This is a Bid Schedule document for the Margood Cottages Restoration Project issued by Collier County, Florida, soliciting bids for a comprehensive historic restoration project. The project involves the restoration of three historic cottages located at MarGood Harbor Park in Goodland, Florida, with a bid due date of July 16, 2024, at 3:00 p.m. local time. A non-mandatory pre-bid meeting is scheduled for June 13, 2024, at 10:00 a.m. at the project site. The scope of work includes replacing roofs, demolishing non-historic additions, removing structurally unsound structures, conducting hazardous material abatement, restoring windows and doors, upgrading ADA accessibility, stabilizing foundations, restoring interior elements, replacing electrical systems, and restoring a cistern.
The bid schedule includes a base bid and three additive alternative options, with the potential for additional work such as interior restoration of individual cottages, constructing an outdoor classroom, and landscaping. The project offers multiple line items for specific restoration tasks, with quantities ranging from 1 to 17 units across various categories. An owner's allowance of $42,500 has been allocated for unforeseen conditions, which can be utilized through change orders with proper documentation. Bidders are required to register on the Collier County procurement portal to access complete project documents, and the total project cost is not specified in the current document, with all line items showing zero dollar amounts pending bidder submissions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
| Solicitation No.: | 24-XXXX | ||||
| Solicitation Title: | MarGood Cottages Restoration | ||||
| Bid Due Date: | XX/XX/2024 | ||||
| BID SCHEDULE | |||||
| BIDDER: | |||||
| ITEM NO. | DESCRIPTION | UNIT | QTY | UNIT COST | TOTAL COST |
| 1 | Replace Roof | EA | 3 | $ - 0 | ||
| 2 | Demolish non-historic additions to cottages #1 - #3 | EA | 3 | $ - 0 | ||
| 3 | Demolish structurally unsound fourth cottages, 20' x 28' | EA | 1 | $ - 0 | ||
| 4 | Hazardous material abatement | LS | 1 | $ - 0 | ||
| 5 | Restore fourteen (14) windows and restore three (3) doors, including painting | EA | 17 | $ - 0 | ||
| 6 | Upgrade ADA accessibility, including ramp and sidewalk installation | LS | 1 | $ - 0 | ||
| 7 | Stabilize foundations | EA | 3 | $ - 0 | ||
| 8 | Restore interior walls, floors, and ceiling, including painting for cottage #1, stabilize | |||||
| cottages #2 and #3 | LS | 1 | $ - 0 | |||
| 9 | Replace electrical and add site lighting | LS | 1 | $ - 0 | ||
| 10 | Restore one (1) cistern to functional use | EA | 1 | $ - 0 | ||
| 11 | General conditions | LS | 1 | $ - 0 | ||
| 12 | Archaeological monitoring | LS | 1 | $ - 0 | ||
| 13 | Contractor Services | T&M | 1 | $ - 0 | ||
| SUB-TOTAL: | ||||||
| ITEM NO. | DESCRIPTION - ADDITIVE ALTERNATIVE ONE | UNIT | QTY | UNIT COST | ||
| 17 | Restore interior walls, floors, and ceiling, including painting for cottage #2 | EA | 1 | $ - 0 | ||
| SUB-TOTAL: | $ - 0 | |||||
| ITEM NO. | DESCRIPTION - ADDITIVE ALTERNATIVE TWO | UNIT | QTY | UNIT COST | ||
| 18 | Restore interior walls, floors, and ceiling, including painting for cottage #3 | EA | 1 | $ - 0 | ||
| SUB-TOTAL: | $ - 0 | |||||
| ITEM NO. | DESCRIPTION - ADDITIVE ALTERNATIVE THREE | UNIT | QTY | UNIT COST | ||
| 19 | Build Outdoor Classroom with a concrete pad and open-sided structure | EA | 1 | $ - 0 | ||
| 20 | Landscaping of the lot | EA | 1 | $ - 0 | ||
| SUB-TOTAL: | $ - 0 | |||||
| PROJECT TOTAL: | $ - 0 | |||||
| “Owners Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.” |
PM: James Sainvilus PS: Brenda Brilhart &"Arial,Bold"ITB 16-XXXX Immokalee Sidewalk Improvements
&P of &N
Sheet1
| Margood Cottages Restoration |
| Construction ITB 24-8237 |
| BID SCHEDULE | |||||
| ITEM NO. | DESCRIPTION | UNIT | QTY | UNIT COST | TOTAL COST |
| GENERAL CONDITIONS | |||||
| 1 | General Conditions | LS | 1 | $ - 0 | |
| 2 | Archaeological Monitoring | LS | 1 | $ - 0 | |
| 3 | Mobilization/Demobilization (Contractor Services) | LS | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| REPLACE ROOF | |||||
| 4 | Tear-Off Existing Roof System for three cottages | EA | 3 | $ - 0 | |
| 5 | Wood Decking Replacement for three cottages | EA | 3 | $ - 0 | |
| 6 | Framing Replacement for three cottages | EA | 3 | $ - 0 | |
| 7 | Rubberized Underlayment for three cottages | EA | 3 | $ - 0 | |
| 8 | Edge Metal, Fascia Metal & Counterlfashings for three cottages | EA | 3 | $ - 0 | |
| 9 | Fascia & Soffit Replacement for three cottages | EA | 3 | $ - 0 | |
| 10 | New 5 V Crimp Metal Roofing System for three cottages | EA | 3 | $ - 0 | |
| REMOVE NON-HISTORIC / STRUCTURALLY UNSOUND & RESTORE | SUB-TOTAL: | $ - 0 | |||
| 11 | Removal of Existing Non-Historic Bathroom for three cottages | EA | 3 | $ - 0 | |
| 12 | Infill Wall for three cottages | EA | 3 | $ - 0 | |
| 13 | Removal of Structurally Unsound Fourth Cottage | EA | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| HAZERDOUS MATERIALS ABATEMENT | |||||
| 14 | Monitoring and Disposal | LS | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| RESTORE COTTAGES - INCLUDING 14 WINDOWS & 3 DOORS | |||||
| 15 | Restore Doors for Three Cottages | EA | 3 | $ - 0 | |
| 16 | Restore Windows for Three Cottages | EA | 14 | $ - 0 | |
| 17 | Siding Repair for Three Cottages | EA | 3 | $ - 0 | |
| 18 | Preparation, Priming, and Painting Exteriors for Three Cottages | EA | 3 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| UPGRADE ADA ACCESSIBILITY | |||||
| 19 | Removal of Existing Stairs for Three Cottages | EA | 3 | $ - 0 | |
| 20 | Installation of New Concrete Stairs, Landing, and Railings for Three Cottages | EA | 3 | $ - 0 | |
| 21 | New ADA Ramp and Railings for Three Cottages | EA | 3 | $ - 0 | |
| 22 | Sidewalks for ADA accessibility | LS | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| STABILIZE FOUNDATION | |||||
| 23 | Tucking Pointing & Repair for Three Cottages | EA | 3 | $ - 0 | |
| 24 | Structural Stabilizations for Three Cottages | EA | 3 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| RESTORE INTERIOR WALLS, FLOOR, & CEILING - INCLUDING PAINTING | |||||
| 25 | Wall Framing Repair | BDFT | 300 | $ - 0 | |
| 26 | Floor Framing Repair | BDFT | 150 | $ - 0 | |
| 27 | Floor Restoration for Cottage #1 | EA | 1 | $ - 0 | |
| 28 | Beadboard Walls for Cottage #1 | EA | 1 | $ - 0 | |
| 29 | Ceiling Restoriation for Cottage #1 | EA | 1 | $ - 0 | |
| 30 | Casework Restoration for Cottage #1 | EA | 1 | $ - 0 | |
| 31 | Period Fixtures for Cottage#1 | EA | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| REPLACE ELECTRICAL & ADD SITE LIGHTING | |||||
| 31 | Site Lighting Fixtures | LS | 1 | $ - 0 | |
| 32 | Site Lighting Conduit and Conductors | LS | 1 | $ - 0 | |
| 33 | Cottage Fixtures | LS | 1 | $ - 0 | |
| 34 | Cottage Conduit and Conductors | LS | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| RESTORE CISTERN TO FUNCTIONAL USE | |||||
| 35 | Structural Restoration | LS | 1 | $ - 0 | |
| 36 | Interior Coating | LS | 1 | $ - 0 | |
| 37 | Plumping/Pump/Irrigation System | LS | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| TOTAL BASE BID: | $ - 0 |
| ITEM NO. | DESCRIPTION - ADDITIVE ALTERNATIVE ONE | UNIT | QTY | UNIT COST | |
| 38 | Cottage #2 Floor Restoration | EA | 1 | $ - 0 | |
| 39 | Cottage #2 Beadboard walls | EA | 1 | $ - 0 | |
| 40 | Cottage #2 Ceiling Restoration | EA | 1 | $ - 0 | |
| 41 | Cottage #2 Casework Restoration | EA | 1 | $ - 0 | |
| 42 | Cottage #2 Period Fixtures | EA | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| ITEM NO. | DESCRIPTION - ADDITIVE ALTERNATIVE TWO | UNIT | QTY | UNIT COST | |
| 43 | Cottage #3 Floor Restoration | EA | 1 | $ - 0 | |
| 44 | Cottage #3 Beadboard walls | EA | 1 | $ - 0 | |
| 45 | Cottage #3 Ceiling Restoration | EA | 1 | $ - 0 | |
| 46 | Cottage #3 Casework Restoration | EA | 1 | $ - 0 | |
| 47 | Cottage #3 Period Fixtures | EA | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| ITEM NO. | DESCRIPTION - ADDITIVE ALTERNATIVE THREE | UNIT | QTY | UNIT COST | |
| 48 | Education Pavilion - Pre-engineered, Premanufactured | EA | 1 | $ - 0 | |
| 49 | Education Pavilion - Concrete Foundation | EA | 1 | $ - 0 | |
| 50 | Education Pavilion - Display Wall | EA | 1 | $ - 0 | |
| 51 | Education Pavilion - Eave Hung Gutter and Downspout System | EA | 1 | $ - 0 | |
| 52 | Signage - Throughout the Lot & Near Each Cottage | EA | 7 | $ - 0 | |
| 53 | Landscaping | LS | 1 | $ - 0 | |
| SUB-TOTAL: | $ - 0 | ||||
| ALTERNATE SUB-TOTAL: | $ - 0 | ||||
| TOTAL BASE BID + ALTERNATE TOTAL: | $ - 0 |
* Staff has allocated $42,500 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.