This is an architectural drawing set prepared by Kueny Architects, LLC for the Kenosha County Public Safety Building Fuel Island Replacement project located at 1000 55th Street, Kenosha, Wisconsin. The project encompasses the complete replacement of an existing fuel island and canopy, including demolition of the current infrastructure and installation of new equipment. The drawings include six sheets covering site plans, floor plans, exterior elevations, sections, roof and lighting plans, and electrical panel schedules. Key components of the new fuel island installation include a 10,000-gallon underground unleaded fuel tank, a 5,000-gallon underground diesel fuel tank, fuel dispensers for both unleaded and diesel fuel, a new canopy structure with aluminum fascia and roof drainage, concrete fuel island with stainless steel edge forms, stainless steel bollards, and a new fuel alarm panel enclosure. The project requires the demolition of the existing fuel island concrete structure, canopy, underground fuel tanks, and associated piping and electrical systems, with selective reuse and relocation of existing equipment such as the fuel master management system and island key reader.

The architectural plans specify a concrete slab construction with Type B concrete (6 inches over 6 inches of crushed stone with vapor barrier and reinforcing), control joints, and provisions for drainage with floor drains and storm pipes connecting to catch basins. General construction notes require all concrete to meet 4000 psi testing at 28 days, field verification of existing utilities and conditions, compliance with applicable codes and safety standards, and contractor responsibility for permit acquisition and fees. The architect, Jon P. Wallenkamp of Kueny Architects, has not provided express or implied warranty for the services, noting that work was conducted consistent with professional standards under the given budget and time constraints. The drawings indicate coordination between the fuel canopy contractor, fuel island contractor, and electrical contractor for final design and installation of specific components, with detailed cross-references to specification sections throughout the construction documents.

View the file

Other files

File Type Posted
2415 Addendum 4.pdf PDF
2415 Bid Documents.pdf PDF
2415 Addendum 1.pdf PDF
2415 Addendum 3.pdf PDF
2415 Specifications.pdf PDF
2415 Addendum 2.pdf PDF
Vendor Responsibility Form Construction.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.0KUENY ARCHITECTS, LLC

10505 CORPORATE DRIVE - SUITE 100 PLEASANT PRAIRIE, WI 53158 PHONE (262) 857-8101 FAX (262) 857 8103

SITE MAP GENERAL NOTES

1. All concrete to test 4000 psi in 28 days.

2. Verify all dimensions, access, utilities and working conditions in the field.

3. Conform to all applicable codes, ordinances and safety standards.

4. Obtain and pay for all required permits and fees.

5. Notify Architect immediately if work cannot proceed as shown on Drawings or as described in the Specifications.

6. No concrete to be poured without Architect's prior review.

7. All Contractor's to co-operate with all trades, Owner's and Architect's representatives.

8. Leave site clean, neat and free of debris at all times.

9. Each Prime and Sub-contractor is responsible for having read each page of the Specifications, Drawings, Addenda and Change Orders.

10. Guard against interfering with Owner's operations.

11. These Drawings contain no provisions or procedures for on-site safety. Each

Contractor and their employees are responsible to follow all laws and ordinances and provide their own engineering to provide a safe work place.

12. The locations of existing underground utilities, shown on these Drawings, are shown in an approximate way only and have not been independently verified by the Owner or its representatives. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occassioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.

13. Services perform for this project have been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in this area under similar budget and time constraints. No warranty, expressed or implied, is made.

