24_FAC_006_Addendum No_ 1_10202023_RSES.pdf
PDF 2 MB Posted
- Attached to
- RADIUM SPRINGS ELEMENTARY SCHOOL HVAC UPGRADES
- Solicitation number
- PE-64710-NONST-2024-000000003
- Issued by
- Douglas County, Georgia
About this file
This document is an Addendum to the bid invitation for HVAC upgrades at Radium Springs Elementary School in Albany, Georgia, issued by the Dougherty County Board of Education. The addendum provides answers to pre-bid meeting questions, changes to the bid specifications and drawings, and revisions to the bid form. Key details include:
The bid due date has been extended from October 17 to October 24, 2023. The contract will require the successful bidder to be a Georgia licensed contractor qualified to perform the work. The project scope involves replacing the existing HVAC systems at the school, with new wall-mounted heat pumps, rooftop units, and other equipment. The base bid amount includes specified allowances for each school in the overall project. Bidders must submit a bid bond if the total bid exceeds $100,000. The owner reserves the right to award the project to the lowest qualified bidder.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Radium Springs Elementary School September 22, 2023
HVAC Upgrades
Dougherty County Board of Education
Albany, Georgia
Addendum No. 1- Page 1 of 5
ANDREWS, HAMMOCK & POWELL, INC. 250 CHARTER LANE, SUITE 100, MACON, GA 31210
ADDENDUM NUMBER: ONE DATED: October 20, 2023
To: All contract bidders of record.
This addendum forms a part of the Contract Documents and modifies the original Specifications and Drawings dated September 22, 2023, as noted below. Acknowledge receipt of this
Addendum in the space provided on the Bid Price Form; failure to do so may subject bidder to disqualification.
ANSWERS TO QUESTIONS FROM PRE-BID MEETING
1. Question: Are Davis Bacon Wages required for this project?
Answer: No
2. Question: At the pre-bid meeting it was mentioned that an addendum would come out changing the bid date. When will this happen?
Answer: Addressed in this addendum.
3. Question: They also mentioned a GC was required. Where in the bid documents does it state General Contractor? I see the wording for a single GA licensed contracting firm.
What would exclude a mechanical contractor from being just that as they can manage and hire subs also?
Answer: The contractor shall be a Georgia licensed contractor qualified to perform the work in accordance with the licensing requirements of the State of Georgia.
4. Is Monroe High School the only one needing new controls and the rest keep existing? I just want to verify this information to be correct.
Answer: All projects are to receive new controls.
5. What software would you prefer to be used by the winning contractor to be compatible with your system as relating to management purposes?
Answer: See Section 013100.
6. A copy of the Pre-Bid Sign In Sheet is included with the addendum.
CHANGES TO THE SPECIFICATIONS
1. SECTION A - INVITATION TO BID
A. On page A-1, delete the paragraph in its entirety and replace with the following:
Sealed Bids will be received by the Dougherty County Board of Education in the
Office of the Logistical Services Department located at 601 Flint Avenue, Albany, Georgia, 31701 until 1:30 PM EST on Tuesday, October 31, 2023. Those Bids will then be publicly opened and read. Bidders will be required to submit specific information/documentation with their Bids.
Addendum No. 1- Page 2 of 5
2. SECTION B - BID FORM
A. Delete pages B-1 through B-8 in their entirety and replace with pages B-1 through B-9, revised October 20, 2023, included herewith.
3. SECTION C - INSTRUCTIONS TO BIDDERS
A. On page C-1, paragraph C-05, change “October 17, 2023” to “October 24, 2023.”
B. On page C-5, delete paragraph C-18 -9 in its entirety and replace with the following:
“9. Provide list of two (2) projects of similar size completed in last two (2) years along with detailed Reference Contact Information.”
4. SECTION E – GENERAL CONDITIONS
A. On page E-17, in the third line of paragraph E-53.a. ,change the words “one year” to “two years.”
B. On page E-22, in the second line of paragraph E-74. ,change the words “one year” to
“two years.”
C. On page E-22, paragraph E-75:
1) In the twentieth line of this paragraph, change the words “one year” to “two years.”
2) In the twenty-first line of this paragraph, change the words “one year” to “two years.”
5. SECTION G – EXHIBIT B PAYMENT BOND
A. On page G-4, in paragraph 4., change the words “one year” to “two years.”
6. SECTION 012100 – ALLOWANCES
A. Add Section 012100, dated October 20, 2023, included herewith.
Addendum No. 1- Page 3 of 5
7. SECTION 230514 – CLOSEOUT DOCUMENT REQUIREMENTS FOR HVAC
A. On page 230514-6, in paragraph 1.11, delete the “TRANSFER OF EXTRA
MATERIALS AND SPARE PARTS” table in its entirety and replace with the following:
TRANSFER OF EXTRA MATERIALS AND SPARE PARTS
Spec Section Total Quantity
Received
Owner's
Rep. Initials
Date
Received
ADDITIONAL REFRIGERANT
Provide one (1) cylinder of R-410a refrigerant.
ADDITIONAL EQUIPMENT
Provide two (2) each of the following components for a Bard T42S1D Wall Hung
Heat Pump or equal:
• Compressor
• Condenser Fan Motor
• Blower Motor
• Reversing Valve
• Thermal Expansion Valve
• Control Board
• Blower Control Board
• Indoor Blower Control Board
• Defrost Control Board
• Timer Control
"I certify that the above list of spare parts and materials have been turned over to the Owners Representative."
Company:
Name:
Title:
Signature:
Date:
8. SECTION 230900 – INSTRUMENTATION AND CONTROLS FOR HVAC
A. On page 230900-6, add the following as paragraph 2.3.L:
“L. Carbon-Dioxide (CO2) Sensor: Provide a CO2 sensor/transmitter which shall be capable of sending a variable (4-20 mA or 0 to 10 volt) signal to the DDC system proportionate to the room CO2 level. CO2 sensor shall be by KMC. Provide mounting base and mount on wall at 4’-6” above finished floor. Unit shall operate from 60°F to 90°F and 10% to 95% RH, non-condensing.”
9. SECTION 238119 – SELF-CONTAINED AIR CONDITIONERS
A. On page 238119-2, paragraph 2.1.A., add “Tempmaster” as an acceptable manufacturer.
Addendum No. 1- Page 4 of 5
10. SECTION 238126 – SPLIT-SYSTEM AIR CONDITIONERS
A. On page 238126-3, paragraph 2.1.I, add “LG” as an acceptable manufacturer.
B. On page 238126-3, paragraph 2.2.I, add “LG” as an acceptable manufacturer.
C. On page 238126-5, paragraph 2.3.H, add “LG” as an acceptable manufacturer.
11. SECTION 238128 – VARIABLE REFRIGERANT FLOW SYSTEM (HEAT RECOVERY)
A. On page 238128-2, paragraph 2.1.C, add “LG” as an acceptable manufacturer.
CHANGES TO DRAWINGS
1. SHEET A100 – ARCHITECTURAL CEILING PLAN - OVERALL
A. Delete Sheet A100 in its entirety and replace with Sheet A100, revised 10/20/2023, included herewith.
2. SHEET MD101 - MECHANICAL DEMOLITION PLAN - BLDG 3400
A. Delete Sheet MD101 in its entirety and replace with Sheet MD101, revised 10/20/2023, included herewith.
3. SHEET M101 - MECHANICAL NEW WORK PLANS - BLDG 3400
A. Delete Sheet M101in its entirety and replace with Sheet M101, revised 10/20/2023, included herewith.
4. SHEET M503 - MECHANICAL DETAILS
A. Delete Sheet M503 in its entirety and replace with Sheet M503, revised 10/20/2023, included herewith.
5. SHEET M601 - MECHANICAL SCHEDULES
A. Delete Sheet M601 in its entirety and replace with Sheet M601, revised 10/20/2023, included herewith.
6. SHEET M602 - MECHANICAL SCHEDULES
A. Delete Sheet M602 in its entirety and replace with Sheet M602, revised 10/20/2023, included herewith.
Addendum No. 1- Page 5 of 5
7. SHEET M603 - MECHANICAL SCHEDULES, LEGEND & GENERAL NOTES
A. `Delete Sheet M603 in its entirety and replace with Sheet M603, revised 10/20/2023, included herewith.
END OF ADDENDUM #1
Revised October 20, 2023
B-1
SECTION B
BID FORM
HVAC Upgrades Projects – Phase 2
Company Name: _______________________________________________________ Date: __________________
BASE BID:
Having carefully examined the Bid Documents entitled Albany Middle School HVAC Upgrades, Bid No. 24-FAC- 003, Merry Acres Middle School HVAC Upgrades, Bid No. 24-FAC-004, Monroe High School HVAC Upgrades, Bid No. 24-FAC-005, Radium Springs Elementary School HVAC Upgrades, Bid No. 24-FAC-006, and Robert Cross Middle School HVAC Upgrades, Bid No. 24-FAC-007 for the Dougherty County Board of Education, Albany, Georgia, dated September 22, 2023; their attachments; and addendum no. (s)___________; as well as the premises and conditions affecting the Work, the undersigned proposes to provide all services, labor, materials, and equipment required to perform the entire Work, in accordance with said Documents. The scope of work includes all labor, material, and equipment required to replace the heating and air conditioning systems as specified in the bid document at Albany Middle School (1700 Cordell Avenue), Merry Acres Middle School (1601 Florence Drive), Monroe High School (900 Lippitt Drive), Radium Springs Elementary School (2400 Roxanna Road), and Robert Cross Middle School (324 Lockett Station Road) for the lump sum of:
______________________________________________________________________________________ Dollars
($__________________________) which sum is herein after called the “Base Bid”.
