24021_V.C._Administration_Building_Drainage_Improvements_(3).pdf
PDF 19 MB Posted
- Solicitation number
- 25-B-62LL
- Issued by
- Volusia County, Florida
About this file
This document comprises final engineering plans for the Volusia County Administration Building Drainage Improvements project located at 123 W. Indiana Ave., DeLand, Florida. The project includes site preparation, grading, drainage system installation and repairs, roadway modifications, curb and sidewalk work, HDPE pipe installation, stormwater inlet construction, corrugated metal pipe rehabilitation via in-situ lining, retaining wall construction, and landscape and irrigation improvements across a 2.492-acre site. The scope encompasses demolition of existing pavement and drainage infrastructure, installation of approximately 730 linear feet of new and rehabilitated stormwater piping in various sizes (8-inch to 24-inch), construction of new concrete curbing and sidewalks, installation of a 24-inch-high poured-in-place retaining wall with colored concrete, site grading with proper drainage slopes, and comprehensive erosion control measures. All construction shall comply with Florida Department of Transportation standards, the City of DeLand's Land Development Code, and requirements from the St. Johns River Water Management District. The contractor must maintain traffic flow on adjacent streets, preserve specimen trees where feasible, implement stormwater pollution prevention practices, and complete the work within 180 days, with 150 days for substantial completion and 30 days for final completion.
Contractors must obtain all necessary permits including NPDES Construction Generic Permit notification, dewatering permits, and stormwater permits prior to commencing work. The project requires maintenance of uninterrupted utility service, proper handling of underground utilities with advance notification to utility companies, and protection of public land corners and monuments. All materials, including concrete with 3,000 PSI minimum strength, reinforced concrete pipe, HDPE culvert pipe, and landscape plants, must meet specified standards. The contractor bears responsibility for shop drawings approval, as-built surveys prepared by a Florida-registered professional land surveyor, erosion and sediment control inspections at least weekly and within 24 hours of rainfall events exceeding 0.5 inches, and 90-day post-installation maintenance of all landscape and sod. A non-mandatory pre-bid meeting is scheduled for March 6, 2025, at 9:30 a.m., with bid responses due April 3, 2025, at 3:01 p.m. The estimated construction cost is approximately $450,000, with the county retaining 5% of monthly payments and assessing liquidated damages of $500 per day for schedule non-compliance. Bidders must provide a 5% bid bond, payment and performance bonds, and proof of comprehensive insurance coverage.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFTED BY: XXX
CHECKED BY: JD
DRAWING FILE: 01_24021 COV
SHEET: OF
DESIGNED BY: JD
PROJECT NO: ZC 24021
NOT VALID WITHOUT SEAL
A
S S
O C
IA
T
E S
IN
C
Z E
V C
O H
E N
CI
VI
L
EN
GI
N
EE
RI
N G
LA
N
DS
CA
PE
A
RC
HI
TE
CT
U
RE
EN
VI
RO
N
M
EN
TA
L
PL
AN
N
IN
G
TR
AN
SP
O
RT
AT
IO
N
(L C
2)
(E
B
IN
TE
RC
HA
N
GE
B
LV
D.
, S
TE
. C
O
RM
O N
D
BE
AC
H, F L
W W
W .Z
EV
CO
HE
N
.C O
M
C1 7
V .C
A D
M
IN
IS
T
R A
T
IO
N B
L D
G D
R A
IN
A
G E
IM
PR
O V
E M
E N
T S
FI
N
A L
E N
G
IN
E E
R
IN
G P
L A
N S
C O
V E
R S
H E
E T
JOHN A. DILLARD, JR., P.E., NO. 37256
C
IT
Y O
F D
EL
AN
D
VO
LU
SI
A C
O U
N
TY
, F
LO
R
ID
A
BY
SU
BM
IT
TA
LS
R
EV
IS
IO
N S
D
AT
E N
O
AutoCAD SHX Text R:\24021 V.C. ADMINISTRATION BUILDING DRAINAGE IMPROVEMENTS\FINAL ENGINEERING PLANS\CADDWGS\01_24021 COV.DWG - PRINTED 12/17/2024 4:21 PM
AutoCAD SHX Text
CITY OF DELAND - VOLUSIA COUNTY, FL
AutoCAD SHX Text THE PROPERTY LIES IN: FLOOD ZONE C-2A & H PER FEMA MAPS 12127C0470H EFF. 2/19/2014
AutoCAD SHX Text THE SITE LIES WITHIN THE FOLLOWING VOLUSIA COUNTY SOIL CLASSIFICATIONS: 71- URBAN LAND
AutoCAD SHX Text
CURRENT ZONING FOR THIS SITE IS: C-2A & H
AutoCAD SHX Text
FINAL ENGEERING PLANS
AutoCAD SHX Text
OWNER:
AutoCAD SHX Text
CIVIL ENGINEER:
AutoCAD SHX Text
SURVEYOR:
AutoCAD SHX Text
GEOTECHNICAL ENGINEER:
AutoCAD SHX Text
LANDSCAPE ARCHITECT:
AutoCAD SHX Text
VOLUSIA COUNTY
AutoCAD SHX Text
ZEV COHEN & ASSOCIATES, INC.
AutoCAD SHX Text
ATLANTIC DRAFTING & SURVEYING, INC
AutoCAD SHX Text
NAME
AutoCAD SHX Text
ZEV COHEN & ASSOCIATES, INC.
AutoCAD SHX Text
123 W. INDIANA AVE.
AutoCAD SHX Text
300 INTERCHANGE BLVD, SUITE C
AutoCAD SHX Text
1362 N. US HWY 1, SUITE 304
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
300 INTERCHANGE BLVD, SUITE C
AutoCAD SHX Text
DELAND, FL 32720
AutoCAD SHX Text
ORMOND BEACH, FL 32174
AutoCAD SHX Text
ORMOND BEACH. FL 32174
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
ORMOND BEACH, FL 32174
AutoCAD SHX Text
PHONE NUMBER
AutoCAD SHX Text
PHONE NUMBER: (386) 677-2482
AutoCAD SHX Text
PHONE NUMBER: (386) 264-8490
AutoCAD SHX Text
PHONE NUMBER
AutoCAD SHX Text
PHONE NUMBER: (386) 677-2482
AutoCAD SHX Text
FAX NUMBER
AutoCAD SHX Text
FAX NUMBER: (386) 677-2505
AutoCAD SHX Text
FAX NUMBER: (386) 845-9216
AutoCAD SHX Text
FAX NUMBER
AutoCAD SHX Text
FAX NUMBER: (386) 677-2505
AutoCAD SHX Text
CONTACT PERSON: KAMRON GARDNER
AutoCAD SHX Text
CONTACT PERSON: JOHN A. DILLARD, JR., P.EJOHN A. DILLARD, JR., P.E
AutoCAD SHX Text
CONTACT PERSON: JOSEPH JAY WOOLDRIDGEJOSEPH JAY WOOLDRIDGE
AutoCAD SHX Text
CONTACT PERSON: NAME
AutoCAD SHX Text
CONTACT PERSON: JAKE STEHR, RLA
AutoCAD SHX Text e-mail: name@name.com
AutoCAD SHX Text e-mail: jdillard@zevcohen.com
AutoCAD SHX Text e-mail: ads.inc.fl1@gmail.comads.inc.fl1@gmail.com
AutoCAD SHX Text e-mail: name@name.com
AutoCAD SHX Text e-mail: jstehr@zevcohen.com
AutoCAD SHX Text
VICINITY MAP SCALE: 1" = 1000'
AutoCAD SHX Text
SOILS MAP SCALE: 1" = 200'
AutoCAD SHX Text
FLOOD ZONE MAP SCALE: 1" = 200'
AutoCAD SHX Text
ZONING MAP SCALE: 1" = 200'
AutoCAD SHX Text LEGAL DESCRIPTION: DESCRIPTION FROM TAX ASSESSOR'S PARCELS: PARCEL 1: LOT S, EXCEPT THE EAST 65 FT & LOTS T, U, V, W, X, Y, Z, AND ZZ. PLAT OF THE ASSESSOR’S SUBDIVISION OF BLOCK 2 OF S SUBDIVISION OF BLOCK 2 OF ROGER’S MAP OF THE CITY OF DELAND, VOLUSIA COUNTY, FLORIDA. PARCEL CONTAINS 1.44 ACRES MORE OR LESS S MAP OF THE CITY OF DELAND, VOLUSIA COUNTY, FLORIDA. PARCEL CONTAINS 1.44 ACRES MORE OR LESS PARCEL 2: LOTS I AND L AND THE SOUTH 3 FT OF WEST 44 FT OF LOT N AND LOTS O, P, Q, R, AND THE EAST 65 FT OF LOT S. PLAT OF THE ASSESSOR’S SUBDIVISION OF BLOCK 2 OF ROGER’S MAP OF THE CITY OF DELAND, VOLUSIA COUNTY, FLORIDA. PARCEL CONTAINS 1.05 S SUBDIVISION OF BLOCK 2 OF ROGER’S MAP OF THE CITY OF DELAND, VOLUSIA COUNTY, FLORIDA. PARCEL CONTAINS 1.05 S MAP OF THE CITY OF DELAND, VOLUSIA COUNTY, FLORIDA. PARCEL CONTAINS 1.05 ACRES MORE OR LESS
AutoCAD SHX Text PROJECT DESCRIPTION: THIS PROJECT INCLUDES IMPROVEMENTS AND REPAIRING OF THE EXISTING DRAINAGE INFRASTRUCTURE AT THE VOLUSIA COUNTY ADMINISTRATION BUILDING.
AutoCAD SHX Text SHEET INDEX: C1 COVER SHEET COVER SHEET C2 CONSTRUCTION NOTES CONSTRUCTION NOTES C3 DEMOLITION & EROSION CONTROL PLAN DEMOLITION & EROSION CONTROL PLAN C4 GEOMETRY, SIGNAGE & STRIPING PLAN GEOMETRY, SIGNAGE & STRIPING PLAN C5 PAVING, GRADING & DRAINAGE PLAN PAVING, GRADING & DRAINAGE PLAN C6-C7 CONSTRUCTION DETAILS -C7 CONSTRUCTION DETAILS C7 CONSTRUCTION DETAILS CONSTRUCTION DETAILS TP1 TREE PROTECTION PLAN & DETAILS TREE PROTECTION PLAN & DETAILS LA1-LA2 LANDSCAPE PLAN & DETAILS-LA2 LANDSCAPE PLAN & DETAILSLA2 LANDSCAPE PLAN & DETAILSLANDSCAPE PLAN & DETAILS
AutoCAD SHX Text
**NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION.**
AutoCAD SHX Text
SITE INFORMATION:
AutoCAD SHX Text
SITE ADDRESS:
AutoCAD SHX Text
123 W. INDIANA AVE. DELAND, FL. 32720
AutoCAD SHX Text
PROJECT AREA:
AutoCAD SHX Text
2.492 AC
AutoCAD SHX Text
TAX PARCEL I.D. #:
AutoCAD SHX Text 700903000190, 700903000090
AutoCAD SHX Text
EXISTING ZONING:
AutoCAD SHX Text C2A
AutoCAD SHX Text
PROPOSED ZONING:
AutoCAD SHX Text C2A
AutoCAD SHX Text
EXISTING LAND USE:
AutoCAD SHX Text
DOWNTOWN COMMERCIAL
AutoCAD SHX Text
PROPOSED LAND USE:
AutoCAD SHX Text
DOWNTOWN COMMERCIAL
AutoCAD SHX Text
EXISTING FUTURE LAND USE:
AutoCAD SHX Text
DOWNTOWN COMMERCIAL
AutoCAD SHX Text
MAXIMUM BUILDING HEIGHT
AutoCAD SHX Text
80 FT
AutoCAD SHX Text
UTILITIES:
AutoCAD SHX Text
PROVIDED BY CITY OF DELAND, FL
AutoCAD SHX Text
LAND USE TABLE:
AutoCAD SHX Text
ACREAGE
AutoCAD SHX Text
PERCENTAGE
AutoCAD SHX Text
EXISTING CONDITIONS:
AutoCAD SHX Text
UPLAND AREA
AutoCAD SHX Text
2.492 AC
AutoCAD SHX Text 100%
AutoCAD SHX Text
PROPOSED IMPROVEMENTS:
AutoCAD SHX Text
BUILDING(S)
AutoCAD SHX Text
1.09 AC
AutoCAD SHX Text 43.7%
AutoCAD SHX Text
PAVEMENT & SIDEWALK
AutoCAD SHX Text
0.64 AC
AutoCAD SHX Text 25.7%
AutoCAD SHX Text
LANDSCAPE/OPEN SPACE
AutoCAD SHX Text
0.76 AC
AutoCAD SHX Text 30.6%
AutoCAD SHX Text
TOTAL PERVIOUS
AutoCAD SHX Text
1.73 AC
AutoCAD SHX Text 69.4%
AutoCAD SHX Text
TOTAL IMPERVIOUS
AutoCAD SHX Text
0.76 AC
AutoCAD SHX Text 30.6%
AutoCAD SHX Text
V.C. ADMINISTRATION BLDG. DRAINAGE IMPROVEMENTS
AutoCAD SHX Text
CONSTRUCTION SITE
AutoCAD SHX Text
CONSTRUCTION SITE
AutoCAD SHX Text
CONSTRUCTION SITE
AutoCAD SHX Text
CONSTRUCTION SITE
DRAFTED BY: XXX
CHECKED BY: JD
DRAWING FILE: 02-04_24021 NOT
SHEET: OF
DESIGNED BY: JD
PROJECT NO: ZC 24021
NOT VALID WITHOUT SEAL
A
S S
O C
IA
T
E S
IN
C
Z E
V C
O H
E N
CI
VI
L
EN
GI
N
EE
RI
N G
LA
N
DS
CA
PE
A
RC
HI
TE
CT
U
RE
EN
VI
RO
N
M
EN
TA
L
PL
AN
N
IN
G
TR
AN
SP
O
RT
AT
IO
N
(L C
IN
TE
RC
HA
N
GE
B
LV
D.
, S
TE
. C
O
RM
O N
D
BE
AC
H, F L
W W
W .Z
EV
CO
HE
N
.C O
M
C2 7
V .C
A D
M
IN
IS
T
R A
T
IO
N B
L D
G D
R A
IN
A
G E
IM
PR
O V
E M
E N
T S
FI
N
A L
E N
G
IN
E E
R
IN
G P
L A
N S
C O
N
ST
R U
C T
IO
N
N O
T E
S
JOHN A. DILLARD, JR., P.E., NO. 37256
C
IT
Y O
F D
EL
AN
D
VO
LU
SI
A C
O U
N
TY
, F
LO
R
ID
A
R
Know what's below.
Call before you dig.
IT
TA
LS
R
EV
IS
IO
N S
D
AT
E N
O
AutoCAD SHX Text R:\24021 V.C. ADMINISTRATION BUILDING DRAINAGE IMPROVEMENTS\FINAL ENGINEERING PLANS\CADDWGS\02-04_24021 NOT.DWG - PRINTED 12/17/2024 4:21 PM
AutoCAD SHX Text GENERAL NOTES 1. ALL CONSTRUCTION, DRAINAGE STRUCTURES AND OTHER SITE IMPROVEMENTS SHALL BE CONSTRUCTED IN ALL CONSTRUCTION, DRAINAGE STRUCTURES AND OTHER SITE IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITIONS OF FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD PLANS AND SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION OR THE COUNTY'S LAND DEVELOPMENT CODE REQUIREMENTS, STANDARD CONSTRUCTION DETAILS & STANDARD SPECIFICATIONS, WHICHEVER IS MORE STRINGENT. 2. SHOP DRAWINGS AND CERTIFICATIONS FOR ALL MATERIALS AND STRUCTURES ARE REQUIRED. THE SHOP DRAWINGS AND CERTIFICATIONS FOR ALL MATERIALS AND STRUCTURES ARE REQUIRED. THE CONTRACTOR SHALL REVIEW AND SIGN SHOP DRAWINGS. THE CONTRACTOR SHALL SUBMIT REVIEWED SHOP DRAWINGS TO THE ENGINEER FOR APPROVAL PRIOR TO ORDERING THE MATERIALS REQUIRED FOR CONSTRUCTION. 3. CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL REQUIRED PERMITS. THE CONTRACTOR SHALL MAINTAIN CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL REQUIRED PERMITS. THE CONTRACTOR SHALL MAINTAIN COPIES OF ALL RELEVANT PERMITS AND CONSTRUCTION DOCUMENTS AVAILABLE ON THE JOB SITE AT ALL TIMES. 4. CONTRACTOR TO MAINTAIN THE SITE IN A SAFE AND SECURE MANNER TO PROTECT PUBLIC SAFETY AND CONTRACTOR TO MAINTAIN THE SITE IN A SAFE AND SECURE MANNER TO PROTECT PUBLIC SAFETY AND THE CONDITIONS OF THE IMPROVEMENTS. 5. THE CONTRACTOR SHALL MAINTAIN, AT THE JOB SITE, A RECORD COPY OF ALL CONSTRUCTION DRAWINGS THE CONTRACTOR SHALL MAINTAIN, AT THE JOB SITE, A RECORD COPY OF ALL CONSTRUCTION DRAWINGS AND SPECIFICATIONS ON WHICH ALL FIELD CHANGES ARE TO BE SHOWN. THESE CHANGES ARE TO BE INCORPORATED IN THE "AS-BUILT" SURVEY FURNISHED TO THE ENGINEER. 6. SHOULD CONDITIONS VARY FROM THOSE SHOWN ON THESE PLANS, THE CONTRACTOR SHALL IMMEDIATELY SHOULD CONDITIONS VARY FROM THOSE SHOWN ON THESE PLANS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD PRIOR TO CONTINUING CONSTRUCTION. 7. ANY FIELD MODIFICATIONS OR DEVIATIONS TO THESE CONSTRUCTION PLANS REQUIRES APPROVAL BY BOTH ANY FIELD MODIFICATIONS OR DEVIATIONS TO THESE CONSTRUCTION PLANS REQUIRES APPROVAL BY BOTH THE ENGINEER OF RECORD AND THE COUNTY PRIOR TO PERFORMING THE WORK. 8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE AN "AS-BUILT" SURVEY OF THE IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE AN "AS-BUILT" SURVEY OF THE COMPLETED CONSTRUCTION. THE "AS-BUILT" SURVEY SHALL BE PREPARED IN ACCORDANCE WITH APPROPRIATE GOVERNMENTAL REGULATIONS AND ZCA REQUIREMENTS. THE "AS-BUILT" SURVEY SHALL BE PREPARED ON ZCA'S DESIGN/PERMITTED PLANS. ELECTRONIC AND PAPER COPIES OF THE AS-BUILT SURVEY SHALL BE PROVIDED TO THE ENGINEER OF RECORD. THE "AS-BUILT" SHALL BE SIGNED AND SEALED BY A FLORIDA REGISTERED PROFESSIONAL LAND SURVEYOR. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING VEHICULAR AND PEDESTRIAN TRAFFIC SAFELY THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING VEHICULAR AND PEDESTRIAN TRAFFIC SAFELY THROUGH THE WORK ZONE AT ALL TIMES, IF APPLICABLE. ANY SIDEWALK, LANE OR ROAD CLOSURE REQUIRES REVIEW AND APPROVAL IN ADVANCE AND A SEVEN (7) DAY MINIMUM NOTICE TO THE JURISDICTIONAL AGENCY/VOLUSIA COUNTY TRAFFIC OPERATIONS (386-239-6535). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REQUIRED COORDINATION. 10. MAINTENANCE OF TRAFFIC WILL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL MAINTENANCE OF TRAFFIC WILL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAY CONSTRUCTION, MAINTENANCE AND UTILITY OPERATIONS AND THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD PLANS, LATEST EDITIONS. 11. CONTRACTOR TO NOTIFY THE REGULATORY AGENCIES FORTY EIGHT (48) HOURS PRIOR TO THE START OF CONTRACTOR TO NOTIFY THE REGULATORY AGENCIES FORTY EIGHT (48) HOURS PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL SEND COPIES OF ALL TESTING REPORTS TO THE REGULATORY AGENCIES AND THE ENGINEER OF RECORD. 12. SURVEY INFORMATION PROVIDED BY ATLANTIC DRAFTING AND SURVEYING, INC. DATED MAY 2,2024. ALL SURVEY INFORMATION PROVIDED BY ATLANTIC DRAFTING AND SURVEYING, INC. DATED MAY 2,2024. ALL ELEVATIONS BASED ON NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) USING NGS BENCHMARK T 474, PID AI 9218 AND ARE SHOWN IN FEET. STATE PLANE COORDINATES ARE BASED UPON NAD 83. AND ARE SHOWN IN FEET. STATE PLANE COORDINATES ARE BASED UPON NAD 83. 