This is an architectural drawing set prepared by Kueny Architects, LLC for the Kenosha County Public Safety Building Fuel Island Replacement project located at 1000 55th Street, Kenosha, Wisconsin. The project encompasses the complete replacement of an existing fuel island and canopy, including demolition of the current infrastructure and installation of new equipment. The drawings include six sheets covering site plans, floor plans, exterior elevations, sections, roof and lighting plans, and electrical panel schedules. Key components of the new fuel island installation include a 10,000-gallon underground unleaded fuel tank, a 5,000-gallon underground diesel fuel tank, fuel dispensers for both unleaded and diesel fuel, a new canopy structure with aluminum fascia and roof drainage, concrete fuel island with stainless steel edge forms, stainless steel bollards, and a new fuel alarm panel enclosure. The project requires the demolition of the existing fuel island concrete structure, canopy, underground fuel tanks, and associated piping and electrical systems, with selective reuse and relocation of existing equipment such as the fuel master management system and island key reader.
The architectural plans specify a concrete slab construction with Type B concrete (6 inches over 6 inches of crushed stone with vapor barrier and reinforcing), control joints, and provisions for drainage with floor drains and storm pipes connecting to catch basins. General construction notes require all concrete to meet 4000 psi testing at 28 days, field verification of existing utilities and conditions, compliance with applicable codes and safety standards, and contractor responsibility for permit acquisition and fees. The architect, Jon P. Wallenkamp of Kueny Architects, has not provided express or implied warranty for the services, noting that work was conducted consistent with professional standards under the given budget and time constraints. The drawings indicate coordination between the fuel canopy contractor, fuel island contractor, and electrical contractor for final design and installation of specific components, with detailed cross-references to specification sections throughout the construction documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2415 Addendum 4.pdf | ||
| 2415 Bid Documents.pdf | ||
| 2415 Addendum 1.pdf | ||
| 2415 Addendum 3.pdf | ||
| 2415 Specifications.pdf | ||
| 2415 Addendum 2.pdf | ||
| Vendor Responsibility Form Construction.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0KUENY ARCHITECTS, LLC
10505 CORPORATE DRIVE - SUITE 100 PLEASANT PRAIRIE, WI 53158 PHONE (262) 857-8101 FAX (262) 857 8103
SITE MAP GENERAL NOTES
1. All concrete to test 4000 psi in 28 days.
2. Verify all dimensions, access, utilities and working conditions in the field.
3. Conform to all applicable codes, ordinances and safety standards.
4. Obtain and pay for all required permits and fees.
5. Notify Architect immediately if work cannot proceed as shown on Drawings or as described in the Specifications.
6. No concrete to be poured without Architect's prior review.
7. All Contractor's to co-operate with all trades, Owner's and Architect's representatives.
8. Leave site clean, neat and free of debris at all times.
9. Each Prime and Sub-contractor is responsible for having read each page of the Specifications, Drawings, Addenda and Change Orders.
10. Guard against interfering with Owner's operations.
11. These Drawings contain no provisions or procedures for on-site safety. Each
Contractor and their employees are responsible to follow all laws and ordinances and provide their own engineering to provide a safe work place.
12. The locations of existing underground utilities, shown on these Drawings, are shown in an approximate way only and have not been independently verified by the Owner or its representatives. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occassioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
13. Services perform for this project have been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in this area under similar budget and time constraints. No warranty, expressed or implied, is made.
MATERIAL INDICATIONS
DRAWING LEGEND
New or Required Point Elevation
Existing Point Elevation
Existing Contours
New or Required Contours
A Grid Lines
3.1 Building Section
Wall Section
Room/Space Number
Door Number
SHEET INDEX
Earth Backfill
Rigid Insulation
Concrete Block
Aluminum
Lumber (Rough)
Steel
Sand Fill
Concrete
Finished Wood
Stone Fill
Plywood
Batt Insulation
4.1
Room 1
101 Interior Elevation
Detail Section
5.1
7.1
CONSULTANTS
5.1
Detail Number
Page Number
Exterior Elevation
2.1
1 Wall Tag
+ 100.0
+ 100.0
+ 100.0
+ 100.0
Kenosha Co. Public Safety
Building
Fuel Island
1000 55th Street Kenosha, WI 53140
April 23, 2024
Kenosha Co. Public Safety Building
Fuel Island
ARCHITECT Kueny Architects 10505 Corporate Drive, Suite 100
(262) 857-8101 Pleasant Prairie, Wisconsin 53158 Architect of Record - Jon P. Wallenkamp
PROJECT
LOCATION
Title
1.0 Title Sheet
ARCHITECTURAL
FI-A101 Site Plans
FI-A102 Architectural Site - Enlarged Plan
FI-A200 Floor Plans
FI-A201 Fuel Island - Exterior Elevations
FI-A301 Fuel Island - Sections, Roof & Lighting Plan - Elec. Panel Schedule
Grand total: 6
BID SET
F �I
C
A
P
Y
F�I� CA��PY
25'�0"
EXISTI�G GE�ERAT�R I�
BASE�E�T
FIE�D VERIFY
EXACT ��CATI��
EXISTI�G VE�T
PIPES (Dashed �"s)
EXISTI�G VAU�T
T� RE�AI�
(11 11 28�14) 5(000 GA�
U�DERGR�U�D DIESE� FUE� TA�)
PER SPECS
(11 11 28�13) 10(000 GA�
U�DERGR�U�D U��EADED FUE�
TA�) PER SPECS
(11 11 28�13) 10(000 GA�
U�DERGR�U�D U��EADED FUE�
TA�) PER SPECS
(11 11 28�16) FUE� CA��PY� FI�A�
DESIG� BY FUE� CA��PY
C��TRACT�R PER SPECS
(01 10 00�04) EXISTI�G GA�VA�I,ED
GRATE @ �V� 1 (12FT AB�VE
BASE�E�T �V�)
(22 01 00�05) T�P �F SAFETY CAP T�
�ATCH EXISTI�G� �ABE� PIPE
I�DICATI�G "DIESE� FUE� ���Y"
(22 01 00�03) �EW 1�102"1 B�AC)
PIPE T� GE�ERAT�R� FIE�D VERIFY
EXACT C��DITI��S� PIPE T�
F����W SI�I�AR R�UTE �F
EXISTI�G PIPES
(22 01 00�04) 1�5"1 B�AC) PIPE FI��
�I�E WITH SAFETY CAP (Red �"�)
(22 01 00�06) PIPE T� PASS THR�UGH
EXISTI�G A�U�I�U� ��UVER A�D
DUCT W�R) AS EXISTI�G� C��P�ETE
SEA� AR�U�D PIPES
(11 11 28�20) I�STA�� H�FF�A�
PE�TAIR B�X F�R FUE� A�AR�
PA�E�� 18x16x10 �E�A 4X
E�C��SURE WITH VIEWI�G WI�D�W
FI�A102
Si4
(01 10 00�05) EXISTI�G E�ECTRIC
PA�E� E�C� USED F�R FUE� IS�A�D
(01 10 00�06) EXISTI�G GAS B�Y
C���U�ICATI��S B�X T� RE�AI�
02 41 00.18
02 41 00.04
02 41 00.12
