsibility of the Mechanical contractor to verify and validate existing conditions against the 2004 mechanical drawings.
· The original 2004 HVAC zoning was design by using the following Carrier Geothermal Heat Pump unit for cooling and heating located in a large open attic area on a mezzanine
Carrier AQUAZONE™ 5-Ton Air to Water Source Heat Pump (WSHP)
Model 50RVR060LPT60120
· The X-Ray department is being served by a 5-Ton WSHP #M-11 located on the southwest attic mezzanine
· The Lab department is being served by a 5-Ton WSHP #M-22 located on the southeast attic mezzanine
· There is easy access and open area to work on the 5-Ton Water Source Heat Pump and easy access for making modifications to the duct work from above the ceiling tile and in the attic.
· Due to modification being made to the HVAC system, NEBB accredited Test & Balance will be required based on IHS provided CFM and Cooling Load requirements.
HVAC Modification Requirements:
Existing HVAC modifications are to be made as followed:
5-Ton WSHP #M-11 Modify to be use Only for the New G407A CT Scanner Room
· The 5-Ton WSHP #M-11 unit is to stay as-is and is to serve only the new G407A CT Scanner Room (20ft x 15.5ft) with the following Toshiba Aquilion 64 Slice CT system specification requirements.
SHAPE \* MERGEFORMAT
· The existing #M11 HVAC main supply and return duct truck is to be separated and modified to serve only the new G407A CT Scanner Room.
· For the following below existing room on #M-11HVAC system is to be separated and modified as indicated. An on-site field review and inspection above the ceiling tiles and attic will be required of the mechanical contractor to determine the most sensible and economical areas for detachment points of the duct branch in keeping as many branch duct lines together. Before any detachment IHS will require the mechanical contractor to provide a submittal denoting the detachment area for review and approval by the IHS COTR. The existing supply and return vents are to be kept in the same location.
G407A New CT Scanner Room (20ft x 15.5ft))
* Add four (4) new duct branch lines with four (4) 2ft x 2ft supply diffusers matching existing inside room for proper ventilation as provided by IHS COTR.
* Relocate one (1) existing supply diffusers inside room for proper ventilation as provided by IHS COTR.
* Relocate one (1) return vent existing by the corridor 4ft door and add one (2) new return vent. The total will be two (2) return vents being required in the new G407A CT Scanner Room.
· For the remaining #M-11HVAC system duct branch lines and supply diffuser & return vents that is outside the new G407A CT Scanner Room are to be modified and tied in to the main duct trunk of Lab department #M-22 HVAC system the new G407A CT Scanner Room.
5-Ton WSHP #M-22 to be Increase to 10-Ton WSHP
· The existing 5-Ton WSHP #M-22 HVAC system will be modified to server both the Lab and remaining X-Ray department that does not include the new G407A CT Scanner Room.
· Replace the existing 5-Ton WSHP with a Carrier AQUAZONE™ 10-Ton Air to Water Source Heat Pump (WSHP).
· The existing #M-22 HVAC system main supply and return duct truck is to be modified to tie into the separated #M-11HVAC system duct branch lines and supply diffuser & return vents that are outside the new G407A CT Scanner Room.
· For the following below existing rooms on #M-11HVAC system are to be separated and tied into #M-22 HVAC system main supply and return duct trunk lines. An on-site field review and inspection above the ceiling tiles and attic will be required of the mechanical contractor to determine the most sensible and economical areas for detachment points of the duct branch in keeping as many branch duct lines together. Before any detachment will require, the mechanical contractor is to provide as submittal denoting the detachment area for review and approval by the IHS COTR. The existing supply and return vents are to be kept in the same location.
G401 Waiting Area for Lab & X-Ray
G403 Hallway for X-Ray
G406 Procedure Room for Digital X-Ray
G408 Dressing Area changed to CT Control Room
G409 Procedure Room for Mammogram
G411 Storage Room changed to Tech Office Room
G412 Reception Open Area
G407B New Bone Densitometer & Ultrasound (BD&U) Room (14ft x 15ft)
* Relocate the two (2) existing supply diffusers inside room for proper ventilation as provided by IHS COTR.
* Add one (1) return vent by entrance door and tie into #M-22 main return trunk matching existing.
General Mechanical Plumbing Services Requirements:
For additional detail reference Appendix A.
· Mechanical plumbing services will consist of providing a fully operational pre-built combo sink & above storage cabinet unit (2ft x 2ft) to be installed inside the new G407A CT Scanner room.
· The style, color, sink type, and faucet type for the pre-built combo sink & above storage cabinet is to be selected by IHS. The mechanical contractor is to provide a submittal based on a pre-built combo sink & above storage cabinet for review and approval by the IHS Pawnee and IHS COTR.
· Original 2004 Mechanical drawings are in metric units. Being provided to the Mechanical contractors are mechanical plumbing drawings with easy to find key yellow highlighted areas for full review and reference. Sole responsibility of the Mechanical contractor to verify and validate existing conditions against the mechanical plumbing drawings.
· The mechanical contractor is to provide full plumbing connection and hook-up of the new sink hot and cold and hot plumbing and tie-in the existing near-by main water lines to match existing plumbing installation.
· Under the sink, install localized shut-off valves for the domestic cold and hot water lines. For safety, install hot water temperature control mixing valve to eliminate scolding of user.
· The mechanical contractor is to provide full plumbing connection and hook-up of the new sink drain and tie-into the near-by sewer system to match existing plumbing installation.
Example of pre-built combo sink & above storage cabinet is to be selected by IHS.
Appendix A
Pawnee Indian Health Center X-Ray & Lab Department HVAC Layout
Pic A1: Referencing 2004 M2.02 Mechanical Drawing of Existing HVAC Duct Layout for X-Ray & Lab Dept. using Heat Pump # M-11 & M-22
Pic A2: Referencing 2004 M2.03 Mechanical Drawing of Existing HVAC Heat Pump # M-11 & M-22 Attic Location
Pic A3: Reference Drawing for Modification of Existing HVAC Heat Pump # M-11 & M-22 for Change of Room G407A CT to only use 5-Ton WSHP #M-11 Only and move Room G407B and Remaining X-Ray Duct Work to #M-22 and increase to 10-Ton WSHP Unit
Pic A4: Reference 3D Drawing for Modification of Existing HVAC Heat Pump #M-11 & #M-22 for Change of Room G407A CT to only use 5-Ton WSHP #M-11 Only and move Room G407B and Remaining X-Ray Duct Work to #M-22 and increase to 10-Ton WSHP Unit
Pic A5: Room G407 East Side Supply Diffusers - Reference 2004 M2.02 HVAC Drawing
Pic A6: Room G407 East Side Supply Diffusers – Reference 2004 M2.02 HVAC Drawing
Pic A7: Room G407 South Side Supply Diffusers & Exhuast - Reference 2004 M2.02 HVAC Drawings
Pic A8: Room G407 Nort Side Supply Diffusers & Exhuast - Reference 2004 M2.02 HVAC Drawings
Pic A9: HVAC Duct above Room G407 - - Reference 2004 M2.02 HVAC Drawings
Appendix B
Pawnee Indian Health Center X-Ray & Lab Department Plumbing Layout
Pic B1: Referencing 2004 M1.01 Mechanical Drawing of Existing Plumbing Location on the Lower Floor under the X-Ray Department
Pic B2: Referencing 2004 M1.02 Mechanical Drawing of Existing Plumbing on the X-Ray Department
Pic B:3 Lower Floor under the X-Ray Department Existing Plimbing
Reference 2004 M1.01 Mechanical Drawing
Pic B:3 Plumbing in Lower Floor under the X-Ray Department Existing Plimbing
Reference 2004 M1.01 Mechanical Drawing
SOW CT - 2004 New Pawnee IHC Mechanical Combinedi.pdf SOW CT - 2004 New Pawnee IHC Mechanical Combinedi.pdf
PATIENT/VISITOR PARKING
STAFF PARKING (108)
FUTURE EXPANSION
GOVERNMENT VEHICLES
PARKING
BUS
C
LI
KS
F
IE
LD
R
O
AD
PROPOSED ELDERLY HOUSING DEVELOPMENT
EXISTING
WATER TANK
LOOP ROAD
PATI0
SERVICE DRIVE
EMPLOYEE &
NEW ENTRY DRIVE
NEW BUILDING
SHEET:
DRAWN:
CHECKED:
DATE:
FILE:
PROJECT:
PHASE:
REVISION: DATE:
M0.01
SITE PLAN
MECHANICAL PLAN
medi-01j1 wgm bak
MechCD-Site
N
ORIGINAL SCALE: 1 = 500
PAWNEE HEALTH CENTER, SITE PLAN
5 m 15 m
CW DOMESTIC COLD WATER
HW DOMESTIC HOT WATER
HWR DOMESTIC HOT WATER RETURN
V WASTE VENT
W WASTE
VTR WASTE VENT THROUGH ROOF
G NATURAL GAS
D CONDENSATE DRAIN
RD ROOF DRAIN
SD STORM DRAIN
FS FIRE SPRINKLER
PLUMBING ABBREVIATIONS
SW SANITARY WASTE
FIRE SPRINKLER SYSTEM
TO BE FULLY SPRINKLED. CONTRACTOR TO VERIFY
CONTRACTOR TO VERIFY SERVICE CAPACITY AND UPGRADE
AS REQUIRED. SPECIFICATION IS A PERFORMANCE SPEC.