13. ALL PUBLIC LAND CORNERS AND MONUMENTS WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE ALL PUBLIC LAND CORNERS AND MONUMENTS WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE PROTECTED. THE CONTRACTOR SHALL EMPLOY A SURVEYOR, REGISTERED IN THE STATE OF FLORIDA, TO REPLACE/RESTORE ANY PROPERTY OR LAND MARKERS DISTURBED BY CONSTRUCTION ACTIVITIES. 14. NO LAND SHALL BE CLEARED, EXCAVATED OR FILLED AND NO STRUCTURES SHALL BE ERECTED, REPAIRED NO LAND SHALL BE CLEARED, EXCAVATED OR FILLED AND NO STRUCTURES SHALL BE ERECTED, REPAIRED OR DEMOLISHED WITHOUT PROPER PERMIT(S). 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS AS WELL AS THE REQUIREMENTS OF ST. JOHNS RIVER WATER MANAGEMENT DISTRICT AND E.P.A. (NPDES). CONTRACTOR SHALL ESTABLISH BEST MANAGEMENT PRACTICES AND EROSION CONTROL METHODS PRIOR TO COMMENCING ANY SITE CLEARING OR DEMOLITION AND SHALL MAINTAIN THOSE BARRIERS UNTIL FINAL ACCEPTANCE OF THE PROJECT. 16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROJECT'S NPDES PERMITTING, INSPECTION AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROJECT'S NPDES PERMITTING, INSPECTION AND REPORTING, IF APPLICABLE. 17. THE EROSION, SEDIMENT AND TURBIDITY CONTROL MEASURES DELINEATED HEREON ARE THE MINIMUM THE EROSION, SEDIMENT AND TURBIDITY CONTROL MEASURES DELINEATED HEREON ARE THE MINIMUM REQUIRED. ADDITIONAL CONTROLS MAY BE NEEDED, DEPENDING UPON THE ACTUAL SITE CONDITIONS, JURISDICTIONAL AGENCY PERMIT REQUIREMENTS AND CONSTRUCTION OPERATIONS. STAKED SILT FENCE SHALL BE UTILIZED TO CONTROL EROSION AND RELEASE OF SUSPENDED SOLIDS. SEDIMENT TRACKING CONTROL DEVICES SHALL BE USED TO PREVENT THE OFFSITE TRANSPORT OF SEDIMENT BY MOTORIZED VEHICLES. IF CONTROL MEASURES DO NOT PROVE SATISFACTORY, WORK SHALL CEASE UNTIL NEW MEASURES ARE ADOPTED WITH SATISFACTORY RESULTS. 18. ALL EROSION AND SEDIMENT TRACKING CONTROL DEVICES SHALL BE INSPECTED DAILY AND IMMEDIATELY ALL EROSION AND SEDIMENT TRACKING CONTROL DEVICES SHALL BE INSPECTED DAILY AND IMMEDIATELY FOLLOWING A RAINFALL EVENT. REFER TO PROJECT'S STORMWATER POLLUTION PREVENT PLAN (SWPPP). ANY DEFICIENCIES FOUND IN THE EROSION CONTROL MEASURES SHALL BE REPAIRED IMMEDIATELY. THE CONTRACTOR SHALL KEEP A LOG BOOK DOCUMENTING THESE DAILY INSPECTIONS, DEFICIENCIES AND REMEDIAL ACTIONS. 19. ALL UNSUITABLE SOILS AND UNSUITABLE MATERIALS (SUCH AS CLAY, ORGANICS, ROCK, CEMENTED ALL UNSUITABLE SOILS AND UNSUITABLE MATERIALS (SUCH AS CLAY, ORGANICS, ROCK, CEMENTED COQUINA, DEBRIS, ETC.) SHALL BE REMOVED, DISPOSED OF IN A LEGAL MANNER AND REPLACED WITH DRY COMPACTED GRANULAR MATERIAL SATISFACTORY TO THE COUNTY. THE COST OF ALL WORK AND MATERIALS IS TO BE INCLUDED IN THE UNIT PRICE OF THE ASSOCIATED CONSTRUCTION ITEMS UNLESS OTHERWISE SHOWN IN THE PLANS. 20. IN THE EVENT THAT WATER IS ENCOUNTERED DURING CONSTRUCTION, DEWATERING SHALL BE PERFORMED IN THE EVENT THAT WATER IS ENCOUNTERED DURING CONSTRUCTION, DEWATERING SHALL BE PERFORMED AS NEEDED. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE DESIGN, PERMITTING, INSTALLATION, OPERATION AND SUBSEQUENT REMOVAL OF DEWATERING SYSTEMS AND THEIR SAFETY AND CONFORMITY WITH APPLICABLE CODES AND REGULATIONS. 21. PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE APPROPRIATE PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE APPROPRIATE ELECTRIC, TELEPHONE, GAS, CABLE TELEVISION, COMMUNICATIONS, ETC. COMPANIES TO DETERMINE THE TYPE AND LOCATION OF ALL UNDERGROUND FACILITIES IN THE AREA OF CONSTRUCTION. 22. ALL UNDERGROUND UTILITIES HAVE BEEN LOCATED HORIZONTALLY AND VERTICALLY BASED ON THE BEST ALL UNDERGROUND UTILITIES HAVE BEEN LOCATED HORIZONTALLY AND VERTICALLY BASED ON THE BEST INFORMATION AVAILABLE AND SHOULD BE CONSIDERED APPROXIMATE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND VERIFYING ALL ELEVATIONS OF EXISTING UTILITIES (PUBLIC AND PRIVATE) SHOWN OR NOT SHOWN PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE VARIOUS UTILITY COMPANIES TO MAKE THE NECESSARY ARRANGEMENTS FOR ANY RELOCATION, DISRUPTION OF SERVICE OR CLARIFICATION OF ACTIVITY REGARDING SAID UTILITY. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING NEAR OR CROSSING A UTILITY, WHETHER SHOWN ON THESE PLANS OR FIELD LOCATED. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE AND NOTIFY THE UTILITY COMPANIES FOR UTILITIES WHICH NEED TO BE RELOCATED FOR THE PROPOSED CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO PAY FOR ANY REPAIR, RELOCATION OR TEMPORARY MEASURES NEEDED FOR EXISTING OR PROPOSED UTILITIES. 23. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE AND AVOID ALL UTILITIES, OTHER IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE AND AVOID ALL UTILITIES, OTHER STRUCTURES AND OBSTRUCTIONS BOTH ABOVE AND BELOW GROUND. ALL DAMAGE RESULTING FROM THE CONTRACTOR'S FAILURE TO COMPLY WITH THIS REQUIREMENT SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 24. THE CONTRACTOR SHALL NOTIFY ALL UTILITY PROVIDERS AT LEAST TWO (2) BUSINESS DAYS PRIOR TO ANY THE CONTRACTOR SHALL NOTIFY ALL UTILITY PROVIDERS AT LEAST TWO (2) BUSINESS DAYS PRIOR TO ANY CONSTRUCTION. 25. THE CONTRACTOR SHALL MAINTAIN UNINTERRUPTED SERVICE AT ALL SERVICE CONNECTIONS. THE MANNER THE CONTRACTOR SHALL MAINTAIN UNINTERRUPTED SERVICE AT ALL SERVICE CONNECTIONS. THE MANNER IN WHICH THIS IS ACCOMPLISHED SHALL BE LEFT TO THE DISCRETION OF THE CONTRACTOR, SUBJECT TO THE REQUIREMENTS OF THE CONTRACT SPECIFICATIONS. 26. ALL EXISTING DRAINAGE STRUCTURES AND UTILITIES WITHIN THE CONSTRUCTION LIMITS SHALL REMAIN, ALL EXISTING DRAINAGE STRUCTURES AND UTILITIES WITHIN THE CONSTRUCTION LIMITS SHALL REMAIN, UNLESS OTHERWISE NOTED IN PLANS. 27. THE LENGTH OF ALL DRAINAGE PIPES AND LOCATION OF ALL DRAINAGE STRUCTURES ARE APPROXIMATE. THE LENGTH OF ALL DRAINAGE PIPES AND LOCATION OF ALL DRAINAGE STRUCTURES ARE APPROXIMATE. THE LOCATION OF THE DRAINAGE STRUCTURE SHALL DETERMINE THE LENGTH OF PIPE. 28. THE TOP OF CASTING ELEVATIONS (TC) OF ALL STRUCTURES ARE SHOWN. HOWEVER, THE CONTRACTOR THE TOP OF CASTING ELEVATIONS (TC) OF ALL STRUCTURES ARE SHOWN. HOWEVER, THE CONTRACTOR SHALL INSTALL ALL FRAMES SO AS TO PROVIDE A SMOOTH SURFACE FOR VEHICULAR AND/OR PEDESTRIAN TRAFFIC. 29. CONTRACTOR SHALL CONFIRM PROPOSED TOP OF CASTING (TC) ELEVATIONS WILL ALLOW POSITIVE CONTRACTOR SHALL CONFIRM PROPOSED TOP OF CASTING (TC) ELEVATIONS WILL ALLOW POSITIVE DRAINAGE TO PROPOSED INLETS. IF POSITIVE DRAINAGE DOES NOT EXIST, CONTRACTOR TO COORDINATE WITH ENGINEER OF RECORD FOR SOLUTION AND ADJUST PROPOSED INLETS AS NECESSARY AT NO COST. 30. CONTRACTOR SHALL CONFIRM ELEVATION OF EXISTING GRADE PRIOR TO PLACING DRAINAGE OUTFALL CONTRACTOR SHALL CONFIRM ELEVATION OF EXISTING GRADE PRIOR TO PLACING DRAINAGE OUTFALL STRUCTURES. CONTRACTOR SHALL NOTIFY ENGINEER OF RECORD IF EXISTING GRADE DOES NOT MATCH PROPOSED OUTFALL INVERT. CONTRACTOR SHALL ADJUST OUTFALL STRUCTURE INVERT AND/OR STRUCTURE LOCATION AS DIRECTED BY ENGINEER OF RECORD AT NO COST. 31. ANY DRAINAGE PROBLEMS CREATED BY CONSTRUCTION, OR EXISTING BEFORE CONSTRUCTION AND NOT ANY DRAINAGE PROBLEMS CREATED BY CONSTRUCTION, OR EXISTING BEFORE CONSTRUCTION AND NOT ALLEVIATED, SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD AT THE TIME OF DISCOVERY. 32. ALL STORMWATER PIPES AND INLETS SHALL BE CLEANED OF DEBRIS AND ERODED MATERIALS AT LAST ALL STORMWATER PIPES AND INLETS SHALL BE CLEANED OF DEBRIS AND ERODED MATERIALS AT LAST STAGES OF AND PRIOR TO COMPLETION OF CONSTRUCTION. 33. SPECIAL ATTENTION IS DIRECTED TO THE FACT THAT PORTIONS OF SOME DRAINAGE STRUCTURES MAY SPECIAL ATTENTION IS DIRECTED TO THE FACT THAT PORTIONS OF SOME DRAINAGE STRUCTURES MAY EXTEND INTO THE STABILIZED PORTION OF THE ROADBED. EXTREME CAUTION WILL BE NECESSARY DURING COMPACTION AND STABILIZATION OPERATIONS AT THESE LOCATIONS TO AVOID DAMAGE AND ACHIEVE THE REQUIRED COMPACTION.