MATERIAL INDICATIONS

DRAWING LEGEND

New or Required Point Elevation

Existing Point Elevation

Existing Contours

New or Required Contours

A Grid Lines

3.1 Building Section

Wall Section

Room/Space Number

Door Number

SHEET INDEX

Earth Backfill

Rigid Insulation

Concrete Block

Aluminum

Lumber (Rough)

Steel

Sand Fill

Concrete

Finished Wood

Stone Fill

Plywood

Batt Insulation

4.1

Room 1

101 Interior Elevation

Detail Section

5.1

7.1

CONSULTANTS

5.1

Detail Number

Page Number

Exterior Elevation

2.1

1 Wall Tag

+ 100.0

+ 100.0

+ 100.0

+ 100.0

Kenosha Co. Public Safety

Building

Fuel Island

1000 55th Street Kenosha, WI 53140

April 23, 2024

Kenosha Co. Public Safety Building

Fuel Island

ARCHITECT Kueny Architects 10505 Corporate Drive, Suite 100

(262) 857-8101 Pleasant Prairie, Wisconsin 53158 Architect of Record - Jon P. Wallenkamp

PROJECT

LOCATION

Title

1.0 Title Sheet

ARCHITECTURAL

FI-A101 Site Plans

FI-A102 Architectural Site - Enlarged Plan

FI-A200 Floor Plans

FI-A201 Fuel Island - Exterior Elevations

FI-A301 Fuel Island - Sections, Roof & Lighting Plan - Elec. Panel Schedule

Grand total: 6

BID SET

F �I

C

A

P

Y

F�I� CA��PY

25'�0"

EXISTI�G GE�ERAT�R I�

BASE�E�T

FIE�D VERIFY

EXACT ��CATI��

EXISTI�G VE�T

PIPES (Dashed �"s)

EXISTI�G VAU�T

T� RE�AI�

(11 11 28�14) 5(000 GA�

U�DERGR�U�D DIESE� FUE� TA�)

PER SPECS

(11 11 28�13) 10(000 GA�

U�DERGR�U�D U��EADED FUE�

TA�) PER SPECS

(11 11 28�13) 10(000 GA�

U�DERGR�U�D U��EADED FUE�

TA�) PER SPECS

(11 11 28�16) FUE� CA��PY� FI�A�

DESIG� BY FUE� CA��PY

C��TRACT�R PER SPECS

(01 10 00�04) EXISTI�G GA�VA�I,ED

GRATE @ �V� 1 (12FT AB�VE

BASE�E�T �V�)

(22 01 00�05) T�P �F SAFETY CAP T�

�ATCH EXISTI�G� �ABE� PIPE

I�DICATI�G "DIESE� FUE� ���Y"

(22 01 00�03) �EW 1�102"1 B�AC)

PIPE T� GE�ERAT�R� FIE�D VERIFY

EXACT C��DITI��S� PIPE T�

F����W SI�I�AR R�UTE �F

EXISTI�G PIPES

(22 01 00�04) 1�5"1 B�AC) PIPE FI��

�I�E WITH SAFETY CAP (Red �"�)

(22 01 00�06) PIPE T� PASS THR�UGH

EXISTI�G A�U�I�U� ��UVER A�D

DUCT W�R) AS EXISTI�G� C��P�ETE

SEA� AR�U�D PIPES

(11 11 28�20) I�STA�� H�FF�A�

PE�TAIR B�X F�R FUE� A�AR�

PA�E�� 18x16x10 �E�A 4X

E�C��SURE WITH VIEWI�G WI�D�W

FI�A102

Si4

(01 10 00�05) EXISTI�G E�ECTRIC

PA�E� E�C� USED F�R FUE� IS�A�D

(01 10 00�06) EXISTI�G GAS B�Y

C���U�ICATI��S B�X T� RE�AI�

02 41 00.18

02 41 00.04

02 41 00.12

02 41 00.13

02 41 00.17

02 41 00.19

02 41 00.18

02 41 00.04

02 41 00.18

02 41 00.20

02 41 00.16

02 41 00.04

01 10 00.05

01 10 00.06

01 10 00.07

02 41 00.21

02 41 00.21

1/16" = 1'-0"1 General Floor Plan - Existing & Demo kuenyarch.com ©2024 Kueny Architects L.L.C. - All Rights Reserved