CO WASTE LINE CLEAN OUT
SIZE OF SERVICE SPRINKLER LINE TO SERVE AREA.
ALL AREAS WITHIN LIMITS OF BUILDING CONSTRUCTION
GEOTHERMAL
REVERSE RETURN HEADER SYSTEMSWEEPING
ELBOWS
91,440 MINIMUMTYPICAL
WELL
FR
M P
U
"G
2"
3"
ONLY LOOP #1 SHOWN
GRADE OR SLAB
PVC SLEEVE (TYP)
1"
13 10 7 151434 1 1 2
DITTO - LOOPS
2,5,8,11,14
DITTO - LOOPS
3,6,9,12,15
1-1WELL NO. 1-2 1-3
(TYPICAL)
ISOLATION VALVE
TRANSITION
PE PIPE TO
STD HVAC PIPE
AT MECH SPACE
INSULATE ALL PIPE FROM
AND INCLUDING MANIFOLD.
INSIDE BLDG. SEE SPECS
1524 MINIMUM
THROUGH CRUSHED ROCK FOUNDATION STABILIZER
GEOTHERMAL FIELD FLOW DIAGRAM
PAWNEE HEALTH CENTER NOM 200 TON GEOTHERMAL SYSTEM
SUPPLY
RETURN
SCALE: NONE
GEOTHERMAL WELL
2134 RADIUS
MINIMUM (TYP)
1500 MIN.
ORANGE WARNING RIBBON
YELLOW WARNING RIBBON
SUPPLY HEADER LINE
RETURN HEADER LINE
450 MIN
GEOTHERMAL WELL,
FINAL GRADE
HEADER &
LOOP LINES
WITH IDENTIFICATION
OF WELL STAMPED IN TOP.
NO SPLICE
RADIUS BEND ONLY
OR ELBOWS.
SCALE: NONE
GEOTHERMAL PIPE DETAIL
#10 BARE COPPER TRACER WIRE
ALL WELL PIPING 25mm
GEOTHERMAL 10 WELL PIPE HEADER DETAIL
SEE SITE PLAN
FOR SPACING
91,440mm DEEP
LOCATE EACH SIDE OF WELL
(SHOWN FOR CLARITY)
32 40
BASED ON 4.5 GPM FLOW PER WELL @ 300 FT DEPTHD
B
WELLS 6850mm ON
CENTER, TYPICAL ALL
75 75 75 75 75 75 75 75 75 75
FLUSH CONN
FLUSH CONN
100 200
TO
S
YS
TE
75 LINE
75 LINE
GEOTHERMAL PIPES
15 - 75mm SUPPLY
TEMP SENSOR
THERMOMETER
10 WELL HEADER
RE D/M0.01 (TYP)
GEOTHERMAL PIPES
15 - 75mm RETURN
Record Drawing
April 15, 2004
FIREMAN'S CONNECTION
POST (COORDINATE WITH CIVIL PLANS)
PA
W
EE
, O
KL
AH
A
H
EA
LT
EN
TI
E
G
IN
D
ES
IG
, I nc
8-
3-
So ut h ar va rd
, S ui te
, T ul sa kl ah om a
7-
En gi ne er in g es ig n, In c.
50 50
40 32
(BASED ON 17LPM FLOW PER WELL @ 91,440mm DEPTH)
MANIFOLD
IDENTIFICATION
NUMBER (TYP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
IDENTIFICATION
NUMBER (TYP)
DO NOT
INSULATE
TYPICAL
1-10 15-10
15-1
GEOTHERMAL WELL LOCATION
DIMENSIONS
FROM TO DIMENSION
A 1-1 59.88 M B 1-1 97.62 M A 1-10 92.07 M B 1-10 117.07 M A 15-1 40.73 M B 15-1 7.76 M A 15-10 83.53 M B 15-10 68.42 M
WHICH MAY BE INCORPORATED HEREIN AS A RESULT.
RESPONSIBLE FOR ANY ERRORS OR OMISSIONS
ACCURACY OF THIS INFORMATION AND SHALL NOT BE
THE ARCHITECT/ENGINEER HAS NOT VERIFIED THE
BASED ON INFORMATION PROVIDED BY OTHERS.
THESE RECORD DRAWINGS HAVE BEEN PREPARED
RECORD DRAWING
LOWER LEVEL
ORIGINAL SCALE: 1 = 100
0 1 m 3 m
SH2
FD
SP
SH1
DF
WC1
UR
WC2
MB
LV2
SK3
SH1 SH2
LV1
SK1
SK6WB
FS
SK4
SP
150 SS BELOW GRADE,
RE: CIVIL DWGS FOR CONTINUATION
250 SD BELOW GRADE,
100 DOM. WATER BELOW
GRADE, RE: CIVIL DWGS
FOR CONTINUATION
150 FIRE SPRINKLER LINE BELOW
GRADE W/ PRESSURE REDUCER
AND BACK-FLOW PREVENTOR,
RE: CIVIL DWGS FOR CONTINUATION31347SF
100 BELOW MAIN SLAB
WT, RE: B/M1.01
FOR DETAIL
150 BELOW GRADE TO
FIRE DEP'T POST
RE: CIVIL DRAWINGS
SH1
SK6
50 HW UP
CO
50 SD
50 SD DN
DN
CONTINUE TO CURB
150 W DN
CO CO
RESERVED FOR GEO PIPING
50 SD 50 SD 50 SD
250 SD BELOW LOWER SLAB
SD
75 TYP
ALL FD'S
150 W
75V TURN UP
75 MAIN VENT
IN LOWER
CLG SPACE
VENT UP
25 HWR DN
M1.01
PLUMBING PLAN
PAWNEE HEALTH CENTER, LOWER LEVEL
100 SD
ES/EW
P09
MARK DESCRIPTION
E-77-AA VINYL BUMPERGUARD, 1453-BB STRAINER. 75 W, 50 V, 15 CW, 15 HW.
832-AA HOSE AND HOSE BRACKET, MSG2424 WALL GUARD,
MOP SINK BASIN, MOLDED-STONE, 24"x24"x10". FIAT #MSB-2424. 830-AA FAUCET, GENERAL NOTES:
1. FURNISH AND INSTALL HYDRO-PNEUMATIC WATER HAMMER ARRESTORS, SIZE AS
REQUIRED. CONFORM TO A.S.S.E. STD. 101. INSTALL ON BOTH COLD AND HOT
WATER PIPING SYSTEMS IN ACCORDANCE WITH MINIMUM LOCAL AND STATE CODE
REGULATIONS AND REQUIREMENTS. ZURN #Z-1700 APPROVED. ADDITIONALLY,
INSTALL AIR CHAMBER ARRESTORS AT ALL NEW FIXTURES FOR BOTH HOT AND
COLD WATER PIPING.
2. EQUAL PRODUCTS MANUFACTURED BY ZURN, JOSAM, SYMMONS, CRANE, KOHLER, WADE,
DELANY, HAWS/SUNROC, MCGUIRE, MCGUIRE PROWRAP AND ELKAY ARE APPROVED.
STANDARD SAN. P-TRAP. 3"W, 1.5"V.
CO REFER TO SPEC. MANUAL.
SK2 SINGLE SINK, 2 HOLE, SELF RIM, 15"x17.5"x7"D. ELKAY #BLR-1517. 1 1/2" 17GA P-TRAP W/C.O., WB WASHING MACHINE BOX, RECESSED WALL MOUNT. SYMMONS MODEL W-602-X.
STANDARD SANITARY P-TRAP, MT TOP AT 1200 A.F.F. 50 W, 40 V, 15 CW, 15 HW.
WC1 WATER CLOSET, WALL MOUNT, FLUSH VALVE, ELONGATED BOWL, WHITE. KOHLER #K-4330, WC2 WATER CLOSET, WALL MOUNT, HANDICAP, FLUSH VALVE, ELONGATED BOWL, WHITE.
SLOAN OPTIMA 8111-MC (1.6 GAL) BATTERY-POWERED SENSOR-OPERATED FLUSH VALVE W/
FLUSH VALVE W/ OVER-RIDE BUTTON, OLSONITE 95 SEAT. MT TOP OF FLUSH VALVE 30"
KOHLER #K-4330. SLOAN OPTIMA 8111-MC (1.6 GAL) BATTERY-POWERED SENSOR-OPERATED
UR URINAL, WALL MOUNT, ADA, FLUSH VALVE, WHITE, CRANE #7-187E. SLOAN OPTIMA
ZR-1221 CARRIER. 50 W, 40 V, 20 CW.
8180-1.0-MC (1.0 GAL) BATTERY-POWERED SENSOR-OPERATED FLUSH VALVE, ZURN
W/ LAM. NOZZLE & DRAIN, MCGUIRE 155WC OFFSET DRAIN, ADA W/ RIM HEIGHT OF 34" A.F.F., WALL MOUNT, ROUNDED LAV., WALL MOUNT, 21"x22", WHITE. AMER. STANDARD MURRO #0954.000. ZURN ZR-1231 CARRIER, 1 1/4" 17GA P-TRAP W/C.O., DELTA 516-WFHDF FAUCET
3/8" FLEX RISERS & L.K. STOPS, INCLUDE OPTIONAL SHROUD. 40 W, 40 V, 15 CW, 15 HW.
