24-RQ140038-KR- Fuel TruckAddendum 2_12.2.24.pdf

PDF 168 KB Posted

Attached to
24-RQ140038-KR-FUEL TRUCK REPLACEMENT IFB
Solicitation number
Doc1352647437
Issued by
Wake County, Teachey Town, North Carolina

About this file

This is Addendum #2 to solicitation 24-RQ140038-KR issued by the North Carolina Department of Public Instruction for 2024-2025 Fuel Truck(s) Replacement. The addendum extends the solicitation opening date from December 5, 2024 to December 10, 2024 at 9:30 AM ET. The document addresses six vendor questions regarding technical specifications, including acceptance of Ford's 6.7L V8 Powerstroke diesel engine in lieu of Inline 6 cylinder engine, Torqshift HD 10-speed automatic transmission instead of Allison 2500 RDS transmission, service brake interlock requirements, air dryer specifications, and body vendor information.

The addendum provides specific technical clarifications, noting that the Ford engine and transmission alternatives are acceptable with proper documentation of deviations, while the Bendix AD-9si air dryer is acceptable in lieu of the Bendix AD-9. The document specifies that body vendor selection is at the vendor's discretion, and refers vendors to section 4.9 of the IFB regarding demonstration and descriptive literature requirements for pilot review requests. The addendum maintains all other terms and conditions from the original solicitation.

View the file

Other files

File Type Posted
24-RQ140038-KR- Fuel TruckAddendum.docx DOCX document
24-RQ140038-KR-IFB DPI-Fuel Truck Replacement Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

North Carolina Solicitation Addendum 2 Version Date: 11/2021

Page | 1 of 2

SOLCITATION ADDENDUM

THIS ADDENDUM IS NOT REQUIRED TO BE RETURNED WITH THE BID RESPONSE

1. The Solicitation timeline is hereby modified as follows:

The solicitation opening date is changed from December 5, 2024 to December 10, 2024 by 9:30 AM ET

2. The following are questions received about the Solicitation and the State’s response to those questions:

Question # Document Section

Vendor Question State’s Response

1 Not Provided

Is Ford's engine - 6.7L V8 Powerstroke diesel - acceptable in lieu of Inline 6 cylinder engine?

Yes, we would accept the 6.7L V8 Powerstroke diesel in lieu of Inline 6.

See Section 5.3 for deviations to the specifications.

2 Not Provided

Is Ford's transmission - Torqshift HD 10-speed automatic - acceptable in lieu of Allison 2500 RDS transmission?

Yes, as long as all other specifications related to the transmission are met.

3 Not Provided

Ford doesn't offer a Service Brake Interlock with its' transmission - is this acceptable?

To release parking brake the service brake must be applied.

4 Not Provided

Is the Air dryer, Bendix AD/IS with heater system acceptable in lieu of the Bendix AD9 system?

No. However, we would accept the Bendix AD-9si air dryer in lieu of the Bendix AD-9

5 Not Provided

Can you provide body vendor information (Make/Model) for current fuel tank bodies in your fuel truck fleet?

No, this is at the discretion of the vendor.

Issuing Agency: North Carolina Department of Public Instruction

Solicitation Number: 24-RQ140038-KR

Solicitation Description: 2024-2025 Fuel Truck(s) Replacement

Solicitation Opening Date and Time:

December 5, 2024 December 10, 2024 by 9:30 AM ET

Addendum Number: 2

Addendum Date: December 2, 2024

Purchasing Agent: Nicole Mathis obo Krystle Rice

SOLICITATION NUMBER: Error! Reference source not found.

ADDENDUM NUMBER: Error! Reference source not found.2

North Carolina Solicitation Addendum 2 Version Date: 11/2021

Page | 2 of 2

Question # Document Section

Vendor Question State’s Response

6 Not Provided

I wanted to ask you and your team if you would be willing to participate in a Pilot review of the first completed truck and fuel tank body, should we be awarded the bid, so that you all can thoroughly review the body for any concerning items should there be any present. This would be a great way of being able to address any issues at the beginning so they can be changed and or modified on the subsequent units.

Please refer to section 4.9 Demonstration and Descriptive Literature of the IFB.

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME

SOLCITATION ADDENDUM

File details come from the government source that posted it. Updated .