Provide a total cost for the scope of work at each school listed below (when combined shall be equivalent of the base bid):
Bid No. 24-FAC-003 – Albany Middle School $
Bid No. 24-FAC-004 – Merry Acres Middle School $
Bid No. 24-FAC-005 – Monroe High School $
Bid No. 24-FAC-006 – Radium Springs Elementary School $
Bid No. 24-FAC-007 – Robert Cross Middle School $
ALLOWANCES:
The base bid amount provided above to include the following allowances;
Bid No. 24-FAC-003 – Albany Middle School $ $4,250.00
Bid No. 24-FAC-004 – Merry Acres Middle School $ $4,800.00
Bid No. 24-FAC-005 – Monroe High School $ $2,400.00
Bid No. 24-FAC-006 – Radium Springs Elementary School $ $4,250.00
Bid No. 24-FAC-007 – Robert Cross Middle School $ $4,250.00
B-2
Unit Price:
The base bid for this project shall include the total cost of items listed below as defined by the contract documents.
This form should be completed in its entirety.
Unit price shall include all labor, materials, overhead, profit, insurance, etc. to cover finished work.
Where applicable unit cost shall include related work activities necessary to complete the work.
No additional surcharges shall be added to unit cost.
The following unit prices apply:
Item Description Unit Price Replace inoperative Needlepoint Bipolar Ionization Unit With New
1 Model No. GPS-FC24-AC EA $ 2 Model No. GPS-FC48-AC EA $ 3 Model No. GPS-iRIB18-36 EA $
BID BOND:
Enclosed herewith is a Bid Bond in the amount of $__________________, being not less than 5% of the Base Bid payable to Dougherty County Board of Education. Certified checks or other forms of bid security are not acceptable.
Bids in excess of $100,000.00 must be accompanied by a five percent (5%) Surety Bid Bond. Bids less than $100,000 do not require a Bid Bond. The undersigned agrees that the above stated amount is the proper measure of liquidated damages which the Owner will sustain by the failure of the undersigned to execute the Contract and/or to furnish the Performance and Bond in case this Bid is accepted.
The undersigned further agrees that if this bid is accepted within sixty (60) days after the date set for the opening of bids and the undersigned fails to execute a Contract for the Work within ten (10) business days after written notice of such acceptance, or if he fails to furnish the Performance Bond, Payment Bond, and Insurance, the obligation of the Bid Bond, if applicable, will remain in full force and effect and the money payable thereon shall be paid into funds of the Owner as liquidated damages for such failure; otherwise the obligation of the bond will be null and void.
BID ACCEPTANCE:
Prior to the bid opening date and hour, errors may be stricken or revisions made and corrections entered on the Bid Form(s) and/or on the outside of the Sealed Envelope, provided that any such strike-over or revision is signed in ink by the person signing the bid or their agent. No oral, telephonic, telegraphic, or facsimile modification to the Bids will be considered after the time set for opening proposals.
The undersigned agrees that this proposal may not be revoked or withdrawn after the time set for opening of bids, but shall remain open for acceptance for a period of sixty (60) days following such time.
BID AWARD:
It is the Owners intent to award the project to a single Georgia Licensed Contracting Firm which will act as the Prime Contractor responsible for coordinating the work of all trades and ensuring the entire project is completed as scheduled at Albany Middle School, Merry Acres Middle School, Monroe High School, Radium Springs Elementary School, and Robert Cross Middle School.
The undersigned understands and agrees, if this bid is awarded, it will be awarded in one Lump Sum to the lowest qualified Bidder judged most advantageous to the DCSS in the areas of lowest responsible bid, financial stability, and proof of ability to fully complete the project on schedule. Upon Owner’s request all information needed to
B-3 document the above requirements will be provided immediately. The Owner reserves the right to reject any or all bids, to waive technicalities and informalities, and to reduce or expand the Project as they deem appropriate.
In the event the undersigned is notified in writing by facsimile, mail, or delivery of the acceptance of this lump sum bid within sixty (60) days after the time set for the opening of bids, the undersigned agrees to execute a separate Contract for the Work at each School for the above stated compensation and/or to schedule a Pre-Contract Meeting with the Owner within ten (10) business days after the issuance of the Notice of Acceptance. All required Pre-Contract Submittals shall be reviewed during this meeting.
Once the Pre-Contract Submittals have been reviewed and approved, the Owner shall issue Contracts for the Work for the above stated compensation for the Contractor to execute.
The undersigned understands and agrees, if the Contract Sum exceeds $100,000.00, they shall be required to furnish a Performance and a Payment Bond, both in an amount equal 100% of the Contract Sum, issued by a Corporate Surety authorized to conduct business in the State of Georgia, and payable to Dougherty County Board of Education.
COMMENCEMENT OF WORK:
The undersigned agrees to commence actual physical work with an adequate force and equipment within ten (10) calendar days of a date to be specified in a written Notice to Proceed and shall achieve Final Completion at each school by October 30, 2024.
If the undersigned fails to commence actual physical work with an adequate force and equipment within ten (10) calendar days of the date to be specified in a written Notice to Proceed, the Owner reserves the right to null and void the Contract.
BID SUBMITTAL INFORMATION:
Bids shall be submitted on the Bid Form provided. The Bid Form shall not be changed or modified in any way. Fill in all blanks on the Bid Form. Bid submittal and signature of authorized representative shall indicate intention to comply with all of the requirements of the Bidding Documents.
Bid submittal certifies that Bidder has been granted and possesses all necessary, valid, current licenses to do business in the State of Georgia as issued by the respective State Boards and Government Agencies responsible for regulating and licensing the services to be provided and pursuant to this Agreement.
Provide one (1) original Proposal Form with the following information in the order specified:
1. Executed Bid Form.
2. Executed Bid Bond, if the Bid exceeds $100,000.00.
3. Statement of Bidders Qualifications
4. Executed Certification of Non-Collusion.
5. Executed Contractor’s Affidavit.
6. Executed DJEA-E Statement of Assurance for Competitively Bid Contracts.
7. Current Business License.
8. Contractor License.
9. Provide a list of Sub-Contractors to be utilized on this project.
10. Provide list of two (2) projects of similar size completed in last two (2) years along with detailed Reference Contact Information.
B-4
BID CERTIFICATION:
The above Bid is in response to the Bid Documents titled Albany Middle School HVAC Upgrades Bid No. 24- FAC-003, Merry Acres Middle School HVAC Upgrades Bid No. 24-FAC-004, Monroe High School HVAC Upgrades Bid No. 24-FAC-005, Radium Springs Elementary School HVAC Upgrades Bid No. 24-FAC-006, Robert Cross Middle School HVAC Upgrades Bid No. 24-FAC-007 for the Dougherty County Board of Education, Albany, Georgia; dated September 22, 2023; and their attachments and addenda.
By submitting this Bid, the undersigned acknowledges that they or their representative have visited each of the project sites and have taken into consideration all observed conditions that might affect the work.
Under oath I certify that I am principal or other representative of the Bidder and that I am authorized by it to execute the forgoing offer on its behalf:
Company Name: ______________________________________________________________________________
Address: _____________________________________________________________________________________
City: __________________________________________________________ State: _____ Zip: _______________
Name: Title: __________________________________
Signature: Date: __________________
Notary Public: _____________________________
____________________________County, Georgia
(Apply Seal Here) My Commission Expires: ____________________
Subscribed and Sworn Before Me On This ___ Day of ____________________, 20___.
B-5
STATEMENT OF BIDDER’S QUALIFICATIONS
HVAC Upgrades Project - Phase 2
Name of Bidder________________________________________________________________________
Business Address______________________________________________________________________
When Organized________________________ Where Incorporated ______________________________
How many years have you been engaged in the business under the present firm name? _____________
Indicate if Bid is a Joint Venture: Yes ( ) or No ( ).
Bid price is $ _________________________________________________________________________
Credit Available for this Contract $________________________________________________________
Contracts now in hand, Gross Amount $____________________________________________________
Plan of Organization: Corporation: __________ Partnership: ________ Sole Proprietorship: _________
Have you ever refused to sign a contract based on your original bid? _____________________________
Have you ever defaulted on a contract? ____________________________________________________
Remarks_____________________________________________________________________________
By __________________________________________________________________________________
Date_______________
Printed Name and Title
Notary Public: _____________________________
____________________________County, Georgia
This_______ Day of _________________, 20___.
RETURN WITH BID FORM
B-6
CERTIFICATION OF NON-COLLUSION
I certify that this Bid/Proposal is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a Bid/Proposal for the same materials, supplies, or equipment, and is in all respects fair and without collusion or fraud per the requirements of OCGA 50-5-67 (e).
I certify that this Bid/Proposal is made without prior understanding, agreement, or connection with any member of the government agency letting this public works contract and is in all respects fair and without collusion or fraud per the requirements of OCGA 36-91-21 (f).
I further certify that the provisions of the Official Code of Georgia Annotated 45-10-20 et. seq. has not and will not be violated in any respect.
I understand that collusive bidding is a violation of State and Federal law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of this Bid/Proposal, and certify that I am authorized to sign this Bid/Proposal for the Bidder/Offeror.
The Bidder being sworn disposes and says, its agents, officers, or employees have not directly or indirectly entered into any agreements, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.
Name: Title: __________________________________
Signature: Date: __________________
(Apply Seal Here)
B-7
CONTRACTOR’S AFFIDAVIT
STATE OF GEORGIA, COUNTY OF ___________________________________________________,
______________________________________________________________________being duly sworn, (Insert Name of Affiant) hereby deposes and says that he/she has read, and is familiar with, the provisions of the Official Code of Georgia Annotated Section 36-91-21(d) which provides as follows:
Whenever a public works construction contract for any governmental entity subject to the requirements of this chapter is to be let out by competitive sealed bid or proposal, no person, by himself or herself or otherwise, shall prevent or attempt to prevent competition in such bidding or proposals by any means whatever. No persons who desires to procure such work for himself or herself or for another shall prevent or endeavor to prevent anyone from making a bid or proposal therefore by any means whatever, nor shall such person so desiring work cause or induce another to withdraw a bid or proposal for work.
And that he/she has not directly or indirectly violated said provisions of the law.
In accordance with the Official Code of Georgia Annotated Section 36-91-21(e):
If the Contractor is a Partnership, the Affidavit shall be executed by all partners and any officer, agent, or other person who may have represented or acted for them in bidding for or procuring the contract.
If the Contractor is a Corporation, the Affidavit shall be executed by all officers, agents, or other persons who may have acted for or represented the corporation in bidding for or procuring the contract shall execute the affidavit.
Further, Affiant saith not.
This ___ day of ____________________, 20____
(Signature of Affiant)
Notary Public: _____________________________
____________________________County, Georgia
(Apply Seal Here)
B-8
DJEA~E
DJEA - COMPETITIVELY BID CONTRACTS
Equal Opportunity for Competitive Bids
It shall be the policy of the Dougherty County Board of Education to promote and insure equal opportunity for all persons, without regard to race, color, religion, sex, handicap, or national origin, employed by or seeking employment with vendors and/or contractors doing business with the Board. As a condition of doing business with the Board, each vendor and/or contractor shall furnish assurance that its business will be operated in accordance with the policy attached hereto and identified as "Competitively Bid Contracts," Policy DJEA.
The following equal opportunity clause shall be deemed incorporated into every contract and agreement between the Board and any of its vendors and/or contractors:
1. The vendor/contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, handicap, or national origin. The vendor/contractor shall take appropriate action to ensure that applicants are employed and that employees are treated during employment without regard to race, color, religion, sex, handicap, or national origin. Such action shall include, but shall not be limited to, the following: employment, upgrading, demotion, transfer, recruitment, layoff, termination, rates of pay or other forms of compensation, and training.
2. In the event of the vendor/contractor's noncompliance with the nondiscrimination policy of the
Board, any contract or purchase order may be canceled, terminated or suspended, in whole or in part, and the vendor/contractor may be declared ineligible to transact further business with the Board.
All vendors and persons desiring to transact business with the Board are to provide assurance that their business will be conducted in accordance with this nondiscrimination policy and that such vendors and/or contractors agree to and shall abide by the equal opportunity clause set forth in this policy.
It is the further policy of the Board to insure equal opportunity for minority/women owned businesses and minority/women professionals with regard to all work, services, and supplies purchased by the Board and all construction projects undertaken by the Board which are competitively bid by the Board.
B-9
DJEA~E
DJEA - COMPETITIVELY BID CONTRACTS
STATEMENT OF ASSURANCE
The undersigned Vendor/Contractor provides this Statement of Assurance to the Dougherty County School System wherein the Undersigned acknowledges receipt and awareness of the DJEA - Competitively Bid Contracts policy and agrees to observe and be bound by all applicable provisions contained therein.
The undersigned submits this Statement of Assurance, understanding that a failure to submit said Statement of Assurance may constitute a basis for rejecting the undersigned’s bid.
Name: Title: __________________________________
Signature: Date: __________________
(Apply Seal Here)
Radium Springs Elementary School October 20, 2023
ALLOWANCES 012100 - 1
SECTION 012100 - ALLOWANCES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. The contractor shall include in the base bid a contingency allowance of $4,250.00. This allowance will be utilized to pay for the costs associated for casual labor to assist with the furniture move from classrooms to portables. By change order the contract amount will be adjusted to cover the stated cost for this item. At the end of the contract, the remaining amount in the contingency allowance will be deducted from the contract.
B. The cost for unforeseen conditions will be added to the contract by change order.
PART 2 - PRODUCTS: NOT USED
PART 3 - EXECUTION: NOT USED
END OF SECTION 012100
Radium Springs Elementary School October 20, 2023
ALLOWANCES 012100 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
CEILING HATCH LEGEND
DEMO EXISTING CEILING TILE & GRID AS REQUIRED TO
REMOVE EXISTING EQUIPMENT AND INSTALL NEW
EQUIPMENT. REPLACE WITH NEW CEILING TILE AND GRID.
NEW TILE SHALL BE STANDARD ACT TO MATCH EXISTING.
DEMO EXISTING CEILING TILE & GRID AS REQUIRED TO
REMOVE EXISTING EQUIPMENT AND INSTALL NEW
EQUIPMENT. REPLACE WITH NEW CEILING TILE AND GRID.
NEW TILE SHALL BE WATER RESISTANT TYPE.
(NO HATCH) EXISTING CEILING TILE & GRID TO REMAIN.
GENERAL NOTE: REMOVAL OF CEILING REQUIRED FOR REMOVAL OF
EXISTING EXHAUST FANS LOCATED ABOVE CEILINGS IN RESTROOMS IS NOT
SHOWN. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF ITEMS LOCATED
ABOVE CEILINGS THAT MAY REQUIRE REMOVAL OF CEILING TILES.
GENERAL NOTE: REMOVAL OF CEILINGS REQUIRED FOR INSTALLATION OF
NEW DUCTLESS FAN COIL UNITS IS NOT SHOWN. SEE MECHANICAL
DRAWINGS FOR LOCATIONS OF NEW DFCUS. TEMPORARILY REMOVE
CEILING TILE & GRID AS REQUIRED TO INSTALL NEW DFCUS, REFRIGERANT
PIPING, CONDENSATE PIPING, SUPPORTS, ETC. AND REINSTALL CEILING.
REPLACE ANY TILE/GRID DAMAGED DURING DEMOLITION/INSTALLATION OF
NEW DFCUS.
GENERAL NOTE: PRIOR TO CONSTRUCTION, CONTRACTOR SHALL
COORDINATE WITH OWNER TO REMOVE ALL PERSONAL ITEMS FROM
SPACES AFFECTED BY DEMOLITION. CONTRACTOR SHALL PROTECT
EXISTING CASEWORK, FURNITURE, FLOORING, WALLS, CEILINGS, ETC. NOT
ABLE TO BE REMOVED. AT THE END OF CONSTRUCTION, CONTRACTOR
SHALL REMOVE ALL PROTECTIVE COVERS AND WIPE DOWN AND CLEAN ALL
SURFACES AFFECTED BY DUST, DIRT, CONSTRUCTION DEBRIS, ETC.
GENERAL NOTE: CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION
PHASING WITH THE OWNER. COORDINATE MOVING EXISTING CLASSROOMS
TO MODULAR CLASROOMS PRIOR TO BEGINNING CONSTRUCTION IN EACH
AREA.
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 5058
A100
ARCHITECTURAL CEILING
PLAN - OVERALL
R A
D
IU
M S
P R
IN
G
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
R
O X
A N
N A
R D
A
L B
A N
Y G
A
2023123
09/22/2023
1/16" = 1'-0"
CEILING PLAN - OVERALL
No. Description Date
1 ADDENDUM #1 10/20/23
ASST. PRINCIPAL
PRINCIPAL
TOILET
STORAGE
TOILET
3RD GRADE CR
3RD GRADE CR
3RD GRADE CR
3RD GRADE CR
3RD GRADE CR
3RD GRADE COMP LAB
GIRLS' TOILET
JANITOR
BOYS' TOILET
ESP CR
WAITING
RECEPTION
ADMIN. CONF.
27 27
DD
D
18 18
35 35
20 20
MD101
MD101
MECHANICAL
STORAGE
TOILET
TOILET
VENDING
VAULT
FOYER
TOILET
CLINIC
TESTING
GUIDANCE
SPEECH
TEACHER DINING
CAFETERIA FOYER
TEACHER WORKROOM
STORAGE
2ND GRADE COMP LAB
2ND GRADE CR
2ND GRADE CR
2ND GRADE CR
2ND GRADE CR
ESP CR
DISHWASH
FOOD STORAGE
TOILET
OFFICE
CAN WASH
CAFETERIA
MECH. YARD
KITCHEN
E X
IS
T
IN
G
E L E
C T
R
IC
A L E
Q U
IP
M
E N
T
R
R(TYP)
29 29
D
R
D
R
R
D R
DD
D
D(TYP)
R
R R
R
SIMILAR FOR AHU-5
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
BLDG. 3402
BLDG. 3401
BLDG. 3403
BLDG. 3400
GA DOE ID#: 5058
BLDG.
3400 MD101
MECHANICAL DEMOLITION
PLAN - BLDG 3400
R A
D
IU
M S
P R
IN
G
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
R
O X
A N
N A
R D
A
L B
A N
Y G
A
2023123
09/22/2023
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - BLDG 3400.1
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - BLDG 3400.2
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING ROOF MOUNTED EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW EXHAUST FAN IN SAME
LOCATION.
2 . REMOVE EXISTING WALL HUNG HEAT PUMP. REMOVE
EXISTING GPS BIPOLAR IONIZTION UNIT AND STORE FOR
INSTALLATION IN NEW WALL HUNG HEAT PUMP IN SAME
LOCATION. SEE NEW WORK PLAN.
3 . REMOVE EXISTING ROOFTOP HEAT PUMP AND
ASSOCIATED CONDENSATE DRAIN. EXISTING ROOF CURB
TO REMAIN. REMOVE EXISTING BIPOLAR IONIZATION UNIT
AND STORE FOR REUSE IN NEW ROOFTOP HEAT PUMP.
SEE NEW WORK PLAN FOR INSTALLATION OF NEW
ROOFTOP HEAT PUMP IN THE SAME LOCATION.
5 . GENERAL NOTE: DUCTWORK, PIPING, EQUIPMENT, ETC.
SHOWN IS GENERALLY BASED ON ORIGINAL DESIGN
DRAWINGS AND MAY NOT REFLECT INSTALLED
CONDITIONS. CONTRACTOR SHALL FIELD VERIFY
EXISTING CONDITIONS AS REQUIRED.
6 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW CEILING HEATER.
7 . REMOVE EXISTING INLINE EXHAUST FAN MOUNTED
ABOVE CEILING. FIELD VERIFY EXACT LOCATION.
REMOVE PORTION OF DUCTWORK AS REQUIRED FOR
INSTALLATION OF NEW EXHAUST FAN IN SAME LOCATION.
8 . REMOVE EXISTING ROOFTOP HEAT PUMP, ASSOCIATED
ERV, AND CONDENSATE PIPING. EXISTING ROOF CURB TO
REMAIN. REMOVE EXISTING GPS BIPOLAR IONIZTION UNIT
AND STORE FOR REUSE. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW OAU IN SAME LOCATION. REMOVE
EXISTING RETURN DUCT.
9 . REMOVE EXISTING VERTICAL FAN COIL UNIT,
ASSOCIATED REFRIGERANT PIPING AND CONDENSATE
DRAIN. REMOVE EXISTING DUCTWORK AS REQUIRED FOR
INSTALLATION OF NEW FCU. REMOVE EXISTING GPS
BIPOLAR IONIZTION UNIT AND STORE FOR REUSE. SEE
NEW WORK PLAN FOR INSTALLATION OF NEW FCU.
10 . REMOVE EXISTING WALL MOUNTED DUCTLESS FAN COIL
UNIT AND ASSOCIATED REFRIGERANT PIPING. REMOVE
CONDENSATE PIPING AS REQUIRED TO ALLOW FOR
INSTALLATION OF NEW WALL MOUNTED DFCU IN THE
SAME LOCATION. SEE NEW WORK PLANS.
11 . REMOVE EXISITNG HEAT PUMP/CONDENSING UNIT
MOUNTED ATOP EQUIPMENT SUPPORT RAILS ON ROOF
AND ASSOCIATED REFRIGERANT PIPING. EXISTING
SUPPORT RAILS TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW HEAT PUMP/CONDENSING UNIT
12 . REMOVE EXISTING CONDENSATE DRAIN AND
REFRIGERANT PIPING ROUTED UNDER STAIRS TO
EXTERIOR WALL.
13 . EXISTING RTU TO REMAIN.
1/4" = 1'-0"MD101
3 ADMIN AREA MECHANICAL ROOM
1/4" = 1'-0"MD101
4 CAFETERIA AIR HANDLER DEMOLITION ELEVATION
No. Description Date
1 ADDENDUM #1 10/20/23
14 . EXISTING OUTSIDE AIR DAMPER TO REMAIN. SEE NEW
WORK PLAN FOR REBALANCING AND ADDING AUTOMATIC
VOLUME DAMPER.
15 . REMOVE EXISTING VERTICAL AIR HANDLING UNIT, SEE
CAFETERIA AIR HANDLER ELEVATION THIS SHEET FOR
MORE INFORMATION.
16 . REMOVE EXISTING DOOR AIR CURTAIN. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW DOOR AIR CURTAIN IN
THE SAME LOCATION.
17 . EXISTING ROOF MOUNTED EXHAUST FAN, ROOF CURB,
DUCTWORK, ETC. SERVING DISHWASHER TO REMAIN.
18 . REMOVE EXISTING KITCHEN MAKE-UP AIR UNIT ON ROOF.
EXISTING ROOF SUPPORT TO REMAIN. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW KITCHEN MAKE-UP AIR
UNIT IN THE SAME LOCATION.
19 . REMOVE EXISTING KITCHEN UPBLAST EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW FAN IN THE SAME LOCATION.
20 . REMOVE EXISITNG HEAT PUMP MOUNTED ATOP
CONCRETE EQUIPMENT PAD AND ASSOCIATED
REFRIGERANT PIPING. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW HEAT PUMP.
21 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP.
REMOVE EXISTING BIPOLAR IONIZATION UNIT AND STORE
FOR REUSE IN NEW PTAC. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW PTAC.
22 . REMOVE PORTION OF OUTSIDE AIR DUCT AS REQUIRED
FOR INSTALLATION OF NEW MANUAL VOLUME DAMPER
AND AUTOMATIC VOLUME DAMPER. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW DAMPERS.
23 . REMOVE EXISTING WALL HEATER. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW WALL HEATER.
24 . EXISTING DUCTWORK TO REMAIN.
25 . REMOVE PORTION OF EXISTING DUCTWORK AS
REQUIRED REMOVAL OF EXISTING AND INSTALLATION OF
NEW VERTICAL AIR HANDLER.
26 . REMOVE EXISTING VERTICAL AIR HANDLER AND
EQUIPMENT SUPPORT STAND. REMOVE EXISTING
BIPOLAR IONIZATION UNIT AND STORE FOR REUSE IN
NEW FCU. SEE NEW WORK PLAN FOR INSTALLATION OF
NEW FCU IN SAME LOCATION.
27 . EXISTING POWER CIRCUIT FOR RTU/CONVENIENCE
OUTLET RISES THROUGH EXISTING PITCH POCKET. SEE
ELECTRICAL DRAWINGS FOR REMOVAL OF POWER
CIRCUIT TO BELOW ROOF DECK, AND JUNCTIONING
BELOW ROOF LEVEL AND ROUTING CIRCUIT UP INSIDE
ROOF CURB ADAPTER OF NEW EQUIPMENT. FILL PITCH
POCKET FOLLOWING POWER CIRCUIT REMOVAL.
PROVIDE 18 GAUGE METAL CAP TO EXISTING PITCH
POCKET. SEAL AIR AND WATER TIGHT.
28 . REMOVE EXISTING HORIZONTAL FAN COIL UNIT AND
REFRIGERANT PIPING MOUNTED ABOVE CEILIENG.
REMOVE EXISTING DUCTWORK AND CONDENSATE PIPING
AS REQUIRED FOR REMOVAL OF FCU. REMOVE
ASSOCIATED EXISTING BIPOLAR IONIZATION UNIT AND
STORE FOR REUSE IN NEW FCU. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW FCU IN SAME LOCATION.
29 . REMOVE EXISTING DUCT, FLEX DUCT, AND
DIFFUSERS/GRILLES AS SHOWN. SEE NEW WORK PLAN
FOR CONNECTION OF NEW DUCT.
30 . COMPLETELY REMOVE EXISTING DUCTWORK,
ASSOCIATED SUPPORTS, INSULATION, ETC. UP TO
LOCATION SHOW.
31 . REMOVE EXISTING DUCTWORK UP TO THIS
APPROXIMATE LOCATION, SEE NEW WORK PLAN FOR
CONNECTION OF NEW DUCT TO EXISTING DUCT.
32 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED
NEW FLEX DUCT (IF APPLICABLE). FIELD VERIFY EXISTING
SIZES AND LOCATIONS. (TYPICAL ALL
GRILLES/DIFFUSERS) SEE NEW WORK PLAN FOR
INSTALLATION OF NEW GRILLE/DIFFUSER IN SAME
LOCATION.
33 . REMOVE EXISTING CEILING MOUNTED DUCTLESS FAN
COIL UNIT, ASSOCIATED REFRIGERANT PIPING,
CONDENSATE PIPING, SUPPORTS, ETC. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW DUCTLESS CEILING
CASSETTE IN SAME LOCATION.
34 . REMOVE EXISTING VERTICAL FAN COIL UNIT,
ASSOCIATED REFRIGERANT PIPING, AND CONDENSATE
PIPING IN ITS ENTIRETY. REMOVE DUCTWORK AS SHOWN
ON PLANS. REMOVE EXISTING BIPOLAR IONIZATION UNIT
AND TURN OVER TO OWNER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ERU.
35 . COMPLETELY REMOVE EXISTING HEAT PUMP AND
ASSOCIATED REFRIGERANT PIPING. EXISTING
EQUIPMENT SUPPORT RAILS TO REMAIN. PROVIDE NEW
18 GAUGE GALVANIZED STEEL CAP. AFTER REMOVING
CONDUIT AND REFRIGERANT PIPING, FILL ALL
ASSOCIATED PITCH POCKETS AND PROVIDE 18 GAUGE
METAL CAP. SEAL PITCH POCKET AIR AND WATER TIGHT.
WHHP-16
WHHP-15
WHHP-14WHHP-13
WHHP-12
WHHP-11
IU-2.4
IU-2.6
IU-2.5
CH-10
CH-9
OAU-3
IU-2.1
RTU-5
EF-14
EF-15
EF-16
EF-12
DOU-7
DFCU-7
ASST. PRINCIPAL
PRINCIPAL
ADMIN. CONF.
TOILET
STORAGE
3RD GRADE CR
3RD GRADE CR
3RD GRADE CR
3RD GRADE CR
3RD GRADE CR
3RD GRADE COMP LAB
GIRLS' TOILET
JANITOR
BOYS' TOILET
ESP CR
WAITING
RECEPTION
DFCU-8
IU-2.7
IU-2.3
MDC-2
HRU-2
1" D 1" D
1" D1" D
R
R
R
R
R
R
R
R
R
R
R
DOU-8
1" D
E4
E4
E4
E4
E4
E4
E4
E2
E4
E4
G3
G3
G3 G3
G3
G3
F1 F1
E2
E2
F1 F1
E2
E2
F1 F1
E2
E2
E2
F1
E5
E5
F4
F4
C1
C1
E1
E1
F3
B1
B1
B2
B2
B1
E4
E4
D
1 1/2" D 1 1/2" D
R
R(TYP)
D
DD
R
D R 38
D
TT
TT
TT
TT
IU-2.3
TT
TT
TT TT
TT
TT
TT TT
WHHP-35WHHP-24
WHHP-19
WHHP-20
WHHP-21
WHHP-17
WHHP-18
WHHP-22
WHHP-23
HRU-1
IU-1.4
IU-1.3 IU-1.2
CH-13
CH-14
CH-11 CH-12
OAU-4
HP-3
FCU-3
FCU-4
HP-4
EF-13
EF-9
EF-8
EF-10
EF-11
KEF-1
KEF-2
EF-25
EF-17
DOU-11
HP-2
OAU-CU-5
OAU-CU-6
PTHP-2
EWH-3
MECHANICAL
STORAGE
TOILET
TOILET
VENDING
VAULT
FOYER
TOILET
CLINIC
TESTING
GUIDANCE
SPEECH
TEACHER DINING
CAFETERIA FOYER
TEACHER WORKROOM
GIRLS' TOILET
BOYS' TOILET
STORAGE
2ND GRADE COMP LAB
2ND GRADE CR
2ND GRADE CR
2ND GRADE CR
2ND GRADE CR
ESP CR
DISHWASH
FOOD STORAGE
TOILET
OFFICE
CAN WASH
CAFETERIA
KITCHEN
IU-1.8
IU-1.7
IU-1.6
MDC-1
11 11
KMUAU-1 KMUAU-2
DAC-1
IU-1.5
DFCU-9.1
DFCU-9.2
IU-1.1
ERU-1
M101
C1
C1
C1
C1
C1
B1
HRU-2
E X
IS
T
IN
G
E L E
C T
R
IC
A L E
Q U
IP
M
E N
T
1" D1" D
R
R
D
D
R
R
R
D
R
R
B1
B1
B1
B1
DOU-9
DOU-10
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
B2
B2
B1
A2
B1
C1
C1
A2
A2
A2
B1
B1
B1
G3 G3
G3G3
G3
E4
E4
E4
E4
4 E4
E4
E4
E4
E4
E4
E5
F4 F4
E5
F1
E2
E2
F1
E2
E2
F1 F1
E2
E2
F1
F1
E3
F2
F2
E3
R
R(TYP)D
R R
1 1/2" D
1 1/2" D D R
DD
D
R
D
R
R
D
30 29
D D
30 30
R
D
A5
A5
A5
R
R
D
M101
A.V.D.
A.V.D.
TT TT
51 51
TT TT TT
TT
TT
TTTT
TT TT
TT
TT
TT
TT
TT
M101
20 M.V.D.
A.V.D.
M.V.D.
A.V.D.
9"ø
9"ø
IU-1.8 ERU-1
D
R D
D
R
R
IU-1.7
D
D
8"ø
"ø
"ø
8"ø
"ø
"ø
8"ø
D
ERU-1
R
D
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
BLDG. 3402
BLDG. 3401
BLDG. 3403
BLDG. 3400
GA DOE ID#: 5058
BLDG.
3400 M101
MECHANICAL NEW WORK
PLANS - BLDG 3400
R A
D
IU
M S
P R
IN
G
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
R
O X
A N
N A
R D
A
L B
A N
Y G
A
2023123
09/22/2023
1/8" = 1'-0"
MECHANICAL NEW WORK PLAN - BLDG 3400.1
1/8" = 1'-0"
MECHANICAL NEW WORK PLAN - BLDG 3400.2
NOTES: (THIS SHEET ONLY)
1 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP
EXISTING ROOF CURB. PROVIDE ADAPTER CURB AS
REQUIRED TO TRANSITION FROM NEW FAN
CONNECTION TO EXISTING DUCT.
2 . NEW WALL HUNG HEAT PUMP MOUNTED IN SAME
LOCATION AS WHHP REMOVED DURING DEMOLITION.
PROVIDE ADAPATER CURB AS REQUIRED FOR
INSTALLATION OF NEW WHHP.
3 . NEW ROOFTOP UNIT MOUNTED ATOP EXISTING ROOF
CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW UNIT CONNECTIONS TO
EXISTING DUCT LAYOUT. REINSTALL BIPOLAR
IONIZATION UNIT REMOVED DURING DEMOLITION.
4 . NEW OUTDOOR HEAT PUMP/CONDENSING UNIT
MOUNTED ATOP EXISTING EQUIPMENT SUPPORT
RAIL(S).
1/4" = 1'-0"M101
3 ADMIN AREA MECHANICAL ROOM - NEW WORK
No. Description Date
1 ADDENDUM #1 10/20/23
1/4" = 1'-0"M101
4 ERU-1 ELEVATION1/4" = 1'-0"M101
5 CAFETERIA AIR HANDLER NEW WORK ELEVATION
5 . NEW CEILING HEATER MOUNTED IN SAME LOCATION
AS HEATER REMOVED DURING DEMOLITION.
6 . NEW INLINE EXHAUST FAN MOUNTED IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION.
7 . NEW 100% AIR UNIT MOUNTED ATOP EXISTING ROOF
CURB. MODIFY EXISTING DUCTWORK AND PROVIDE
ADAPTER CURB AS REQUIRED TO TRANSITION FROM
EXISTING DUCT CONNECTION TO NEW OAU DUCT
CONNECTION.
8 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT
MOUNTED IN SAME LOCATION AS DFCU REMOVED
DURING DEMOLITION. CONNECT NEW CONDENSATE
PIPE TO EXISTING PIPE. FIELD VERIFY EXACT
LOCATION. SEE WALL MOUNTED INDOOR UNIT DETAIL.
9 . PROVIDE AUTOMATIC VOLUME DAMPER TO OPEN
DURING COMPRESSOR OPERATION. SEE CONTROLS
SPECIFICATION FOR ADDITIONAL INFORMATION.
10 . NEW DOOR AIR CURTAIN MOUNTED IN SAME
LOCATION AS DAC REMOVED DURING DEMOLITION.
11 . NEW KITCHEN MAKE-UP AIR UNIT MOUNTED ATOP
EXISTING EQUIPMENT SUPPORTS.
12 . NEW UPBLAST KITCHEN EXHAUST FAN MOUNTED
ATOP EXISTING ROOF CURB. PROVIDE ADAPTER CURB
AS REQUIRED TO TRANSITION FROM NEW FAN
CONNECTION TO EXISTING DUCT.
13 . NEW HEAT PUMP MOUNTED ATOP EXISTING
CONCRETE EQUIPMENT PAD.
14 . NEW PACKAGED TERMINAL HEAT PUMP IN SAME
LOCATION AS PTHP REMOVED DURING DEMOLITION.
15 . NEW WALL HEATER MOUNTED IN SAME LOCATION AS
HEATER REMOVED DURING DEMOLITION.
16 . REFRIGERANT AND CONDENSATE PIPING ROUTED
BELOW STAIRS AND THROUGH EXTERIOR WALL IN
SAME LOCATION AS PIPING REMOVED DURING
DEMOLITION.
17 . BRACKET PIPING TO WALL. PROVIDE NEW UNISTRUT
AND HORIZONTAL PIPING SUPPORTS BETWEEN WALL
AND HEAT PUMP AS SHOWN. PIPING INSULATION
SHALL BE CONTINUOUS THROUGH ALL SUPPORTS.
18 . ROUTE SLOPED (1/4" PER FOOT), TRAPPED, PVC
CONDENSATE DRAIN PIPING FROM ROOFTOP
EQUIPMENT TO ROOF DRAIN AS SHOWN. PROVIDE
PIPE SUPPORTS ON MAXIMUM 6' CENTERS. SEE
CONENSATE DRAIN TRAP DETAIL AND CONDENSATE
PIPE SUPPORT ON ROOF DETAIL.
19 . CONDENSATE PIPE ELBOWS DOWN INTO GUTTER AT
THIS APPROXIMATE LOCATION.
20 . BALANCE NEW MANUAL VOLUME DAMPER FOR 50 CFM
OF OUTSIDE AIR.
21 . BALANCE EXISTING MANUAL VOLUME DAMPER FOR
600 CFM.
22 . VRF CENTRAL CONTROLLER MOUNTED ON WALL AT
4'-6" A.F.F. PROVIDE BACNET INTERFACE TO ALLOW
VRF SYSTEM TO COMMUNICATE WITH DDC SYSTEM.
23 . DDC CONTROL PANEL MOUNTED ON 3/4" PLYWOOD
BACKBOARD.
24 . EXISTING DUCT RISES FROM FAN COIL UNIT RETURN
PLENUM TO GRAVITY VENTILATOR ON ROOF.
BALANCE FOR 50 CFM OF OUTSIDE AIR.
25 . PROVIDE OFFSETS AND TRANSITIONS AS REQUIRED
TO CONNECT NEW DUCT OF SIZE INDICATED TO
EXISTING DUCT AT THIS APPROXIMATE LOCATION.
26 . PROVIDE 1½" ELBOW UP AND MINIMUM 8"TALL
VERTICAL OPEN STAND PIPE AT THIS APPROXIMATE
LOCATION.
27 . 1 ½" CONENSATE DRAIN LINE PENTRATES EXTERIOR
WALL ABOVE CEILING, DROPS DOWN EXTERIOR WALL
AND ELBOWS ONTO SPLASH BLOCK. PAINT
CONDENSATE PIPING TO MATCH EXTERIOR BRICK.
SPLASH BLOCK BY MECHANICAL.
28 . REFRIGERANT PIPING RISES UP EXTERIOR WALL AND
PENETRATES WALL ABOVE CEILING LEVEL.
29 . PROVIDE FULL SIZE, SLOPED, INSULATED PVC VINYL
TUBE FOR DRAIN PIPING FROM UNIT DRAIN PORT AND
TRANSITION TO RIGID DRAIN PIPE AS DETAILED IN VRF
CONDENSATE DRAIN CONNECTION DETAIL. PROVIDE
FITTINGS AS REQUIRED TO CONNECT DRAIN PIPE.
30 . NEW VRF CEILING CASSETTE SUSPENDED FROM
DROP RODS (MIN 3/8") CONNECTED TO STRUCTURE
WITH SUPPLEMENTAL 2"X2"X1/4" ANGLE IRON. SEE
VRF / MINI SPLIT CEILING CASSETTE UNIT DETAIL AND
COMPACT CEILING CASSETTE IN CEILING GRID
DETAIL.
31 . VRF DISTRIBUTION CONTROLLER SUSPENDED FROM
DROP RODS (MIN 3/8"). PROVIDE DRAIN PAN BELOW
DISTRIBUTION CONTROLLER WITH AUDIBLE ALARM
AND DOWNTURNED PIPE WITH VALVE. SEE VRF DRAIN
PAN DETAIL AND VRF HEAT RECOVERY DISTRIBUTION
CONTROLLER DETAIL.
32 . NEW VRF HEAT RECOVERY UNIT MOUNTED ATOP NEW
CONCRETE EQUIPMENT PAD. SEE CONCRETE
EQUIPMENT PAD DETAIL. DO NOT INSTALL HRU UNDER
ROOF OVERHANG INDICATED BY DASHED LINE.
33 . NEW VRF VERTICAL FAN COIL UNIT MOUNTED ATOP
NEW RETURN AIR PLENUM STAND. PROVIDE DUCT
OFFSETS AND FITTINGS AS REQUIRED TO CONNECT
EXITING DUCT TO NEW FAN COIL UNIT.
34 . PROVIDE FULL SIZE TRAPPED, SLOPED, INSULATED
COPPER CONDENSATE DRAIN LINE ROUTED TO
ELBOW DOWN INTO EXISTING FLOOR DRAIN AS
SHOWN.
35 . PROVIDE FULL SIZE TRAPPED, SLOPED, INSULATED
COPPER CONDENSATE DRAIN LINE ROUTED TO SAME
LOCATION AS CONDENSATE DRAIN LINE REMOVED
DURING DEMOLITION. FIELD VERIFY EXACT LOCATION.
36 . VRF VERTICAL FAN COIL UNIT MOUNTED
HORIZONTALLY ABOVE CEILING. SUSPENDED FROM
DROP RODS (MIN 3/8") PROVIDE DUCT OFFSETS AND
TRANSITIONS AS REQUIRED TO CONNECT EXISTING
DUCT TO NEW FAN COIL UNIT.
37 . VRF WALL MOUNTED UNIT CONDENSATE PIPE
CONNECTS TO EXISTING CONDENSATE PIPE AT THIS
APPROXIMATE LOCATION. FIELD VERIFY EXACT
LOCATION.
38 . NEW PIPE BOX ON ROOF. SEE PIPE BOX DETAIL.
39 . DFCU DRAIN PIPING ROUTED TO SPILL ON ROOF.
ONCE TUBING PENETRATES PIPE BOX IT SHALL BE
CONCEALED IN PVC PIPING THAT IS ELBOWED DOWN
TO 4" ABOVE ROOF LEVEL AND SECURED TO PIPE
BOX. CONCEALING VINYL TUBING SHALL PROTECT IT
FROM UV DAMAGE. DO NOT EXPOSE TUBING TO
OUTDOORS.
40 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP NEW
EQUIPMENT SUPPORT PLATFORM. SEE EQUIPMENT
SUPPORT PLATFORM DETAIL.
41 . NEW CEILING CASSETTE SUSPENDED FROM DROP
RODS (MIN 3/8") CONNECTED TO STRUCTURE WITH
SUPPLEMENTAL 2"X2"X1/4" ANGLE IRON. SEE VRF /
MINI SPLIT CEILING CASSETTE UNIT DETAIL AND
COMPACT CEILING CASSETTE IN CEILING GRID
DETAIL. COORDINATE THERMOSTAT LOCATION WITH
OWNER.
42 . PROVIDE NEW GRILLE/DIFFUSER. PROVIDE NEW FLEX
DUCT (IF APPLICABLE) OF NECK SIZE SCHEDULED.
PROVIDE TRANSITIONS/OFFSETS AS REQUIRED TO
CONNECT NEW GRILLE/DIFFUSER TO EXISTING
DUCTWORK. (TYPICAL ALL GRILLES/DIFFUSERS)
43 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP NEW
EQUIPMENT SUPPORT RAILS. SEE EQUPIMENT
SUPPORT RAIL DETAIL.
44 . NEW CEILING CASSETTE LOCATION IS BASED ON
ORIGINAL DESIGN DRAWINGS DUCT LAYOUT. FIELD
VERIFY EXISTING CONDITIONS TO ENSURE ADEQUATE
ABOVE CEILING SPACE IS PRESENT TO ALLOW
INSTALLATION OF NEW DFCU.
45 . CONDENSATE PIPE SUPORT ON ROOF. SEE
CONDENSATE PIPE SUPOORT ON ROOF DETAIL.
(TYPICAL)
46 . PROVIDE FULL SIZE TRAPPED, SLOPED, INSULATED
COPPER CONDENSATE DRAIN LINE ROUTED TO
EXTERIOR. SEE FLOOR PLANS FOR CONTINUATION.
47 . VERTICAL FAN COIL UNIT MOUNTED ATOP 3" X 3" X 1/4"
ANGLE IRON STAND. UNIT SHALL HAVE BOTTOM FREE
RETURN WITH INTEGRAL FILTER RACK.
48 . PROVIDE NEW DUCT OFFSETS AND FITTINGS AS
REQUIRED TO CONNECT NEW DUCT.
49 . NEW REFRIGERANT PIPING ROUTED BELOW FAN COIL
UNIT ROUTED TO EXTERIOR. SEE FLOOR PLANS FOR
CONTINUATION.
50 . ERU EXHAUST DUCT CONNECTS TO NEW 8"Ø WALL
CAP. BASIS OF DESIGN GREENHECK MODEL WC-8 OR
EQUAL. COORDINATE ELEVATION WITH EXISTING
BOND BEAM, CONDUIT, ETC. CENTER ABOVE DOOR.
51 . COOLER/FREEZER DDC TEMPERATURE SENSOR.
MOUNTED NEAR CENTER OF FREEZER IN LOCATION
THAT ACCURATELY MEASURES COOLER/FREEZER
TEMPERATURE.
52 . VRF WALL MOUNTED INDOOR UNIT MOUNTED AS HIGH
ON WALL AS POSSIBLE. PROVIDE RECTORSEAL
FORTRESS LINE HIDE KIT OR EQUAL TO CONCEAL ALL
PIPING BELOW CEILING. SEE WALL MOUNTED
DUCTLESS INDOOR UNIT DETAIL AND WALL MOUNTED
INDOOR UNIT CONDENSATE PUMP DETAIL.
53 . WALL MOUNTED DDC TEMPERATURE SENSOR TO
ALLOW FOR MONITORING OF SPACE TEMPERATURE
BY DDC SYSTEM.
54 . PROVIDE NEW DDC THERMOSTAT FOR CONTROL OF
PTHP. THERMOSTAT MOUNTED ON WALL WITH B.E. AT
4'-6" A.F.F. PROVIDE SURFACE MOUNTED RACEWAY AS
REQUIRED TO CONCEAL ALL CONTROL WIRING BELOW
CEILING ROUTED FROM PTHP TO THERMOSTAT.
COORDINATE NEW THERMOSTAT WITH EXISTING
LIGHT SWITCHES, WALL BOARDS, ETC.
55 . PROVIDE LINE SIZE, TRAPPED, SLOPED, INSULATED
COPPER CONDENSATE DRAIN LINE ROUTED FROM
UNIT DRAIN CONNECTION TO FLOOR DRAIN AS SHOWN
ON PLANS.
56 . NEW SUPPLY/RETURN DUCT TRANSITIONS AS
REQUIRED FOR CONNECTION TO EXISTING
DUCTWORK AT THIS APPROXIMATE LOCATION.
DUCT SUPPORT KIT SHALL BE MIRO OR ERICO
SECURE DUCT TO UNISTRUT
WITH GALVANIZED SCREWS.
SEAL WATERTIGHT.
SEE PLANS FOR SIZES
ADJUSTABLE
HORIZONTAL STRUT
DUCT. SEE PLANS
FOR SIZES.
ROOFROOF
ISOMETRIC VIEW
M
IN
V A
R
IE
S
1 5/8" X 1 5/8" HOT
DIPPED GALVANIZED
UNISTRUT
16 X 18 POLYCARBONATE
BASE (TYP)
PROVIDE EXTRA EPDM OR
TPO PAD UNDER FEET OF
STANDS (TYP)
INSULATION (WHERE
SPECIFIED)
INSULATION SHIELD
PROVIDE COAT OF BLACK RUST INHIBITIVE
PAINT ON ALL METAL COMPONENTS
PIPE HANGER. SEE
SPECIFICATIONS
FOR TYPE.
HEX BOLT AND LOCKWASHER
(TOP AND BOTTOM)
STEEL HANGER ROD. SEE SPECIFICATIONS
FOR SIZES AND SPACING.
PIPING
PROVIDE SECTION OF FOAMGLASS INSULATION
AT HANGERS OF PIPING 2 1/2" AND UP
EXISTING EXTERIOR WALL
NEW HEAVY DUTY STEEL RETURN AIR GRILLE WITH O.B.D. IN
SAME LOCATION AS EXISTING SUPPLY AND RETURN GRILLES.
1" DUCT LINER INSIDE SUPPLY AND RETURN DUCT.
DUCT CONTINUES SIDEWALL GRILLES. SEE FLOOR
PLANS FOR NEW GRILLES
PIPE CLAMP SECURED TO WALL
ON MAX 18" CENTERS
3/4" PAINTED SCHEDULE 80 PVC DRAIN PIPE
STAINLESS STEEL HOSE CLAMP
3" X 3" X 1/4" STRUCTURAL ANGLE. PAINT EXPOSED ANGLE
WITH TWO COATS OF PANT TO MATCH BUILDING COLOR
MAINTAIN MINIMUM 12" FROM BOTTOM
OF WHHP TO GRADE.
FILTER ACCESS PANEL
FRESH AIR INLET
INTEGRAL DISCONNECT SWITCH
WALL HUNG HEAT PUMP MOUNTED TO WALL CURB
PER MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
WALL HUNG HEAT PUMP (WHHP)
INTEGRAL SLOPED TOP
22 GAUGE PAINT GALV GRIP GALVANIZED FLASHING.
PAINT FLASHING TO MATCH WHHP COLOR. FLASHING
SHALL EXTEND UP 4". CAULK AND SEAL WATERTIGHT
AT FLASHING OVERLAP FLASHING OVER WHAC'S
INTEGRAL VERTICAL FLASHING.
CAULK FULL LENGTH, BOTH SIDES AND TOP OF UNIT. COLOR SHALL MATCH
EXTERIOR WALL. ALSO, PROVIDE CLOSED CELL EPDM ADHESIVE BACKED
WEATHER STRIPPING (MINIMUM 1/4" THICK X 1" WIDE) AROUND FULL PERIMETER
OF UNIT PRIOR TO MOUNTING AGAINST WALL TO SERVE AS INSERT AND
INFILTRATION BARRIER.
INTERNALLY MOUNTED BI-POLAR
IONIZATION UNIT
SEE
INSERT
CEILING
NOTE: NEW WHHPS MAY HAVE DIFFERENT
SUPPLY AND RETURN CONNECTION
LOCATIONS THAN EXISTING WHHPS. WHHP
SHALL UTILIZE SUPPLY AND RETURN PLENUMS
IN CURB AS REQUIRED TO MAINTAIN EXISTING
SUPPLY AND RETURN OPENINGS. SUPPLY AND
RETURN PLENUMS NOT SHOWN FOR CLARITY.
ELECTRIC HEAT
INTEGRAL VINYL DRAIN TUBING BY
EQUIPMENT MANUFACTURER. PVC TUBING
SHALL BE INSERTED INTO VINYL TUBING
FILTER IN INTEGRAL FILTER RACK
WALL CURB TO ALLOW INSTALLATION OF NEW
WHHP IN SAME LOCATION AS EXISTING WHHP.
CONDENSATE LINE DOWN WALL TO GRADE. AT
GRADE, ELBOW PIPE AWAY FROM BUILDING
EXISTING
BULKHEAD
CAULK AROUND FULL PERIMETER OF ANGLE
EACH SIDE OF WALL.
3" X 3", 22 GAUGE SHEET METAL ANGLE
AROUND PERIMETER OF DUCT EACH SIDE
OF WALL. ANCHOR TO WALL WITH
EXPANSION ANCHOR.
DUCT WRAP INSULATION WITH FSK JACKET.
INSULATION IS CONTINUOUS THROUGH WALL
OPENING.
ELEVATION SECTION
NOTE: DETAIL IS SIMILAR FOR
UNINSULATED DUCTS. SEE
SPECIFICATION FOR REQUIRED
INSULATION THICKNESS.
SEAL WITH VAPOR PROOF MASTIC AND CLOTH FABRIC
OVERLAPPING ANGLE AND DUCT WRAP FSK JACKET TO
PREVENT PASSAGE OF SMOKE.
CAULK AROUND FULL PERIMETER OF ANGLE
EACH SIDE OF WALL.
3" X 3", 22 GAUGE SHEET METAL ANGLE AROUND
PERIMETER OF DUCT EACH SIDE OF WALL.
ANCHOR TO WALL WITH EXPANSION ANCHOR.
DUCT WRAP INSULATION WITH FSK
JACKET.INSULATION IS CONTINUOUS
THROUGH WALL OPENING.
SEAL WITH VAPOR PROOF MASTIC AND CLOTH
FABRIC OVERLAPPING ANGLE AND DUCT WRAP
FSK JACKET TO PREVENT PASSAGE OF SMOKE.
NOTE: DETAIL IS SIMILAR FOR UNINSULATED DUCTS.
CAULK AROUND FULL PERIMETER OF ESCUTCHEON
EACH SIDE OF WALL.
3" WIDE (MINIMUM) GAUGE SHEET METAL ESCUTCHEON
AROUND PERIMETER OF DUCT EACH SIDE OF WALL.
ANCHOR TO WALL WITH EXPANSION ANCHOR.
DUCT
DUCT WRAP INSULATION WITH FSK JACKET.
INSULATION IS CONTINUOUS THROUGH WALL OPENING.SEAL WITH VAPOR PROOF MASTIC AND
CLOTH FABRIC OVERLAPPING
ESCUTCHEON AND DUCT
WRAP FSK JACKET TO PREVENT
PASSAGE OF SMOKE.
NOTE: THIS DETAIL IS APPLICABLE TO CONCEALED ROUND, FLAT OVAL,
AND SPIRAL DUCTWORK. THIS DETAIL IS NOT APPLICABLE TO THE
INSTALLATION OF EXPOSED NON-RECTANGULAR DUCTWORK. SEE
SPECIFICATIONS FOR REQUIRED INSULATION THICKNESS
ELEVATION
SECTION
MASONRY WALL SHOWN. INSTALLATION REQUIREMENTS
ARE THE SAME FOR GYP BOARD WALLS.
SEAL WITH FSK TAPE OVERLAPPING ESCUTCHEON AND DUCT
WRAP FSK JACKET TO PREVENT PASSAGE OF SMOKE.
DUCT WRAP INSULATION WITH FSK JACKET.
INSULATION IS CONTINUOUS THROUGH WALL
OPENING.
3" WIDE (MINIMUM) 22 GAUGE SHEET METAL
ESCUTCHEON AROUND PERIMETER OF DUCT EACH
SIDE OF WALL. ANCHOR TO WALL WITH EXPANSION
ANCHOR .ENSURE ESCUTCHEON WIDTH IS
SUFFICIENT TO CONCEAL EDGES OF WALL OPENING.
CAULK AROUND FULL PERIMETER OF ESCUTCHEON
EACH SIDE OF WALL.
SPEED CONTROLLER. FIELD VERIFY EXACT LOCATION.
THREADED STEEL ROD (TYPICAL) ; SUPPORT FROM BLDG.
STRUCTURE
FACTORY CONNECTION OUTLET FLANGE AND BACKDRAFTER DAMPER.
(RECTANGULAR OUTLET SHOWN; SIMILAR FOR ROUND OUTLETS)
ADJUSTABLE MOUNTING FLANGES
CEILING. VERIFY WITH ARCHITECT GYP. BOARD
OR T-BAR. SEE REFLECTED CEILING PLAN. FOR
T-BAR CEILINGS, CENTER GRILLE IN CEILING
TILE.
WHITE POLYSTYRENE FACE GRILLE
EXHAUST DUCT. SEE PLANS FOR SIZE.
FOR ROUND DUCTS, PROVIDE 12" LONG
SECTION OF FLEX DUCT AFTER SHEET
METAL CONNECTION DUCT.
INTEGRAL INTERNAL PLUG-IN TYPE DISCONNECT.
FAN HOUSING W/ DIRECT DRIVE CENTRIFUGAL
BLOWER. SEE SCHEDULE FOR HOUSING TYPE.
(LOW PROFILE OR INSULATED)
INSTALL SCREWS TO PREVENT INTERFERENCE WITH OPENING AND
CLOSING OF BACKDRAFT DAMPER
SHEET METAL CONNECT DUCT LENGTH SHALL BE AS
REQUIRED TO ALLOW BACKDRAFT TO FULLY OPEN
NEOPRENE VIBRATION ISOLATORS AND ACCESSORY KIT
BY FAN MANUFACTURER. (TYP ALL DROP RODS)
WHERE SCHEDULED, PROVIDE FACTORY MOUNTED
MOTION SENSOR WITH BUILT-IN TIME DELAY
EXISTING ROOF
RE-WORK ROOFING FOR INSTALLATION
OF NEW ROOF CURB IN ACCORDANCE WITH
ROOF MANUFACTURER'S BOND REQUIREMENTS.
C U
R B
H E
IG
H
T
EQUIPMENT
GASKET SEALER
PRESSURE
TREATED
WOOD NAILER
RIGID INSULATION
METAL ROOF CURB
LAG BOLT
PRESSURE TREATED BLOCKING
AS REQUIRED TO MATCH INSULATION
THICKNESS.
DUCT
ANCHOR TO DECK
ROOF DECK TO EXTEND
BENEATH ENTIRE ROOF CURB,
COORDINATE DUCT OPENING
LOCATION WITH MECH. UNIT
FULL PERIMETER STRUCTURAL STEEL FRAMING
UNDER ROOF CURB.
EXISTING METAL DECK
5/16" X 1/2" (MINIMUM) HEX HEAD
SCREWS ON 18" CENTERS. PROVIDE
MINIMUM 2 SCREWS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .