2425-00827_Cost_Worksheet_Final.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
RFQ FTB-2425-827
Solicitation number
0000032960
Issued by
Sacramento County, San Francisco City, California

About this file

This document is a cost worksheet that is part of a Request for Quotes (RFQ) for the replacement of end-of-life post-processing equipment on the Variostream 7650 print line. The equipment to be replaced includes a Tecnau folder, autoload table, detensioner, single loop festoon, and printer interface. The contracting agency is seeking to procure this equipment, as well as associated professional services for installation, deinstallation, removal, and transportation. The worksheet details the model numbers, serial numbers, quantities, unit prices, and extended prices for the hardware and maintenance services. It also includes sections for click charges and unanticipated tasks. The contract term is from January 1, 2025 to December 31, 2025.

The cost worksheet provides pricing details, including hardware, maintenance, and click charges. The hardware maintenance covers the Variostream 7650 print line equipment, such as the unwind units, conveyors, buffers, and cutters. The click charges are based on the estimated monthly click volumes for the three Variostream 7650 printers. The worksheet also includes provisions for unanticipated tasks, such as holiday rates and zone service charges.

View the file

Other files

File Type Posted
RFQ_FTB-2425-827.docx DOCX document
RFQ_FTB-2425-827_QA_Set_1.pdf PDF
RFQ_FTB-2425-827_Intent_to_Award.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFQ FTB-2425-827

Attachment 2 - Cost Worksheet Model #s Serial #s Description Hardware (includes 90 day warranty)

Replacement Equipment for EOL Post-Processing Equipment on Variostream 7650 Print LineQTYUnit PriceExtension Price
80019201ATBDTecnau FOLDER f4 (REFURBISHED)1$ - 0
506822ATBDTecnau AUTOLOAD TABLE t3 (NEW)1$ - 0
755439ATBDTecnau TEC755439 TC VM1 DETENSIONER1$ - 0
804365-003TBDTecnau STR804365003 SINGLE LOOP FESTOON1$ - 0
749495-ADTBDTecnau PRINTER INTERFACE1$ - 0
501192TBDTecnau 2 x 4-sided stack racks2$ - 0
505023TBDTecnau 4 x 2-sided stack racks4$ - 0
503113TBDTecnau 4 x 1sided stack rack4$ - 0
Hardware (Taxable) Subtotal$ - 0
Professional ServicesHours
(to be completed by the Contractor)Hourly RateFixed Fee
Installation of FanFold F4 and associated equipment$ - 0
Deinstallation, Removal, and Transporting of Folder 92 and VST 192$ - 0
Deinstallation, Removal, and Transporting for VS 7650$ - 0
Deinstallation, Removal, and Transporting for VS 7400$ - 0
Professional Services Subtotal$ - 0
Model #sSerial #sHardware Maintenance for VS 7650 Print LineQTYMonthly CostExtension Price
Term: 01/01/2025 - 12/31/2025
SF758026A29382STR758026A UNWIND UNIT, 550 6-20111$ - 0
SF758026A0714728146401F029339LRS728164001 CONVEYOR, 1.2M1$ - 0
SF758026ARSI506267A LOOP TUB1$ - 0
SF758026A29395STR758026A UNWIND UNIT, 550 6-20111$ - 0
VS7650187327VARIOSTREAM 76501$ - 0
VS7650287360VARIOSTREAM 76501$ - 0
VS7650387361VARIOSTREAM 76501$ - 0
SF718980AB5301028STR718980A BUFFER, 5301$ - 0
SPSMVSS30064SPS MVS1$ - 0
SF7280464-TABLEMD-85STR728046 CONVEYOR, 1.2M1$ - 0
SPSMVS420660768-82PRISMA SPS V4.0X( NFS)1$ - 0
$ - 0
LR718944AC5611059LRS718944A CUTTER 5611$ - 0
LR718974AM5351031LRS718974A MERGER 5351$ - 0
SF718962AS5661045STR718962A STACKER, 5661$ - 0
Term: Upon expiration of 90 day warranty - 12/31/2025
80019201ATBDTecnau FOLDER f4 (REFURBISHED)1$ - 0
506822ATBDTecnau AUTOLOAD TABLE t3 (NEW)1$ - 0
755439ATBDTecnau TEC755439 TC VM1 DETENSIONER1$ - 0
804365-003TBDTecnau STR804365003 SINGLE LOOP FESTOON1$ - 0
749495-ADTBDTecnau PRINTER INTERFACE1$ - 0
HW Maintenance Subtotal$ - 0
Model #sSerial #sClick ChargesEstimated ClicksMonthly CostExtension Price
87327VARIOSTREAM 7650 Printer 1250,581$ - 0
87360VARIOSTREAM 7650 Printer 21,503,509$ - 0
87361VARIOSTREAM 7650 Printer 31,494,819$ - 0
Click charges will be at the rates quoted above by the Contractor and shall be binding for the term of the Agreement. The estimated click count stated above is not binding on the contracting agency.
Click Charges Subtotal$ - 0
Unanticapted TasksQty/HrsUnit Price/Hrly RateExtension Price
Holiday Rates Based Minimum 2 hours$ - 0
Per hour after base holiday rates$ - 0
Zone service charge for Zone 1 (1-25 miles)$ - 0
$ - 0
$ - 0
Unanticipated Tasks Subtotal$ - 0
Non-Taxable Subtotal$ - 0
Taxable Subtotal$ - 0
Subtotal$ - 0
Sales Tax7.75%$ - 0
Grand Total$ - 0

File details come from the government source that posted it. Updated .