24.4.19_EDINBURG_FIRE_STATION_MEP_SPECS_1-28-25_(2).pdf

PDF 2 MB Posted

Attached to
Edinburg Fire Department Station 3 - Heating Ventilation and Air Conditioning to include New Ducts and Vents
Solicitation number
2025-12
Issued by
Hidalgo County, Texas

About this file

The document is a comprehensive set of technical specifications and engineering drawings for the Edinburg Fire Department Station 3 Heating, Ventilation, and Air Conditioning (HVAC) project, prepared by Trinity MEP Engineering, LLC. The specifications cover the installation of new HVAC systems, including DX split system air conditioning units, exhaust fans, sheet metal ductwork, diffusers, grilles, and associated accessories. The project involves detailed technical requirements for raceway and conduit installation, electrical connections, and comprehensive installation guidelines for mechanical and electrical systems. The specifications are dated January 28, 2025, and provide extensive technical details for contractors bidding on the HVAC and electrical infrastructure work for the fire station.

The technical specifications outline specific requirements for material standards, installation methods, equipment identification, support structures, and testing procedures. Key components include provisions for electrical power conductors, grounding systems, wiring devices, and detailed mechanical system installations. The documents specify that all materials must be new, of high quality, and comply with relevant industry standards such as NFPA, NEMA, and ASTM. While no specific budget or funding details are provided in the specifications, the comprehensive nature of the documents suggests a thorough approach to ensuring high-quality, code-compliant HVAC and electrical systems for the Edinburg Fire Department Station 3 project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3533 Moreland Dr. Suite A | Weslaco, Texas 78596 P: 956.973.0500 | F:956.351.5750 www.trinitymep.com | Copyright 2025 Texas Registered Engineering Firm No. - F10362

1/28/2025

DIVISION 23 − HEATING VENTILATION & AIR CONDITIONING

23 00 00 HEATING, VENTILATION AND AIR‐CONDITIONING (HVAC)

23 05 00 COMMON WORK RESULTS FOR HVAC

23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 05 63 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC

23 07 13 DUCT INSULATION

23 07 13 HVAC PIPE INSULATION

23 23 00 REFRIGERANT PIPING

23 26 00 CONDENSATE DRAIN PIPING

23 31 13 METAL DUCTS

23 33 00 HVAC DUCT ACCESSORIES

23 33 46 FLEXIBLE DUCTS

23 34 16 CENTRIFUGAL HVAC FANS

23 37 13 DIFFUSERS, REGISTERS AND GRILLES

23 73 12 DX AIR‐HANDLING UNITS, SINGLE ZONE VAV

DIVISION 26 − ELECTRICAL

26 00 00 ELECTRICAL

26 00 01 ELECTRICAL GENERAL REQUIREMENTS

26 05 00 COMMON WORK RESULTS FOR ELECTRICAL

26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 27 26 WIRING DEVICES

HEATING, VENTILATION, AND AIR‐CONDITIONING

TRINITY MEP ENGINEERING, LLC 23 00 00 ‐ 1/2

SECTION 23 00 00

HEATING, VENTILATION AND AIR‐CONDITIONING (HVAC)

PART 1 ‐ GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. The following Summary of Work is intended as an aid to achieve an understanding of the various elements of work included in the project, as is not intended to be all‐inclusive. Detailed descriptions of work and requirements are given in drawings and specifications.

B. Mechanical Contract Documents were prepared for the Project by:

Trinity MEP Engineering, LLC

3533 Moreland Dr. Ste. A

Weslaco, Texas 78596

Phone Number: (956) 973‐0500

Contact Person: Leonardo Munoz, P.E.

C. General Scope of Work:

1. Install AC equipment and ductwork as shown on the contract documents. Refer to drawings for schedule of equipment that will be installed. After installing equipment, connect power to unit.

2. HVAC: Provide all materials and labor associated with a complete operational installation of new

HVAC systems including, but not limited to:

DX Split System A/C Units

Exhaust fans

Sheet metal, Ductwork

Diffusers and Grilles

Duct accessories, including grilles, and louvers

Air Test and Balance

1.3 COORDINATION

A. All mechanical work shall be done under sub‐contract to a General Contractor. Mechanical Contractor shall coordinate all work through General Contractor, even in areas where only mechanical work is to take place.

B. Coordination between all trades shall take place on a regular basis to avoid conflicts between disciplines and equipment clearances.

C. Work shall take place with minimal disruption to Owner’s operations in areas surrounding the new building.

D. Cooperate fully with other contractors so that work under those contracts may be carried out smoothly, without interfering with or delaying work under this Contract.

HEATING, VENTILATION, AND AIR‐CONDITIONING

TRINITY MEP ENGINEERING, LLC 23 00 00 ‐ 2/2

E. Fully coordinate with electrical contractor for providing power to mechanical equipment.

F. Mechanical Contractor is responsible for all control wiring including thermostat(s). This includes all conduit, wire, and accessories both low voltage and source voltage for the controls' system. Mechanical

Contractor will provide all the necessary actuators, relays, software, hardware, and all necessary accessories required for a fully functional controls' system.

1.4 UTILITIES

1. Coordinate with power, water, telephone, cable and gas utilities to locate all utilities prior to digging in any area.

2. Obtain any approvals required from utilities to relocate utilities.

3. Cost of relocating or bypassing utilities indicated on drawings shall be included in Base Bid.

1.5 CONTRACTOR USE OF PREMISES

A. Use of the Site: Limit use of the premises to work in areas indicated. Confine operations to areas within contract limits indicated. Do not disturb portions of the site beyond the areas in which the Work is indicated.

1. Owner Occupancy: Allow for Owner occupancy and use by the public.

2. Driveways and Entrances: Keep driveways and entrances serving the premises, clear and available to the Owner, the Owner's employees, and emergency vehicles at all time. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on‐site.

B. Site Safety: Take every precaution to ensure the site does not present a threat to the safety of occupants and/or workers. Minimal safety requirements include, but are not limited to the following:

1. Temporary fencing around construction areas.

2. Yellow caution tape and construction barricades along open trenches during the day. Trenches shall be covered at night and warning lights provided on construction barricades.

3. Temporary fencing around equipment while site work is in progress.

1.6 SUBMITTALS

1. To extradite the submittal process more efficiently, DO NOT piece‐meal the submittals. Submit entire mechanical or plumbing in a bound enclosure. This will eliminate delays in the submittal process.

END OF SECTION

COMMON WORK RESULTS FOR HVAC

TRINITY MEP ENGINEERING, LLC 23 05 00 ‐ 1/9

SECTION 23 05 00

1.2 SUMMARY

A. This Section includes the following basic mechanical materials and methods to complement other

Sections.

1. Piping materials and installation instructions common to most piping systems.

2. Concrete base construction requirements.

3. Escutcheons.

4. Dielectric fittings.

5. Flexible connectors.

6. Mechanical sleeve seals.

7. Equipment nameplate data requirements.

8. Nonshrink grout for equipment installations.

9. Field‐fabricated metal and wood equipment supports.

10. Installation requirements common to equipment specification sections.

11. Cutting and patching.

12. Touchup painting and finishing.

1.3 DEFINITIONS

A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawl spaces, and tunnels.

B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

C. Exposed, Exterior Installations: Exposed to view outdoors, or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in duct shafts.

E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants, but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.

F. The following are industry abbreviations for plastic materials:

G. PVC: Polyvinyl chloride plastic.

H. The following are industry abbreviations for rubber materials:

1. EPDM: Ethylene propylene diene terpolymer rubber.

1.4 SUBMITTALS

A. Product Data: For dielectric fittings, flexible connectors, mechanical sleeve seals, and identification materials and devices.

TRINITY MEP ENGINEERING, LLC 23 05 00 ‐ 2/9

B. Coordination Drawings: Detail major elements, components, and systems of mechanical equipment and materials in relationship with other systems, installations, and building components. Show space requirements for installation and access. Indicate if sequence and coordination of installations are important to efficient flow of the Work. Include the following:

1. Planned piping layout, including valve and specialty locations and valve‐stem movement.

2. Clearances for servicing and maintaining equipment, accessories, and specialties, including space for disassembly required for periodic maintenance.

3. Sizes and location of required concrete pads and bases.

4. Floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations.

5. Reflected ceiling plans to coordinate and integrate installation of air outlets and inlets, light fixtures, communication system components, sprinklers, and other ceiling‐mounted items.

1.5 QUALITY ASSURANCE

A. Comply with ASME A13.1 for lettering size, length of color field, colors, and viewing angles of identification devices.

B. Equipment Selection: Equipment of higher electrical characteristics, physical dimensions, capacities, and ratings may be furnished provided such proposed equipment is approved in writing and connecting mechanical and electrical services, circuit breakers, conduit, motors, bases, and equipment spaces are increased. Additional costs shall be approved in advance by appropriate Contract Modification for these increases. If minimum energy ratings or efficiencies of equipment are specified, equipment must meet design and commissioning requirements.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver pipes and tubes with factory‐applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and prevent entrance of dirt, debris, and moisture.

B. Protect stored pipes, ductwork, equipment, and tubes from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor, if stored inside.

C. Protect flanges, fittings, and piping specialties from moisture and dirt.

D. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.

1.7 SEQUENCING AND SCHEDULING

A. Coordinate mechanical equipment installation with other building components.

B. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction to allow for mechanical installations.

C. Coordinate installation of required supporting devices and set sleeves in poured‐in‐place concrete and other structural components, as they are constructed.

D. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. Coordinate installation of large equipment requiring positioning before closing in building.

E. Coordinate connection of mechanical systems with exterior underground and overhead utilities and services. Comply with requirements of governing regulations, franchised service companies, and controlling agencies.

F. Coordinate requirements for access panels and doors if mechanical items requiring access are concealed behind finished surfaces. Access panels and doors are specified in architectural section.

TRINITY MEP ENGINEERING, LLC 23 05 00 ‐ 3/9

G. Coordinate installation of identifying devices after completing covering and painting, if devices are applied to surfaces. Install identifying devices before installing acoustical ceilings and similar concealment.

1.8 OPERATION PRIOR TO ACCEPTANCE

A. When any equipment is operable, and it is to the advantage of the Contractor to operate the equipment, he may do so provided that he properly supervises the operation, and retains full responsibility for the equipment operated.

B. Regardless of whether or not the equipment has or has not been operated, the Contractor shall clean the equipment properly, make required adjustments, and complete punch list items before final acceptance by the Owner.

C. The date of acceptance by the Engineer, for beneficial use by the Owner, shall be the beginning date of the warranty period.

1.9 SPACE AND EQUIPMENT ARRANGEMENT

A. The size of each item of mechanical equipment shown on the Drawings is based on the dimensions of a particular manufacturer as indicated. While other manufacturers may be acceptable, it shall be the responsibility of the Contractor to determine whether or not the equipment he proposes to furnish will fit into the space. Shop drawings shall be prepared when required by the engineer to indicate a suitable arrangement.

B. Install equipment in a manner to permit access to all surfaces. Install valves, motors, drives, lubricating devices, filters, and other accessory items in a position to allow removal for service without requiring the disassembly of another part.

C. Provide access panels acceptable to the Engineer for equipment that is concealed above ceiling space.

D. Large equipment assemblies or components which will be installed in the building, and which are too large to permit access through doorways, stairways or shafts, shall be brought to the site and placed in the appropriate spaces before the enclosing structure is completed. Provisions shall be implemented by the Contractor to insure that the equipment will not be damaged in any way during the associated construction procedures.

1.10 START‐UP OF EQUIPMENT AND SYSTEMS

A. Whenever the manufacturer of a particular item of equipment or a particular system makes available a start‐up service after completion of the installation, such manufacturer’s start‐up service (rendered by the manufacturer or his authorized representative) shall be provided.