TB BATHTUB, 1500 x 900, ADA, WHITE. LASCO 2603-NW LASCOAT GELCOAT FINISH, INTEGRAL
SOAP SHELF & DRAIN. DELTA #1412-LHP ANTI-SCALD PRESS. BALANCE TUB VALVE W/
A.F.F., CENTER OF WATER CLOSET 18" FROM SIDE WALL, MOUNT RIM @ 18" A.F.F., ZURN
100 W, 50 V, 25 CW.
HANGER, 1 1/4" 17GA P-TRAP W/ C.O., FLEX RISER & L.K. STOP, 4.5FLA AT 115V/1. MT ONE
@ STD HT & ONE @ ADA HT. 40 W, 40 V, 15 CW.
FD FLOOR DRAIN, 3" STANDARD DUTY, 6" DIA. POLISHED NICKEL STRAINER. ZURN #ZN-415-6B.
ELEC. WATER COOLER, WALL MOUNT, TWO LEVEL, ADA. SUNROC #ADA-8-BLN. WALL
LK-35 DRAIN, FLEX RISERS & L.K. STOPS. 50 W, 40 V, 15 CW, 15 HW.
OVER-RIDE BUTTON, OLSONITE 95 SEAT. ZURN 1203 OR 1204 CARRIER, MT RIM AT 15" A.F.F.
SK4 DOUBLE SINK, 2 HOLE, SELF RIM, 29"x18". ELKAY #LR-2918. 1 1/2" 17GA P-TRAP W/C.O., DELTA 711-WFHDF SINGLE HANDLE GOOSENECK FAUCET W/ LAM. FLOW NOZZLE, ADA, SK5
CHROME ADA KNOB, RIGHT HAND DRAIN. 50 W, 40 V, 15 CW, 15 HW.
SH1 SHOWER. DELTA 1325-WSHDF CHROME ANTI-SCALD PRESSURE BALANCE VALVE W/ VANDAL
RESISTANT HANDLE & SHOWER HEAD, VACUUM BREAKER. 15 CW, 15 HW.
SH2 SHOWER. DELTA 11T5143 CHROME ANTI-SCALD PRESSURE BALANCE VALVE W/ VANDAL
RESISTANT HANDLE, ADA, ADJUSTABLE SLIDE BRACKET & VACUUM BREAKER. 15 CW, 15 HW.
DOUBLE SINK, 2 HOLE, SELF RIM, 37"x22". ELKAY #LR-3722. 1 1/2" 17GA P-TRAP W/C.O., ELKAY LK-35 DRAIN, FLEX RISERS & L.K. STOP. 50 W, 40 V, 15 CW, 15 HW.
ELKAY LK-35 DRAIN, FLEX RISERS & L.K. STOPS. 50 W, 40 V, 15 CW, 15 HW.
SINGLE DEEP SINK, 2 HOLE, SELF RIM, 22"x22"x12". ELKAY #DLR-222212. 1 1/2" 17GA P-TRAP
W/C.O., DELTA 711-WFHDF SINGLE HANDLE GOOSENECK FAUCET W/ LAM. FLOW NOZZLE,
ADA, ELKAY LK-35 DRAIN, FLEX RISERS & L.K. STOPS. 50 W, 40 V, 15 CW, 15 HW.
DELTA 711-WFHDF SINGLE HANDLE GOOSENECK FAUCET W/ LAM. FLOW NOZZLE, ADA, ELKAY
A.R.E. INTERIOR, STANDARD SAN. P-TRAP. 75 W, 40 V.
FS FLOOR SINK, 12"x12", 8" DEPTH, POLISHED NICKEL GRATE, DOME STRAINER. ZURN #ZN-1901.
SINGLE SINK, 2 HOLE, SELF RIM, 17"x16". ELKAY #LR-1716. 1 1/2" 17GA P-TRAP W/C.O., ELKAY LK-35 DRAIN, FLEX RISERS & L.K. STOPS. 50 W, 40 V, 15 CW, 15 HW.
SK6 LAUNDRY SINK, MOLDED STONE, 23"x22". FIAT #FL-1, A-1 DECK MOUNTED FAUCET, STAINLESS STEEL LEGS & 75 STANDARD TRAP. 75 W, 50 V, 15 CW, 15 HW.
SK2-PT SAME AS 'SK2' ABOVE PLUS PLASTER TRAP.
#1203 OR #1204 CARRIER. 100 W, 50 V, 25 CW.
SAME AS 'WC2' BUT REPLACE AUTOM. FLUSH VALVE W/ MANUAL SLOAN REGAL 811-XL.WC3
SK7 CLINICAL SINK, FLOOR MOUNT, FLUSHING RIM, WHITE. KOHLER K-6676, ZURN Z-6000XL-BW
(3.5 GAL) FLUSH VALVE W/ VAC. BREAKER, K-8935 STAINLESS STEEL RIM GUARDS, MT ON
700x350x250 HIGH TERRAZZO BASE. 100W, 50V, 25CW. INCLUDE FAUCET - 15 HW, 15 CW.
HWRP RETURN HOT WATER CIRCULATING PUMP, 8 GPM @ 22 FT HD. GRUNDFOS MODEL UP26-96BF.
SPECIFICALLY MANUFACTURED FOR OPEN SYSTEM. 1/12 HP @ 120V/1 SERVICE.
CS OVAL CUP SINK, STRAINER, 4.5"x10.5", DURCON CS-12. 40 W, 25 V.
HB HOSE BIBB, EXPOSED, 3/4" FREEZE PROOF, WALL MOUNT. ZURN #Z-1310-3.
ANTI-SIPHON, AUTOMATIC DRAINING, 3/4"CW.
ES/EW EMERGENCY SHOWER/EYEWASH. BRADLEY MODEL S19-310 W/ PLASTIC SHOWER HEAD
AND EYE WASH BOWL, SAFETY COATED COMPONENTS. 40 CW, 15 HW.
MechCD-LowerFlr
100 CW TO MAIN
FLR CLG SPACE.
100 CW AT LOWER
FLOOR STRUCTURE
INSTALL BUILDING SHUTOFF VALVE
WITH BACKFLOW PREVENTOR
1.
GATE VALVE
CHECK VALVE
COLD WATER PIPE
HOT WATER PIPE
VENT PIPE
WASTE PIPE
RD ROOF DRAIN
HOT WATER RETURN PIPE
ALL AREAS WITHIN LIMITS OF CONSTRUCTION
TO BE FULLY SPRINKLED. CONTRACTOR TO VERIFY
SPECIFICATION IS A PERFORMANCE SPEC.
SIZE OF SERVICE SPRINKLER LINE TO SERVE AREA.
2. ALL THERAPEUTIC POOL PIPING, CONTROLS, PUMPS, WATER
HEATER AND CONNECTIONS WILL BE BY POOL CONTRACTOR.
PROVIDE CONNECTIONS AS INDICATED ON THIS PLAN.
CO WASTE LINE CLEAN OUT
INSTALL DOMESTIC WATER PIPING ABOVE CLG & BELOW INSULATION
SO THAT NONE OF THE PIPING IS EXPOSED TO UNINSULATED SPACE.
WH WATER HEATER, FLOOR MOUNT, GLASS LINED, INSULATION. A.O. SMITH #DVE-120. 119 GAL.
HOT WATER STORAGE TANK, VERTICAL, 200 GALLON CAPACITY, GLASS LINED, INSULATED
A.O. SMITH #TJV-200. 50mm INLET & OUTLET. PIPE T&P TO FLOOR DRAIN.
HB
FIRE SPRINKLER RISER
20 CW
T'STAT SET TO 110°F, 50 INLET & OUTLET, PIPE T&P TO FLOOR DRAIN. INCLUDE AMTROL
CAPACITY, 212 GPH @ 70°F RISE, TOTAL INPUT 36KW, 6 - 6KW ELEMENTS, @ 480V/3.
WT
WH
EW EMERGENCY EYE/FACE WASH. BRADLEY MODEL S19-220BF W/ WRAP AROUND SKIRT
(BARRIER FREE), STAINLESS STEEL. 40 W, 40 V, 15 CW.
PROVIDE A SOLENOID VALVE IN FIRE SPRINKLER LINE FEEDING ELEVATOR
SHAFT AND ELEVATOR EQUIPMENT ROOM. INSTALL HEAT DETECTOR AND
SMOKE DETECTOR IN ELEVATOR SHAFT AND ELEVATOR EQUIPMENT ROOM.
IS TO RESPOND TO NORMAL ELEVATOR CAPTURE FEATURE. ONLY UPON
ON GENERAL ALARM OR LOBBY SMOKE DETECTOR ALARM, THE ELEVATOR
IS ELEVATOR TO GO TO DESIGNATED FLOOR, OPEN DOORS, RELEASE
SMOKE OR HEAT DETECTION IN ELEVATOR SHAFT OR EQUIPMENT ROOM
SOLENOID VALVE AND CONNECT POWER VIA SHUNT TRIP BREAKER.
#AST-42 THERMAL EXPANSION TANK.
SP STAINLESS STEEL SUBMERSIBLE SUMP PUMP, GRUNDFOS BOSS 200, 1/3HP @ 115V/1.
SK3-PT SAME AS 'SK3' ABOVE PLUS PLASTER TRAP.
P01 ACCESORY CONSOLE - ADEC #5531, REF. TEMPLATE
# 86.014?.00, TECHNICAL PACKET 86.0142.00.
STUB AND CONNECT PER MANUFACTURE'S INSTRUCTION
THE FOLLOWING UTILITIES:
1/2" COLD WATER, MAN. SHUTOFF, 3/8" COMPR. FITTING
1/2" HOT WATER, MAN. SHUTOFF, 3/8" COMPR. FITTING
1/2" COMP AIR, MAN. SHUTOFF, 3/8" COMPR. FITTING
3/4" C. W/ 2#12, 1#12G, CONN. TO SUPPLIED QUAD RECEPT.
1-1/2" PVC DRAIN W/ AIR ADMITTANCE VALVE FOR VENT.
2" EMPTY PVC TO TREATMENT CONSOLE, SWEEP 90'S.
P02 CENTRAL CONSOLE - ADEC #5543, REF. TEMPLATE
# 86.0145.00, TECHNICAL PACKET 86.0142.00.
1/2" HOT WATER, MAN. SHUTOFF, 3/8" COMPR. FITTING
1/2" COMP AIR, MAN. SHUTOFF, 3/8" COMPR. FITTING
3/4" C. W/ 2#12, 1#12G, CONN. TO SUPPLIED QUAD RECEPT.
1-1/2" PVC DRAIN W/ AIR ADMITTANCE VALVE FOR VENT.
3/4" C. W/ 2#12, 1#12G, DED. CIRC, CONN. TO EXRAY.
P03 CASCADE CHAIR - ADEC #1040, REF. TEMPLATE
# 85.0498.00, TECHNICAL PACKET 86.0142.00.
1/2" COMP AIR, MAN. SHUTOFF, 3/8" COMPR. FITTING
3/4" C. W/ 2#12, 1#12G, CONN. TO SUPPLIED QUAD RECEPT.
P04 TREATMENT CONSOLE - ADEC #5580.42, REF. TEMPLATE
# 86.1046.00, TECHNICAL PACKET 86.0142.00.
1/2" COMP AIR, MAN. SHUTOFF, 3/8" COMPR. FITTING
3/4" C. W/ 2#12, 1#12G, CONN. TO SUPPLIED QUAD RECEPT.
RECEIVE 2" PVC'S FROM 5531, 5543 & 1040, SWEEP 90'S.
1/2" PVC VACUUM TO TRUNK LINE IN TRENCH.
P05 15 CW FOR COFFEE MAKER, MT 1200 A.F.F.
P06 RUN 15 CW & HW DN WALL & BELOW SLAB TO SINK
P.B.O. IN DENTAL EQUIPMENT. INSTALL ISOLATION
VALVE FOR H & CW ABOVE CLG.
P09 TAP COLD WATER LINE SERVING SINK WITH 1/4"
LINE TO SERVE COFFEE MAKER.
3. PROVIDE CONNECTIONS & CONNECT ALL EQUIPMENT PROVIDED
BY OWNERE PER MANUFACTURER'S INSTRUCTIONS.
75 MAIN VTR
100 W
75 V
15 HW30 CW
L.K. STOPS. 40 W, 40 V, 15 CW, 15 HW.
LAVATORY, OVAL, 20"x17", SELF RIM, WHITE. CRANE #1-280-V. 1 1/4" 17GA P-TRAP W/C.O., DELTA 516-WFHDF FAUCET & DRAIN, MCGUIRE 155WC OFFSET DRAIN. FLEX RISERS &
BRANCH OFF 75 CW WITH BACK-FLOW
PREVENTOR FOR LANDSCAPE IRRIGATION.
NO SCALE PLUM
BRONZE SWING TYPE
CHECK VALVE INSTALLED
HORIZONTALLY
32 COLD WATER INLET
LINE OF FINISHED CEILING
EMERGENCY SHOWER HEAD
SHOWER ACTIVATION VALVE
HAND PULL FOR EMERGENCY
FINISHED FLOOR
HAND OR FOOT OPERATED
EYEWASH ACTIVATION VALVE
EMERGENCY EYEWASH
EMERGENCY EYEWASH DRAIN
PEDAL ACTIVATION CHAIN
PEDAL FOR EMERGENCY
FLOOR DRAIN
FLOOR DRAIN TRAP ARM
TO BRANCH WASTE LINE
15 HOT WATER INLET
32 TEMPERED WATER SUPPLY
PIPE TO FIXTURE
FINISHED WALL
TEMPERED WATER SUPPLY
TO EMERGENCY SHOWER
TEMPERED WATER SUPPLY
TO EMERGENCY EYEWASH
FIXTURE SUPPORT PIPE
32 WASTE FROM EYEWASH
TOWARD FLOOR DRAIN
FIXTURE BASE SUPPORT FLANGE
EXTENDED BEYOND SUPPORT
FLANGE AND TURNED DOWN
1" AIR GAP
COMBINATION UNIT WITH TEMPERED WATER SUPPLY EMERGSH1
SH3 SHOWER MODULE, HANDICAP, CRANE MODEL ADA-3636S, ONE PIECE ACRYLIC, WHITE.
COMPLETE W/ S-5 FOLD-UP SEAT W/ PHENOLIC SLATS, INTEGRAL SOAP & SHAMPOO
SHELVES, STN. STL. GRAB BAR, INTEGRAL BACK & HEAD SUPPORT, ATP-1 DOME LIGHT,
ASSEMBLY TO BE DELTA 1305-WSHDF CHROME PRES. BALANCE VALVE W/ VANDAL
H-30 2" CHROME PLATED DRAIN W/ STRAINER GRATE, STN. STL. CURTAIN ROD. SHWR
BAR, IN-LINE VACUUM BREAKER. 50 W, 40 V, 15 CW, 15 HW.
RESISTANT HANDLE & W/ RPW1111HDF HAND SHWR W/ ADJ. SLIDE BRACKET, WALL
FINISHED FLOOR
FINISHED GRADE
V
IF
Y
NONE PLUM
SIZE OF ALL LINES.
FIRE PROTECTION SUB CONTRACTOR RESPONSIBLE FOR ALL
FIRE PROTECTION PIPING INSIDE BUILDING UP TO 5'-0" OUTSIDE
BUILDING LINE.
BEYOND 1500 OUTSIDE BUILDING LINE.
RE: CIVIL SITE UTILITIES DRAWING FOR CONTINUATION
FIRESP2
PRESSURE GAUGES
DETECTOR CHECK VALVE
OS&Y VALVE W/ TAMPER SWITCH
100 SWING CHECK VALVE
GENERAL NOTE:
IT IS THE RESPONSIBILITY OF
THE CONTRACTOR TO CONFIRM
TO FD
50 MAIN DRAIN
FIRE PROTECTION MAIN TO F/A PANEL
VANE TYPE
FLOW SWITCH
ALARM CHECK VALVE
WITH MAIN DRAIN
ZONE MAIN DRAIN
TO NEAREST MOP SINK
TO ZONE
MULTIPLE ZONES, MARK CEILING WITH RED DOT AT EACH ZONE VALVE.
ZONE (OS&Y) VALVE W/ TAMPER SWITCH
ZONE
PRESSURE GAUGE
FIRE DEPT.
CONN. POST
PIPE TO FD (TYP)
RWH
WT#1 WT#2
HWCP
NONE
HWRP
EXP TANK
50 HWS
25 HWR
50 CW SUPPLY
T THERMOMETERPUMP CONNECTIONS
UNION
BALL VALVE
T&P Relief Valve (typ) typ
METALLIC ELECT. CONDUIT
1/ 2" = 16mm 3/ 4" = 21mm 1" = 25mm 1-1/4" = 35mm 1-1/2" = 41mm 2" = 53mm 2-1/2" = 63mm 3" = 78mm 3-1/2" = 91mm 4" = 103mm 6" = 155mm
MECHANICAL PIPE & FITTINGS
ELECTRICAL PVC CONDUIT
1/ 2" = 15mm 3/ 4" = 20mm 1" = 25mm 1-1/2" = 40mm 2" = 50mm 2-1/2" = 65mm 3" = 75mm 4" = 100mm 6" = 150mm 8" = 200mm
HWCP STORAGE TANKS CIRCULATING PUMP, 14 GPM @ 7 FT HD. GRUNDFOS MODEL UP26-64SU&SF.
SPECIFICALLY MANUFACTURED FOR OPEN SYSTEM. 1/12 HP @ 120V/1 SERVICE.
20CW
ELECTRICAL PANELS
50 CW
TAP 100 CW LINE AND CONNECT SYSTEM MAKE UP WATER FOR:
1. HEAT PUMP CIRCULATION SYSTEM (TS&TR) - 20CW.
2. WATER TO WATER HEAT PUMPS FOR OA UNIT - 20CW.
3. HEAT RECOVERY WATER LOOP - 20CW.
4. BACK FLOW SOURCE FOR CIRCULATION LOOP FILTER - 40CW.
INCLUDE BACKFLOW PREVENTER AND PRESSURE REGULATOR
WITH EACH. INCLUDE DDC FLOW SENSOR FOR ALL EXCEPT FOR
FILTER BACKWASH SUPPLY.
ALL BACKFLOW PREVENTERS
WILL BE REDUCED PRESSURE
VALVE - DOUBLE CHECK VALVE
TYPE IS NOT APPROVED.
AI
LE
TR
IC
AL
IT
W/W HEAT PUMPS, TYP.
FILTER
/A
T
PU
PS
YP
OA AHU
EXP TNK
PUMP
Pump
BELOW LOWER SLAB
LANDSCAPE IRRIGATION 75 LINE,
200 SLEEVE FROM INSIDE TO OUTSIDE
PAST WALK, RE 1/L3.01.
75 CW
DRAIN VALVE
RELIEF VALVE (TYP)
UNION (TYP)
BALL VALVE (TYP)
REGULATOR (TYP)
FILTER (TYP)
PRESS. GAUGE
SOUND REDUCING
COVER (TYP)
20mm MAIN
15mm
FLEX
CONNECTOR
DRIP LEG &
EXHAUST, ROUTE TO
OUTDOORS PER NFPA 99
VACUUM
PRES SW
TO SYSTEM
LEAD-LAG
PARALLEL
CONTROLLER
RAMVAC
S1 ELECTROLS
#8-600-425
MSTR SLAVE
THRU FLAT ROOF
VAC. GAGE
ALL PIPING TO BE 32mm SCH 40 PVC (1-1/4" I.P.S.), EXCEPT NOTED.
REMOTE
SWITCH
LEAD-LAG
PARALLEL
CONTROLLER
REMOTE
SWITCH
AIR TECHNIQUES
53251, LABEL "AIR1 AIR2"
CONTRACTOR TO
MANUFACTURE CUSTOM
STEEL RACK FOR AIR
COMPRESSORS,
PAINT BLACK.
NONE
15mm
PROVIDE ALL EQUAL PIPE LENGTHS BETWEEN WT#1 AND WT#2 FOR EVEN FLOW.
sp ac e re se rv ed fo r e le ct ric al no p ip g, n o du ct s.
space reserved for electrical, no piping, no ducts.
WATER SOFTENER & BRINE TANK - "WS"
MARK DESCRIPTION
AC
CONTINUOUS, 20mm MANIFOLD IN TRENCH, 15mm TO CABINET. INSTALL PRES. REGULATOR AIR COMPRESSOR, AIR TECHNIQUES #AIRSTAR 50C, 3 HP @ 208V/1. 9.2 CFM PEAK, 5.2 CFM
SET TO 689kPa (100 PSI). CONTACT INFO - (516)433-7676, (800)247-8324-2 (MARK).
VAC
DISPLACEMENT, 114 LITER (30 GAL.) TANK, MOUNT 1-1/4" MANIFOLD ON TRENCH WALL WITH
UPGRADEABLE VACUUM AIR, RAMVAC BISON E-SERIES COMBO 3, 3HP @ 208V/1. 1.8 LITER,
1/100 SLOPE. CONTACT INFO - JOE OR BOB (800)572-6822.
INCLUDE OPTIONAL STAND, LEAD-LAG / PARALLEL CONTROL FOR TWO UNITS.
INCLUDE SOUND COVER, LEAD-LAG / PARALLEL CONTROL FOR TWO UNITS.
BYPASS VALVE
100 CONC PAD
WS WATER SOFTENER, COMMERCIAL GRADE, 360,000 MAX. GRAIN CAPACITY, 65 GPM SERVICE
FLOW RATE, 1200 LBS. SALT STORAGE, MacCLEAN MODEL KS12000. 2" SOLID BRASS
CONTROL VALVE, HEAVY DUTY FIBERGLASS MINERAL TANK, QUARTZ GRAVEL UNDER
DRAINAGE, HEAVY DUTY BRINE MAKER, PROGRAMMER WITH 6 CYCLE WITH TIMED BRINE
REFILL, CAPABLE OF BEING PROGRAMMED TO REGENERATE DURING LOW DEMAND
PERIODS. SYSTEM DESIGNED FOR 100° F, AND 100 PSI PRESSURE.
SK6
50mmPVC50mmPVC
RM G133
RM G133
FIRE SPRINKLER
WATER GONG, +2700
1 2 3
5 5.3 5.5 7
D.2
2.1
ALCOVE
B135
VESTIBULE
B143
EXERCISE
B140
LOUNGE
B141
STORAGE
B144
B139
WORKROOM
B124
OPEN
SPACE
B122
OFFICE
B123
STAIR 1
SB002
STAIR 2
SB001
MEN
SHOWERS
B133
B134
WOMEN
B136
B137
CORRIDOR
B131
B132
RR
ID
OR
B1
B121
B128
MEDICAL GAS
B130
SOILED LINEN
B142
HAZARDOUS
WASTE
B145
RECEIVING
B129
B127
B126
B119
HOUSEKEEPING
B102
ELEVATOR
EQUIPMENT
B103
CLINICAL ENG.
B118
B117
SHOP
B115
B116
B114
B120
MECHANICAL
ROOM
B101
B104
B110
B109 OFFICE
B108
B107
LABORATORY
B106
B105
B113
CONCESSIONS
B138
HALL
B112
SINK3
UP
LOW WALL LOW WALL
SAFE AREA
PLUMBING FIXTURE SCHEDULE
GENERAL PLUMBING NOTES
PLUMBING ABBREVIATIONS
FIRE SPRINKLER SYSTEM
PLUMBING PIPING SYMBOLS
EMERGENCY ELEVATOR OPERATION
PLUMBING KEYNOTES
C EMERGENCY SHOWER/EYEWASH D FIRE PROTECTION PIPING DETAILB WATER HEATER WITH STORAGE
E DENTAL VACUUM AND AIR COMPRESSOR EQUIPMENT DETAILS
DENTAL EQUIPMENT SCHEDULE
50 HW
40 CW25 HW
ACCURACY OF THIS INFORMATION AND SHALL NOT BE
THE ARCHITECT/ENGINEER HAS NOT VERIFIED THE
hgonzalez
Highlight
Inserted Text
Text Box
6"
4"
Line
MAIN LEVEL
16882SF +
14492SF =
31374SF
15333SF
50SD DN
14491SF
P01
P02
P03
P04 P01P02
P04
P01P02
P03P01
5d fu
9d df u
4dfu
6dfu
18dfu
30dfu
P06 P06P06 P06 P06
15dfu
16dfu
MechCD-MainFlr
Dental Section
Admin Section
Bottom Right Section
PAWNEE HEALTH CENTER, MAIN LEVEL
3/ 4" = 21mm 1" = 25mm 1-1/4" = 35mm 1-1/2" = 41mm 2" = 53mm 2-1/2" = 63mm 3" = 78mm 3-1/2" = 91mm
1" = 25mm 1-1/2" = 40mm 2" = 50mm 2-1/2" = 65mm 3" = 75mm 4" = 100mm
TURN UP THRU ROOF
5d
12dfu
7dfu
50 V dfu
50 V50 V
75 VTR75 V
51dfu
75 V75 V 88dfu
9dfu dfu
58dfu
73dfu
65 V
75 V 65 V
99dfu, 185ft
113dfu
G603
G619
HYDROTHERAPY
G618
CONFERENCE
G601
DRESSING
G617
TOILET
G615
JANITOR
G614
WAITING
G612
RECEPTION
G624
G625
G623
G622
PROCEDURE
G621
G620
G110
G109
G164
WOMEN SHOWER
G165
MEN SHOWER
G161
G160
G159
G137
G150
G148
G149
G144
G145
CEPH/PAN
G138
FILM PROC.
G139
G143
G136
G134
G140
G141
G128
G127
G126
G129
G133
G131
TESTING
G130
NURSE
STATION
G214
G213
STAFF
G219
SOILED
LINEN
G218
G216
G226
G227
G240
G239
G237
CLEAN
G235
G233
G238
G236
G234
EXAM
G232
G241
G244
G245
G246
G247
G220
G248
NURSE'S
G221
G249
G251
G250
G252
TRIAGE
G253
G255
VITAL
G257
G254
G258
TRIBAL
G262
G260
ISOLATION EXAM
G259
PHARMACY
G205
G224
G225
G228
HOUSE
KEEPING
G229
G231
G230
G201
G204
G203
G202
G125
G209
G208
PREPARATION
G210
G264
G206
G607
SHREDDER
G606
LIBRARY
G605
VENDING
G608
G609
G611
G4
CLOSET
G602
PHYSICAL
THERAPY
G613
G404
G405
G406 WORKROOM
G407
G410
G409
G408
G411MICRO
G415
G416
G420
G419
G417
LAB
G413
G402
G414 RECEPTION
G412
G401
MAIL AREA
G503
G531
G527
G529
G526
G525
G524
G523
G522
G521
G520
G519
G530
G516
G323
G544
G543
G542
G541
G540
G539
G537
ART
G538
G536
COPIER ALCOVE
G535
G533
G517
G502
G504
G506
G515
G513OFFICE
G512OFFICE
G511
G510
G509
G508
G507
SUPPLY/DUPLICATION
G320
G319
G318
G317
G316
G315
G314
STUDY
G322
INTERVIEW
G321
G313
G162
G166
G167
G123
G122
G121
G120
G104
G105
G112
G114 ALCOVE
G113
G117
G103
G108
G107
REGISTRATION
G102
G156
G157
G155
SUBWAITING
G223
G222
G312
G309
G311
G308
WORK
G304
G310
TECH
AREA
G306
VISION
FIELD
G305
G303
EYEWEAR
G302
G301
G151
UTILITY
G153
G604
G610
SG001
G403
HA
LL
G2
G217
G263
G242
G215
G256
G501
G545
OPEN OFFICE
G518
G528
SG002
G1
G546
G5
G114
G532
G307
G158
G124
G119
G146
G152
G135
OFFICE SPACE
G106
LOBBY/
COMMON WAITING
G101
G100
G111
G115
G116
G211
G147
SINK5
SI
NK
SINK
P4700
OTOSCOPE
RE
REF
CUBCURTAI N2CUBCURTAI N2
REFRIG3
UN
DE
RC
OU
NT
ER
FI
CA
BI
NE
FAX
2020CPR
UNDERCOUNTERFI LECABI NET
UNDERCOUNTERFILECABINET
PROJECTOR
3350E
1 2 3 5
6 7 8 9
D.8
1.2
1 2 3 4 6 7 8 9 10
5.3 5.52.1
6.1
D.7
CANOPY
DOWN
LOW WALL LOW WALLLOW WALL LOW WALL LOW WALL LOW WALL LOW WALL
LOW WALL LOW WALLLOW WALLLOW WALLLOW WALLLOW WALL
LOW WALL LOW WALL LOW WALL
LOW WALL LOW WALL LOW WALL LOW WALL LOW WALL LOW WALL
LO
L
LOW WALL
PAY TELEPHONE
WHEEL CHAIRS
HEALTH RECORDS
GENERAL PLUMBING NOTES
M1.02
100 BELOW MAIN SLAB
50 HW DN
SK2
EW
WC3
SK1, LOOKS LIKE SK2
WC3 LV1
WC3LV1 SK1
SK3-PT
SK3 SK1
SK5
WC3LV1
WC2WC2
WC1WC1
URWC1 LV
LV2MB
SK2-PT
SK2-PTSK2
3LV1
250 SD, 3/1000 SLOPE
BELOW SLAB
300 SD, 3/1000 SLOPE
AS HIGH AS POSSIBLE
BELOW MAIN SLAB
250 SD DN FROM
ATTIC SPACE
250 SD DN FROM
ATTIC SPACE250 SD DN
50SD DN
250 ESD DN 250 ESD, 3/1000 SLOPE
300 SD OUT FOR EMERGENCY
ROOF DRAINAGE, BELOW GRADE.
100 W BELOW
MAIN SLAB
75 W, 40 V, 15 CW & 15 HW ROUGH
IN FOR FUTURE SINK (TYP. IN OFF.)
CAP W, V, CW & HW IN WALL.
75 W, 40 V, 15 CW & 15 HW
ROUGH IN FOR FUTURE SINK
CAP W, V, CW & HW IN WALL.
ESD
ESDESDESD
SDSD
SDSD
100 W BELOW
MAIN SLAB
DN
50SD DN 50 SD DN
300 SD BELOW LOWER SLAB,
RE: A/M1.01 FOR CONTINUATION
50 V BELOW SLAB
SH
TB
LV
WC1WC1
SK4
WB
WC2WC2
SK2-PT
75W
SK7
25 HW
20 HW
300 SD
250 ESD,
3/1000 SLOPE
EMPTY 50 PVC
EMPTY 50 PVC
150 W DN
75 W
CS
15 HW
100 CW UP
20 HW & 25 CW
& CW
40 CW
25 CW
15 HW & 25 CW
20 HW25 CW
15 CW
20 CW 15 CW
25CW
15CW
15HW
WCO
75 W75 W
HUB DRAIN
20HW
15CW40 CW
15 HW &
VAC-2
1. INSTALL DOMESTIC WATER PIPING ABOVE CLG & BELOW
INSULATION SO THAT NONE OF THE PIPING IS EXPOSED
2. PROVIDE CONNECTIONS & CONNECT ALL EQUIPMENT PROVIDED
BY OWNER PER MANUFACTURER'S INSTRUCTIONS.
3. REFER TO SHEET M1.01 FOR PLUMBING KEYNOTES.
75 V FROM
75 VTR
HB20CW
20CW
TO UNINSULATED SPACE.
VAC-1 AC-1,2
STACKED
32 VACUUM
LINE IN TRENCH.
ATTACH TO SIDE
TO FACILATATE
SLOPE.
20 AIR COMPRESSOR
MANIFOLD LINE IN
TRENCH.
v
TWO (2) 50 VACUUM
DENTAL DISCHARGE
LINES, MT AS HIGH
AS PRACTICAL.
1/4" TAP
FOR MODEL
TRIMMER,
+1100
75 MAIN VENT UP
FROM LOWER LEVEL
ROUTE TO
BATHROOM
BELOW
VENT PLBG FIX. W/
AIR ADMIT. VAVLE
CS
VENT PLBG FIX. W/
AIR ADMIT. VAVLE
25 HWR
ACCURACY OF THIS INFORMATION AND SHALL NOT BE
THE ARCHITECT/ENGINEER HAS NOT VERIFIED THE
ATTIC LEVEL
PAWNEE HEALTH CENTER, ATTIC LEVEL
1 m 3 mPLUMBING PLAN
150 SD VERTICAL
65 SD VERTICAL
75 SD
VERTICAL
50 SD VERTICAL
75 SD, 3/1000 SLOPE
ABOVE ATTIC DECK
100 DN
75 SD 3/1000 SLOPE
ABOVE ATTIC DECK
895SF 1549SF
100 SD AS HIGH
AS POSSIBLE
8759SF
200 SD 3/1000 SLOPE
15333SF
250 SD 3/1000 SLOPE
15295SF
250 SD 3/1000 SLOPE AS
HIGH AS POSSIBLE8123SF
200 SD 3/1000 SLOPE
16882SF
250 DN TO BELOW
MAIN FLR SLAB
1549SF
8721SF
200 SD, 3/1000 SLOPE
8721SF7320SF
660SF
654SF
6574SF 7172SF
1587SF
235SF
M1.03
MechCD-Attic
50 DN 50 DN 50 DN
50 DN 50 DN 50 DN
14491SF
100 SD 3/1000 SLOPE
75 SD VERTICAL
EM
150 SD
EMEM
100 DN
150 SD EM
7320SF
7171SF
AS HIGH AS POSSIBLE200 SD, 3/1000 SLOPE
250 SD
3/1000 SLOPE
PLATFORM
A105 PLATFORM
A104
A106
A108
A109
STAIR
SA002
A101
A1
1936SF
915SF 915SF 75 SD 465SF
1065SF 100 SD
810SF
1315SF
2125SF
100 SD 3/1000 SLOPE
150 SD 3/1000 SLOPE
3440SF
4755SF
537SF840SF915SF915SF493SF 75 SD 75 SD 75 SD 75 SD75 SD
705SF 75 SD 1305SF 100 SD 1265SF 100 SD 1265SF 100 SD 781SF
3/ 4" = 21mm 1" = 25mm 1-1/4" = 35mm 1-1/2" = 41mm 2" = 53mm 2-1/2" = 63mm 3" = 78mm 3-1/2" = 91mm
1" = 25mm 1-1/2" = 40mm 2" = 50mm 2-1/2" = 65mm 3" = 75mm 4" = 100mm
FD, PLASTIC FLOOR DRAIN
WITH NO STRAINER
FD FD
FDFD
FD FD
TWO (2) 50 VACUUM
DENTAL DISCHARGE
LINES, TERMINATE
ABOVE ROOF 180°
FITTING W/ SCREEN
& BACKDRAFT DAMPER/
VALVE.
PER NFPA 99
MAINTAIN 600 AIR
GAP ABOVE ROOF.
UP THRU ROOF FROM BELOW
PVC ROOF DRAIN
HUB ONLY.
50 AIR GAP
GUTTER DOWN LEAD
FLAT ROOF
METAL ROOF
GUTTER
ESCUTCHEON
SEAL PER DETAIL 7/A3.21a
INSULATE
RE: PLANS
FOR SIZE
SUPPORT STRAP
CLEAN AND SAND
ALL EXPOSED PVC,
PAINT WITH ACRYLIC
BLACK SPRAY PAINT
TO PREVENT
ULTRAVIOLET
DEGRADATION
OF PIPE.
ORIGINAL SCALE: NONE
ROOF DRAIN DETAIL
SECTION AT METAL ROOF TO FLAT ROOF
DISPLAY
WALL BELOW
IDO
COMMUNICATIONS
A103
SA001
A107
A105
5.3 5.5
ROOF HATCH
SK
YL
IGH
PVC COND. PIPING
W/ INSULATION FOR
SOUND DEADENING.
ACCURACY OF THIS INFORMATION AND SHALL NOT BE
THE ARCHITECT/ENGINEER HAS NOT VERIFIED THE
550 x 350, UP
SPACE ALLOCATED FOR
FIRE SPRINKLER RISER
G3
C1
C2
OUTSIDE AIR
HANDLING UNIT
EXPANSION TANK
800x800 UP TO
ATTIC SPACE
SUPPLY AIR
SUPPLY & RETURN PIPING
FROM GEOTHERMAL FIELD
RE: B/M0.01 FOR CONNECTIONS
& B/M3.02 FOR DETAILS.
DOMESTIC WATER
HEATERS
SY
ST
YP
AS
BLADDER
AIR VENT, AMTROL #706
EXP TANK
TEMP SENSOR (TYP)
TWO WAY 2 POSITION
VALVES, INTERLOCK W/
RESPECTIVE PUMP.
TYPICAL FOR EACH
GEOTHERMAL FIELD.
GEOTHRMGEOTHRM
GEOTHRM
EO
TH
EL
PUMP - 'G1'
PUMP - 'G2' PUMP - 'G3'
AIR PURGER, AMTROL #462 (150mm) - MOUNT AT HIGHEST POINT
WATER
FILTER
BACKFLUSH
TO DRAIN
TS
HEAT PUMPS
SYSTEM
CIRC
PUMPS
100 100 100
100 100 100
150150
SA180
SA200, 200
SV60
SA190, 200
SA190, 200
SA220SA230
SA
0, SA140,
SA130, 150
SA130,
SA130, 150 SA130, 150
SD200SA220
SA190
M2.01
HVAC PLAN
SA190,
SC90
SC140
SA40 SA180 SA180
RC270
RA500SA100
RA100
RA360
RA340
RA500,
RA180
SC260
SC260
SC250
EB100
SC100
SC100
SD60
PAWNEE HEALTH CENTER, LOWER LEVEL
SA250
A2
RA400RB690
SA240SA240
SA230
EB50
SA140
SA200
RA130
SA100
RA500
RA440
SA160
SC60
EB300
EB250,
350EXH 1400EXH
850EXH
EB250
SC220
2150EXH
RA600
RA160
SC130
RA210
RA200, 200
DAMPER
THERMOSTAT
SQUARE TO ROUND FITTING
RETURN AIR GRILLE
EXHAUST GRILLE
SPIN-IN DUCT TAKEOFF
ROUND OR RECTANGULAR DUCT
CEILING SUPPLY DIFFUSER
45° DUCT TAKEOFF
PAINT ALL ROOF & WALL MTD EXH. FANS & PENETRATIONS THRU BLDG
TO MATCH BUILDING EXTERIOR.
RELIEF AIR DAMPER, TYPICAL ALL AHU-5, RE: D/M2.01M01
M02
M01
500x400 I.D.
600x400 I.D.
SD30
200EXH
RA780
RA170
RA340,
SC150
SA140 SA140 SA140
300CFMEXH
300EXH
EF120, MTD ON WALL ABOVE CANOPY
EB120
e d
4" FILTER
RAOA
VOLUME DAMPER
POSITION DAMPER
MOTORIZED TWO
500* CFM
600x400
8" DIAMETER RELIEF
AIR WITH BACK-DRAFT
cws&r d
EDGE OF
MECH SPACE
TOP
500x400
ABOVE
INSTALL 1" ACCOUSTICAL
DUCT LINER FROM UNIT
SUPPLY AND RETURN DUCTS.
TYPICAL FOR BOTH
TO MIN. OF 3600 LENGTH.
* INITIAL SETTING
UNLESS NOTED ON
FLEX
CONNECTION
RA
RAILING
HP UNIT
TYPICAL HP
VERT. UNIT
PLAN.
6" STAND,
BRAMEC 4008
6x6 ANTI-VIBRATION
PAD, BRAMEC #6136
400x600
400x500
1" COND. TO FLOOR
DRAIN, TYPICAL
FLEX CONNECTION
12'x4'
1700x900
900x800, HUG CLG.
STRUCTURE
800x800
TWO (2) 5 TON WATER TO WATER UNITS STACKED*
THREE (3) 5 TON WATER TO WATER UNITS STACKED*
THREE (3) 5 TON WATER TO WATER UNITS STACKED*
* CONTRACTOR TO FABRICATE SUITABLE
STEEL RACK TO SUPPORT UNITS AND
TO PROVIDE MFR'S CLEARANCES.
DESCRIPTIONMARK
UNIT
SIZE
(CFM)
S.P.
GPM GPMGPM
100% O.A.
ER COIL
MARK
OA
PRIMARY COIL
HP
FAN
NOTES
CONN CONN CONN
25 2.5" 2.5" 2.5"48
UNITS
1, 2, 3, 412000 48
SECONDRY COIL
MODULAR AIR HANDLER, VARIABLE VOLUME, MULTIPLE WATER COILS, TRANE CLIMATE CHANGER. INCLUDE
THE FOLLOWING MODULES IN ORDER:
VERTICAL INTAKE MODULE (40" L), "G" FLAT FILTER MODULE WITH 4" 30% EFF PLEATED FILTERS, "R" MEDIUM MODULE WITH 6-ROW UNIT (UW) ENERGY RECOVERY COIL, "K" SMALL INSPECTION MODULE WITH ACCESS DOOR, "R" MEDIUM COIL MODULE WITH 8-ROW UNIT (UW) PRIMARY COIL, "K" SMALL INSPECTION MODULE WITH ACCESS DOOR, "R" MEDIUM COIL MODULE WITH 8-ROW UNIT (UW) SECONDARY COIL, "AA" VERTICAL DISCHARGE FC FAN, TYPE "B" WITH VARIABLE FREQUENCY DRIVE AND ISOLATION TRANSFORMER. ALL COILS TO HAVE LESS THAN 5 FT WG PRESSURE DROP AT GIVEN GPM. DO NOT EXCEED 500 FPM VELOCITY AT FACE OF
COILS, SUPPLY LARGEST FACE AREA COIL AVAILABLE FOR MODULE.
IN-LINE
TYP
5 TON
WTR-WTR
PR
IM
AR
EC
AR
IL
DDC ANALOG INPUT
UNION P/T PLUG
TEMPERATURE SENSOR
AIR COIL
BALL VALVEUNION
THERMOMETER
MANUAL AIR VENT
COIL # HPS
PRIMARY
SECONDARY
PIPE SIZE
GPM
48 65
1. UNIT TO INCLUDE 2" SPRING ISOLATORS FOR FAN & MOTOR ASSEMBLY.
2. UNIT TO INCLUDE BASE RAIL.
EF
ED
PE
YS
FO
. O
PROVIDE ANTIFREEZE
SOLUTION TO PREVENT
FREEZING AT -5°F OA
ALL OUTSIDE AIR UNIT COILS.
EXP TANK,
AMTROL SX-90V
3. FAN MOTOR TO BE RATED FOR VARIABLE SPEED DRIVE USE, 460/3 VOLT.
PE
AT
SE
SO
FAN MODULE OA
BLANK MODULE W/ACCESS DOOR
FLEX CONNECTION (TYP)
BASE RAIL
PROVIDE NEOPRENE ISOLATION UNDER ALL BASE RAILS
COIL MODULE* W/ 6-ROW ENERGY RECOVERY COIL
CONTINUOUS - MASON TYPE "W" WAFFLE PAD
600x600
ACCESS
DOOR
FILTER MODULE W/ 4"-30% EFF. PLEATED FILTERS
COIL MODULE* W/ 8-ROW PRIMARY COIL
COIL MODULE* W/ 8-ROW SECONDARY COIL
4" DRAINABLE ALUMINUM
LOUVER WITH INSECT SCREEN
BY ARCHITECT
OF BUILDING OR AS DIRECTED
PAINT TO MATCH EXTERIOR
2 - POSITION
INSULATED,
WEATHER-
TIGHT BLADES.
4. CARRIER, TEMTROL AND YORK MANUFACTURERS ARE APPROVED PROVIDED PROPOSED EQUIPMENT WILL MEET OR
EXCEED SPECIFIED QUALITY AND PERFORMANCE.
CONDENSING WATER
FILTER ASSEMBLY
TO GEOTHERMAL
FIELD, RE: M0.01
15 - 75mm LINES.
FROM GEOTHERMAL
FIELD, RE: M0.01
15 - 75mm LINES.
INTAKE OUTSIDE AIR
LOUVER "LV", MOUNT
AS HIGH AS PRACTICAL.
(3600x1200)
65 65
SW SANITARY WASTE
AW ACID WASTE
RD ROOF DRAIN
TS CONDENSING WATER SUPPLY
TR CONDENSING WATER RETURN
CA CONTROL OR COMPRESSED AIR
TW DOMESTIC TEMPERED WATER
VA NON-MEDICAL VACUUM AIR
20CW MAKE-UP
7 GAL. (26 L) BLADDER
TYPE EXPANSION TANK
EXHAUSTEXHAUST
AUTOMATIC
AIR VENT
12,000 CFM
5500 CFM 3800 CFM
ENERGY RECOVERY COIL
(TYPICAL OF 2)
25 GPM (95LPM)
ENERGY RECOVERY COIL
50 GPM (189LPM)
LOCATED IN MECH RM
MOUNTED IN OA UNIT
BASE MT PUMP
50 GPM (189 LPM),
30 FEET HEAD (90kPa)
3/4" (20mm) WITH HOSE NIPPLES
CHEM FEED
50% ANTI-FREEZE
MechCD-LowerFlr
200 200
150 200
200 EB300,
35048 0c fm
800cfm
1650cfm 1880cfm
430cfm
850cfm
1650EXH 1850EXH
450 500 x 350 550 x 350
1040cfm 1300cfm
280cfm 600cfm
RA605
940cfm 1300cfm
250 1540cfm
500cfm 700cfm
760cfm
1010cfm
1260cfm
1780cfm
300 300 300
200300
500x400 I.D.
EB100,
3.5" 15
COIL CONNECTIONS
OUTSIDE AIR SYSTEM
FLOW DIAGRAM
M-1
M-2
M-3
M-4
M-5
M-6
DDC ANALOG INPUT
FLEX HOSE
P/T PLUG
VALVE WITH P/T TAPS
MANUAL FLOW BALANCETEMP. SENSOR
HEAT
RETURN (40)
SUPPLY (40)
HP CONNECTIONS
2 WAY
2 POSITION
VALVE
+100 CONC PAD
+100 CONC PAD (TYP)
GATE VALVE
BUTTERFLY VALVE
STRAINER
BALANCE VALVE
FLOW DIRECTION
PRESSURE REDUCTION VALVE
MOTOR OPERATED VALVE
L/S, liters/second (CFM) AIR FLOWMARK
AIR DISTRIBUTION SYSTEM
AIR TERMINALS:
2ND ENTRY 3RD ENTRY1ST ENTRY
EXHAUST
VAV
TYPE
AIR VOLUME QTY
ETC.
EXAMPLE:
SA100, 150 SUPPLY DIFFUSER, TYPE A, 50 L/S, 150 DUCT
SA50 25 (50)
SA100 50 (100)
SA250 125 (250)
SA400 200 (400)
RA1000 500 (1000)
EA300 150 (300)
1080cfm
1460cfm
150x150
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 11
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
200250
900cfm fm300
1460cfm400
320cfm
360cfm
1100cfm 1360cfm
EA200200
1540cfm
1360cfm
BRANCH OFF SA DUCT & CONNECT TO SA DIFFUSER WITH 200
DUCT AND DAMPER.
180cfm
370cfm
250 200
910cfm 1780cfm1780cfm
200 250
30056
M03 BRANCH OFF RA DUCT & CONNECT TO RA GRILLE WITH 200 DUCT,
SPIN-IN AND DAMPER.
M03
450cfm
410cfm 970cfm
ELECTRICAL PANELS
AI
3/ 4" = 21mm 1" = 25mm 1-1/4" = 35mm 1-1/2" = 41mm 2" = 53mm 2-1/2" = 63mm 3" = 78mm 3-1/2" = 91mm
1" = 25mm 1-1/2" = 40mm 2" = 50mm 2-1/2" = 65mm 3" = 75mm 4" = 100mm
DUCT MOUNTED
SMOKE DETECTOR
DDC FLOW SENSOR
20CW MAKE-UP
DDC FLOW SENSOR
AIR COIL
COIL CONNECTIONS
DUCT MOUNTED
SMOKE DETECTOR
E:
/M
0.
LANDSCAPE IRRIGATION 75 LINE,
200 SLEEVE FROM INSIDE TO OUTSIDE
PAST WALK, RE 1/L3.01.
500X400
600X400
600X400 500X400
350x300
W610x113 BEYOND W410x39
CEILING
600x400 WITH 37.5 INSULATION - RETURN DUCT
MAX HT OF LTG FIX
300 DIA WITH 37.5 INSULATION
CENTER BEAM
CROSS BEAM
LOOKING NORTHWEST
4TH ENTRY
DUCT SIZE
1. INDICATED EXAMPLES ONLY.
WATER SOFTENER & BRINE TANK
'C1' & 'C2'
M-2 M-5
M-1
M-6
M-3
M-4
1 1 1 1 1 1 1 1 1 1 1
"R"
100 DIA
DRYER
VENT
ALUM VENT
WALL CAP,
BACKDRAFT
DAMPER, NO
SCREEN
HVACNO SCALE HTPMP
HVACNO SCALE ERLOOP
HVAC SYSTEM
HVAC SYSTEM HVACSCALE: 1 = 25 SECTIONHVAC SYSTEM
HVACNO SCALE ERLOOP
HVAC SYSTEM
600x500
CLEAR
DUCT
O.A.
HVACNO SCALE HTPMPHVAC SYSTEM
EF
3.
FO
:2
SC
PL
AN
VA
IP
RE: A/M3.02
FOR FLOW PLAN
1 2 3
5 5.3 5.5 7
B135
B143
EXERCISE
B140
B141
B144
B139
B124
B122
B123
SB002
SB001
B133
B134
B136
B137
B131
B132
B121
B128
MEDICAL GAS
B130
SOILED LINEN
B142
HAZARDOUS
WASTE
B145
RECEIVING
B129
B127
B126
B119
HOUSEKEEPING
B102
EQUIPMENT
B103
CLINICAL ENG.
B118
B117
SHOP
B115
B116
B114
B120
MECHANICAL
B101
B104
B110
B109 OFFICE
B108
B107
B106
B105
B113
CONCESSIONS
B138
B112
SAFE AREA
HVACNO SCALE HTPMPHVAC SYSTEM
8FT
DUCTER RETURN
TR TS
ER SUPPLY
4'6" MAXIMUM
BETWEEN SUPPORT
TRAPEZE SUPPORTED
AT EACH JOIST
DISTRIBUTE WEIGHT
EQUALLY ABOUT
CENTER LINE
CENTERLINE OF
TRAPEZE & BEAM
TWO WAY 2 POSITION VALVE
FOR CHEM TREATMENT
ONE PUMP PER SYSTEM
HOSE BIBBS CONN.
IN LINE PUMP CONNECTION
MOTORIZED TWO POSITION DAMPER,
ENERGIZE WITH 120V POWER FROM
NEAREST REC CIRCUIT, OPERATE WITH
FAN AND CO2 SENSOR. OPEN - CO2 OVER
SETPOINT, CLOSED BELOW AND CLOSED
WITH FAN OFF.
200FIRE DMPR
100° FUSE
9x4 DUCT UP TO
EF120 MOUNTED
TO SIDEWALL
PLAN VIEW SIDE VIEW
ABBREVIATIONS
FLOW DIAGRAM SYMBOLS
AIR TERMINAL NOTATION
OUTSIDE AIR HANDLER EQUIPMENT SCHEDULE
SYSTEM SCHEDULE
100% O.A. HANDLER DETAIL
GENERAL MECHANICAL NOTES
MECHANICAL KEYNOTES
MECHANICAL SYMBOLS
D TYPICAL GEOTHERMAL HEAT PUMP UNIT DETAIL
E ENERGY RECOVERY LOOP DIAGRAM F SECTION AT DUCT CROSSING
B CONDENSING WATER FLOW DIAGRAM
C ATTIC CROSS SECTION @ HEAT PUMPSG NEW SECTION UTILITY SUPPORT
ACCURACY OF THIS INFORMATION AND SHALL NOT BE
THE ARCHITECT/ENGINEER HAS NOT VERIFIED THE
M2.02
BRANCH OFF SA DUCT & CONNECT TO SA DIFFUSER WITH 200
M04
M05
& ENERGY RECOVERY PIPING THRU MAIN FLOOR STRUCTURE.
UP TO
M-13
UP TO M-12
M-10
UP TO M-11
UP TO M-7
UP TO M-8
TO M-9
-2
-1
TO M-18
UP TO M-26
TO M-27
TO M-34
M-23
TO M-22
TO M-21
TO M-20
550x500
EF3800
SA220
SA300, 250
EA250
SA100 SA295 SA295
EB200,
SA280
SA200SA200SA200SA200SA180
SA230,
SA230, 200
RB1000
SB50
SA160 SA160
SA160, 200
RA300
RA800
EB80
EA50
SA160SA260
SA320
SA220,
SA140 SA110 SA200
SA140 SA110 SA110SA110
EA160
SA240 SA250
SA330
SA240
SA140, 150
SA200, 200SA190, 200
SA170
SB110
SA150, 150
SA130, 150
SA130
SB100
SA90
SA150
SA280,
SB100 SB100
SA120
SB90
SA90 SA290
SA270
SA310
SC80
EB
SC
EA160
SA160, 200
SA150SA150
EA100
SA110
SA90
SA280 SA280
SA300 SA300
EB150
SA190 SA200, 200
SA250SA250
SA240, 200
EB70
0, SA180SA140,
200 EB100
SA190 SA190, 200
SB40
SB130
SA260
EA100
SA200 SA250 SA250 SA250
EA130
SA240 SA240 SA240 SA240SA240
SA190 SA190 SA190 SA190,200
SA180SA240,200
SA190 SA190 SA190SA220SA160SA280
SA210
SA210
SA210 SA140
SA350
SA320 SA320 SA320
SA80
SA200 SA220 SA230
SA100 SA210
EB100 SA130 SA130
SB70
SA180, 200
SA190,
SB210
SC160,200
SA50
SE140
SC160
SA350SA350
SA350SA350
SA150SA110
SA80
SA310
EA250, 200
EA150
SA170, 200
SA230SA360
SA150,
SB80
650x300, FROM BELOW
SD80
RB1350
RB1800
RA120
RA820
RA110
RA200
RA700
RA280
SD250
RA180,
RA170,
RA130,150
RA150
RA130,
RA180,
THERMOSTAT
SQUARE TO ROUND FITTING
RETURN AIR GRILLE
EXHAUST GRILLE
SPIN-IN DUCT TAKEOFF
ROUND OR RECTANGULAR DUCT
CEILING SUPPLY DIFFUSER
45°…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| SF 24.pdf | ||
| http //www.wdol.gov/wdol/scafiles/davisbacon/OK13.dvb v 13 | — | |
| PawneeCTHVACAmendment0001.docx.pdf | ||
| 52.213-4.pdf | ||
| Additional Provisions-Terms and Conditions-Non 8(a).docx | DOCX document | |
| Insurance Requirements.docx | DOCX document | |
| Pawnee-Div-15-Mech.pdf | ||
| Pawnee X-Ray Room Modification | — | |
| PawneeCTMechanicalSF18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .