About this file

This is a Bid Schedule document for the Margood Cottages Restoration Project issued by Collier County, Florida, soliciting bids for a comprehensive historic restoration project. The project involves the restoration of three historic cottages located at MarGood Harbor Park in Goodland, Florida, with a bid due date of July 16, 2024, at 3:00 p.m. local time. A non-mandatory pre-bid meeting is scheduled for June 13, 2024, at 10:00 a.m. at the project site. The scope of work includes replacing roofs, demolishing non-historic additions, removing structurally unsound structures, conducting hazardous material abatement, restoring windows and doors, upgrading ADA accessibility, stabilizing foundations, restoring interior elements, replacing electrical systems, and restoring a cistern.

The bid schedule includes a base bid and three additive alternative options, with the potential for additional work such as interior restoration of individual cottages, constructing an outdoor classroom, and landscaping. The project offers multiple line items for specific restoration tasks, with quantities ranging from 1 to 17 units across various categories. An owner's allowance of $42,500 has been allocated for unforeseen conditions, which can be utilized through change orders with proper documentation. Bidders are required to register on the Collier County procurement portal to access complete project documents, and the total project cost is not specified in the current document, with all line items showing zero dollar amounts pending bidder submissions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

Solicitation No.:24-XXXX
Solicitation Title:MarGood Cottages Restoration
Bid Due Date:XX/XX/2024
BID SCHEDULE
BIDDER:
ITEM NO.DESCRIPTIONUNITQTYUNIT COSTTOTAL COST
1Replace RoofEA3$ - 0
2Demolish non-historic additions to cottages #1 - #3EA3$ - 0
3Demolish structurally unsound fourth cottages, 20' x 28'EA1$ - 0
4Hazardous material abatementLS1$ - 0
5Restore fourteen (14) windows and restore three (3) doors, including paintingEA17$ - 0
6Upgrade ADA accessibility, including ramp and sidewalk installationLS1$ - 0
7Stabilize foundationsEA3$ - 0
8Restore interior walls, floors, and ceiling, including painting for cottage #1, stabilize
cottages #2 and #3LS1$ - 0
9Replace electrical and add site lightingLS1$ - 0
10Restore one (1) cistern to functional useEA1$ - 0
11General conditionsLS1$ - 0
12Archaeological monitoringLS1$ - 0
13Contractor ServicesT&M1$ - 0
SUB-TOTAL:
ITEM NO.DESCRIPTION - ADDITIVE ALTERNATIVE ONEUNITQTYUNIT COST
17Restore interior walls, floors, and ceiling, including painting for cottage #2EA1$ - 0
SUB-TOTAL:$ - 0
ITEM NO.DESCRIPTION - ADDITIVE ALTERNATIVE TWOUNITQTYUNIT COST
18Restore interior walls, floors, and ceiling, including painting for cottage #3EA1$ - 0
SUB-TOTAL:$ - 0
ITEM NO.DESCRIPTION - ADDITIVE ALTERNATIVE THREEUNITQTYUNIT COST
19Build Outdoor Classroom with a concrete pad and open-sided structureEA1$ - 0
20Landscaping of the lotEA1$ - 0
SUB-TOTAL:$ - 0
PROJECT TOTAL:$ - 0
“Owners Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.”

PM: James Sainvilus PS: Brenda Brilhart &"Arial,Bold"ITB 16-XXXX Immokalee Sidewalk Improvements

&P of &N

Sheet1

Margood Cottages Restoration
Construction ITB 24-8237
BID SCHEDULE
ITEM NO.DESCRIPTIONUNITQTYUNIT COSTTOTAL COST
GENERAL CONDITIONS
1General ConditionsLS1$ - 0
2Archaeological MonitoringLS1$ - 0
3Mobilization/Demobilization (Contractor Services)LS1$ - 0
SUB-TOTAL:$ - 0
REPLACE ROOF
4Tear-Off Existing Roof System for three cottagesEA3$ - 0
5Wood Decking Replacement for three cottagesEA3$ - 0
6Framing Replacement for three cottagesEA3$ - 0
7Rubberized Underlayment for three cottagesEA3$ - 0
8Edge Metal, Fascia Metal & Counterlfashings for three cottagesEA3$ - 0
9Fascia & Soffit Replacement for three cottagesEA3$ - 0
10New 5 V Crimp Metal Roofing System for three cottagesEA3$ - 0
REMOVE NON-HISTORIC / STRUCTURALLY UNSOUND & RESTORESUB-TOTAL:$ - 0
11Removal of Existing Non-Historic Bathroom for three cottagesEA3$ - 0
12Infill Wall for three cottagesEA3$ - 0
13Removal of Structurally Unsound Fourth CottageEA1$ - 0
SUB-TOTAL:$ - 0
HAZERDOUS MATERIALS ABATEMENT
14Monitoring and DisposalLS1$ - 0
SUB-TOTAL:$ - 0
RESTORE COTTAGES - INCLUDING 14 WINDOWS & 3 DOORS
15Restore Doors for Three CottagesEA3$ - 0
16Restore Windows for Three CottagesEA14$ - 0
17Siding Repair for Three CottagesEA3$ - 0
18Preparation, Priming, and Painting Exteriors for Three CottagesEA3$ - 0
SUB-TOTAL:$ - 0
UPGRADE ADA ACCESSIBILITY
19Removal of Existing Stairs for Three CottagesEA3$ - 0
20Installation of New Concrete Stairs, Landing, and Railings for Three CottagesEA3$ - 0
21New ADA Ramp and Railings for Three CottagesEA3$ - 0
22Sidewalks for ADA accessibilityLS1$ - 0
SUB-TOTAL:$ - 0
STABILIZE FOUNDATION
23Tucking Pointing & Repair for Three CottagesEA3$ - 0
24Structural Stabilizations for Three CottagesEA3$ - 0
SUB-TOTAL:$ - 0
RESTORE INTERIOR WALLS, FLOOR, & CEILING - INCLUDING PAINTING
25Wall Framing RepairBDFT300$ - 0
26Floor Framing RepairBDFT150$ - 0
27Floor Restoration for Cottage #1EA1$ - 0
28Beadboard Walls for Cottage #1EA1$ - 0
29Ceiling Restoriation for Cottage #1EA1$ - 0
30Casework Restoration for Cottage #1EA1$ - 0
31Period Fixtures for Cottage#1EA1$ - 0
SUB-TOTAL:$ - 0
REPLACE ELECTRICAL & ADD SITE LIGHTING
31Site Lighting FixturesLS1$ - 0
32Site Lighting Conduit and ConductorsLS1$ - 0
33Cottage FixturesLS1$ - 0
34Cottage Conduit and ConductorsLS1$ - 0
SUB-TOTAL:$ - 0
RESTORE CISTERN TO FUNCTIONAL USE
35Structural RestorationLS1$ - 0
36Interior CoatingLS1$ - 0
37Plumping/Pump/Irrigation SystemLS1$ - 0
SUB-TOTAL:$ - 0
TOTAL BASE BID:$ - 0
ITEM NO.DESCRIPTION - ADDITIVE ALTERNATIVE ONEUNITQTYUNIT COST
38Cottage #2 Floor RestorationEA1$ - 0
39Cottage #2 Beadboard wallsEA1$ - 0
40Cottage #2 Ceiling RestorationEA1$ - 0
41Cottage #2 Casework RestorationEA1$ - 0
42Cottage #2 Period FixturesEA1$ - 0
SUB-TOTAL:$ - 0
ITEM NO.DESCRIPTION - ADDITIVE ALTERNATIVE TWOUNITQTYUNIT COST
43Cottage #3 Floor RestorationEA1$ - 0
44Cottage #3 Beadboard wallsEA1$ - 0
45Cottage #3 Ceiling RestorationEA1$ - 0
46Cottage #3 Casework RestorationEA1$ - 0
47Cottage #3 Period FixturesEA1$ - 0
SUB-TOTAL:$ - 0
ITEM NO.DESCRIPTION - ADDITIVE ALTERNATIVE THREEUNITQTYUNIT COST
48Education Pavilion - Pre-engineered, PremanufacturedEA1$ - 0
49Education Pavilion - Concrete FoundationEA1$ - 0
50Education Pavilion - Display WallEA1$ - 0
51Education Pavilion - Eave Hung Gutter and Downspout SystemEA1$ - 0
52Signage - Throughout the Lot & Near Each CottageEA7$ - 0
53LandscapingLS1$ - 0
SUB-TOTAL:$ - 0
ALTERNATE SUB-TOTAL:$ - 0
TOTAL BASE BID + ALTERNATE TOTAL:$ - 0

* Staff has allocated $42,500 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.