B. Witnessing and explanations of start‐up services shall be included as part of the “Instruction of Owner’s

Personnel” as specified below.

1.11 INSTRUCTION OF OWNER’S PERSONNEL

A. Provide the services of competent engineers or technicians acceptable to the Engineer to instruct representatives of the Owner in complete and detailed operation and maintenance of each item of equipment, and each system. These instructions shall be provided for whatever periods may be necessary to accomplish the desired results. Upon completion of these instructions, the Contractor shall obtain a letter of release, acknowledged by the Owner or his authorized representative, stating the dates on which the various kinds of instruction were given, and the personnel to whom the instructions were given.

B. The Contractor shall be fully responsible for proper maintenance of equipment and systems until the instructions have been given to the Owner’s personnel and the letter of release acknowledged.

TRINITY MEP ENGINEERING, LLC 23 05 00 ‐ 4/9

C. In providing the instructions to the Owner’s personnel, the written operating and maintenance manuals shall be followed in all instances, and the Owner’s personnel shall be familiarized with such manuals.

Operating and maintenance manuals used for instructions shall include piping diagrams, valve identification charts, control and interlocking wiring diagrams, manufacturers’ operation and maintenance manuals, parts lists (with sources identified), and other data as appropriate for each system, and as required elsewhere in the Specifications to be furnished to the Owner prior to final acceptance of the project.

D. Provide the Owner with three (3) complete sets of all maintenance manuals, pamphlets, brochures or instructions. This material shall be catalogued, indexed and bound into books.

1.12 ACCEPTABLE MANUFACTURERS

A. A. Provide equipment and materials from listed manufacturers listed within this specification.

Deviations from this specification will not be acceptable. When one manufacturer is listed, alternate materials and equipment may be provided “equal to” the listed. When more than one manufacturer is listed, equipment and material must be provided by one of the listed manufacturers.

PART 2 ‐ PRODUCTS

2.1 STANDARD PRODUCTS

A. Each item of equipment furnished under this Division of the Specifications shall be essentially the standard product of the manufacturer. Where two or more units of the same kind or class of equipment are required, these shall be the products of a single manufacturer; however, the component parts of the equipment need not be the products of one manufacturer.

B. Materials and equipment shall be of the base quality normally used in good commercial practice, and shall be the products of reputable domestic manufacturers unless otherwise specified. Each major component shall bear a nameplate giving the name and address of the manufacturer, and the catalog number or designation of the component.

2.2 QUALITY AND CLASSIFICATION OF MATERIALS

A. Materials and equipment shall be new and of the quality specified, and shall be free from defects at the time of installation. Materials or equipment damaged in shipment or otherwise damaged prior to installation shall not be repaired at the job site, but shall be replaced with new materials or equipment identical with those damaged.

B. Wherever a UL standard has been established for a particular type of material or equipment, each such material or equipment provided on this project shall meet the requirements of the UL standard in every way and shall be UL listed and labeled.

2.3 LOCAL PARTS AND SERVICE

A. Each item of equipment furnished on this project shall have local representation, factory‐authorized service, and an adequate stock of repair parts. “Local” shall be defined, for this purpose, as “within 50 miles of the project site.”

2.4 FLAME SPREAD PROPERTIES OF MATERIALS

A. Materials used for insulation, acoustical linings, adhesives, jackets and coatings, and combinations of these materials, shall each have a flame spread rating of 25 or less, and a smoke developed rating of 50 or less, as determined by an independent testing laboratory in accordance with NFPA‐255.

2.5 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Dielectric Unions:

TRINITY MEP ENGINEERING, LLC 23 05 00 ‐ 5/9

a. Watts Industries, Inc.; Water Products Div.

b. Zurn Industries, Inc.; Wilkins Div.

2. Mechanical Sleeve Seals:

a. Calpico, Inc.

b. Metraflex Co.

c. Thunderline/Link‐Seal.

2.6 MECHANICAL SLEEVE SEALS

A. Description: Modular design, with interlocking rubber links shaped to continuously fill annular space between pipe and sleeve. Include connecting bolts and pressure plates.

2.7 PIPING SPECIALTIES

A. Sleeves: The following materials are for wall, floor, slab, and roof penetrations:

1. Steel Sheet Metal: 0.0239‐inch minimum thickness, galvanized, round tube closed with welded longitudinal joint.

2. Steel Pipe: ASTM A 53, Type E, Grade A, Schedule 40, galvanized, plain ends.

3. Cast Iron: Cast or fabricated "wall pipe" equivalent to ductile‐iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.

4. Stack Sleeve Fittings: Manufactured, cast‐iron sleeve with integral clamping flange. Include clamping ring and bolts and nuts for membrane flashing.

a. Underdeck Clamp: Clamping ring with set screws.

B. Escutcheons: Manufactured wall, ceiling, and floor plates; deep‐pattern type if required to conceal protruding fittings and sleeves.

1. ID: Closely fit around pipe, tube, and insulation of insulated piping.

2. OD: Completely cover opening.

3. Cast Brass: One piece, with set screw.

a. Finish: Rough brass.

b. Finish: Polished chrome‐plate.

4. Cast‐Iron Floor Plate: One‐piece casting.

2.8 GROUT

A. Nonshrink, Nonmetallic Grout: ASTM C 1107, Grade B.

1. Characteristics: Post‐hardening, volume‐adjusting, dry, hydraulic‐cement grout, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications.

2. Design Mix: 5000‐psig, 28‐day compressive strength.

3. Packaging: Premixed and factory packaged.

PART 3 ‐ EXECUTION

3.1 PIPING SYSTEMS ‐ COMMON REQUIREMENTS

A. General: Install piping as described below, unless piping Sections specify otherwise. Individual Sections specify unique piping installation requirements.

B. General Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated, unless deviations to layout are approved on Coordination Drawings.

C. Install piping at indicated slope.

D. Install components with pressure rating equal to or greater than system operating pressure.

TRINITY MEP ENGINEERING, LLC 23 05 00 ‐ 6/9

E. Install piping in concealed interior and exterior locations, except in equipment rooms and service areas.

F. Install piping free of sags and bends.

G. Install exposed interior and exterior piping at right angles or parallel to building walls. Diagonal runs are prohibited, unless otherwise indicated.

H. Install piping tight to slabs, beams, joists, columns, walls, and other building elements. Allow sufficient space above removable ceiling panels to allow for ceiling panel removal.

I. Install piping to allow application of insulation plus 1‐inch clearance around insulation.

J. Locate groups of pipes parallel to each other, spaced to permit valve servicing.

K. Install fittings for changes in direction and branch connections.

L. Install couplings according to manufacturer's written instructions.

M. Install pipe escutcheons for pipe penetrations of concrete and masonry walls, wall board partitions, and suspended ceilings according to the following:

1. Chrome‐Plated Piping: Cast brass, one piece, with set screw, and polished chrome‐plated finish.

2. Uninsulated Piping Wall Escutcheons: Cast brass or stamped steel, with set screw.

3. Uninsulated Piping Floor Plates in Utility Areas: Cast‐iron floor plates.

4. Insulated Piping: Cast brass or stamped steel; with concealed hinge, spring clips, and chrome‐plated finish.

5. Piping in Utility Areas: Cast brass or stamped steel, with set‐screw or spring clips.

N. Sleeves are not required for core drilled holes.

O. Install sleeves for pipes passing through concrete and masonry walls, and concrete floor and roof slabs.

P. Install sleeves for pipes passing through concrete and masonry walls, gypsum‐board partitions, and concrete floor and roof slabs.

1. Cut sleeves to length for mounting flush with both surfaces.

a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level. Extend cast‐iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified.

2. Build sleeves into new walls and slabs as work progresses.

3. Install sleeves large enough to provide 1/4‐inch annular clear space between sleeve and pipe or pipe insulation. Use the following sleeve materials:Steel Pipe Sleeves: For pipes smaller than 6‐inch NPS.

b. Steel, Sheet‐Metal Sleeves: For pipes 6‐inch NPS and larger, penetrating gypsum‐board partitions.

4. Except for underground wall penetrations, seal annular space between sleeve and pipe or pipe insulation, using elastomeric joint sealants.

5. Use Type S, Grade NS, Class 25, Use O, neutral‐curing silicone sealant, unless otherwise indicated.

Q. Aboveground, Exterior‐Wall, Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Size sleeve for 1‐inch annular clear space between pipe or pipe insulation and sleeve for installing mechanical sleeve seals.

1. Install steel pipe for sleeves smaller than 6 inches in diameter.

2. Install cast‐iron "wall pipes" for sleeves 6 inches in diameter and larger.

3. Assemble and install mechanical sleeve seals according to manufacturer's written instructions.

Tighten bolts that cause rubber sealing elements to expand and make watertight seal.

R. Underground, Exterior‐Wall, Pipe Penetrations: Install cast‐iron "wall pipes" for sleeves. Seal pipe penetrations using mechanical sleeve seals. Size sleeve for 1‐inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.

TRINITY MEP ENGINEERING, LLC 23 05 00 ‐ 7/9

1. Assemble and install mechanical sleeve seals according to manufacturer's written instructions.

Tighten bolts that cause rubber sealing elements to expand and make watertight seal.

S. Fire‐Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestopping materials.

T. Verify final equipment locations for roughing‐in.

U. Refer to equipment specifications in other Sections of these Specifications for roughing‐in requirements.

V. Piping Joint Construction: Join pipe and fittings as follows and as specifically required in individual piping specification Sections:

1. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

2. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

3. Soldered Joints: Construct joints according to AWS's "Soldering Manual," Chapter "The Soldering of

Pipe and Tube"; or CDA's "Copper Tube Handbook."

4. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," Chapter "Pipe and Tube."

5. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

a. Note internal length of threads in fittings or valve ends, and proximity of internal seat or wall, to determine how far pipe should be threaded into joint.

b. Apply appropriate tape or thread compound to external pipe threads, unless dry seal threading is specified.

c. Align threads at point of assembly.

d. Tighten joint with wrench. Apply wrench to valve end into which pipe is being threaded.

e. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.

Do not use pipe sections that have cracked or open welds.

6. Welded Joints: Construct joints according to AWS D10.12, "Recommended Practices and Procedures for Welding Low Carbon Steel Pipe," using qualified processes and welding operators according to

"Quality Assurance" Article.

7. Flanged Joints: Align flange surfaces parallel. Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Assemble joints by sequencing bolt tightening to make initial contact of flanges and gaskets as flat and parallel as possible. Use suitable lubricants on bolt threads. Tighten bolts gradually and uniformly using torque wrench.

8. Plastic Piping Solvent‐Cement Joints: Clean and dry joining surfaces by wiping with clean cloth or paper towels. Join pipe and fittings according to the following:

a. Comply with ASTM F 402 for safe‐handling practice of cleaners, primers, and solvent cements.

b. PVC Nonpressure Piping: ASTM D 2855.

c. PVC to ABS Nonpressure Transition Fittings: Procedure and solvent cement according to

ASTM D 3138.

9. Plastic Piping Heat‐Fusion Joints: Clean and dry joining surfaces by wiping with clean cloth or paper towels. Join according to ASTM D 2657 procedures and manufacturer's written instructions.

a. Plain‐End Pipe and Fittings: Use butt fusion.

b. Plain‐End Pipe and Socket Fittings: Use socket fusion.

W. Piping Connections: Make connections according to the following, unless otherwise indicated:

TRINITY MEP ENGINEERING, LLC 23 05 00 ‐ 8/9

1. Install unions, in piping 2‐inch NPS and smaller, adjacent to each valve and at final connection to each piece of equipment with 2‐inch NPS or smaller threaded pipe connection.

2. Install flanges, in piping 2‐1/2‐inch NPS and larger, adjacent to flanged valves and at final connection to each piece of equipment with flanged pipe connection.

3. Dry Piping Systems: Install dielectric unions and flanges to connect piping materials of dissimilar metals.

4. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of dissimilar metals.

3.2 EQUIPMENT AND MATERIAL INSTALLATION ‐ COMMON REQUIREMENTS

A. Install equipment and material to provide maximum possible headroom, if mounting heights are not indicated.

B. Install equipment according to approved submittal data. Portions of the Work are shown only in diagrammatic form. Refer conflicts to Architect.

C. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.

D. Install mechanical equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.

E. Install equipment and ductwork giving right of way to piping installed at required slope.

F. Install flexible connectors on equipment side of shutoff valves, horizontally and parallel to equipment shafts if possible.

3.3 PAINTING AND FINISHING

A. Refer to paint materials, surface preparation, and application of paint.

B. Do not paint piping specialties with factory‐applied finish.

C. Damage and Touchup: Repair marred and damaged factory‐painted finishes with materials and procedures to match original factory finish.

3.4 CONCRETE BASES

A. Construct concrete bases of dimensions indicated, but not less than 4 inches larger in both directions than supported unit. Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. Use 3000‐psig, 28‐day compressive‐strength concrete and reinforcement or as specified.

3.5 ERECTION OF METAL SUPPORTS AND ANCHORAGE

A. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor mechanical materials and equipment.

B. Field Welding: Comply with AWS D1.1, "Structural Welding Code‐‐Steel."

3.6 CUTTING AND PATCHING

A. Cut, channel, chase, and drill floors, walls, partitions, ceilings, and other surfaces necessary for mechanical installations. Perform cutting by skilled mechanics of trades involved.

B. Repair cut surfaces to match adjacent surfaces.

3.7 GROUTING

A. Install nonmetallic, nonshrink, grout for mechanical equipment base bearing surfaces, pump and other equipment base plates, and anchors. Mix grout according to manufacturer's written instructions.

B. Clean surfaces that will come into contact with grout.

C. Provide forms as required for placement of grout.

D. Avoid air entrapment during placing of grout.

TRINITY MEP ENGINEERING, LLC 23 05 00 ‐ 9/9

E. Place grout, completely filling equipment bases.

F. Place grout on concrete bases to provide smooth bearing surface for equipment.

G. Place grout around anchors.

H. Cure placed grout according to manufacturer's written instructions.

HANGERS & SUPPORTS FOR HVAC PIPING & EQUIPMENT

TRINITY MEP ENGINEERING, LLC 23 05 29 ‐ 1/6

2017.16 TTBH PHASE II RENOVATION

2018 06 15 EDINBURG, TX.

SECTION 23 05 29

HANGER & SUPPORTS FOR HVAC PIPING & EQUIPMENT

PART 1 GENERAL

1.1 SUMMARY

.1 Section includes:

.1 Concrete housekeeping pads, hangers and supports for mechanical piping, ducting and equipment.

1.2 RELATED SECTIONS

.1 Section 01 33 00 ‐ Submittal Procedures.

.2 Section 01 74 21 – Construction/Demolition Waste Management and Disposal

.3 Section 03 30 00 ‐ Cast‐in‐Place Concrete.

.4 Section 05 12 23 ‐ Structural Steel for Buildings.

.5 Section 05 50 00 ‐ Metal Fabrications.

1.3 REFERENCES

.1 American National Standards Institute/ American Society of Mechanical Engineers (ANSI/ASME)

.1 ANSI/ASME B31.1, Power Piping, (SI Edition).

.2 American Society for Testing and Materials (ASTM)

.1 ASTM A125, Specification for Steel Springs, Helical, Heat‐Treated.

.2 ASTM A307, Specification for Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength.

.3 ASTM A563, Specification for Carbon and Alloy Steel Nuts.

.3 Factory Mutual (FM) .4 Health Canada / Workplace Hazardous Materials Information System (WHMIS).

.1 Materials Safety Data Sheets (MSDS).

.5 Manufacturer's Standardization Society of the Valves and Fittings Industry (MSS)

.1 MSS SP‐58, Pipe Hangers and Supports ‐ Materials, Design and Manufacture.

.2 ANSI/MSS SP‐69, Pipe Hangers and Supports ‐ Selection and Application.

.3 MSS SP‐89, Pipe Hangers and Supports ‐ Fabrication and Installation Practices.

.6 Underwriter's Laboratories of Canada (ULC)

1.4 SYSTEM DESCRIPTION

.1 Design Requirements

.1 Construct pipe hanger and support to manufacturer's recommendations utilizing manufacturer's regular production components, parts and assemblies.

.2 Base maximum load ratings on allowable stresses prescribed by MSS SP58 or ASME B31.1.

.3 Ensure that supports, guides, anchors do not transmit excessive quantities of heat to building structure.

.4 Design hangers and supports to support systems under all conditions of operation, allow free expansion and contraction, prevent excessive stresses from being introduced into pipework or connected equipment.

.5 Provide for vertical adjustments after erection and during commissioning. Amount of adjustment to be in accordance with MSS SP58.

TRINITY MEP ENGINEERING, LLC 23 05 29 ‐ 2/6

2017.16 TTBH PHASE II RENOVATION

2018 06 15 EDINBURG, TX.

.2 Performance Requirements

.1 Design supports, platforms, catwalks, hangers, to withstand seismic events for location as per the National Building Code

1.5 SUBMITTALS

.1 Submittals: in accordance with Section 01 33 00 ‐ Submittal Procedures.

.2 Shop drawings: submit drawings stamped and signed for approval by Owner’s Representative.

.3 Submit shop drawings and product data for following items:

.1 Bases, hangers and supports.

.2 Connections to equipment and structure.

.3 Structural assemblies.

.4 Quality assurance submittals: submit following in accordance with Section 01 33 00 ‐ Submittal

Procedures.

.1 Certificates: submit certificates signed by manufacturer certifying that materials comply with specified performance characteristics and physical properties.

.2 Instructions: submit manufacturer's installation instructions.

.1 Owner’s Representative will make available 1 copy of systems supplier's installation instructions.

.5 Closeout Submittals:

.1 Provide maintenance data for incorporation into manual specified in Section 01 78 00 ‐ Closeout Submittals

1.6 QUALITY ASSURANCE

.1 Health and Safety:

.1 Do construction occupational health and safety in accordance with Section 01 35 29.06 ‐ Health and Safety Requirements.

1.7 DELIVERY, STORAGE, AND HANDLING

.1 Packing, shipping, handling and unloading:

.1 Deliver, store and handle in accordance with Section 01 61 00 ‐ Common Product Requirements.

.2 Deliver, store and handle materials in accordance with manufacturer's written instructions.

.2 Waste Management and Disposal:

.1 Construction/Demolition Waste Management and Disposal: separate waste materials for reuse and recycling in accordance with Section 01 74 21 ‐ Construction/Demolition Waste Management and Disposal.

PART 2 ‐ PRODUCTS

2.1 GENERAL

.1 Fabricate hangers, supports and sway braces in accordance with ANSI B31.1 and MSS SP‐58 and SP‐ 89.

.2 Use components for intended design purpose only. Do not use for rigging or erection purposes.

2.2 PIPE HANGERS

.1 Finishes:

.1 Pipe hangers and supports: galvanized painted with zinc‐rich paint after manufacture.

.2 Use electro‐plating galvanizing process or hot dipped galvanizing process.

.3 Ensure steel hangers in contact with copper piping are copper plated or epoxy coated.

.2 Upper attachment structural: Suspension from lower flange of I‐Beam.

TRINITY MEP ENGINEERING, LLC 23 05 29 ‐ 3/6

2017.16 TTBH PHASE II RENOVATION

2018 06 15 EDINBURG, TX.

.1 Cold piping NPS 2 maximum: malleable iron C‐clamp with hardened steel cup point setscrew, locknut and carbon steel retaining clip.

.1 Rod: 9 mm UL listed, 13 mm FM approved.

.2 Cold piping NPS 2 1/2 or greater, hot piping: Malleable iron beam clamp, eye rod, jaws and extension with carbon steel retaining clip, tie rod, nuts and washers, UL listed, FM approved where required to MSS‐SP58 and MSS‐SP69.

.3 Upper attachment structural: Suspension from upper flange of I‐Beam.

.1 Cold piping NPS 2 maximum: Ductile iron top‐of‐beam C‐clamp with hardened steel cup point setscrew, locknut and carbon steel retaining clip, UL listed FM approved where required to MSS SP69.

.2 Cold piping NPS 2 1/2 or greater, all hot piping: Malleable iron top‐of‐beam jaw‐clamp with hooked rod, spring washer, plain washer and nut UL listed, FM approved where required.

.4 Upper attachment to concrete.

.1 Ceiling: Carbon steel welded eye rod, clevis plate, clevis pin and cotters with weldless forged steel eye nut. Ensure eye 6 mm minimum greater than rod diameter.

.2 Concrete inserts: wedge shaped body with knockout protector plate UL listed FM approved where required to MSS SP‐69.

.5 Shop and field‐fabricated assemblies.

.1 Trapeze hanger assemblies: MSS SP‐89.

.2 Steel brackets: MSS SP‐89.

.3 Sway braces for seismic restraint systems: to MSS SP‐89.

.6 Hanger rods: threaded rod material to MSS SP‐58.

.1 Ensure that hanger rods are subject to tensile loading only.

.2 Provide linkages where lateral or axial movement of pipework is anticipated.

.3 Do not use 22 mm or 28 mm rod.

.7 Pipe attachments: material to MSS SP‐58.

.1 Attachments for steel piping: carbon steel galvanized.

.2 Attachments for copper piping: copper plated black steel.

.3 Use insulation saddles for hot pipework.

.4 Oversize pipe hangers and supports for insulated pipes.

.8 Adjustable clevis: material to MSS SP‐69, UL listed FM approved, where required clevis bolt with nipple spacer and vertical adjustment nuts above and below clevis.

.1 Ensure "U" has hole in bottom for rivetting to insulation shields.

.9 Yoke style pipe roll: carbon steel yoke, rod and nuts with cast iron roll, to MSS SP‐69.

.10 U‐bolts: carbon steel to MSS SP‐69 with 2 nuts at each end to ASTM A563.

.1 Finishes for steel pipework: galvanized.

.2 Finishes for copper, glass, brass or aluminum pipework: black with formed portion plastic coated or epoxy coated.

.11 Pipe rollers: cast iron roll and roll stand with carbon steel rod to MSS SP‐69.

2.3 RISER CLAMPS

.1 Steel or cast iron pipe: galvanized black carbon steel to MSS SP‐58, type 42, UL listed FM approved where required.

.2 Copper pipe: carbon steel copper plated to MSS SP‐58, type 42.

.3 Bolts: to ASTM A307.

.4 Nuts: to ASTM A563.

TRINITY MEP ENGINEERING, LLC 23 05 29 ‐ 4/6

2017.16 TTBH PHASE II RENOVATION

2018 06 15 EDINBURG, TX.

2.4 INSULATION PROTECTION SHIELDS

.1 Insulated cold piping:

.1 64 kg/m3 density insulation plus insulation protection shield to: MSS SP‐69, galvanized sheet carbon steel. Length designed for maximum 3 m span.

.2 Insulated hot piping:

.1 Curved plate 300 mm long, with edges turned up, welded‐in centre plate for pipe sizes NPS 12 and over, carbon steel to comply with MSS SP‐69.

2.5 CONSTANT SUPPORT SPRING HANGERS

.1 Springs: alloy steel to ASTM A125, shot peened, magnetic particle inspected, with +/‐5% spring rate tolerance, tested for free height, spring rate, loaded height and provided with Certified Mill Test Report(CMTR).

.2 Load adjustability: 10 % minimum adjustability each side of calibrated load. Adjustment without special tools. Adjustments not to affect travel capabilities.

.3 Provide upper and lower factory set travel stops.

.4 Provide load adjustment scale for field adjustments.

.5 Total travel to be actual travel + 20%. Difference between total travel and actual travel 25 mm minimum.

.6 Individually calibrated scales on each side of support calibrated prior to shipment, complete with calibration record.

2.6 VARIABLE SUPPORT SPRING HANGERS

.1 Vertical movement: 13 mm minimum, 50 mm maximum, use single spring pre‐compressed variable spring hangers.

.2 Vertical movement greater than 50 mm: use double spring pre‐compressed variable spring hanger with 2 springs in series in single casing.

.3 Variable spring hanger to be complete with factory calibrated travel stops. Provide certificate of calibration for each hanger.

.4 Steel alloy springs: to ASTM A125, shot peened, magnetic particle inspected, with +/‐5 % spring rate tolerance, tested for free height, spring rate, loaded height and provided with CMTR.

2.7 EQUIPMENT SUPPORTS

.1 Fabricate equipment supports not provided by equipment manufacturer from structural grade steel meeting requirements of Section 05 12 23 ‐ Structural Steel for Buildings. Submit calculations with shop drawings.

2.8 EQUIPMENT ANCHOR BOLTS AND TEMPLATES

.1 Provide templates to ensure accurate location of anchor bolts.

2.9 PLATFORMS AND CATWALKS

.1 To Section 05 50 00 ‐ Metal Fabrication.

2.10 HOUSE‐KEEPING PADS

.1 For base‐mounted equipment: Concrete, at least 100 mm high, 50 mm larger all around than equipment, and with chamfered edges.

.2 Concrete: to Section 03 30 00 ‐ Cast‐in‐place Concrete by Division 3.

2.11 OTHER EQUIPMENT SUPPORTS

.1 From structural grade steel meeting requirements of Section 05 12 23 ‐ Structural Steel for

Buildings.

.2 Submit structural calculations with shop drawings.

TRINITY MEP ENGINEERING, LLC 23 05 29 ‐ 5/6

2017.16 TTBH PHASE II RENOVATION

2018 06 15 EDINBURG, TX.

PART 3 ‐ EXECUTION

3.1 MANUFACTURER’S INSTRUCTIONS

.1 Compliance: comply with manufacturer’s written recommendations or specifications, including product technical bulletins, handling, storage and installation instructions, and datasheet.

3.2 INSTALLATION

.1 Install in accordance with:

.1 Manufacturer's instructions and recommendations.

.2 Vibration Control Devices:

.1 Install on piping systems at pumps, boilers, chillers, cooling towers, elsewhere as indicated.

.3 Clamps on riser piping:

.1 Support independent of connected horizontal pipework using riser clamps and riser clamp lugs welded to riser.

.2 Bolt‐tightening torques to be to industry standards.

.3 Steel pipes: Install below coupling or shear lugs welded to pipe.

.4 Cast iron pipes: Install below joint.

.4 Clevis plates:

.1 Attach to concrete with 4 minimum concrete inserts, one at each corner.

.5 Provide supplementary structural steelwork where structural bearings do not exist or where concrete inserts are not in correct locations.

.6 Use approved constant support type hangers where:

.1 vertical movement of pipework is 13 mm or more, .2 transfer of load to adjacent hangers or connected equipment is not permitted.

.7 Use variable support spring hangers where:

.1 transfer of load to adjacent piping or to connected equipment is not critical.

.2 variation in supporting effect does not exceed 25 % of total load.

3.3 HANGER SPACING

.1 Plumbing piping: most stringent requirements of Canadian Plumbing Code

.2 Fire protection: to applicable fire code.

.3 Gas and fuel oil piping: up to NPS 1/2: every 1.8 m.

.4 Copper piping: up to NPS 1/2: every 1.5 m.

.5 Hydronic, steam, condensate, rigid, and flexible joint roll groove pipe: in accordance with table below, but not less than one hanger at joints.

Maximum Pipe Size: NPS

Maximum Spacing: Steel Maximum Spacing: Copper up to 1‐1/4 2.1 m 1.8 m

1‐1/2 2.7 m 2.4 m

2 3.0 m 2.7 m

2‐1/2 3.6 m 3.0 m

3 3.6 m 3.0 m

3‐1/2 3.9 m 3.3 m

4 4.2 m 3.6 m

5 4.8 m

6 5.1 m

8 5.7 m

TRINITY MEP ENGINEERING, LLC 23 05 29 ‐ 6/6

2017.16 TTBH PHASE II RENOVATION

2018 06 15 EDINBURG, TX.

Maximum Pipe Size: NPS

Maximum Spacing: Steel Maximum Spacing: Copper

10 6.6 m

12 6.9 m

.6 Within 300 mm of each elbow.

.7 Pipework greater than NPS 12: to MSS SP69.

3.4 HANGER INSTALLATION

.1 Install hanger so that rod is vertical under operating conditions.

.2 Adjust hangers to equalize load.

.3 Support from structural members. Where structural bearing does not exist or inserts are not in suitable locations, provide supplementary structural steel members, comprised of angel iron or c‐ channel.

3.5 HORIZONTAL MOVEMENT

.1 Angularity of rod hanger resulting from horizontal movement of pipework from cold to hot position not to exceed 4 degrees from vertical.

.2 Where horizontal pipe movement is less than 13 mm, offset pipe hanger and support so that rod hanger is vertical in the hot position.

3.6 FINAL ADJUSTMENT

.1 Adjust hangers and supports:

.1 Ensure that rod is vertical under operating conditions.

.2 Equalize loads.

.2 Adjustable clevis:

.1 Tighten hanger load nut securely to ensure proper hanger performance.

.2 Tighten upper nut after adjustment.

.3 C‐clamps:

.1 Follow manufacturer's recommended written instructions and torque values when tightening C‐clamps to bottom flange of beam.

.4 Beam clamps:

.1 Hammer jaw firmly against underside of beam.

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

TRINITY MEP ENGINEERING, LLC 23 05 63 ‐ 1/5

SECTION 23 05 53

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions.

1.2 SUMMARY

A. This Section includes the following mechanical identification materials and their installation:

1. Equipment nameplates.

2. Equipment markers.

3. Access panel and door markers.

4. Pipe markers.

5. Duct markers.

6. Valve tags.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

1.4 COORDINATION

A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with location of access panels and doors.

C. Install identifying devices before installing acoustical ceilings and similar concealment.

PART 2 ‐ PRODUCTS

2.1 EQUIPMENT IDENTIFICATION DEVICES

A. Equipment Nameplates: Metal, with data engraved or stamped, for permanent attachment on equipment.

1. Data:

a. Manufacturer, product name, model number, and serial number.

b. Capacity, operating and power characteristics, and essential data.

c. Labels of tested compliances.

2. Location: Accessible and visible.

3. Fasteners: As required to mount on equipment.

B. Equipment Markers: Engraved, color‐coded laminated plastic. Include contact‐type, permanent adhesive.

1. Terminology: Match schedules as closely as possible.

2. Data:

a. Name and plan number.

b. Equipment service.

c. Design capacity.

d. Other design parameters such as pressure drop, entering and leaving conditions, and speed.

TRINITY MEP ENGINEERING, LLC 23 05 63 ‐ 2/5

3. Size: 2‐1/2 by 4 inches (64 by 100 mm) for control devices, dampers, and valves; 4‐1/2 by 6 inches

(115 by 150 mm) for equipment.

4. Fasteners: Self‐tapping, stainless‐steel screws or contact‐type, permanent adhesive.

2.2 PIPING IDENTIFICATION DEVICES

A. Manufactured Pipe Markers, General: Preprinted, color‐coded, with lettering indicating service, and showing direction of flow.

1. Colors: Comply with ASME A13.1, unless otherwise indicated.

2. Lettering: Use piping system terms indicated and abbreviate only as necessary for each application length.

3. Pipes with OD, Including Insulation, Less Than 6 Inches (150 mm): Full‐band pipe markers extending

360 degrees around pipe at each location.

4. Pipes with OD, Including Insulation, 6 Inches (150 mm) and Larger: Either full‐band or strip‐type pipe markers at least three times letter height and of length required for label.

5. Arrows: Integral with piping system service lettering to accommodate both directions; or as separate unit on each pipe marker to indicate direction of flow.

B. Pretensioned Pipe Markers: Precoiled semirigid plastic formed to cover full circumference of pipe and to attach to pipe without adhesive.

C. Shaped Pipe Markers: Preformed semirigid plastic formed to partially cover circumference of pipe and to attach to pipe with mechanical fasteners that do not penetrate insulation vapor barrier.

D. Self‐Adhesive Pipe Markers: Plastic with pressure‐sensitive, permanent‐type, self‐adhesive back.

E. Plastic Tape: Continuously printed, vinyl tape at least 3 mils (0.08 mm) thick with pressure‐sensitive, permanent‐type, self‐adhesive back.

1. Width for Markers on Pipes with OD, Including Insulation, Less Than 6 Inches (150 mm): 3/4 inch (19

mm) minimum.

2. Width for Markers on Pipes with OD, Including Insulation, 6 Inches (150 mm) or Larger: 1‐1/2 inches

(38 mm) minimum.

2.3 DUCT IDENTIFICATION DEVICES

A. Duct Markers: Engraved, color‐coded laminated plastic. Include direction and quantity of airflow and duct service (such as supply, return, and exhaust). Include contact‐type, permanent adhesive.

2.4 VALVE TAGS

A. Valve Tags: Stamped or engraved with 1/4‐inch (6.4‐mm) letters for piping system abbreviation and 1/2‐ inch (13‐mm) numbers, with numbering scheme [approved by Architect] <Insert other>. Provide 5/32‐ inch (4‐mm) hole for fastener.

1. Material: 3/32‐inch‐ (2.4‐mm‐) thick laminated plastic with 2 black surfaces and white inner layer.

2. Valve‐Tag Fasteners: Brass wire‐link or beaded chain; or S‐hook.

PART 3 ‐ EXECUTION

3.1 APPLICATIONS, GENERAL

A. Products specified are for applications referenced in other Divisions. If more than single‐type material, device, or label is specified for listed applications, selection is Installer's option.

3.2 EQUIPMENT IDENTIFICATION

A. Install and permanently fasten equipment nameplates on each major item of mechanical equipment that does not have nameplate or has nameplate that is damaged or located where not easily visible. Locate

TRINITY MEP ENGINEERING, LLC 23 05 63 ‐ 3/5

nameplates where accessible and visible. Include nameplates for the following general categories of equipment:

1. Pumps, compressors, chillers, condensers, and similar motor‐driven units.

2. Heat exchangers, coils, evaporators, and similar equipment.

3. Fans, blowers, primary balancing dampers, and mixing boxes.

4. Packaged HVAC central‐station and zone‐type units.

B. Install equipment markers with permanent adhesive on or near each major item of mechanical equipment. Data required for markers may be included on signs, and markers may be omitted if both are indicated.

1. Letter Size: Minimum 1/4 inch (6.4 mm) for name of units if viewing distance is less than 24 inches

(600 mm), 1/2 inch (13 mm) for viewing distances up to 72 inches (1830 mm), and proportionately larger lettering for greater viewing distances. Include secondary lettering two‐thirds to three‐fourths the size of principal lettering.

2. Data: Distinguish among multiple units, indicate operational requirements, indicate safety and emergency precautions, warn of hazards and improper operations, and identify units.

3. Locate markers where accessible and visible. Include markers for the following general categories of equipment:

a. Main control and operating valves, including safety devices and hazardous units such as gas outlets.

b. Fire department hose valves and hose stations.

c. Meters, gages, thermometers, and similar units.

d. Pumps, compressors, chillers, condensers, and similar motor‐driven units.

e. Heat exchangers, coils, evaporators, and similar equipment.

f. Fans, blowers, primary balancing dampers, and mixing boxes.

g. Packaged HVAC central‐station and zone‐type units.

h. Strainers, filters, humidifiers, water‐treatment systems,…