STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

Troubleshoot and repair

CG 24303 CB-ATON-L SFLC

1.0 GENERAL

1.1 Background

Work to be accomplished is necessary for getting the CB-ATON-L fully mission capable

1.2 Scope

Troubleshoot and repair 24' Metal Shark CBAL diesel engine for CG 24303 which is experiencing starting and performance issues. Asset will not achieve 2000RPM.

CG 24303 was in layup for several years prior to temporary use by unit, and numerous systems are suspected to be degraded. Vendor shall be responsible for providing all labor, personnel, and material required to complete the work.

1.3 OBJECTIVE

Perform troubleshooting and repair of CG 24303 systems.

2.0 SPECIFIC REQUIREMENTS/TASKS

2.1 TASK ONE. CG 24303 Troubleshoot

2.1.1 Complete full Troubleshoot of by a certified STYER Technician

2.2 TASK TWO. STYER ENGINE repair:

2.2.1 Oil and filter change (Primary, Secondary fuel filter, oil filter, air filter)

2.2.2 Replace Sea water pump impeller.

2.2.3 Remove Charge Air Cooler for cleaning and replacing seals.

2.2.4 Replace turbocharger.

2.2.5 Remove Heat Exchanger for cleaning and replacing seals

2.2.6 Replace STYER Coolant

2.2.7 Replace Engine timing belt

2.2.8 Replace Engine glow plugs

2.2.9 Replace V-belt and belt tensioner

2.2.10 Remove, inspect Primary Exhaust Riser

2.2.11 Adjust valve clearance, engine timing, injector settings and fuel rack timing.

2.2.12 Replace engine cooling system zinc anodes.

2.2.13 Maintenance in-service engine mounts.

2.2.14 Clean bilge

2.3 TASK THREE. Mercruser Outdrive Service

2.3.1 Replace Gimbal Bearing U-Joint Assembly & Bellows

2.3.2 Replace Drive Shaft and Upper/Lower Bearings

2.3.3 Replace Shift Cable

2.3.4 Replace Oil Reservoir Hose

2.3.5 Replace Trim Cylinder and Hoses

2.3.6 Replace related gaskets, Anodes and fasteners

2.3.7 Replace Drive & Trim Tilt oil

2.3.8 Paint Outdrive and related Trim Tilt components

2.3.9 Grease Propeller Shaft

2.4 TASK FOUR. Operational test of asset

2.5 TASK FIVE. Complete any additional repairs required by inspection to return asset to fully operational

2.6 TASK SIX. Notify CG via CFR if additional parts, consumables, expendables are required.

3.0 CONTRACTOR PERSONNEL

3.1 QUALIFIED PERSONNEL

The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.

3.2 CONTINUITY OF SUPPORT

None.

3.3 KEY PERSONNEL

None.

3.4 PROJECT MANAGER

The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this SOW. The Project Manager shall be a single point of contact for the Contracting Officer and the COR. It is anticipated that the Project Manager shall be one of the senior level employees provided by the Contractor for this work effort. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project Manager, shall be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates shall be able to read, write, speak and understand English. Additionally, the Contractor shall not replace the Project Manager without prior approval from the Contracting Officer.

3.4.1 The Project Manager shall be available to the COR via telephone between the hours of 0800 and 1600 EST, Monday through Friday, and shall respond to a request for discussion or resolution of technical problems within 02 hours of notification.

4.0 OTHER APPLICABLE CONDITIONS

4.1 SECURITY

Contractor access to classified information is not currently required under this SOW.

4.2 Period of Performance

TBD

4.3 PLACE OF PERFORMANCE

The primary place of performance will be at repair facility Full sail marine.

4.4 HOURS OF OPERATION

Contractor will perform work on the asset during there normal scheduled hours.

4.7 PROJECT PLAN

The Contractor shall provide an accurate estimate which itemizes each repair required for the asset, and provide CFR for growth work during repair. CFR will require prior authorization from COR before work can be performed

4.8 PROTECTION OF INFORMATION

Contractor access to proprietary information is required under this SOW. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.

7.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

7.2 The COR will have 01 business day to review deliverables and make comments. The Contractor shall have 01 business day to make corrections and redeliver.

7.3 All other review times and schedules for deliverables shall be agreed upon by the parties based on the final approved Project Plan. The Contractor shall be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor shall work with personnel reviewing the deliverables to assure that the established schedule is maintained.