240080_Price_Page.pdf

PDF 80 KB Posted

Attached to
Steel Fabrication Services
Solicitation number
240080
Issued by
Pima County, Arizona

About this file

This is a price page document for RFP 240080 issued by the City of Tucson Department of Procurement for steel fabrication services to support the Facilities and Communications Maintenance department. The City seeks a qualified steel fabrication contractor to provide comprehensive services including custom doors, steel cages, anti-vandalism boxes and covers, hand railings, and custom steel works designed to protect city assets and mitigate safety hazards. The contractor must demonstrate capabilities across multiple fabrication disciplines including metal fabrication, machining, metal finishing, mobile welding, and emergency welding, utilizing various materials such as steel, galvanized steel, stainless steel, aluminum, and coated steel. A pre-submittal virtual meeting was scheduled for November 16, 2023, with proposals due November 30, 2023, at 2:00 P.M. Arizona time. The contract includes an initial one-year term with options to extend for up to four additional one-year periods. Most work is expected to be performed at the contractor's fabrication shop, with a typical project completion timeline of six weeks from approval.

The pricing page requires contractors to provide detailed labor rates by fabrication category and specify markup percentages for hardware and accessories as well as raw materials including coated steel and other supplies. Evaluation criteria will emphasize the vendor's method of approach, qualifications, experience, and pricing proposal. The solicitation includes significant federal compliance requirements, including HUD Section 3 Program provisions mandating that 25 percent of total labor hours be performed by Section 3 Workers, with 5 percent specifically by Targeted Section 3 Workers. Additional compliance obligations encompass disadvantaged business enterprise participation, Buy America provisions, civil rights standards, and specific employment opportunity guidelines. Non-compliance with these requirements may result in contract sanctions, termination, or debarment from future federally assisted contracts.

View the file

Other files

File Type Posted
Steel_Fabrication_Services.pdf PDF
Steel_Fabrication_Services.pdf PDF
240080_Price_Page.pdf PDF
FTA_TERMS_AND_CONDITIONS.pdf PDF
HUD-5370-C1_(excl_11.30.2023).pdf PDF
HUD_5370_(exp_11.30.2023).pdf PDF
FTA_TERMS_AND_CONDITIONS.pdf PDF
HUD_5369.PDF PDF
Section_3-Attachment_Complete_(FY23).pdf PDF
HUD_5369.PDF PDF
HUD_5370_(exp_11.30.2023).pdf PDF
OFFER_AND_ACCEPTANCE_RFP.pdf PDF
OFFER_AND_ACCEPTANCE_RFP.pdf PDF
HUD-5370-C1_(excl_11.30.2023).pdf PDF
Section_3-Attachment_Complete_(FY23).pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF TUCSON DEPT OF PROCUREMENT

255 W. ALAMEDA, 6TH FLOOR

TUCSON AZ 85701

RFP 240080

STEEL FABRICATION SERVICES

PRICE PAGE

RFP 240080

TAYLOR ROSENOW

PH: (520) 837-4109

List of Raw Material Suppliers Manufacturer/Supplier Name Material Supplied (List All That Apply)

Hardware and Accessories Required for Project (Percent Mark-Up from Contractor Cost, must be quoted as separate line item)

For additional informational purposes only:

Aluminum

Galvanized Steel Stainless Steel

Metal Finishing Drawing/Drafting

Machining

Mobile Welding Emergency Welding

Price Page

Labor Rates Category Labor Rate/Hour Metal Fabrication

Category % Mark-up from Supplier Cost Hardware/Accessories

Coated Steel

Raw Materials (Percent Mark-Up from Contractor Cost) Raw Material % Mark-up form Raw Material Cost Steel

Sheet1

File details come from the government source that posted it. Updated .