PawneeCTElecSOWAmendment0001.docx

DOCX document 563 KB Posted

Attached to
Provide Electrical Work for Installation of a CT Scanner
Solicitation number
246-2012-Q-0033
Issued by

About this file

SOW Amendment

View the file

Other files

File Type Posted
SF 24.pdf PDF
PawneeCTElecAmendment0001.docx.pdf PDF
Insurance Requirements.docx DOCX document
Additional Provisions-Terms and Conditions A-E.docx DOCX document
PawneeCTElectricalSF18.pdf PDF
52.213-4.pdf PDF
Pawnee X-Ray Room Modification —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. How is the UPS electrical to be installed?

IHS COTR contacted Toshiba America Medical Systems - Greg G Atkins, Sr. Installation Project Manager

1. The UPS is used for backup power for the CPU (Computer) when power is lost or interrupted

1. UPS is getting the electrical from the PCDU at 208V 40 AMPS and electrical wire At 208V 40AMPS is to be ran from the UPS to the CPU and tied to the EPD Emergency Push Button as indicated in the E3 Toshiba Typical Electrical Drawings (see below)

1. Who is doing the floor level trench duct?

1. To amend in to the Pawnee X-Ray Modification for CT - Electrical Scope of Work Contractor bidding to include cutting the concert for the floor level trench duct behind CT (see below) For this project No Wall duct, the electrical and low voltage to be ran in the wall per NEC Code.

1. Requested example photos of Toshiba Aquilion CT electrical install

1. Claremore Indian Hospital Toshiba Aquilion 64 Slice CT image3.png image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image1.png image2.png