02 41 00.13
02 41 00.17
02 41 00.19
02 41 00.18
02 41 00.04
02 41 00.18
02 41 00.20
02 41 00.16
02 41 00.04
01 10 00.05
01 10 00.06
01 10 00.07
02 41 00.21
02 41 00.21
1/16" = 1'-0"1 General Floor Plan - Existing & Demo kuenyarch.com ©2024 Kueny Architects L.L.C. - All Rights Reserved
TRUE
NORTH
KEYNOTE LEGEND
SCALE: As indicated
FI-A101Kenosha Co. Public Safety Building - Fuel Island
April 23, 2024
Site P�a s
1000 55th Street Kenosha, WI 53140
1" = 20'-0"2 Architectural Site Plan
01 10 00.04 EXISTING GALVANIZED GRATE @ LVL 1 (12FT ABOVE BASEMENT LVL)
01 10 00.05 EXISTING ELECTRIC PANEL E.C. USED FOR FUEL ISLAND
01 10 00.06 EXISTING GAS BOY COMMUNICATIONS BOX TO REMAIN
01 10 00.07 EXISTING VEDEER-ROOT CONTROLERS TO REMAIN
02 41 00.04 DEMO CONCRETE SLAB. FIELD VERIFY EXISTING CONDITIONS
02 41 00.12 DEMO COMPLETE FUEL ISLAND CONCRETE ISLAND, FUEL DISPENSER
EQUIPMENT AND CANOPY
02 41 00.13 DEMO FUEL ISLAND CANOPY FOOTING
02 41 00.16 REMOVE EXISTING FUEL MASTER MANGAMENT SYSTEM. RE-USE &
RELOCATE PER NEW LAYOUT
02 41 00.17 DEMO DUEL ISLAND CONCRETE BOLLARD
02 41 00.18 DEMO ASPHALT IN THIS AREA
02 41 00.19 DEMO EXISTING UNDERGROUND FUEL TANK AND PIPING
02 41 00.20 REMOVE EXISTING PIPES FROM GENERATOR TO INSIDE BUILDING. CUT PIPE
4 FT INSIDE BUILDING OR NEAREST CONNECTION POINT (FIELD VERIFY)
02 41 00.21 DEMO EXISTING CONDUITS OF FUEL ISLAND CARD READER MANAGAMENT
SYSTEM
11 11 28.13 10,000 GAL UNDERGROUND UNLEADED FUEL TANK PER SPECS
11 11 28.14 5,000 GAL UNDERGROUND DIESEL FUEL TANK PER SPECS
11 11 28.16 FUEL CANOPY. FINAL DESIGN BY FUEL CANOPY CONTRACTOR PER SPECS
11 11 28.20 INSTALL HOFFMAN PENTAIR BOX FOR FUEL ALARM PANEL. 18x16x10 NEMA 4X
ENCLOSURE WITH VIEWING WINDOW
22 01 00.03 NEW 1-1/2"Ø BLACK PIPE TO GENERATOR. FIELD VERIFY EXACT CONDITIONS.
PIPE TO FOLLOW SIMILAR ROUTE OF EXISTING PIPES
22 01 00.04 1.5"Ø BLACK PIPE FILL LINE WITH SAFETY CAP (Red Ln.)
22 01 00.05 TOP OF SAFETY CAP TO MATCH EXISTING. LABEL PIPE INDICATING "DIESEL
FUEL ONLY"
22 01 00.06 PIPE TO PASS THROUGH EXISTING ALUMINUM LOUVER AND DUCT WORK AS
EXISTING. COMPLETE SEAL AROUND PIPES
C Fnc
C FncC
F n c
C F n c
C F n c
C F n c
C F n c
C F n c
C F n c
C F n c
C F n c
C F n c
C F n c
CFnc
CFnc
CFnc CFnc
CFnc CFnc
CFnc CFnc
CFnc
C F n c
C F n c
C F n c
C F n c
C F n c
C F n c
C F n c
CFnc CFncCFnc CFnc CFnc CFnc C F n c
C F n c
C F n c
C F n c
C F n c
C F n c
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
C Fnc
T H
A V E N
U E
54TH STREET
EXISTING BUILDING
ex mech ex mech
E�ECTRICA� SERVICE
TER�I�ATI�� B�X
WE E�ERGIES
C��CRETE
E�CASED
DUCT BA�)
��R�A� P�WER T�
E�ERGE�CY GE�ERAT�R
20' B�U�DARY
WE E�ERGIES
PAD ��U�T
TRA�SF�R�ER
��R�A� P�WER T�
E�ERGE�CY GE�ERAT�R
20' B�U�DARY
FUE� IS�A�D
20' C�ASS 1 DIV 2
B�U�DARY
GE�ERAT�R
��CATI��
FUEL ISLAND
FI�A201
FI�A201
FI�A201
FI�A201
R
0'
R 2 0' �
03 30 00.21
03 30 00.03
11 11 28.20
DE�IVERY D��R
01 10 00.05
01 10 00.06
01 10 00.07
26 05 00.01
11 11 30.01
11 11 28.12
11 11 28.12
03 30 00.30
03 30 00.30
03 30 00.30
02 41 00.20
22 01 00.02 fleet maintenance storage
26 05 00.02
26 05 00.02
26 05 00.01
(31 20 00) CRUSHED ST��E AGGREGATE
VARIES 2'�0" �I�
(07 11 00) 10 �I� VAP�R BARRIER
(03 30 00) REI�F�RCI�G PER SCHEDU�E
(03 30 00) C��CRETE S�AB
�VER�AP REI�F�RCI�G
AT C��STRUCTI�� 6�I�TS
C��STRUCTI�� 6�I�T
1'�0" �I�
(07 11 00) AIR SHIE�D F�ASHI�G
TAPE AT EXTERI�R WA�� �I�E
(03 30 00) 15# FE�T � B��D BREA)ER
C��TR�� 6�I�T
CONCRETE SLAB NOTES
CONCRETE TYPE "B"
6" C��CRETE S�AB � 6 x 6 W 2�9 x W 2�9 WWF w0 10 �I� P��YETHY�E�E VAP�R BARRIER
�VER 6" C��PACTED CRUSHED ST��E
�ue yarch�c�� �2024 �ue y Architects ����C� � A�� Rights Reserved
P�A! !"RTH
KEYNOTE LEGEND
SCALE: As indicated
FI-A102Kenosha Co. Public Safety Building - Fuel Island
April 23, 2024
Architectura� Site � E �arged P�a
1000 55th Street Kenosha, WI 53140
1" = 10'-0"1 Architectural Site Plan
1 1/2" = 1'-0"2 Concrete Slab - Type B
01 10 00.05 EXISTING ELECTRIC PANEL E.C. USED FOR FUEL ISLAND
01 10 00.06 EXISTING GAS BOY COMMUNICATIONS BOX TO REMAIN
01 10 00.07 EXISTING VEDEER-ROOT CONTROLERS TO REMAIN
02 41 00.20 REMOVE EXISTING PIPES FROM GENERATOR TO INSIDE BUILDING. CUT PIPE
4 FT INSIDE BUILDING OR NEAREST CONNECTION POINT (FIELD VERIFY)
03 30 00.03 6" CONCRETE SLAB OVER 6" CRUSHED STONE; SLAB TYPE "B"
03 30 00.21 TYPICAL CONTROL JOINTS
03 30 00.30 ALL NEW CONCRETE TO MATCH ADJACENT GRADE
11 11 28.12 FUEL DISPENSER UNIT PER SPECS
11 11 28.20 INSTALL HOFFMAN PENTAIR BOX FOR FUEL ALARM PANEL. 18x16x10 NEMA 4X
ENCLOSURE WITH VIEWING WINDOW
11 11 30.01 RE-USE EXISTING MASTER ISLAND KEY READER
22 01 00.02 REPLACE EXISTING BLACK PIPE FROM GENERATOR TO BUILDING. FIELD
VERIFY PIPE WIDTH
26 05 00.01 REPLACE EXISTING CONDUIT AND INSTALL (2) TWO 1-1/2"Ø CONDUITS FOR
FUEL ISLAND LOW VOLTAGE
26 05 00.02 ELECTRIC CONTRACTOR TO INSTALL NEW NEW CONDUITS AND WIRING FOR
NEW FUEL ISLAND. RE-USE EXISTING & SPARE BREAKERS IN PANEL E.C. AS
NEEDED
MECHANICAL
MECHANICAL
D S
L D
S L
D S
L D
S L
D S
L D
S L
D S
L
U L
U L
UL UL
U L
U L
U L
UL ULUL
UL ULUL UL UL UL UL UL
UL ULUL UL UL UL UL UL UL
U L
U L
MECHANICAL
MECHANICAL
D S
L D
S L
D S
L D
S L
D S
L D
S L
D S
L
D S
L
D S
L
FI-A
02 41 00.12
02 41 00.14
25'�6"
E X
IS
T
I� G
F U
E I
S A
D
C A
P Y
EXISTI�G FUE� IS�A�D CA��PY
25'�0"
8'�0
'�0
02 41 00.16
02 41 00.14
21'�0"
02 41 00.15
02 41 00.04
FI-1
FI-1
FI-2
FI-2
EXISTI�G
GE�ERAT�R
��CATI��
02 41 00.18
02 41 00.16
FI-A
F U
E I
S A
D
C A
P Y
FUE� IS�A�D CA��PY
25'�0"
1'�6"22'�8"1'�6"
11 11 28.05
11 11 30.01
11 11 28.05
11 11 28.04
11 11 28.04
11 11 28.07
11 11 28.12
11 11 28.12
11 11 28.19
22 13 16.A6
11 11 28.19
22 13 16.A6
FI�A201
FI�A201
FI�A201
FI�A201
FI�A301
FI�A301
FI-1
FI-1
FI-2
FI-2
ADD T� CA��PY
4'�0"
A�TER�ATE
ADD T� CA��PY
4'�0"
A�TER�ATE
ELECTRIC
GENERATOR
5000 UNDERGROUD
DIESEL TANK
10,000 UNDERGROUD
UNLEADED FUEL TANK
UNLEADED
UNLEADED
DIESEL
UNLEADED
03 30 00.03
03 30 00.03
03 30 00.0303 30 00.03
22 13 16.A7
22 13 16.A2
F�D�
01 10 00.03
01 10 00.03
22 01 00.02
03 30 00.21
03 30 00.21
22 01 00.07
22 01 00.07
22 01 00.08
11 11 28.20
26 05 00.02
26 05 00.01
03 30 00.30
03 30 00.30
03 30 00.30
03 30 00.30
03 30 00.30
26 05 00.02
26 05 00.01
03 30 00.30
11 11 28.21
10,000 UNDERGROUD
UNLEADED FUEL TANK
�ue yarch�c�� �2024 �ue y Architects ����C� � A�� Rights Reserved
P�A! !"RTH
KEYNOTE LEGEND
SCALE: As indicated
FI-A200Kenosha Co. Public Safety Building - Fuel Island
April 23, 2024
F���r P�a s
1000 55th Street Kenosha, WI 53140
3/16" = 1'-0"1 Floor Plan - Demo 1/4" = 1'-0"2 Floor Plan
01 10 00.03 EXISTING BOLLARDS TO REMAIN
02 41 00.04 DEMO CONCRETE SLAB. FIELD VERIFY EXISTING CONDITIONS
02 41 00.12 DEMO COMPLETE FUEL ISLAND CONCRETE ISLAND, FUEL DISPENSER EQUIPMENT AND CANOPY
02 41 00.14 DEMO CONCRETE - REMOVE EXISTING UNDERGROUND FUEL TANK & PIPING
02 41 00.15 DEMO EXISTING UNDERGROUND OIL TANK. DEMO ASPHALT/CONCRETE AS NEEDED. FIELD VERIFY ALL
CONDITIONS.
02 41 00.16 REMOVE EXISTING FUEL MASTER MANGAMENT SYSTEM. RE-USE & RELOCATE PER NEW LAYOUT
02 41 00.18 DEMO ASPHALT IN THIS AREA
03 30 00.03 6" CONCRETE SLAB OVER 6" CRUSHED STONE; SLAB TYPE "B"
03 30 00.21 TYPICAL CONTROL JOINTS
03 30 00.30 ALL NEW CONCRETE TO MATCH ADJACENT GRADE
11 11 28.04 4" STAINLESS STEEL U-BOLLARD. TYP. @ ENDS OF FUEL ISLAND BY FUEL ISLAND CONTRACTOR
11 11 28.05 FUEL CANOPY STRUCTURAL COLUMN PER FUEL ISLAND CONTRACTOR
11 11 28.07 CONCRETE FUEL ISLAND W/ STAINLESS STEEL EDGE FORM. VARIES HEIGHT PER LOCATION (6" MIN)
11 11 28.12 FUEL DISPENSER UNIT PER SPECS
11 11 28.19 FUEL ISLAND ALUMINUM DOWNSPOUT BY FUEL ISLAND CONTRACTOR
11 11 28.20 INSTALL HOFFMAN PENTAIR BOX FOR FUEL ALARM PANEL. 18x16x10 NEMA 4X ENCLOSURE WITH VIEWING
WINDOW
11 11 28.21 COMPLETE STARTUP FOR ADDITIONAL DISPENSING UNITS
11 11 30.01 RE-USE EXISTING MASTER ISLAND KEY READER
22 01 00.02 REPLACE EXISTING BLACK PIPE FROM GENERATOR TO BUILDING. FIELD VERIFY PIPE WIDTH
22 01 00.07 EXISTING FUEL PUMP AND FUEL LINE TO REMAIN
22 01 00.08 CONNECT EXISTING FUEL LINE TO NEW UNDERGROUND DIESEL FUEL TANK
22 13 16.A2 FLOOR DRAIN
22 13 16.A6 6" STORM PIPE. CONNECT TO NEAREST CATCH BASIN
22 13 16.A7 3" DRAIN PIPE. CONNECT TO NEAREST CATCH BASIN
26 05 00.01 REPLACE EXISTING CONDUIT AND INSTALL (2) TWO 1-1/2"Ø CONDUITS FOR FUEL ISLAND LOW VOLTAGE
26 05 00.02 ELECTRIC CONTRACTOR TO INSTALL NEW NEW CONDUITS AND WIRING FOR NEW FUEL ISLAND. RE-USE
EXISTING & SPARE BREAKERS IN PANEL E.C. AS NEEDED
�EVE� 1
0'�0"
B" Ca �py
16'�0"
T" Ca �py
18'�6"
T" F��ti g
�3'�0"
A�TER�ATE
4'�0"
CA��PY � BASE BID
25'�0"
A�TER�ATE
4'�0"
8'�6" 8'�0" 8'�6"
11 11 28.02
11 11 28.16
11 11 28.19
11 11 28.05
11 11 28.12
11 11 28.11
11 11 30.01
11 11 28.07
11 11 28.17
11 11 28.05
11 11 28.12
11 11 28.07
11 11 28.17
FI�A301FI-1 FI-2
11 11 28.10 11 11 28.11
11 11 28.01
CA��PY w0 A�TER�ATE
33'�0"
11 11 28.10
�EVE� 1
0'�0"
B" Ca �py
16'�0"
T" Ca �py
18'�6"
FI-A
T" F��ti g
�3'�0"
25'�0"
3'�2"
FI�A301
11 11 28.16
11 11 28.19
11 11 28.05
11 11 28.12
11 11 28.11
11 11 28.08
11 11 28.17
11 11 28.02
11 11 28.01
�EVE� 1
0'�0"
B" Ca �py
16'�0"
T" Ca �py
18'�6"
T" F��ti g
�3'�0"
A�TER�ATE
4'�0" 8'�6" 8'�0" 8'�6"
A�TER�ATE
4'�0"
CA��PY � BASE BID
25'�0"
11 11 28.02
11 11 28.05
11 11 28.12
11 11 28.11
11 11 30.01
11 11 28.07
11 11 28.02
11 11 28.05
11 11 28.12
11 11 28.11
11 11 28.07
11 11 28.17
11 11 28.16
FI�A301
FI-1FI-2
11 11 28.11
11 11 28.10
CA��PY w0 A�TAR�ATE
33'�0"
11 11 28.10
�EVE� 1
0'�0"
B" Ca �py
16'�0"
T" Ca �py
18'�6"
FI-A
T" F��ti g
�3'�0"
12'�6" 12'�6"
25'�0"
3'�0"
11 11 28.02
11 11 28.12
11 11 28.05
11 11 28.19
11 11 28.11
11 11 28.07
3'�2"
FI�A301
11 11 28.17
11 11 28.01
�ue yarch�c�� �2024 �ue y Architects ����C� � A�� Rights Reserved
P�A! !"RTH
KEYNOTE LEGEND
SCALE: 1/4" = 1'-0"
FI-A201Kenosha Co. Public Safety Building - Fuel Island
April 23, 2024
Fue� Is�a d � Exteri�r E�evati� s
1000 55th Street Kenosha, WI 53140
11 11 28.01 ROOF DRAIN PER FUEL ISLAND CONTRACTOR; TIE ROOF DRAIN TO
ALUMINUM DOWNSPOUT INTERNAL IN MASONRY COLUMN
11 11 28.02 ALUMINUM PANEL FASCIA PER FUEL ISLAND CONTRACTOR; PANEL TO
MATCH BUILDING 01 PANEL
11 11 28.05 FUEL CANOPY STRUCTURAL COLUMN PER FUEL ISLAND CONTRACTOR
11 11 28.07 CONCRETE FUEL ISLAND W/ STAINLESS STEEL EDGE FORM. VARIES HEIGHT
PER LOCATION (6" MIN)
11 11 28.08 6" CONCRETE CURB PER FUEL ISLAND CONTRACTOR REQUIREMENTS
11 11 28.10 UNLEADED FUEL DISPENSER
11 11 28.11 DIESEL FUEL DISPENSER
11 11 28.12 FUEL DISPENSER UNIT PER SPECS
11 11 28.16 FUEL CANOPY. FINAL DESIGN BY FUEL CANOPY CONTRACTOR PER SPECS
11 11 28.17 FUEL CANOPY FOOTING. FOOTING DESIGN BY FUEL CANOPY CONTRACTOR
11 11 28.19 FUEL ISLAND ALUMINUM DOWNSPOUT BY FUEL ISLAND CONTRACTOR
11 11 30.01 RE-USE EXISTING MASTER ISLAND KEY READER
1/4" = 1'-0"2 Elevation - South 1/4" = 1'-0"3 Elevation - West
1/4" = 1'-0"4 Elevation - North 1/4" = 1'-0"5 Elevation - East
FI-A
FI�A201
FI�A201
FI�A201
FI�A201
FI�A301
FI�A301
FI-1
FI-1
FI-2
FI-2
108" 0 1'�0"104" 0 1'�0"
A�TER�ATE
4'�0"
CA��PY � BASE BID
25'�0"
A�TER�ATE
4'�0"
CA��PY w0 A�TER�ATE
33'�0"
C A
P Y
11 11 28.01
11 11 28.16
11 11 28.02
�EVE� 1
0'�0"
B" Ca �py
16'�0"
T" Ca �py
18'�6"
T" F��ti g
�3'�0"
FI�A301
FI-1 FI-2
A�TER�ATE
4'�0"
FUE� CA��PY � BASE BID
25'�0"
A�TER�ATE
4'�0"
FUE� CA��PY w0 A�TER�ATE
33'�0"
11 11 28.16
11 11 28.16
11 11 28.19
11 11 28.05
11 11 28.12
11 11 28.11
11 11 28.10
11 11 28.10
11 11 28.12
11 11 28.11
11 11 28.1111 11 30.01
�EVE� 1
0'�0"
B" Ca �py
16'�0"
T" Ca �py
18'�6"
FI-A
T" F��ti g
�3'�0"
FI�A301
11 11 28.16
11 11 28.01
11 11 28.02
11 11 28.05
11 11 28.19
11 11 28.11
11 11 28.12
11 11 28.08
25'�0"
FI-A
FI�A201
FI�A201
FI�A201
FI�A301
FI�A301
FI-1
FI-1
FI-2
FI-2
4'�6" 14'�8" 4'�10"5
A�TER�ATE
4'�0"
CA��PY � BASE BID
25'�0"
A�TER�ATE
4'�0"
26 56 00.A3
11 11 28.16
11 11 28.12
11 11 28.05
11 11 28.1911 11 28.19
11 11 28.05
11 11 28.16
��2 ��1
��2 ��2
��2
��2
26 56 00.A3
26 56 00.A3
E�ECTRICA� !"TES
• E�ECTRICA� C��TRACT�R T� FIE�D VERIFY A�� CIRCUITS
• RE�USE A�� EXISTI�G CIRCUITS BREA)ERS BEI�G USED F�R THE FUE� IS�A�D A�D SPARE CIRCUITS AS �EEDED�
• E�ECTRIC C��TRACT�R T� I�STA�� A�� �EW C��DUITS A�D �EW WIRI�G F�R �EW FUE� IS�A�D�
�ue yarch�c�� �2024 �ue y Architects ����C� � A�� Rights Reserved
KEYNOTE LEGEND
SCALE: As indicated
FI-A301Kenosha Co. Public Safety Building - Fuel Island
April 23, 2024
Fue� Is�a d � Secti� s2 R��f & �ighti g P�a � E�ec� Pa e� Schedu�e
1000 55th Street Kenosha, WI 53140
1/4" = 1'-0"1 Fuel Island Roof Plan
1/4" = 1'-0"4 Section - E/W North1/4" = 1'-0"3 Section - N/S East
11 11 28.01 ROOF DRAIN PER FUEL ISLAND CONTRACTOR; TIE ROOF DRAIN TO
ALUMINUM DOWNSPOUT INTERNAL IN MASONRY COLUMN
11 11 28.02 ALUMINUM PANEL FASCIA PER FUEL ISLAND CONTRACTOR; PANEL TO
MATCH BUILDING 01 PANEL
11 11 28.05 FUEL CANOPY STRUCTURAL COLUMN PER FUEL ISLAND CONTRACTOR
11 11 28.08 6" CONCRETE CURB PER FUEL ISLAND CONTRACTOR REQUIREMENTS
11 11 28.10 UNLEADED FUEL DISPENSER
11 11 28.11 DIESEL FUEL DISPENSER
11 11 28.12 FUEL DISPENSER UNIT PER SPECS
11 11 28.16 FUEL CANOPY. FINAL DESIGN BY FUEL CANOPY CONTRACTOR PER SPECS
11 11 28.19 FUEL ISLAND ALUMINUM DOWNSPOUT BY FUEL ISLAND CONTRACTOR
11 11 30.01 RE-USE EXISTING MASTER ISLAND KEY READER
26 56 00.A3 LIGHT FIXTURE - CREE VG SERIES - ON ALL THE TIME. CONNECT TO
DUSC-TO-DAWN SENSOR
1/4" = 1'-0"2 Fuel Island Canopy - Lighting Plan
LIGHT FIXTURE SCHEDULE
TYPE 6A!UFACTURER SERIES "RDER I!F"R6ATI"! !"TE
��1 CREE VG VG A PD 5� 40) U� SV P�� �� A�� THE TI�E
��2 CREE VG VG A PD 5� 40) U� SV P�� �� WITH �CC� SE�S�R
Electric Panel Schedule
| Sheets |
| 1.0 - Title Sheet |
| FI-A101 - Site Plans |
| FI-A102 - Architectural Site - Enlarged Plan |
| FI-A200 - Floor Plans |
| FI-A201 - Fuel Island - Exterior Elevations |
| FI-A301 - Fuel Island - Sections, Roof & Lighting Plan - Elec. Panel Schedule |