AutoCAD SHX Text GENERAL NOTES 34. DURING CONSTRUCTION, AN ALL-WEATHER ACCESSIBLE ROADWAY SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION, AN ALL-WEATHER ACCESSIBLE ROADWAY SHALL BE MAINTAINED AT ALL TIMES FOR FIRE ACCESS. 35. ALL REQUIRED FIRE LINES & HYDRANTS SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL & STATE ALL REQUIRED FIRE LINES & HYDRANTS SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL & STATE REQUIREMENTS AND OPERATIONAL PRIOR TO THE START OF VERTICAL CONSTRUCTION. 36. EXISTING DRIVEWAYS WITHIN THE LIMITS OF THIS PROJECT ARE TO BE REPLACED AT THE SAME LOCATION EXISTING DRIVEWAYS WITHIN THE LIMITS OF THIS PROJECT ARE TO BE REPLACED AT THE SAME LOCATION AND WIDTH WITH THE SAME TYPE OF MATERIAL, UNLESS OTHERWISE SHOWN IN THE PLANS. 37. ALL RAMPS, SIDEWALKS AND ACCESSIBLE ROUTES ARE TO BE IN COMPLIANCE WITH CURRENT A.D.A. ALL RAMPS, SIDEWALKS AND ACCESSIBLE ROUTES ARE TO BE IN COMPLIANCE WITH CURRENT A.D.A. REQUIREMENTS. 38. SIGNS THAT ARE REMOVED AND ARE TO BE RELOCATED SHALL BE STOCK PILED BY THE CONTRACTOR. ANY SIGNS THAT ARE REMOVED AND ARE TO BE RELOCATED SHALL BE STOCK PILED BY THE CONTRACTOR. ANY EXISTING SIGNS DAMAGED DURING CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR AT HIS COST. 39. ROADWAY AND PARKING SIGNAGE AND MARKINGS SHALL BE IN CONFORMANCE WITH THE MANUAL OF ROADWAY AND PARKING SIGNAGE AND MARKINGS SHALL BE IN CONFORMANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION. 40. UNLESS OTHERWISE NOTED, PROPOSED GRADES SHOWN ARE FINISHED GRADES. UNLESS OTHERWISE NOTED, PROPOSED GRADES SHOWN ARE FINISHED GRADES. 41. OPERATION AND MAINTENANCE OF THE STORMWATER SYSTEM WILL BE PROVIDED BY THE OWNER OF OPERATION AND MAINTENANCE OF THE STORMWATER SYSTEM WILL BE PROVIDED BY THE OWNER OF PROPERTY. MAINTENANCE IS TO INCLUDE BI-WEEKLY MOWING OF SIDE SLOPES FOR VEGETATION CONTROL AND MONTHLY INSPECTION/CLEANING OF CULVERTS & STORM SYSTEMS. 42. ALL DISTURBED AREAS SHALL BE SODDED, UNLESS OTHERWISE SHOWN, AND SHALL HAVE SOD/ VEGETATED ALL DISTURBED AREAS SHALL BE SODDED, UNLESS OTHERWISE SHOWN, AND SHALL HAVE SOD/ VEGETATED COVER ESTABLISHED PRIOR TO THE INSPECTION FOR THE CERTIFICATE OF OCCUPANCY. 43. INSTALLATION OF THE REQUIRED STREET SIGNS, TRAFFIC SIGNS, PAVEMENT STRIPING, STREET LIGHTS AND INSTALLATION OF THE REQUIRED STREET SIGNS, TRAFFIC SIGNS, PAVEMENT STRIPING, STREET LIGHTS AND SIDEWALKS ALONG WITH THE PAINTING OF THE FIRE HYDRANTS MUST BE COMPLETED PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF COMPLETION. 44. CONTRACTOR IS RESPONSIBLE FOR INSPECTING AND PRE-TESTING PRIOR TO SCHEDULING A TEST OR CONTRACTOR IS RESPONSIBLE FOR INSPECTING AND PRE-TESTING PRIOR TO SCHEDULING A TEST OR WALK-THROUGH WITH THE UTILITY REPRESENTATIVES, MUNICIPAL REPRESENTATIVES AND ENGINEER OF RECORD. ANY COST ASSOCIATED WITH RETESTING SHALL BE PAID FOR BY THE CONTRACTOR. 45. THE ENGINEER OF RECORD AND LOCAL UTILITY SHALL BE GIVEN SEVENTY-TWO (72) HOURS NOTICE OF ALL THE ENGINEER OF RECORD AND LOCAL UTILITY SHALL BE GIVEN SEVENTY-TWO (72) HOURS NOTICE OF ALL REQUESTED MEETINGS AND/OR TESTING MEASURES. 46. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH THE REGULATORY REPRESENTATIVES TO CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH THE REGULATORY REPRESENTATIVES TO DETERMINE THE INSPECTIONS NEED FOR THE PROJECT. CONTRACTOR SHALL PROVIDE PROPER NOTIFICATION TO INSPECTING AUTHORITIES BEFORE AND DURING CONSTRUCTION. 47. ZEV COHEN AND ASSOCIATES, INC (ZCA) LIABILITY SHALL BE LIMITED TO THE COMPANY'S DESIGN OF ZEV COHEN AND ASSOCIATES, INC (ZCA) LIABILITY SHALL BE LIMITED TO THE COMPANY'S DESIGN OF SPECIFIC IMPROVEMENTS AS DEPICTED ON THE SITE INFRASTRUCTURE CONSTRUCTION DOCUMENTS.
AutoCAD SHX Text SITE CLEARING & GRADING NOTES THE FOLLOWING REPRESENTS MINIMUM STANDARDS TO BE ADHERED TO BY THE CONTRACTOR THROUGHOUT THE CONSTRUCTION OF A PROJECT. THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL MEASURES TO BE EMPLOYED WHEN WARRANTED BY EXTREME CONDITIONS AND/OR THE FAILURE OF THE CONTRACTOR TO EMPLOY THE APPROPRIATE EROSION CONTROL BEST MANAGEMENT PRACTICES. FAILURE TO COMPLY WITH THESE PROVISIONS SHALL RESULT IN THE ISSUANCE OF A "STOP WORK ORDER". 1. NO DISTURBANCE OF EXISTING OR PROPOSED CONSERVATION EASEMENTS, NATURAL BUFFERS, OR WATER BODIES IS NO DISTURBANCE OF EXISTING OR PROPOSED CONSERVATION EASEMENTS, NATURAL BUFFERS, OR WATER BODIES IS PERMITTED WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER OR DESIGNEE. THE CONTRACTOR SHALL LOCATE THESE AREAS ON SITE AND BARRICADE THEM TO AVOID ANY UNAUTHORIZED CLEARING. BARRICADES AND OTHER PROTECTIVE FENCING ARE TO BE LOCATED AT THE DRIP LINE OF EXISTING NATIVE TREES OR AT THE EDGE OF THE NATIVE UNDER-STORY HABITAT, WHICHEVER IS NEAREST TO THE CONSTRUCTION ACTIVITY. 2. SPECIMEN AND HISTORIC TREES, CONSERVATION EASEMENTS, NATURAL VEGETATION BUFFERS, AND SIMILAR AREAS SPECIMEN AND HISTORIC TREES, CONSERVATION EASEMENTS, NATURAL VEGETATION BUFFERS, AND SIMILAR AREAS MUST BE PROTECTED BY BARRICADES OR FENCING PRIOR TO CLEARING. BARRICADES ARE TO BE SET AT THE DRIP LINE OF THE TREES AND MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT. BARBED WIRE IS NOT PERMITTED AS A PROTECTIVE BARRIER. 3. WHERE A CHANGE OF GRADE OCCURS AT THE DRIP LINE OF A SPECIMEN TREE, SILT FENCE WILL BE REQUIRED WHERE A CHANGE OF GRADE OCCURS AT THE DRIP LINE OF A SPECIMEN TREE, SILT FENCE WILL BE REQUIRED DURING CONSTRUCTION AND RETAINING WALLS MUST BE INSTALLED PRIOR TO FINAL ACCEPTANCE BY THE CITY. 4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE ALL PROTECTIVE VEGETATION BARRICADES AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE ALL PROTECTIVE VEGETATION BARRICADES AND EROSION CONTROL STRUCTURES AND MEASURES IN PLACE PRIOR TO THE COMMENCEMENT OF ANY EARTHWORK, INCLUDING PRELIMINARY GRUBBING. THESE MEASURES INCLUDE, BUT ARE NOT LIMITED TO, TEMPORARY CONSTRUCTION FENCES, SYNTHETIC JUTE BALES, SILT FENCES, AND FLOATING TURBIDITY BARRIERS. FURTHER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN ALL EROSION CONTROL DEVICES THROUGHOUT THE DURATION OF THE ENTIRE PROJECT. MAINTENANCE SHALL INCLUDE PERIODIC INSPECTION AND REMOVAL OF DEBRIS ABUTTING EROSION CONTROL DEVICES IN ACCORDANCE WITH THE CITY'S UTILITY DEPARTMENT STANDARDS. 5. PRIOR TO THE INSTALLATION OF ANY FILL MATERIAL ON SUBJECT SITE, SILT FENCE SHALL BE INSTALLED: PRIOR TO THE INSTALLATION OF ANY FILL MATERIAL ON SUBJECT SITE, SILT FENCE SHALL BE INSTALLED: a. ALONG SUBJECT SITE BOUNDARY AND PROPERTY LINES. ALONG SUBJECT SITE BOUNDARY AND PROPERTY LINES. b. AT THE EDGE OF CONSERVATION EASEMENTS AND WETLANDS. AT THE EDGE OF CONSERVATION EASEMENTS AND WETLANDS. c. ADJACENT TO NATURAL LANDSCAPE BUFFERS. ADJACENT TO NATURAL LANDSCAPE BUFFERS. d. AROUND THE PERIMETER OF EXISTING STORM WATER TREATMENT FACILITIES. AROUND THE PERIMETER OF EXISTING STORM WATER TREATMENT FACILITIES. e. AT ANY ADDITIONAL AREAS THAT THE CITY DEEMS NECESSARY TO BE PROTECTED FROM POTENTIAL EROSION AT ANY ADDITIONAL AREAS THAT THE CITY DEEMS NECESSARY TO BE PROTECTED FROM POTENTIAL EROSION IMPACTS DURING CONSTRUCTION. THESE CONDITIONS SHALL APPLY IN ALL INSTANCES WHERE FILL MATERIAL IS BEING INSTALLED WITHIN 25 FEET OF ANY OF THE AFOREMENTIONED LOCATIONS. WHILE THESE ITEMS REPRESENT THE MINIMUM REQUIREMENTS, THE CITY RESERVES THE RIGHT TO IMPOSE ADDITIONAL PROTECTIVE MEASURES, AS DETERMINED DURING ACTUAL SITE VISITS CONDUCTED AS PART OF THE STANDARD REVIEW OF THE SITE-SPECIFIC CLEARING PERMIT AND THROUGHOUT PROJECT CONSTRUCTION. 6. WHERE FILL MATERIAL IS INTENDED TO BE INSTALLED ADJACENT TO EXISTING VEGETATION WHICH IS INTENDED TO WHERE FILL MATERIAL IS INTENDED TO BE INSTALLED ADJACENT TO EXISTING VEGETATION WHICH IS INTENDED TO REMAIN NATURAL, THE CONTRACTOR MAY INSTALL SILT FENCING AS A TREE PROTECTION MEASURE, IN LIEU OF INSTALLING EITHER WOOD BRACING OR ORANGE MESH FENCING. THIS PRACTICE IS ENCOURAGED BY THE CITY. IF THE SILT FENCE FAILS TO PROVIDE ADEQUATE PROTECTION FROM IMPACT DUE TO CONSTRUCTION, THEN ADDITIONAL CONSTRUCTION FENCING OR WOOD BRACING SHALL BE REQUIRED. 7. AT A MINIMUM, THE CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS. GRASS COVERAGE IS TO BE AT A MINIMUM, THE CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS. GRASS COVERAGE IS TO BE ESTABLISHED WITHIN THIRTY DAYS. 8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THROUGH SCHEDULING, TO MINIMIZE THE DISTURBANCE OF IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THROUGH SCHEDULING, TO MINIMIZE THE DISTURBANCE OF SITE AREAS THAT HAVE BEEN BROUGHT TO THEIR PROPOSED FINAL GRADE. WITHIN TWENTY DAYS OF BRINGING A SUBJECT AREA TO ITS FINAL GRADE, THE CONTRACTOR SHALL INSTALL SEED AND MULCH OR SOD AND WATERING, AS REQUIRED. 9. FOR INDIVIDUAL CONSTRUCTION PROJECTS INVOLVING MULTIPLE PHASES, UPON COMPLETION OF EACH PHASE OF FOR INDIVIDUAL CONSTRUCTION PROJECTS INVOLVING MULTIPLE PHASES, UPON COMPLETION OF EACH PHASE OF THE PROJECT, SEEDING AND MULCHING AND OR/ SODDING IS TO BE PERFORMED PRIOR TO COMMENCING THE NEXT PHASE OF CONSTRUCTION. 10. ONCE AN AREA IS SEEDED OR SODDED, IT MUST BE MAINTAINED, INCLUDING WATERING AND TRIMMING BY THE ONCE AN AREA IS SEEDED OR SODDED, IT MUST BE MAINTAINED, INCLUDING WATERING AND TRIMMING BY THE CONTRACTOR TO ALLOW THE GRASS TO BECOME ESTABLISHED. 11. ALL BURNING OF CLEARED MATERIALS MUST BE APPROVED AND PERMITTED THROUGH THE FL FOREST SERVICE, ALL BURNING OF CLEARED MATERIALS MUST BE APPROVED AND PERMITTED THROUGH THE FL FOREST SERVICE, BUNNELL OFFICE. 12. ABSOLUTELY NO BURYING OF CLEARED & GRUBBED MATERIALS IS PERMITTED. ABSOLUTELY NO BURYING OF CLEARED & GRUBBED MATERIALS IS PERMITTED. 13. THE REMOVAL OF ALL VEGETATION AND TOPSOIL ON THE FUTURE ROADWAY, PARKING AND BUILDING LOT AREAS IS THE REMOVAL OF ALL VEGETATION AND TOPSOIL ON THE FUTURE ROADWAY, PARKING AND BUILDING LOT AREAS IS REQUIRED TO BE COMPLETED PRIOR TO THE PLACEMENT OF FILL ON THOSE AREAS. THE TOPSOIL MAY BE TEMPORARILY STOCKPILED AND USED AS TOPSOIL OVER PROPOSED GREEN AREAS SUCH AS PLANT BEDS, SODDED AREAS, AND WHERE TREES ARE TO BE INSTALLED OR RELOCATED. TEMPORARY STOCKPILE SLOPES SHALL NOT EXCEED 4:1 (H:V). 14. A SIGNED, DATED, AND SEALED LETTER FROM A SOILS ENGINEER OR THE ENGINEER OF RECORD CERTIFYING THAT A SIGNED, DATED, AND SEALED LETTER FROM A SOILS ENGINEER OR THE ENGINEER OF RECORD CERTIFYING THAT THE AREAS TO BE FILLED HAVE BEEN STRIPPED OF ORGANIC MATERIALS, MUST BE SUBMITTED TO THE CITY PRIOR TO FILLING. 15. FILL MATERIAL IS TO BE PLACED IN ONE FOOT LIFTS AND COMPACTED TO THE APPROPRIATE DENSITY (98% FOR FILL MATERIAL IS TO BE PLACED IN ONE FOOT LIFTS AND COMPACTED TO THE APPROPRIATE DENSITY (98% FOR PAVED AREAS AND 95% FOR BUILDING PADS AND ALL OTHER AREAS AS PER MODIFIED AASHTO T-180).
AutoCAD SHX Text EROSION & SEDIMENT CONTROL NOTES 1. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL INCORPORATE APPROPRIATE BEST MANAGEMENT PRACTICES ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL INCORPORATE APPROPRIATE BEST MANAGEMENT PRACTICES PRACTICES (BMP'S) TO PREVENT EROSION, OFFSITE SEDIMENTATION, AND THE POTENTIAL FOR DOWNSTREAM WATER QUALITY IMPACTS. 2. THE SITE WORK/GRADING AND UTILITIES CONTRACTOR SHALL AT A MINIMUM, ENSURE IMPLEMENTATION OF AN THE SITE WORK/GRADING AND UTILITIES CONTRACTOR SHALL AT A MINIMUM, ENSURE IMPLEMENTATION OF AN OF AN APPROVED EROSION PREVENTION AND SEDIMENT CONTROL PLAN IN ACCORDANCE WITH FLORIDA DEPARTMENT OF DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) CONSTRUCTION ACTIVITY GUIDELINES. 3. A SITE SPECIFIC STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE SUBMITTED WITH THE PROPOSED A SITE SPECIFIC STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE SUBMITTED WITH THE PROPOSED PROPOSED SITE PLANS FOR REVIEW AND APPROVAL BY THE CITY PER THE CITY'S LAND DEVELOPMENT CODE (LDC) "ADDITIONAL APPLICATION REQUIREMENTS FOR SITE PLANS". 4. ALL APPLICABLE PERMITS, SWPPP, AND SITE SPECIFIC BMP'S SHALL BE INSPECTED BY THE CITY, PRIOR TO THE ALL APPLICABLE PERMITS, SWPPP, AND SITE SPECIFIC BMP'S SHALL BE INSPECTED BY THE CITY, PRIOR TO THE PRIOR TO THE START OF ANY LAND DISTURBANCE ACTIVITIES. PRECONSTRUCTION EROSION CONTROL INSPECTIONS CAN BE PRECONSTRUCTION EROSION CONTROL INSPECTIONS CAN BE SCHEDULED THROUGH PERMITS AND LICENSING. PERMITS AND LICENSING. 5. THE SITE WORK CONTRACTOR SHALL MINIMIZE DISTURBANCES OF EXISTING WETLANDS, VEGETATION AND DRAINAGE THE SITE WORK CONTRACTOR SHALL MINIMIZE DISTURBANCES OF EXISTING WETLANDS, VEGETATION AND DRAINAGE PATTERNS ON ADJACENT PROPERTIES TO THE MAXIMUM EXTENT PRACTICABLE DURING CONSTRUCTION ACTIVITIES. DURING CONSTRUCTION ACTIVITIES. 6. STORMWATER RETENTION, DETENTION, STORAGE AND CONVEYANCE SYSTEMS MUST BE EXCAVATED TO ROUGH GRADE STORMWATER RETENTION, DETENTION, STORAGE AND CONVEYANCE SYSTEMS MUST BE EXCAVATED TO ROUGH GRADE ROUGH GRADE PRIOR TO BUILDING CONSTRUCTION OR PLACEMENT OF IMPERVIOUS SURFACE WITHIN THE AREA SERVED BY THOSE THE AREA SERVED BY THOSE SYSTEMS. ADEQUATE BMP'S MUST BE IMPLEMENTED TO PREVENT SILTATION OF THESE TREATMENT SYSTEMS AND CONTROL STRUCTURES DURING CONSTRUCTION. SILTATION MUST BE REMOVED FROM THE STORMWATER SYSTEM WHEN HALF FULL AND IMMEDIATELY PRIOR TO FINAL GRADING AND STABILIZATION OF THE PROJECT. 7. THE OWNER AND OR, CONTRACTOR(S) IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION THE OWNER AND OR, CONTRACTOR(S) IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION EROSION PREVENTION AND SEDIMENT CONTROL MEASURES AND PROJECT. SPECIFIC PERMIT REQUIREMENTS. BEST MANAGEMENT BEST MANAGEMENT PRACTICES INSTALLED ONSITE SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM EVENT THAT IS 0.50 INCHES OR GREATER (EVEN IF IT RAINS ON THE WEEKEND INCHES OR GREATER (EVEN IF IT RAINS ON THE WEEKEND OR HOLIDAY). THE SITE SHALL BE INSPECTED AND THE INSPECTION DOCUMENTED BY A QUALIFIED INSPECTOR AND AND THE INSPECTION DOCUMENTED BY A QUALIFIED INSPECTOR AND CORRECTIVE ACTIONS TAKEN AS NECESSARY. 8. THE SITE WORK/GRADING AND UTILITIES CONTRACTOR SHALL INITIATE STABILIZATION MEASURES WITHIN SEVEN THE SITE WORK/GRADING AND UTILITIES CONTRACTOR SHALL INITIATE STABILIZATION MEASURES WITHIN SEVEN SEVEN CALENDAR DAYS AFTER CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED FOR ANY PORTION OF FOR ANY PORTION OF THE PROJECT. FINAL STABILIZATION IS DEFINED AS A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF COVER WITH A DENSITY OF GROWTH OF AT LEAST 70% OR GREATER. 9. THE SITE WORK OWNER AND/OR CONTRACTOR(S) IS RESPONSIBLE FOR MAINTAINING THE PROJECT IN COMPLIANCE THE SITE WORK OWNER AND/OR CONTRACTOR(S) IS RESPONSIBLE FOR MAINTAINING THE PROJECT IN COMPLIANCE WITH ALL JURISDICTIONAL PERMITS AND THE CITY'S LAND DEVELOPMENT CODE REQUIREMENTS. REQUIREMENTS. 10. FOR ANY LAND DISTURBANCES OF ONE ACRE OR MORE, THE CONTRACTOR SHALL SUBMIT A COMPLETED NPDES FOR ANY LAND DISTURBANCES OF ONE ACRE OR MORE, THE CONTRACTOR SHALL SUBMIT A COMPLETED NPDES NPDES CONSTRUCTION GENERIC PERMIT (CGP) NOTICE OF INTENT (NOI) TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) AT LEAST 2 CALENDAR DAYS PRIOR TO COMMENCEMENT OF CLEARING, GRADING, DEMOLITION, OR OTHER CONSTRUCTION RELATED LAND DISTURBANCE ACTIVITIES. THE NPDES CGP SHALL BE MAINTAINED UNTIL COMPLETION OF ALL CONSTRUCTION ACTIVITIES. 11. FOR PROJECTS THAT DISCHARGE STORMWATER INTO THE CITY'S MS4 STORMWATER CONVEYANCE SYSTEM, THE CITY'S FOR PROJECTS THAT DISCHARGE STORMWATER INTO THE CITY'S MS4 STORMWATER CONVEYANCE SYSTEM, THE CITY'S SYSTEM, THE CITY'S MS4 MUST BE DESIGNATED AS A DISCHARGE LOCATION ON THE FDEP CGP NOI. IF DESIGNATED AS SUCH, A COPY OF THE NPDES CGP NOI OR ACKNOWLEDGEMENT LETTER MUST BE SUBMITTED TO THE CITY OF DELAND UTILITIES DEPARTMENT WITHIN 7 CALENDAR DAYS.
AutoCAD SHX Text SITE CLEARING & GRADING NOTES-CONT. 17. IF ANY MUCK OR ANY UNSUITABLE MATERIAL IS DISCOVERED, IT SHALL BE REMOVED AND REPLACED WITH A IF ANY MUCK OR ANY UNSUITABLE MATERIAL IS DISCOVERED, IT SHALL BE REMOVED AND REPLACED WITH A SUITABLE MATERIAL THAT IS PROPERLY BACKFILLED, COMPACTED AND TESTED USING AASHTO T-180 MODIFIED PROCTOR METHOD. 18. STOCKPILING IS NOT GENERALLY PERMITTED BY THE CITY. WHEN ALLOWED, STOCKPILES SHALL NOT EXCEED SIX STOCKPILING IS NOT GENERALLY PERMITTED BY THE CITY. WHEN ALLOWED, STOCKPILES SHALL NOT EXCEED SIX FEET IN HEIGHT MEASURED FROM THE ORIGINAL GRADE. AT A MINIMUM, STOCK PILES THAT WILL REMAIN IN PLACE IN EXCESS OF FIVE DAYS SHALL BE COVERED OR WATERED TO MINIMIZE THE ADVERSE IMPACT ON ADJACENT PROPERTY OWNERS AT NO ADDITIONAL COST TO THE CITY OR OWNER. SEED AND MULCH IMMEDIATELY UPON PLACEMENT OF THE FINAL LIFT. 19. SOILS ARE TO BE STABILIZED BY WATER OR OTHER MEANS DURING CONSTRUCTION. THIS IS INTENDED TO REDUCE SOILS ARE TO BE STABILIZED BY WATER OR OTHER MEANS DURING CONSTRUCTION. THIS IS INTENDED TO REDUCE SOIL EROSION AND THE IMPACT TO NEIGHBORING COMMUNITIES. ADEQUATE WATERING METHODS SHOULD BE EMPLOYED TO ALLOW DAILY COVERAGE OF THE ENTIRE LIMITS OF ALL AREAS THAT DO NOT HAVE AN ESTABLISHED VEGETATIVE COVER. METHODS TO BE EMPLOYED INCLUDE, BUT ARE NOT LIMITED TO, WATER TRUCKS, PERMANENT IRRIGATION SYSTEMS, TEMPORARY SPRINKLER SYSTEMS OPERATED BY PUMPING UNITS CONNECTED TO WET RETENTION PONDS, WATER CANNONS, TEMPORARY IRRIGATION SYSTEMS MOUNTED ATOP STOCKPILE AREAS, AND OTHER METHODS AS DEEMED NECESSARY BY THE CITY. 20. ALL FILL MATERIALS LOCATED BENEATH STRUCTURES AND PAVEMENT SHALL CONSIST OF CLEAN GRANULAR SAND ALL FILL MATERIALS LOCATED BENEATH STRUCTURES AND PAVEMENT SHALL CONSIST OF CLEAN GRANULAR SAND FREE FROM ORGANICS AND SIMILAR MATERIAL THAT COULD DECOMPOSE. 21. ALL FILL TO BE PLACED IN LANDSCAPED AREAS SHALL HAVE A PH RANGE BETWEEN 5.5 AND 7.5, BE ORGANIC IN ALL FILL TO BE PLACED IN LANDSCAPED AREAS SHALL HAVE A PH RANGE BETWEEN 5.5 AND 7.5, BE ORGANIC IN NATURE, FREE OF ROCKS AND DEBRIS, OR MATCH NATIVE EXISTING SOILS.
