2455_B Addendum 1.pdf
PDF 2 MB Posted
- Attached to
- #2455-B Starrs Mill School Tunnel Construction
- Solicitation number
- PE-65600-NONST-2025-000000078
- Issued by
- Douglas County, Georgia
About this file
The document provided is an addendum for Invitation to Bid #2455-B Starrs Mill School Tunnel Construction, a state and local contract opportunity issued by Fayette County, Georgia. The project involves the construction of a multiuse tunnel under Redwine Road. Bids are due by 3:00pm on Wednesday, September 4, 2024. The addendum includes location sketches and grading plans for the project site.
The contract opportunity does not provide details on pricing terms, set asides, incumbents, funding requirements, or other salient financial information. The document focuses solely on the technical specifications and design details for the tunnel construction project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024_07_03 _ Starr_s Mill School Tunnel Bid T.xlsx | XLSX spreadsheet | |
| 2024_02_27 _ Starr_s Mill Tunnel 100_ Plans R.pdf | ||
| 2455_B ITB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION SKETCH
PROJECT LOCATION
P:
\M ar ie tta \1
Fa ye tte C ou nt y\
.0
S ta rr s M ill
S ch oo l T un ne l D es ig n\
En gi ne er in g\
D es ig n\
.0
_N ot es E tc .d w g
8/
/2
:5
PM
U
SE
R
: E ric
B ris se
THESE PLANS AND DRAWINGS ARE NOT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN PERMISSION AND CONSENT OF CROY
ENGINEERING, LLC, NOR ARE THEY TO BE ASSIGNED TO ANY PARTY WITHOUT WRITTEN PERMISSION AND CONSENT.
P:
\M ar ie tta \1
Fa ye tte C ou nt y\
.0
S ta rr s M ill
S ch oo l T un ne l D es ig n\
En gi ne er in g\
D es ig n\
.0
_G ra di ng
.d w g 8/
/2
:4
PM
U
SE
R : E ric B ris se
THESE PLANS AND DRAWINGS ARE NOT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN PERMISSION AND CONSENT OF CROY
ENGINEERING, LLC, NOR ARE THEY TO BE ASSIGNED TO ANY PARTY WITHOUT WRITTEN PERMISSION AND CONSENT.
| DOC090324-09032024115632.pdf |
| 2024.08.29 - Starr's Mill School Tunnel IFC Grading Plan Revision1.pdf |
File details come from the government source that posted it. Updated .