TRUE

NORTH

KEYNOTE LEGEND

SCALE: As indicated

FI-A101Kenosha Co. Public Safety Building - Fuel Island

April 23, 2024

Site P�a s

1000 55th Street Kenosha, WI 53140

1" = 20'-0"2 Architectural Site Plan

01 10 00.04 EXISTING GALVANIZED GRATE @ LVL 1 (12FT ABOVE BASEMENT LVL)

01 10 00.05 EXISTING ELECTRIC PANEL E.C. USED FOR FUEL ISLAND

01 10 00.06 EXISTING GAS BOY COMMUNICATIONS BOX TO REMAIN

01 10 00.07 EXISTING VEDEER-ROOT CONTROLERS TO REMAIN

02 41 00.04 DEMO CONCRETE SLAB. FIELD VERIFY EXISTING CONDITIONS

02 41 00.12 DEMO COMPLETE FUEL ISLAND CONCRETE ISLAND, FUEL DISPENSER

EQUIPMENT AND CANOPY

02 41 00.13 DEMO FUEL ISLAND CANOPY FOOTING

02 41 00.16 REMOVE EXISTING FUEL MASTER MANGAMENT SYSTEM. RE-USE &

RELOCATE PER NEW LAYOUT

02 41 00.17 DEMO DUEL ISLAND CONCRETE BOLLARD

02 41 00.18 DEMO ASPHALT IN THIS AREA

02 41 00.19 DEMO EXISTING UNDERGROUND FUEL TANK AND PIPING

02 41 00.20 REMOVE EXISTING PIPES FROM GENERATOR TO INSIDE BUILDING. CUT PIPE

4 FT INSIDE BUILDING OR NEAREST CONNECTION POINT (FIELD VERIFY)

02 41 00.21 DEMO EXISTING CONDUITS OF FUEL ISLAND CARD READER MANAGAMENT

SYSTEM

11 11 28.13 10,000 GAL UNDERGROUND UNLEADED FUEL TANK PER SPECS

11 11 28.14 5,000 GAL UNDERGROUND DIESEL FUEL TANK PER SPECS

11 11 28.16 FUEL CANOPY. FINAL DESIGN BY FUEL CANOPY CONTRACTOR PER SPECS

11 11 28.20 INSTALL HOFFMAN PENTAIR BOX FOR FUEL ALARM PANEL. 18x16x10 NEMA 4X

ENCLOSURE WITH VIEWING WINDOW

22 01 00.03 NEW 1-1/2"Ø BLACK PIPE TO GENERATOR. FIELD VERIFY EXACT CONDITIONS.

PIPE TO FOLLOW SIMILAR ROUTE OF EXISTING PIPES

22 01 00.04 1.5"Ø BLACK PIPE FILL LINE WITH SAFETY CAP (Red Ln.)

22 01 00.05 TOP OF SAFETY CAP TO MATCH EXISTING. LABEL PIPE INDICATING "DIESEL

FUEL ONLY"

22 01 00.06 PIPE TO PASS THROUGH EXISTING ALUMINUM LOUVER AND DUCT WORK AS

EXISTING. COMPLETE SEAL AROUND PIPES

C Fnc

C FncC

F n c

C F n c

C F n c

C F n c

C F n c

C F n c

C F n c

C F n c

C F n c

C F n c

C F n c

CFnc

CFnc

CFnc CFnc

CFnc CFnc

CFnc CFnc

CFnc

C F n c

C F n c

C F n c

C F n c

C F n c

C F n c

C F n c

CFnc CFncCFnc CFnc CFnc CFnc C F n c

C F n c

C F n c

C F n c

C F n c

C F n c

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

C Fnc

T H

A V E N

U E

54TH STREET

EXISTING BUILDING

ex mech ex mech

E�ECTRICA� SERVICE

TER�I�ATI�� B�X

WE E�ERGIES

C��CRETE

E�CASED

DUCT BA�)

��R�A� P�WER T�

E�ERGE�CY GE�ERAT�R

20' B�U�DARY

WE E�ERGIES

PAD ��U�T

TRA�SF�R�ER

��R�A� P�WER T�

E�ERGE�CY GE�ERAT�R

20' B�U�DARY

FUE� IS�A�D

20' C�ASS 1 DIV 2

B�U�DARY

GE�ERAT�R

��CATI��

FUEL ISLAND

FI�A201

FI�A201

FI�A201

FI�A201

R

0'

R 2 0' �

03 30 00.21

03 30 00.03

11 11 28.20

DE�IVERY D��R

01 10 00.05

01 10 00.06

01 10 00.07

26 05 00.01

11 11 30.01

11 11 28.12

11 11 28.12

03 30 00.30

03 30 00.30

03 30 00.30

02 41 00.20

22 01 00.02 fleet maintenance storage

26 05 00.02

26 05 00.02

26 05 00.01

(31 20 00) CRUSHED ST��E AGGREGATE

VARIES 2'�0" �I�

(07 11 00) 10 �I� VAP�R BARRIER

(03 30 00) REI�F�RCI�G PER SCHEDU�E

(03 30 00) C��CRETE S�AB

�VER�AP REI�F�RCI�G

AT C��STRUCTI�� 6�I�TS

C��STRUCTI�� 6�I�T

1'�0" �I�

(07 11 00) AIR SHIE�D F�ASHI�G

TAPE AT EXTERI�R WA�� �I�E

(03 30 00) 15# FE�T � B��D BREA)ER

C��TR�� 6�I�T

CONCRETE SLAB NOTES

CONCRETE TYPE "B"

6" C��CRETE S�AB � 6 x 6 W 2�9 x W 2�9 WWF w0 10 �I� P��YETHY�E�E VAP�R BARRIER

�VER 6" C��PACTED CRUSHED ST��E

�ue yarch�c�� �2024 �ue y Architects ����C� � A�� Rights Reserved

P�A! !"RTH

KEYNOTE LEGEND

SCALE: As indicated

FI-A102Kenosha Co. Public Safety Building - Fuel Island

April 23, 2024

Architectura� Site � E �arged P�a

1000 55th Street Kenosha, WI 53140

1" = 10'-0"1 Architectural Site Plan

1 1/2" = 1'-0"2 Concrete Slab - Type B

01 10 00.05 EXISTING ELECTRIC PANEL E.C. USED FOR FUEL ISLAND

01 10 00.06 EXISTING GAS BOY COMMUNICATIONS BOX TO REMAIN

01 10 00.07 EXISTING VEDEER-ROOT CONTROLERS TO REMAIN

02 41 00.20 REMOVE EXISTING PIPES FROM GENERATOR TO INSIDE BUILDING. CUT PIPE

4 FT INSIDE BUILDING OR NEAREST CONNECTION POINT (FIELD VERIFY)

03 30 00.03 6" CONCRETE SLAB OVER 6" CRUSHED STONE; SLAB TYPE "B"

03 30 00.21 TYPICAL CONTROL JOINTS

03 30 00.30 ALL NEW CONCRETE TO MATCH ADJACENT GRADE

11 11 28.12 FUEL DISPENSER UNIT PER SPECS

11 11 28.20 INSTALL HOFFMAN PENTAIR BOX FOR FUEL ALARM PANEL. 18x16x10 NEMA 4X

ENCLOSURE WITH VIEWING WINDOW

11 11 30.01 RE-USE EXISTING MASTER ISLAND KEY READER

22 01 00.02 REPLACE EXISTING BLACK PIPE FROM GENERATOR TO BUILDING. FIELD

VERIFY PIPE WIDTH

26 05 00.01 REPLACE EXISTING CONDUIT AND INSTALL (2) TWO 1-1/2"Ø CONDUITS FOR

FUEL ISLAND LOW VOLTAGE

26 05 00.02 ELECTRIC CONTRACTOR TO INSTALL NEW NEW CONDUITS AND WIRING FOR

NEW FUEL ISLAND. RE-USE EXISTING & SPARE BREAKERS IN PANEL E.C. AS

NEEDED

MECHANICAL

MECHANICAL

D S

L D

S L

D S

L D

S L

D S

L D

S L

D S

L

U L

U L

UL UL

U L

U L

U L

UL ULUL

UL ULUL UL UL UL UL UL

UL ULUL UL UL UL UL UL UL

U L

U L

MECHANICAL

MECHANICAL

D S

L D

S L

D S

L D

S L

D S

L D

S L

D S

L

D S

L

D S

L

FI-A

02 41 00.12

02 41 00.14

25'�6"

E X

IS

T

I� G

F U

E I

S A

D

C A

P Y

EXISTI�G FUE� IS�A�D CA��PY

25'�0"

8'�0

'�0

02 41 00.16

02 41 00.14

21'�0"

02 41 00.15

02 41 00.04

FI-1

FI-1

FI-2

FI-2

EXISTI�G

GE�ERAT�R

��CATI��

02 41 00.18

02 41 00.16

FI-A

F U

E I

S A

D

C A

P Y

FUE� IS�A�D CA��PY

25'�0"

1'�6"22'�8"1'�6"

11 11 28.05

11 11 30.01

11 11 28.05

11 11 28.04

11 11 28.04

11 11 28.07

11 11 28.12

11 11 28.12

11 11 28.19

22 13 16.A6

11 11 28.19

22 13 16.A6

FI�A201

FI�A201

FI�A201

FI�A201

FI�A301

FI�A301

FI-1

FI-1

FI-2

FI-2

ADD T� CA��PY

4'�0"

A�TER�ATE

ADD T� CA��PY

4'�0"

A�TER�ATE

ELECTRIC

GENERATOR

5000 UNDERGROUD

DIESEL TANK

10,000 UNDERGROUD

UNLEADED FUEL TANK

UNLEADED

UNLEADED

DIESEL

UNLEADED

03 30 00.03

03 30 00.03

03 30 00.0303 30 00.03

22 13 16.A7

22 13 16.A2

F�D�

01 10 00.03

01 10 00.03

22 01 00.02

03 30 00.21

03 30 00.21

22 01 00.07

22 01 00.07

22 01 00.08

11 11 28.20

26 05 00.02

26 05 00.01

03 30 00.30

03 30 00.30

03 30 00.30

03 30 00.30

03 30 00.30

26 05 00.02

26 05 00.01

03 30 00.30

11 11 28.21

10,000 UNDERGROUD

UNLEADED FUEL TANK

�ue yarch�c�� �2024 �ue y Architects ����C� � A�� Rights Reserved

P�A! !"RTH

KEYNOTE LEGEND

SCALE: As indicated

FI-A200Kenosha Co. Public Safety Building - Fuel Island

April 23, 2024

F���r P�a s

1000 55th Street Kenosha, WI 53140

3/16" = 1'-0"1 Floor Plan - Demo 1/4" = 1'-0"2 Floor Plan

01 10 00.03 EXISTING BOLLARDS TO REMAIN

02 41 00.04 DEMO CONCRETE SLAB. FIELD VERIFY EXISTING CONDITIONS

02 41 00.12 DEMO COMPLETE FUEL ISLAND CONCRETE ISLAND, FUEL DISPENSER EQUIPMENT AND CANOPY

02 41 00.14 DEMO CONCRETE - REMOVE EXISTING UNDERGROUND FUEL TANK & PIPING

02 41 00.15 DEMO EXISTING UNDERGROUND OIL TANK. DEMO ASPHALT/CONCRETE AS NEEDED. FIELD VERIFY ALL

CONDITIONS.

02 41 00.16 REMOVE EXISTING FUEL MASTER MANGAMENT SYSTEM. RE-USE & RELOCATE PER NEW LAYOUT

02 41 00.18 DEMO ASPHALT IN THIS AREA

03 30 00.03 6" CONCRETE SLAB OVER 6" CRUSHED STONE; SLAB TYPE "B"

03 30 00.21 TYPICAL CONTROL JOINTS

03 30 00.30 ALL NEW CONCRETE TO MATCH ADJACENT GRADE

11 11 28.04 4" STAINLESS STEEL U-BOLLARD. TYP. @ ENDS OF FUEL ISLAND BY FUEL ISLAND CONTRACTOR

11 11 28.05 FUEL CANOPY STRUCTURAL COLUMN PER FUEL ISLAND CONTRACTOR

11 11 28.07 CONCRETE FUEL ISLAND W/ STAINLESS STEEL EDGE FORM. VARIES HEIGHT PER LOCATION (6" MIN)

11 11 28.12 FUEL DISPENSER UNIT PER SPECS

11 11 28.19 FUEL ISLAND ALUMINUM DOWNSPOUT BY FUEL ISLAND CONTRACTOR

11 11 28.20 INSTALL HOFFMAN PENTAIR BOX FOR FUEL ALARM PANEL. 18x16x10 NEMA 4X ENCLOSURE WITH VIEWING

WINDOW

11 11 28.21 COMPLETE STARTUP FOR ADDITIONAL DISPENSING UNITS

11 11 30.01 RE-USE EXISTING MASTER ISLAND KEY READER

22 01 00.02 REPLACE EXISTING BLACK PIPE FROM GENERATOR TO BUILDING. FIELD VERIFY PIPE WIDTH

22 01 00.07 EXISTING FUEL PUMP AND FUEL LINE TO REMAIN

22 01 00.08 CONNECT EXISTING FUEL LINE TO NEW UNDERGROUND DIESEL FUEL TANK

22 13 16.A2 FLOOR DRAIN

22 13 16.A6 6" STORM PIPE. CONNECT TO NEAREST CATCH BASIN

22 13 16.A7 3" DRAIN PIPE. CONNECT TO NEAREST CATCH BASIN

26 05 00.01 REPLACE EXISTING CONDUIT AND INSTALL (2) TWO 1-1/2"Ø CONDUITS FOR FUEL ISLAND LOW VOLTAGE

26 05 00.02 ELECTRIC CONTRACTOR TO INSTALL NEW NEW CONDUITS AND WIRING FOR NEW FUEL ISLAND. RE-USE

EXISTING & SPARE BREAKERS IN PANEL E.C. AS NEEDED

�EVE� 1

0'�0"

B" Ca �py

16'�0"

T" Ca �py

18'�6"

T" F��ti g

�3'�0"

A�TER�ATE

4'�0"

CA��PY � BASE BID

25'�0"

A�TER�ATE

4'�0"

8'�6" 8'�0" 8'�6"

11 11 28.02

11 11 28.16

11 11 28.19

11 11 28.05

11 11 28.12

11 11 28.11

11 11 30.01

11 11 28.07

11 11 28.17

11 11 28.05

11 11 28.12

11 11 28.07

11 11 28.17

FI�A301FI-1 FI-2

11 11 28.10 11 11 28.11

11 11 28.01

CA��PY w0 A�TER�ATE

33'�0"

11 11 28.10

�EVE� 1

0'�0"

B" Ca �py

16'�0"

T" Ca �py

18'�6"

FI-A

T" F��ti g

�3'�0"

25'�0"

3'�2"

FI�A301

11 11 28.16

11 11 28.19

11 11 28.05

11 11 28.12

11 11 28.11

11 11 28.08

11 11 28.17

11 11 28.02

11 11 28.01

�EVE� 1

0'�0"

B" Ca �py

16'�0"

T" Ca �py

18'�6"

T" F��ti g

�3'�0"

A�TER�ATE

4'�0" 8'�6" 8'�0" 8'�6"

A�TER�ATE

4'�0"

CA��PY � BASE BID

25'�0"

11 11 28.02

11 11 28.05

11 11 28.12

11 11 28.11

11 11 30.01

11 11 28.07

11 11 28.02

11 11 28.05

11 11 28.12

11 11 28.11

11 11 28.07

11 11 28.17

11 11 28.16

FI�A301

FI-1FI-2

11 11 28.11

11 11 28.10

CA��PY w0 A�TAR�ATE

33'�0"

11 11 28.10

�EVE� 1

0'�0"

B" Ca �py

16'�0"

T" Ca �py

18'�6"

FI-A

T" F��ti g

�3'�0"

12'�6" 12'�6"

25'�0"

3'�0"

11 11 28.02

11 11 28.12

11 11 28.05

11 11 28.19

11 11 28.11

11 11 28.07

3'�2"

FI�A301

11 11 28.17

11 11 28.01

�ue yarch�c�� �2024 �ue y Architects ����C� � A�� Rights Reserved

P�A! !"RTH

KEYNOTE LEGEND

SCALE: 1/4" = 1'-0"

FI-A201Kenosha Co. Public Safety Building - Fuel Island

April 23, 2024

Fue� Is�a d � Exteri�r E�evati� s

1000 55th Street Kenosha, WI 53140

11 11 28.01 ROOF DRAIN PER FUEL ISLAND CONTRACTOR; TIE ROOF DRAIN TO

ALUMINUM DOWNSPOUT INTERNAL IN MASONRY COLUMN

11 11 28.02 ALUMINUM PANEL FASCIA PER FUEL ISLAND CONTRACTOR; PANEL TO

MATCH BUILDING 01 PANEL

11 11 28.05 FUEL CANOPY STRUCTURAL COLUMN PER FUEL ISLAND CONTRACTOR

11 11 28.07 CONCRETE FUEL ISLAND W/ STAINLESS STEEL EDGE FORM. VARIES HEIGHT

PER LOCATION (6" MIN)

11 11 28.08 6" CONCRETE CURB PER FUEL ISLAND CONTRACTOR REQUIREMENTS

11 11 28.10 UNLEADED FUEL DISPENSER

11 11 28.11 DIESEL FUEL DISPENSER

11 11 28.12 FUEL DISPENSER UNIT PER SPECS

11 11 28.16 FUEL CANOPY. FINAL DESIGN BY FUEL CANOPY CONTRACTOR PER SPECS

11 11 28.17 FUEL CANOPY FOOTING. FOOTING DESIGN BY FUEL CANOPY CONTRACTOR

11 11 28.19 FUEL ISLAND ALUMINUM DOWNSPOUT BY FUEL ISLAND CONTRACTOR

11 11 30.01 RE-USE EXISTING MASTER ISLAND KEY READER

1/4" = 1'-0"2 Elevation - South 1/4" = 1'-0"3 Elevation - West

1/4" = 1'-0"4 Elevation - North 1/4" = 1'-0"5 Elevation - East

FI-A

FI�A201

FI�A201

FI�A201

FI�A201

FI�A301

FI�A301

FI-1

FI-1

FI-2

FI-2

108" 0 1'�0"104" 0 1'�0"

A�TER�ATE

4'�0"

CA��PY � BASE BID

25'�0"

A�TER�ATE

4'�0"

CA��PY w0 A�TER�ATE

33'�0"

C A

P Y

11 11 28.01

11 11 28.16

11 11 28.02

�EVE� 1

0'�0"

B" Ca �py

16'�0"

T" Ca �py

18'�6"

T" F��ti g

�3'�0"

FI�A301

FI-1 FI-2

A�TER�ATE

4'�0"

FUE� CA��PY � BASE BID

25'�0"

A�TER�ATE

4'�0"

FUE� CA��PY w0 A�TER�ATE

33'�0"

11 11 28.16

11 11 28.16

11 11 28.19

11 11 28.05

11 11 28.12

11 11 28.11

11 11 28.10

11 11 28.10

11 11 28.12

11 11 28.11

11 11 28.1111 11 30.01

�EVE� 1

0'�0"

B" Ca �py

16'�0"

T" Ca �py

18'�6"

FI-A

T" F��ti g

�3'�0"

FI�A301

11 11 28.16

11 11 28.01

11 11 28.02

11 11 28.05

11 11 28.19

11 11 28.11

11 11 28.12

11 11 28.08

25'�0"

FI-A

FI�A201

FI�A201

FI�A201

FI�A301

FI�A301

FI-1

FI-1

FI-2

FI-2

4'�6" 14'�8" 4'�10"5

A�TER�ATE

4'�0"

CA��PY � BASE BID

25'�0"

A�TER�ATE

4'�0"

26 56 00.A3

11 11 28.16

11 11 28.12

11 11 28.05

11 11 28.1911 11 28.19

11 11 28.05

11 11 28.16

��2 ��1

��2 ��2

��2

��2

26 56 00.A3

26 56 00.A3

E�ECTRICA� !"TES

• E�ECTRICA� C��TRACT�R T� FIE�D VERIFY A�� CIRCUITS

• RE�USE A�� EXISTI�G CIRCUITS BREA)ERS BEI�G USED F�R THE FUE� IS�A�D A�D SPARE CIRCUITS AS �EEDED�

• E�ECTRIC C��TRACT�R T� I�STA�� A�� �EW C��DUITS A�D �EW WIRI�G F�R �EW FUE� IS�A�D�

�ue yarch�c�� �2024 �ue y Architects ����C� � A�� Rights Reserved

KEYNOTE LEGEND

SCALE: As indicated

FI-A301Kenosha Co. Public Safety Building - Fuel Island

April 23, 2024

Fue� Is�a d � Secti� s2 R��f & �ighti g P�a � E�ec� Pa e� Schedu�e

1000 55th Street Kenosha, WI 53140

1/4" = 1'-0"1 Fuel Island Roof Plan

1/4" = 1'-0"4 Section - E/W North1/4" = 1'-0"3 Section - N/S East

11 11 28.01 ROOF DRAIN PER FUEL ISLAND CONTRACTOR; TIE ROOF DRAIN TO

ALUMINUM DOWNSPOUT INTERNAL IN MASONRY COLUMN

11 11 28.02 ALUMINUM PANEL FASCIA PER FUEL ISLAND CONTRACTOR; PANEL TO

MATCH BUILDING 01 PANEL

11 11 28.05 FUEL CANOPY STRUCTURAL COLUMN PER FUEL ISLAND CONTRACTOR

11 11 28.08 6" CONCRETE CURB PER FUEL ISLAND CONTRACTOR REQUIREMENTS

11 11 28.10 UNLEADED FUEL DISPENSER

11 11 28.11 DIESEL FUEL DISPENSER

11 11 28.12 FUEL DISPENSER UNIT PER SPECS

11 11 28.16 FUEL CANOPY. FINAL DESIGN BY FUEL CANOPY CONTRACTOR PER SPECS

11 11 28.19 FUEL ISLAND ALUMINUM DOWNSPOUT BY FUEL ISLAND CONTRACTOR

11 11 30.01 RE-USE EXISTING MASTER ISLAND KEY READER

26 56 00.A3 LIGHT FIXTURE - CREE VG SERIES - ON ALL THE TIME. CONNECT TO

DUSC-TO-DAWN SENSOR

1/4" = 1'-0"2 Fuel Island Canopy - Lighting Plan

LIGHT FIXTURE SCHEDULE

TYPE 6A!UFACTURER SERIES "RDER I!F"R6ATI"! !"TE

��1 CREE VG VG A PD 5� 40) U� SV P�� �� A�� THE TI�E

��2 CREE VG VG A PD 5� 40) U� SV P�� �� WITH �CC� SE�S�R

Electric Panel Schedule

Sheets
1.0 - Title Sheet
FI-A101 - Site Plans
FI-A102 - Architectural Site - Enlarged Plan
FI-A200 - Floor Plans
FI-A201 - Fuel Island - Exterior Elevations
FI-A301 - Fuel Island - Sections, Roof & Lighting Plan - Elec. Panel Schedule

File details come from the government source that posted it. Updated .