AutoCAD SHX Text STORMWATER CONSTRUCTION NOTES 1. ALL SITE SPECIFIC, EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) MEASURES AT A MINIMUM SHALL BE ALL SITE SPECIFIC, EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) MEASURES AT A MINIMUM SHALL BE INSTALLED PER APPROVED SITE PLANS AND STORMWATER POLLUTION PREVENTION PLANS (SWPPP). EPSC DESIGN, (SWPPP). EPSC DESIGN, INSTALLATION AND MAINTENANCE SHALL BE IN ACCORDANCE WITH THE STATE OF FLORIDA EROSION AND SEDIMENT FLORIDA EROSION AND SEDIMENT CONTROL DESIGNER AND REVIEWER MANUAL CURRENT EDITION. 2. THE SITE WORK CONTRACTOR SHALL ENSURE IMPLEMENTATION OF APPROVED SWPPP AND INSTALLATION OF ALL THE SITE WORK CONTRACTOR SHALL ENSURE IMPLEMENTATION OF APPROVED SWPPP AND INSTALLATION OF ALL OF ALL APPROVED EROSION PREVENTION AND SEDIMENT CONTROL PRACTICES. A PRECONSTRUCTION EROSION CONTROL A PRECONSTRUCTION EROSION CONTROL PRECONSTRUCTION EROSION CONTROL PRECONSTRUCTION EROSION CONTROL INSPECTION SHALL BE SCHEDULED WITH CITY PERSONNEL PRIOR TO COMMENCEMENT OF ANY LAND DISTURBANCE TO COMMENCEMENT OF ANY LAND DISTURBANCE TO COMMENCEMENT OF ANY LAND DISTURBANCE COMMENCEMENT OF ANY LAND DISTURBANCE COMMENCEMENT OF ANY LAND DISTURBANCE ACTIVITIES. 3. THE SITE WORK CONTRACTOR SHALL ENSURE THAT THE NPDES CONSTRUCTION GENERIC PERMIT (CGP) NOTICE OF THE SITE WORK CONTRACTOR SHALL ENSURE THAT THE NPDES CONSTRUCTION GENERIC PERMIT (CGP) NOTICE OF INTENT (NOI) AND ANY REQUIRED DEWATERING PERMITS HAVE BEEN OBTAINED OR SUBMITTED PRIOR TO ANY LAND DISTURBANCE ACTIVITIES. 4. A CODB DEWATERING PERMIT IS REQUIRED PRIOR TO ENGAGING IN ANY DEWATERING OR CONSTRUCTION ACTIVITY A CODB DEWATERING PERMIT IS REQUIRED PRIOR TO ENGAGING IN ANY DEWATERING OR CONSTRUCTION ACTIVITY THAT CHANGES THE IMPERVIOUS AREA OF LAND. PERMITABLE DEWATERING ACTIVITIES INCLUDE; THE REMOVAL OF GROUND WATER FROM A CONSTRUCTION SITE, ENCLOSED VAULT, COFFERDAM, OR TRENCHES, ALLOWING CONSTRUCTION OR MAINTENANCE IN A DRY ENVIRONMENT. SITE SPECIFIC DEWATERING PERMITS REQUIRE PAYMENT OF A PER ACRE FEE BASED ON THE SIZE OF THE DEVELOPMENT AND GENERAL PURPOSE PERMITS REQUIRE AN ANNUAL FEE BASED ON A BIANNUAL SCHEDULE OF DEWATERING ACTIVITIES DISCHARGING DIRECTLY INTO THE CITY'S PHASE II MS4 STORMWATER CONVEYANCE SYSTEM. DEWATERING PERMITS MAY BE APPLIED FOR DIRECTLY THROUGH ETRAKIT. FEES ARE SUBJECT TO ARTICLE 7, SECTION 7.2 OF THE LAND DEVELOPMENT CODE AND MUST BE SUBMITTED WITH THE PERMIT APPLICATION PRIOR TO ANY USE OF THE CITY'S STORMWATER CONVEYANCE SYSTEM. 5. CONTRACTOR SHALL FOLLOW ALL OF THE CITY'S REQUIRED WASTE MANAGEMENT PRACTICES. ALL CONSTRUCTION, CONTRACTOR SHALL FOLLOW ALL OF THE CITY'S REQUIRED WASTE MANAGEMENT PRACTICES. ALL CONSTRUCTION, RENOVATION, AND DEMOLITION SITES ARE TO BE KEPT CLEAN AND FREE OF REFUSE, DEBRIS, AND LITTER DURING THE CONSTRUCTION, RENOVATION, OR DEMOLITION PROCESS. A CERTIFICATE OF OCCUPANCY FOR A NEWLY CONSTRUCTED OR RENOVATED BUILDING SHALL NOT BE ISSUED UNTIL ALL REFUSE AND LITTER CAUSED BY THE REFUSE AND LITTER CAUSED BY THE CONSTRUCTION OR REMODELING IS REMOVED FROM THE SITE PER THE DELAND CODE OF ORDINANCES CHAPTER 78 DELAND CODE OF ORDINANCES CHAPTER 78 SECTION 78-5 AND 78-7. 6. ALL DEVELOPMENT PLANS SHALL BE CONSISTENT WITH THE DELAND LAND DEVELOPMENT CODE ARTICLE 6 ALL DEVELOPMENT PLANS SHALL BE CONSISTENT WITH THE DELAND LAND DEVELOPMENT CODE ARTICLE 6 ARTICLE 6 ARTICLE 6 DEVELOPMENT STANDARDS, SECTION 6.15, 6.18 AND ARTICLE 7 SUBDIVISION AND INFRASTRUCTURE, SECTION 7.2 INFRASTRUCTURE, SECTION 7.2 7. STORMWATER MAINS SHALL HAVE A MINIMUM DRAINAGE MAINTENANCE EASEMENT AND ACCESS WIDTH OF 20 FEET. STORMWATER MAINS SHALL HAVE A MINIMUM DRAINAGE MAINTENANCE EASEMENT AND ACCESS WIDTH OF 20 FEET. OF 20 FEET. THE EASEMENT WIDTH MAY BE INCREASED DEPENDING UPON THE SIZE AND DEPTH OF PIPE. 8. CONCRETE EROSION CONTROL BMP'S MUST BE PROVIDED WHERE SWALES OR CULVERTS INTERCEPT DRAINAGE CONCRETE EROSION CONTROL BMP'S MUST BE PROVIDED WHERE SWALES OR CULVERTS INTERCEPT DRAINAGE DRAINAGE DITCHES. 9. IN GENERAL, ALL RETENTION/DETENTION STRUCTURES SHOULD BE CONSTRUCTED TO ROUGH GRADE PRIOR TO ANY IN GENERAL, ALL RETENTION/DETENTION STRUCTURES SHOULD BE CONSTRUCTED TO ROUGH GRADE PRIOR TO ANY ROAD, PARKING LOT, OR BUILDING CONSTRUCTION OR AS PERMIT CONDITIONS DICTATE. SEWER AND WATER MAINS MAY BE INSTALLED PRIOR TO CONSTRUCTION OF RETENTION/DETENTION IF DEWATERING IS NOT REQUIRED. ADDITIONAL BMP'S FOR EROSION AND SEDIMENT CONTROL SHALL BE IMPLEMENTED AS NECESSARY. 10. IT IS THE RESPONSIBILITY OF ALL CONTRACTOR'S TO REVIEW AND MAINTAIN COPIES OF THE SJRWMD, ERP, NPDES IT IS THE RESPONSIBILITY OF ALL CONTRACTOR'S TO REVIEW AND MAINTAIN COPIES OF THE SJRWMD, ERP, NPDES ERP, NPDES CGP, SITE SPECIFIC SWPPP, AND ALL OTHER APPLICABLE PERMITS AT THE CONSTRUCTION SITE AT ALL TIMES. CONSTRUCTION SITE AT ALL TIMES. 11. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL INCORPORATE APPROPRIATE BEST MANAGEMENT ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL INCORPORATE APPROPRIATE BEST MANAGEMENT PRACTICES (BMP'S) TO PREVENT EROSION, OFFSITE SEDIMENTATION, AND THE POTENTIAL FOR DOWNSTREAM WATER QUALITY IMPACTS. 12. THE SITE WORK/GRADING AND UTILITIES CONTRACTOR SHALL AT A MINIMUM, ENSURE IMPLEMENTATION OF THE SITE WORK/GRADING AND UTILITIES CONTRACTOR SHALL AT A MINIMUM, ENSURE IMPLEMENTATION OF OF AN APPROVED EROSION PREVENTION AND SEDIMENT CONTROL PLAN IN ACCORDANCE WITH FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) CONSTRUCTION ACTIVITY GUIDELINES. 13. A SITE SPECIFIC STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE SUBMITTED WITH THE A SITE SPECIFIC STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE SUBMITTED WITH THE PROPOSED SITE PLANS FOR REVIEW AND APPROVAL BY THE CITY PER THE CITY'S LAND DEVELOPMENT CODE (LDC) "ADDITIONAL APPLICATION REQUIREMENTS FOR SITE PLANS". 14. ALL APPLICABLE PERMITS, SWPPP, AND SITE SPECIFIC BMP'S SHALL BE INSPECTED BY THE CITY, PRIOR ALL APPLICABLE PERMITS, SWPPP, AND SITE SPECIFIC BMP'S SHALL BE INSPECTED BY THE CITY, PRIOR PRIOR TO THE START OF ANY LAND DISTURBANCE ACTIVITIES. PRECONSTRUCTION EROSION CONTROL PRECONSTRUCTION EROSION CONTROL INSPECTIONS CAN BE SCHEDULED THROUGH PERMITS AND LICENSING. PERMITS AND LICENSING. 15. THE SITE WORK CONTRACTOR SHALL MINIMIZE DISTURBANCES OF EXISTING WETLANDS, VEGETATION AND THE SITE WORK CONTRACTOR SHALL MINIMIZE DISTURBANCES OF EXISTING WETLANDS, VEGETATION AND DRAINAGE PATTERNS ON ADJACENT PROPERTIES TO THE MAXIMUM EXTENT PRACTICABLE DURING DURING CONSTRUCTION ACTIVITIES. 16. STORMWATER RETENTION, DETENTION, STORAGE AND CONVEYANCE SYSTEMS MUST BE EXCAVATED TO ROUGH STORMWATER RETENTION, DETENTION, STORAGE AND CONVEYANCE SYSTEMS MUST BE EXCAVATED TO ROUGH ROUGH GRADE PRIOR TO BUILDING CONSTRUCTION OR PLACEMENT OF IMPERVIOUS SURFACE WITHIN THE AREA SERVED THE AREA SERVED BY THOSE SYSTEMS. ADEQUATE BMP'S MUST BE IMPLEMENTED TO PREVENT SILTATION OF THESE TREATMENT SYSTEMS AND CONTROL STRUCTURES DURING CONSTRUCTION. SILTATION MUST BE REMOVED FROM THE STORMWATER SYSTEM WHEN HALF FULL AND IMMEDIATELY PRIOR TO FINAL GRADING AND STABILIZATION OF THE PROJECT. 17. THE OWNER AND OR, CONTRACTOR(S) IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL THE OWNER AND OR, CONTRACTOR(S) IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION PREVENTION AND SEDIMENT CONTROL MEASURES AND PROJECT. SPECIFIC PERMIT REQUIREMENTS. BEST MANAGEMENT PRACTICES INSTALLED ONSITE SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM EVENT THAT IS 0.50 INCHES OR GREATER INCHES OR GREATER (EVEN IF IT RAINS ON THE WEEKEND OR HOLIDAY). THE SITE SHALL BE INSPECTED AND THE INSPECTION AND THE INSPECTION DOCUMENTED BY A QUALIFIED INSPECTOR AND CORRECTIVE ACTIONS TAKEN AS NECESSARY. 18. THE SITE WORK/GRADING AND UTILITIES CONTRACTOR SHALL INITIATE STABILIZATION MEASURES WITHIN THE SITE WORK/GRADING AND UTILITIES CONTRACTOR SHALL INITIATE STABILIZATION MEASURES WITHIN SEVEN CALENDAR DAYS AFTER CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED FOR FOR ANY PORTION OF THE PROJECT. FINAL STABILIZATION IS DEFINED AS A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF GROWTH OF AT LEAST 70% OR GREATER. 19. THE SITE WORK OWNER AND/OR CONTRACTOR(S) IS RESPONSIBLE FOR MAINTAINING THE PROJECT IN THE SITE WORK OWNER AND/OR CONTRACTOR(S) IS RESPONSIBLE FOR MAINTAINING THE PROJECT IN COMPLIANCE WITH ALL JURISDICTIONAL PERMITS AND THE CITY'S LAND DEVELOPMENT CODE REQUIREMENTS. REQUIREMENTS. 20. FOR ANY LAND DISTURBANCES OF ONE ACRE OR MORE, THE CONTRACTOR SHALL SUBMIT A COMPLETED NPDES FOR ANY LAND DISTURBANCES OF ONE ACRE OR MORE, THE CONTRACTOR SHALL SUBMIT A COMPLETED NPDES NPDES CONSTRUCTION GENERIC PERMIT (CGP) NOTICE OF INTENT (NOI) TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) AT LEAST 2 CALENDAR DAYS PRIOR TO COMMENCEMENT OF CLEARING, GRADING, DEMOLITION, OR OTHER CONSTRUCTION RELATED LAND DISTURBANCE ACTIVITIES. THE NPDES CGP SHALL BE MAINTAINED UNTIL COMPLETION OF ALL CONSTRUCTION ACTIVITIES. 21. FOR PROJECTS THAT DISCHARGE STORMWATER INTO THE CITY'S MS4 STORMWATER CONVEYANCE SYSTEM, FOR PROJECTS THAT DISCHARGE STORMWATER INTO THE CITY'S MS4 STORMWATER CONVEYANCE SYSTEM, SYSTEM, THE CITY'S MS4 MUST BE DESIGNATED AS A DISCHARGE LOCATION ON THE FDEP CGP NOI. IF DESIGNATED AS SUCH, A COPY OF THE NPDES CGP NOI OR ACKNOWLEDGEMENT LETTER MUST BE SUBMITTED TO THE CITY OF DELAND UTILITIES DEPARTMENT WITHIN 7 CALENDAR DAYS. 22. DEVELOPMENT PLANS FOR ALL STORMWATER MANAGEMENT SYSTEMS SHALL CONTAIN DISCHARGE DATA (OVERFLOW), DEVELOPMENT PLANS FOR ALL STORMWATER MANAGEMENT SYSTEMS SHALL CONTAIN DISCHARGE DATA (OVERFLOW), (OVERFLOW), BOTTOM ELEVATION, NORMAL WATER LEVELS, MEAN ANNUAL SEASONAL HIGH WATER TABLE ELEVATION, TREATMENT TABLE ELEVATION, TREATMENT VOLUME AND CORRESPONDING ELEVATION, 25 YEAR/100 YEAR HIGH WATER LEVELS, AND THE DESIGN TAILWATER LEVELS, AND THE DESIGN TAILWATER ELEVATION (IF APPLICABLE). 23. ALL STORM SEWERS AND CULVERTS LOCATED IN ROADWAY RIGHT-OF-WAYS AND ROADWAY EASE-MENTS SHALL ALL STORM SEWERS AND CULVERTS LOCATED IN ROADWAY RIGHT-OF-WAYS AND ROADWAY EASE-MENTS SHALL MENTS SHALL BE A MINIMUM OF CLASS III O-RING REINFORCED CONCRETE PIPE. OUTSIDE OF ROADWAY EASEMENTS AND ROADWAY EASEMENTS AND R.O.W., PIPE MAY BE MADE OF ALTERNATE MATERIALS INCLUDING: A. SMOOTH INNER WALL HIGH DENSITY POLYETHYLENE (HDPE) IN ACCORDANCE WITH AASHTO M-294, AASHTO SMOOTH INNER WALL HIGH DENSITY POLYETHYLENE (HDPE) IN ACCORDANCE WITH AASHTO M-294, AASHTO MP7, ASTM D3350 AND ASTM D2412 FOR SIZES UP TO 42" IN DIAMETER OR B. PVC IN ACCORDANCE WITH THE PROVISION NOTED IN THE "SEWER DETAILS" OF THESE SPECIFICATIONS.PVC IN ACCORDANCE WITH THE PROVISION NOTED IN THE "SEWER DETAILS" OF THESE SPECIFICATIONS.
AutoCAD SHX Text FDOT GENERAL NOTES 1. MAINTENANCE OF TRAFFIC TO BE SUPERVISED BY A CERTIFIED PERSON. MAINTENANCE OF TRAFFIC TO BE SUPERVISED BY A CERTIFIED PERSON. 2. THE CONTRACTOR SHALL NOTIFY THE DEPARTMENT A MINIMUM OF TWO BUSINESS DAYS PRIOR TO ANY LANE THE CONTRACTOR SHALL NOTIFY THE DEPARTMENT A MINIMUM OF TWO BUSINESS DAYS PRIOR TO ANY LANE CLOSURES OR BEGINNING ANY CONSTRUCTION WITHIN THE FDOT RIGHT-OF-WAY. 3. ALL WORK PERFORMED WITHIN THE FDOT RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF ALL WORK PERFORMED WITHIN THE FDOT RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF FDOT DESIGN STANDARDS, SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, AND THE UTILITY ACCOMMODATION MANUAL. 4. IF THE DEPARTMENT DETERMINES THAT AS-BUILT CONDITIONS VARY SIGNIFICANTLY FROM THE APPROVED PLANS, IF THE DEPARTMENT DETERMINES THAT AS-BUILT CONDITIONS VARY SIGNIFICANTLY FROM THE APPROVED PLANS, THE PERMITTEE SHALL PROVIDE AS-BUILT PLANS, ALONG WITH A RECORD DRAWINGS REPORT BY PERMITTEE'S PROFESSIONAL ENGINEER, FORM 850-040-19, WITHIN 30 DAYS. 5. IT WILL BE THE RESPONSIBILITY OF THE PERMITTEE TO REPAIR ANY DAMAGE TO FDOT FACILITIES CAUSED BY IT WILL BE THE RESPONSIBILITY OF THE PERMITTEE TO REPAIR ANY DAMAGE TO FDOT FACILITIES CAUSED BY CONSTRUCTION OF THE PROJECT. 6. TEST RESULTS OF ANY TESTS TAKEN FOR OR DURING CONSTRUCTION OF THE PERMITTED WORK SHALL BE TEST RESULTS OF ANY TESTS TAKEN FOR OR DURING CONSTRUCTION OF THE PERMITTED WORK SHALL BE PROVIDED TO THE FDOT UPON REQUEST. 7. ALL CONCRETE TO BE REMOVED SHALL BE SAW CUT AT THE NEAREST JOINT IN GOOD CONDITION, SO AS TO ALL CONCRETE TO BE REMOVED SHALL BE SAW CUT AT THE NEAREST JOINT IN GOOD CONDITION, SO AS TO PRODUCE A CONNECTION WITH NEW CONCRETE THAT IS FREE OF CRACKS, DEFORMITY IN SHAPE, NOTICEABLE VOIDS, SURFACE IRREGULARITIES, AND OTHER DEFECTS. 8. ALL CONCRETE SHALL BE AN APPROVED FDOT MIX DESIGN OF 3,000 PSI. ALL CONCRETE SHALL BE AN APPROVED FDOT MIX DESIGN OF 3,000 PSI. 9. ALL MATERIALS INSTALLED WITHIN FDOT RIGHT OF WAY SHALL BE LIMITED TO THOSE ON THE FDOT'S QUALIFIED ALL MATERIALS INSTALLED WITHIN FDOT RIGHT OF WAY SHALL BE LIMITED TO THOSE ON THE FDOT'S QUALIFIED PRODUCTS LIST OR APPROVED PRODUCT LIST OF TRAFFIC CONTROL SIGNALS AND DEVICES.
AutoCAD SHX Text TRAFFIC CONTROL NOTES 1. CONTRACTOR SHALL PERFORM ALL PROJECT WORK IN ACCORDANCE WITH FDOT DESIGN STANDARDS, LATEST CONTRACTOR SHALL PERFORM ALL PROJECT WORK IN ACCORDANCE WITH FDOT DESIGN STANDARDS, LATEST…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .