24-2472 IFB 1st Floor South Garage Lighting Replacement - Drawings.pdf

PDF 7 MB Posted

Attached to
24-2472 IFB 1ST FLOOR SOUTH GARAGE LIGHTING REPLACEMENT
Solicitation number
71373
Issued by
Henrico County, Richmond City, Virginia

About this file

This document contains the specifications and drawings for an Invitation for Bid (IFB) for the 1st Floor South Garage Lighting Replacement project located in Richmond, Virginia. The contractor shall replace various exterior lighting on the first floor of the South Parking Garage, the South Expansion Parking Garage, as well as interior and exterior lighting in both the North and South Garage Elevator Lobbies with LED lights. The project is being overseen by Henrico County and the City of Richmond. The IFB has a due date of June 20, 2024 and the work must be completed by the end of 2024. The specifications include details on lighting types, quantities, mounting, photometrics, phasing, and other requirements. The contractor is required to verify all existing conditions, maintain airport and tenant access, and coordinate closely with the owner throughout construction.

The pricing and contracting terms are not included in this document, but it is stated that the contractor shall comply with all requirements of the drawings and project manual. There are no details provided on any set asides, incumbent contractors, funding sources, or other salient commercial terms. The contractor shall provide all labor, supervision, equipment, tools, materials, and incidentals necessary to complete the work in accordance with the specifications.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2024 Gresham Smith

IFB NUMBER : 24-2472

6/20/2024 2:25:24 PM

06.17.2024

RIC SOUTH GARAGE

LIGHTING

REPLACEMENT

ISSUE FOR

BIDDING

1 RICHARD E BYRD

TERMINAL DR,

RICHMOND, VA 23250

THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE DRAWINGS AND THE PROJECT MANUAL.

THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THESE DRAWINGS AND THE PROJECT MANUAL;

AND SHALL IMMEDIATELY NOTIFY THE DESIGN PROFESSIONAL OF ANY INCONSISTENCIES THAT ARE

DISCOVERED.

THE CONTRACTOR SHALL VERIFY THAT EXIT EGRESS IS MAINTAINED FOR ALL OCCUPIED AREAS OF THE BUILDING THROUGHOUT ALL PHASES OF CONSTRUCTION. ALL EXISTING STAIRWAYS AND EXIT PASSAGEWAYS SHALL BE MAINTAINED SO THAT THEY ARE CLEAR AND ACCESSIBLE; AND THE INTEGRITY OF THE PARTITION

AROUND THEM SHALL BE MAINTAINED THROUGHOUT ALL PHASES OF CONSTRUCTION.

THE EXISTING BUILDING ENVELOPE SHALL BE MAINTAINED SO AS TO PROVIDE WATER-TIGHT, WEATHER-TIGHT AND CONDITIONED SPACE AT ALL TIMES THROUGHOUT ALL PHASES OF CONSTRUCTION. PROVIDE TEMPORARY ENCLOSURES AS REQUIRED. PROVIDE PORTABLE HEATING UNITS AND/OR COOLING UNITS TO MAINTAIN 70 DEGREES F (INSIDE TEMPERATURE) IN OCCUPIED SPACES, UNLESS OTHERWISE DIRECTED BY

THE OWNER.

DO NOT RECESS OR EMBED CONDUIT, PIPING, BACK BOXES OR ANYTHING ELSE INTO ANY TYPE OF ELEVATED

SLAB.

THE SHAPES AND SIZES OF STRUCTURAL MEMBERS SHOWN ON ARCHITECTURAL FLOOR PLANS, SECTIONS AND DETAILS ARE "DIAGRAMMATIC ONLY". SEE THE STRUCTURAL DRAWINGS FOR THE ACTUAL SHAPE AND

SIZE OF EACH STRUCTURAL MEMBER.

ACC ACCESSIBLE

ADA ACCESSIBLE ITEM OR SPACE

ADDL ADDITIONAL

ADJ ADJUSTABLE

A/E ARCHITECT/ENGINEER

AED AUTOMATIC EXTERNAL DEFIBRILLATOR

AFF ABOVE FINISHED FLOOR

AFS AT FINISHED SLAB

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

ALUM ALUMINUM

AMB AMBULATORY

AP ACCESS PANEL

APPROX APPROXIMATE

AUD AUDIO

AUTO AUTOMATIC

AUTO W/ HO AUTOMATIC DOOR OPERATOR WITH

INTEGRAL HOLD-OPEN

AUX AUXILIARY

AV AUDIO VISUAL

BRKT BRACKET

BOT BOTTOM

BUR BUILT-UP ROOF

BW BOTTOM OF THE WALL

C COMPUTER

CAB CABINET

CATV COMMUNITY ANTENNA TELEVISION

CB CATCH BASIN

CCTV CLOSED CIRCUIT TELEVISION

CFCI CONTRACTOR FURNISHED /

CONTRACTOR INSTALLED

CFOI CONTRACTOR FURNISHED / OWNER

INSTALLED

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

COF COFFEE MACHINE

COL COLUMN

CONC CONCRETE

CONSTR CONSTRUCTION

CONT CONTINUOUS / CONTINUE

CR CARD READER / CRASH RAIL

CSK COUNTERSUNK

CSWK CASEWORK

CTR CENTER

CTRL CONTROL

CTV CABLE TELEVISION

D DRYER

DBL DOUBLE

DEG DEGREE

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DP DISCONNECT PANEL

DS DOWNSPOUT

DTL DETAIL

DW DISHWASHER

DWG DRAWING

EA EACH

EEW EMERGENCY EYE WASH

EFG ENTRANCE FLOOR GRILLE

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EJC EXPANSION JOINT CEILING

EJF EXPANSION JOINT FLOOR

EJW EXPANSION JOINT WALL

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EMHO ELECTROMAGNETIC HOLD OPEN

ENCL ENCLOSURE

EP ELECTRICAL PANEL

EQ EQUAL

EQUIP EQUIPMENT

ES EMERGENCY SHOWER

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPOSED

EXT EXTERIOR

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATE PANEL

FACP FIRE ALARM CONTROL PANEL

FB FLOOR BUMPER

FD FLOOR DRAIN

FDS FOLD DOWN SEAT

FDV FIRE DEPARTMENT VALVE

FDVC FIRE DEPARTMENT VALVE CABINET

FDV W/ FE FIRE DEPARTMENT VALVE CABINET

WITH FIRE EXTINGUISHER

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFE FINISH FLOOR ELEVATION

FH FIRE HYDRANT

FIN FINISH

FL FLOOR

FOB FACE OF BRICK

FOF FACE OF FINISH

FOM FACE OF MASONRY

FRT FIRE RESISTANT TREATED

FRZ FREEZER

FS FLOOR SINK

FTG FOOTING

FV FIELD VERIFY

G GROMMET

GA GAUGE

GAL GALLON

GALV GALVANIZED

GB GRAB BAR

GEJ GUTTER EXPANSION JOINT

GEN GENERAL

GL GLASS / GLAZING

GYP BD GYPSUM BOARD

GYP GYPSUM

H HIGH

HB HOSE BIBB

HD HEAD

HDW HARDWARE

HM HOLLOW METAL

HO HOLD OPEN

IB INTEGRAL BASE

ICE ICE MACHINE / ICE MAKER

ID INSIDE DIAMETER

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

IP ISOLATION PANEL

IWP IMPACT WALL PANEL / IMPACT WALL

PROTECTION

JT JOINT

KP KEY PAD

LAV LAVATORY

LKR LOCKER

LVT LUXURY VINYL TILE

LMP LAMINATE WALL PANEL

LWR/LWE LOW WALL RETURN/EXHAUST

MACH MACHINE

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MECH MECHANICAL

MEX MATCH EXISTING

MH MANHOLE

MICRO MICROWAVE OVEN

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MP MOBILE PEDESTAL

MTD MOUNTED

MTL METAL

NIC NOT IN CONTRACT

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED / CONTRACTOR

INSTALLED

OFE OWNER FURNISHED EQUIPMENT

OFOI OWNER FURNISHED / OWNER

INSTALLED

OH OPPOSITE HAND

OHC OVERHEAD COILING

OPER OPERATIONS

OPNG OPENING

OPP OPPOSITE

P PAINT / PRINTER

PB PANIC BUTTON

PL/PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

POS POINT OF SALE / POSITIVE

PP PUSH PLATE FOR AUTOMATIC DOOR

PPE PERSONAL PROTECTIVE EQUIPMENT

PROJ PROJECTOR / PROJECT

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

QT QUARRY TILE

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

REF REFRIGERATOR

REF REFER / REFERENCE

REINF REINFORCING / REINFORCED

REQD REQUIRED

RF RUBBER FLOORING

RO ROUGH OPENING

ROD ROOF OVERFLOW DRAIN

RR REMOTE RELEASE BUTTON

RS ROLLER SHADE

SAN SANITARY

SB SPLASH BLOCK

SC SEALED CONCRETE

SD SOAP DISH / SOAP DISPENSER

SEC SECTION

SGNL SIGNAL

SHLVG SHELVING

SIM SIMILAR

SP STANDPIPE

SPEC SPECIFICATION / SPECIFICATIONS

S STL STAINLESS STEEL

SS SANITARY SEWER / SOLID SURFACE

STD STANDARD

STL STEEL

STRUCT STRUCTURAL

SV SHEET VINYL

SVT SOLID VINYL TILE

SYS SYSTEM

T/TOIL/TLT TOILET

TB TOWEL BAR / TACK BOARD

TBL TABLE

TEL TELEPHONE

TEMP GL TEMPERED GLASS

TFS TO FACE OF STUD

THK THICK / THICKNESS

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

TZ TERRAZZO

UON UNLESS OTHERWISE NOTED

VIF VERIFY IN FIELD

W WASHER

W/ WITH

WAP WIRELESS ACCESS POINT

WC WATER CLOSET / WHEELCHAIR / WALL

COVERING

WCO WALL CLEAN OUT

WD WOOD

WM WALL MOUNTED

W/O WITHOUT

WP WAVE PAD FOR AUTOMATIC DOOR /

WATERPROOFING / WOOD PANEL

WR WEATHER RESISTANT

WRB WEATHER RESISTANT BARRIER

XFMR TRANSFORMER

DETAIL OR

ENLARGED PLAN

CALLOUT NUMBER

SHEET NUMBER

DETAIL OR

SECTION NUMBER

SHEET NUMBER

ELEVATION

NUMBER

REVISION

NUMBER

COLUMN GRID

COLUMN

DESIGNATION

SHEET NUMBER

CALLOUTS

SECTIONS COLUMN GRIDS REVISION MARKERS

INTERIOR ELEVATIONS

LEVELS

LEVEL NAME

DATUM

ROOM TAGS WINDOW TAGS WALL TAGS

FIRE RATING

WALL TYPE NUMBER

EXTERIOR ELEVATIONS

ELEVATION

NUMBER

SHEET NUMBER

NAME

ELEVATION

ROOM NAME

A A00

A101

SIM

A101 11 1 A101

SIM

A101

SIM

KEYNOTE TAGS

DOOR NUMBER TAGS

3A

Authority Name:

Street Address:

City, State & Zip Code:

Phone:

Architecture: Gresham Smith 919 E Main St Suite 1200 Richmond, VA 23219

(804) 788-0710

A.O.R.

P.I.C.

P.M.

Mechanical, Plumbing and Electrical Engineering:

PACE Collaborative, P.C 7814 Carousel Ln.

Eric Sweet

Henrico County 4301 East Parham Road Henrico, VA 23228

(804) 501-7770

David L. King

Richmond, VA 23294

(804) 270-7222

ELECT. E.O.R. Keith Neubert Matt Amos

COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING NOTES IN THIS SET OF DRAWINGS WHICH

ALSO APPLY TO THE DEMOLITION FLOOR PLANS:

A. "GENERAL NOTES FOR PROJECT"

B. "GENERAL NOTES FOR WORK RESTRICTIONS"

C. "GENERAL NOTES FOR REFLECTED CEILING PLANS"

THE DEMOLITION DRAWINGS HAVE BEEN DEVELOPED FROM EXISTING DRAWINGS, AND THEY MAY

NOT REFLECT ACTUAL FIELD CONDITIONS. PRIOR TO PROCEEDING WITH ANY WORK, THE

CONTRACTOR SHALL VERIFY THE ACCURACY OF THESE DRAWINGS IN COMPARISON TO EXISTING

FIELD CONDITIONS AND THEN IMMEDIATELY NOTIFY THE DESIGN PROFESSIONAL OF ANY

INCONSISTENCIES BETWEEN THESE DRAWINGS AND ACTUAL CONDITIONS.

THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DESIGN PROFESSIONAL IF ANY DEMOLITION

OR NEW CONSTRUCTION WORK (AS INDICATED IN THE CONSTRUCTION DOCUMENTS) CANNOT BE

PERFORMED DUE TO EXISTING FIELD CONDITIONS.

IF ANY EXISTING FIREPROOFING AND/OR RATED ASSEMBLIES (WHICH ARE SHOWN TO REMAIN)

ARE DAMAGED DURING DEMOLITION, THEY SHALL BE REPAIRED TO CONFORM TO THE ORIGINAL

FIRE PROTECTION REQUIREMENTS.

THE INTEGRITY OF EXISTING RATED FLOOR, PARTITION AND/OR ROOF ASSEMBLIES (WHICH ARE

SHOWN TO REMAIN) SHALL BE MAINTAINED THROUGHOUT ALL PHASES OF CONSTRUCTION. AS

APPLICABLE, CONTACT DESIGN PROFESSIONAL TO VERIFY TESTED ASSEMBLIES TO BE USED FOR

REPAIRS.

REMOVE EXISTING CONSTRUCTION AS INDICATED. TYPICAL WALL REMOVAL SHALL INCLUDE

MECHANICAL, PLUMBING, ELECTRICAL, COMMUNICATIONS AND SECURITY SYSTEMS CONTAINED

THEREIN. REMOVE DOORS, CASEWORK, WINDOWS, FRAMES, FINISHES, FIXTURES AND THEIR

ATTACHMENTS AS REQUIRED. AFTER REMOVAL, REPAIR HOLES IN EXISTING-TO-REMAIN FLOORS, PARTITIONS AND/OR ROOFS TO COMPLY WITH ORIGINAL FIRE, SMOKE AND/OR SOUND

ASSEMBLIES, FIRE PROTECTION REQUIREMENTS AND STRUCTURAL INTEGRITY.

SEE ELECTRICAL DRAWINGS FOR DEMOLITION OF UTILITIES.

DEMOLITION WORK SHALL BE EXECUTED IN CONFORMANCE WITH ALL CODES AND ORDINANCES

AS SET FORTH BY ALL AUTHORITIES HAVING JURISDICTION [AHJ].

THE CONTRACTOR SHALL NOT CUT EXISTING OR NEW STRUCTURES WITHOUT PRIOR WRITTEN

APPROVAL FROM THE DESIGN PROFESSIONAL AND/OR STRUCTURAL ENGINEER.

G100.

G101.

G102.

G103.

G104.

G105.

G106.

G107.

G108.

ALL EXISTING CEILING FIXTURES SUCH AS CAMERAS, SPEAKERS, SPRINKLERS, MECHANICAL FIXTURES, ETC. ARE TO BE MAINTAINED AT ALL TIMES THROUGHOUT ALL PHASES OF CONSTRUCTION.

CONTRACTOR IS RESPONSIBLE FOR INCORPORATING ALL PROJECTS ELEMENTS AS DEFINED IN THE

CONTRACT DOCUMENTS.

ACTUAL PHASING AND SEQUENCING TO BE AT THE DISCRETION OF THE CONTRACTOR; CONTRACTOR

SHALL SUBMIT A CONSTRUCTION PHASING/SEQUENCING PLAN AND PROJECT SCHEDULE WHICH

COMPLIES WITH THE ACCESS REQUIREMENTS INDICATED IN THESE PHASING PLANS AND REQUIREMENTS

OF THE CONTRACT DOCUMENTS.

THE AIRPORT IS A 24 HOURS/7 DAYS A WEEK FACILITY AND WILL REMAIN FULLY OPERATIONAL

THROUGHOUT THE CONSTRUCTION DURATION.

AIRPORT OPERATIONS, AIRLINE OPERATIONS AND PASSENGER ACCESS TO BE MAINTAINED AT ALL TIMES

DURING CONSTRUCTION.

COORDINATE WITH OWNER ANY ELEMENTS OF THE WORK THAT WILL IMPACT PASSENGER ACCESS TO

ANY PART OF THE AIRPORT.

FLIGHT ACTIVITY IS SUBJECT TO SCHEDULE CHANGES AND DAILY VARIATIONS DUE TO DELAYS.

ANY OVERNIGHT SHUT DOWN WILL NEED TO BE SCHEDULED A MINIMUM OF ONE WEEK IN ADVANCE AND

COORDINATED WITH THE OWNER.

CONTRACTOR SHALL MAINTAIN A SAFE PUBLIC ACCESS PATH DURING THE DURATION OF CONSTRUCTION

ACTIVITIES.

EMERGENCY EGRESS SHALL BE MAINTAINED AT ALL TIMES.

DEMOLITION WORK WITHIN THE LIMITS OF THE BUILDING FOOTPRINT THAT ARE CONSIDERED TO BE NOISY SHALL BE EXECUTED ONLY BETWEEN THE HOURS OF 11:00 PM AND 4:30 AM UNLESS OTHERWISE AGREED

UPON BY THE OWNER.

CONTRACTOR SHALL PROTECT ALL AIRPORT AND TENANT EQUIPMENT WHILE WORKING AROUND IT.

PROTECT ALL EXISTING FURNISHINGS THAT ARE NOT RELOCATED DURING WORK. COORDINATE

TEMPORARY RELOCATION OF ANY FURNISHINGS OR EQUIPMENT THAT NEED TO BE MOVED TO COMPLETE

NEW WORK.

DURING CONSTRUCTION CONTRACTOR SHALL SECURE WORK AREAS BY USING A FORM OF BARRIERS.

CONTRACTOR TO PROVIDE CLOSURE AND DETOUR SIGNAGE. COORDINATE WITH OWNER LOCATION OF

SIGNAGE.

SHUT DOWNS TO BE COORDINATED WITH OWNER A MINIMUM OF 5 WORKING DAYS IN ADVANCE.

CONTRACTOR TO PROVIDE PROPER FALL PROTECTION IN AREAS WHERE REQUIRED.

WHERE CUTTING AND PATCHING OF EXISTING WALLS OR CEILINGS OCCUR, CONTRACTOR TO PROVIDE A SOFT CONSTRUCTION BARRIER CONSISTING OF 6 MIL (MIN) POLY CONSTRUCTION SHEETING TO CONTROL DUST. SOFT BARRIER IS TO BE ADEQUATELY SUPPORTED AND COMPLETELY SEALED AT ALL SHEET JOINTS AND AT FLOOR AND CEILING. WHERE CEILIING HEIGHT PROHIBIT SEALING THE BARRIER TO THE

CEILING A CAP IS TO BE PROVIDED.

CONTRACTOR REQUIRED TO FULLY CLEAN CURRENT WORK AREA PRIOR TO MOVING TO THE NEXT AREA.

CONTRACTOR TO BE FAMILIAR WITH SITE AND PROVIDE APPROPRIATE EQUIPMENT TO ACCESS LIGHTING FIXTURES. HEAVY EQUIPMENT WILL BE EVALUATED PRIOR TO USE AND IS SUBJECT TO USE BASED ON

EXISTING FLOOR CONSTRUCTION.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

D ra w n

By

C he ck ed

B y:

Ap pr ov ed

B y:

919 E Main Street Suite 1200

Richmond, VA 23219 804.788.0710

This Line is 3 Inches When Printed Full Size

IF

B

N U

M

BE

R

-2

6/

/2

2:

:2

PM

Au to de sk

D oc s:

//R ic hm on d

In te rn at io na l A irp or t R

/4

.4

Ar ch

C en tra lR

.rv t

Au th or

C he ck er

Ap pr ov er

R

IC

S O

U

TH

G

AR

AG

E

LI

G

H

TI

N G

R

EP

LA

C

EM

EN

T

NOT FOR

CONSTRUCTIO

N

PROJECT

INFORMATION

G010 45533.46

06.17.2024

R

IC

H

AR

D

E B

YR

D

T

ER

M

IN

AL

D

R

R

IC

H M

O N

D , V

A

PROJECT INFORMATION SHEET

PROJECT LOCATION

PROJECT AREA

GENERAL PROJECT NOTES

PROJECT TEAM

AUTHORITY HAVING JURISDICTION

PROJECT ABBREVIATIONS GENERAL NOTES FOR REFLECTED CEILING PLANS

GRAPHIC SYMBOLS LEGEND

GreshamSmith.com

GENERAL NOTES FOR DEMOLITION

GENERAL NOTES FOR WORK RESTRICTIONS

APPICABLE CODES:

2018 VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VIRGINIA USBC) (IBC 2018)

2018 VIRGINIA MECHANICAL CODE (IMC)

2017 NATIONAL ELECTRICAL CODE (NEC)

2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

2018 VIRGINIA EXISTING BUILDING CODE

BUILDING DATA:

CONSTRUCTION TYPE: IIB

OCCUPANCY TYPE: S-2, LOW HAZARD STORAGE OPEN PARKING STRUCTURE

Sheet No. Sheet Name Discipline

GENERAL

G000 COVER SHEET GENERAL

G010 PROJECT INFORMATION GENERAL

ARCHITECTURE

A601 OVERALL PHASING PLAN - PHASE 1 ARCHITECTURE

A602 OVERALL PHASING PLAN - PHASE 2 ARCHITECTURE

A603 OVERALL PHASING PLAN - PHASE 3 ARCHITECTURE

A604 OVERALL PHASING PLAN - PHASE 4 ARCHITECTURE

A606 ELEVATOR ROOM REFLECTED CEILING PLANS ARCHITECTURE

ELECTRICAL

E001 LEGEND, NOTES AND ABBREVIATIONS ELECTRICAL

E101 FIRST FLOOR - LIGHTING PLAN - G5 GARAGE ELECTRICAL

E102 FIRST FLOOR - LIGHTING PLAN - G6 GARAGE ELECTRICAL

E103 FIRST FLOOR - LIGHTING PLAN - G7 GARAGE ELECTRICAL

E104 FIRST FLOOR - LIGHTING PLAN - G8 GARAGE ELECTRICAL

E105 NORTH & SOUTH GARAGE ELEVATOR ROOM LIGHTING

PLANS

ELECTRICAL

E801 FIRST FLOOR - PHOTOMETRIC PLAN - G5 GARAGE ELECTRICAL

E802 FIRST FLOOR - PHOTOMETRIC PLAN - G6 GARAGE ELECTRICAL

E803 FIRST FLOOR - PHOTOMETRIC PLAN - G7 GARAGE ELECTRICAL

E804 FIRST FLOOR - PHOTOMETRIC PLAN - G8 GARAGE ELECTRICAL

E805 NORTH & SOUTH GARAGE ELEVATOR ROOM

PHOTOMETRIC PLANS

ELECTRICAL

COMPLY WITH THE FOLLOWING NOTES IN THIS SET OF DRAWINGS WHICH ALSO APPLY TO THE REFLECTED

CEILING PLANS:

A. "GENERAL NOTES FOR DEMOLITION

B. "GENERAL NOTES FOR WORK RESTRICTIONS"

C. "GENERAL NOTES FOR PROJECT"

THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE REFLECTED CEILING PLANS WITH ALL OTHER DRAWINGS AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF ANY ERROR, INCONSISTENCY OR OMISSION

THAT IS DISCOVERED.

WHERE EXISTING LAY-IN CEILINGS ARE REMOVED AND RE-INSTALLED, THE CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE EITHER THE CEILING TILES OR THE GRID. DAMAGED TILES OR GRID SHALL BE REPLACED WITH NEW MATERIAL. THESE NEW MATERIALS SHALL MATCH THE EXISTING IN A UNIFORM MANNER FOR COLOR, TEXTURE, PATTERN, ETC. IF UNIFORMITY CANNOT BE ACHIEVED, THE CONTRACTOR SHALL REPLACE THE ENTIRE CEILING WITHIN THAT SPACE WITH NEW MATERIAL. THE CONTRACTOR SHALL PROVIDE NEW MATERIAL AS APPROVED BY

BOTH OWNER AND ARCHITECT.

THE "LIMITS OF CONSTRUCTION" LINES SHOWN ON THE ARCHITECT'S REFLECTED CEILING PLANS APPLY ONLY TO THE LIMITS OF THE ARCHITECTURAL NEW CONSTRUCTION AND RENOVATION. SEE THE OTHER DISCIPLINES' DRAWINGS FOR THE LIMITS OF THE NEW CONSTRUCTION AND RENOVATION FOR THEIR DISCIPLINE.

EXISTING TO REMAIN ELEMENTS ARE SHOWN AS LIGHT GRAY LINES.

DRAWING INDEX

PROJECT CODE DATA

G01.

G02.

G03.

G04.

G05.

G600.

G603.

G602.

G601.

Revision No. Date Description

G604.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

SOUTH GARAGE HOURLY

PARKING

SOUTH GARAGE

EXPANSION

SOUTH GARAGE DAILY

PARKING

D ra w n

By

C he ck ed

B y:

Ap pr ov ed

B y:

919 E Main Street Suite 1200

Richmond, VA 23219 804.788.0710

This Line is 3 Inches When Printed Full Size

IF

B

N U

M

BE

R

-2

6/

/2

2:

:2

PM

Au to de sk

D oc s:

//R ic hm on d

In te rn at io na l A irp or t R

/4

.4

Ar ch

C en tra lR

.rv t

Au th or

C he ck er

Ap pr ov er

R

IC

S O

U

TH

G

AR

AG

E

LI

G

H

TI

N G

R

EP

LA

C

EM

EN

T

NOT FOR

CONSTRUCTIO

N

OVERALL PHASING

PLAN - PHASE 1

A601 45533.46

06.17.2024

R

IC

H

AR

D

E B

YR

D

T

ER

M

IN

AL

D

R

R

IC

H M

O N

D , V

A

GreshamSmith.com

B

CONCOURSE A CONCOURSE B

ATRIUM

DEPARTURES TERMINALAC

D

E F

G H I

J K L

G3

G4

G1

G2

G7

G8

G5

G6

ELEVATED ROADWAY

NORTH GARAGE SOUTH GARAGE

PLAN

NORTH

0' 15' 60'30' 90' 1" = 30'-0"1 FIRST FLOOR REFLECTED CEILING PLAN PHASE-1

Revision No. Date Description

PHASE 1

NO WORK SHALL BEGIN UNTIL ALL FIXTURES ARE IN-HAND, EITHER ON SITE OR IN

CONTRACTOR'S WAREHOUSE.

BEGIN WORK ON MAIN DRIVE LANES (PHASE 1) AND PLACE BARRIERS SHOWN. AIRPORT WILL

BEGIN TO CLOSE SOUTH GARAGE HOURLY AND DAILY PARKING WHEN WORK ON PHASE 1

BEGINS.

PHASE 1 WORK MUST BE COMPLETE PRIOR TO BEGINNING PHASE 2 WORK.

ELIMINATE THE ADDITIONAL OFF-MODULE FIXTURES AT THE ENTRANCE TO THE GARAGES.

PHASE DURATIONS:

DRIVE LANES (3 TOTAL) - (7) CALENDAR DAYS - WORK TO BE PERFORMED FROM 7:00 PM TO 4:00 AM AND SHALL INCLUDE FLAG MEN. PHASE 1 AREAS WILL BE OPEN TO TRAFFIC AT ALL TIMES.

NORTH AND SOUTH LOBBY TOWERS (2 TOTAL) - WORK CAN BE PERFORMED AS FILLER WORK,

BUT ALL WORK SHALL BE COMPLETED BY 11/15/2024

SYMBOLS

PLACE WATER-FILLED BARRIER

PREVIOUSLY PLACED WATER-FILLED BARRIER

DO NOT ENTER SIGN TEMPORARILY AFFIXED TO BARRIER

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

PHASE 2-A

PHASE 2-B

PHASE 3

PHASE 2-B

D ra w n

By

C he ck ed

B y:

Ap pr ov ed

B y:

919 E Main Street Suite 1200

Richmond, VA 23219 804.788.0710

This Line is 3 Inches When Printed Full Size

IF

B

N U

M

BE

R

-2

6/

/2

2:

:3

PM

Au to de sk

D oc s:

//R ic hm on d

In te rn at io na l A irp or t R

/4

.4

Ar ch

C en tra lR

.rv t

Au th or

C he ck er

Ap pr ov er

R

IC

S O

U

TH

G

AR

AG

E

LI

G

H

TI

N G

R

EP

LA

C

EM

EN

T

NOT FOR

CONSTRUCTIO

N

OVERALL PHASING

PLAN - PHASE 2

A602 45533.46

06.17.2024

R

IC

H

AR

D

E B

YR

D

T

ER

M

IN

AL

D

R

R

IC

H M

O N

D , V

A

GreshamSmith.com

B

CONCOURSE A CONCOURSE B

ATRIUM

DEPARTURES TERMINALAC

D

E F

G H I

J K L

G3

G4

G1

G2

G7

G8

G5

G6

ELEVATED ROADWAY

NORTH GARAGE SOUTH GARAGE

PLAN

NORTH

Revision No. Date Description

0' 15' 60'30' 90' 1" = 30'-0"1 FIRST FLOOR REFLECTED CEILING PLAN PHASE-2

PHASE 2

MAINTAIN ALL BARRIERS FROM PHASE 1 AND INFILL WHERE NEEDED TO COMPLETELY

DISALLOW ACCESS TO PHASE 2 WORK AREA.

BEGIN WORK ON PHASE 2 WHEN SOUTH GARAGE HOURLY PARKING (PHASE 2-A) IS EMPTY, OR

AS INDICATED BY THE OWNER. IF PHASE 2-A AREA IS NOT CLEAR OF VEHICLES, WORK IN NORTH

OR SOUTH ELEVATOR LOBBY TOWER, UNTIL VEHICLES HAVE VACATED PHASE 2-A WORK AREA.

UPON COMPLETION OF PHASE 2-A, REMOVE ALL BARRIERS AND OPEN PHASE 2-A TO THE

PUBLIC. BEGIN WORK ON PHASE 2-B.

PHASE 2 WORK CAN BE COMPLETED AT ANY TIME OF DAY.

WHEN PHASE 2 WORK BEGINS, PLACE BARRIERS IN PHASE 3 AREA. OWNER WILL BEGIN TO

CLOSE PHASE 3 AREA AT THIS TIME.

PHASE 2 WORK MUST BE COMPLETE PRIOR TO BEGINNING PHASE 3 WORK.

PHASE DURATIONS:

PHASE 2A - (7) CALENDAR DAYS

PHASE 2B - (7) CALENDAR DAYS

PHASE 3 - (14) CALENDAR DAYS

NORTH AND SOUTH LOBBY TOWERS (2 TOTAL) - WORK CAN BE PERFORMED AS FILLER WORK,

BUT ALL WORK SHALL BE COMPLETED BY 11/15/2024

THE PARKING STALL CLOSURE WILL BE AS FOLLOWS:

PHASE 2A & 2B (HOURLY AND DAILY) – CLOSURE TO OCCUR AT THE SAME TIME. THE PHASED

OPENING APPROACH SHALL BE AS SHOWN IN THE PROPOSED PLAN.

PHASE 3 & 4 (DAILY) – CLOSURE TO OCCUR AT THE SAME TIME. THE PHASED OPENING

APPROACH SHALL BE AS SHOWN IN THE PROPOSED PLAN.

IN FILL BARRIERS

AFTER AREA HAS

BEEN VACATED

IN FILL BARRIERS

AFTER AREA HAS

BEEN VACATED

IN FILL BARRIERS

AFTER AREA HAS

BEEN VACATED

SYMBOLS

PLACE WATER-FILLED BARRIER

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

PHASE 3-A

PHASE 3-C

PHASE

3-B

PHASE 4

PLACE BARRIER WHEN

PHASE 3-A IS

COMPLETE AND PRIOR

TO MOVING TO PHASE

3-B

PLACE YELLOW

CAUTION TAPE

BETWEEN COLUMNS

WHEN PHASE 3-A IS

COMPLETE AND

PRIOR TO MOVING

TO PHASE 3-B.

PLACE YELLOW

CAUTION TAPE

BETWEEN COLUMNS

WHEN PHASE 3-B IS

COMPLETE AND

PRIOR TO MOVING

TO PHASE 3-C

REMOVE AT THE

END OF PHASE 3-A

REMOVE AT THE

END OF PHASE 3-C

REMOVE AT THE

END OF PHASE 3-C

INFILL BARRIERS

AFTER AREA HAS

BEEN VACATED

INFILL BARRIERS

AFTER AREA HAS

BEEN VACATED

INFILL BARRIERS

AFTER AREA HAS

BEEN VACATED

PLACE AT THE END OF PHASE

3-A AND PROVIDE SIGNAGE

PLACE AT THE BEGINNING OF

PHASE 3 AND REMOVE AT THE

THE END OF PHASE 3-A

ADDITIONAL

PARKING

PLACE AT BEGINNING OF

PHASE 3

PLACE BARRIER WHEN

PHASE 3-B IS

COMPLETE AND PRIOR

TO MOVING TO PHASE

3-C

D ra w n

By

C he ck ed

B y:

Ap pr ov ed

B y:

919 E Main Street Suite 1200

Richmond, VA 23219 804.788.0710

This Line is 3 Inches When Printed Full Size

IF

B

N U

M

BE

R

-2

6/

/2

2:

:3

PM

Au to de sk

D oc s:

//R ic hm on d

In te rn at io na l A irp or t R

/4

.4

Ar ch

C en tra lR

.rv t

Au th or

C he ck er

Ap pr ov er

R

IC

S O

U

TH

G

AR

AG

E

LI

G

H

TI

N G

R

EP

LA

C

EM

EN

T

NOT FOR

CONSTRUCTIO

N

OVERALL PHASING

PLAN - PHASE 3

A603 45533.46

06.17.2024

R

IC

H

AR

D

E B

YR

D

T

ER

M

IN

AL

D

R

R

IC

H M

O N

D , V

A

GreshamSmith.com

B

CONCOURSE A CONCOURSE B

ATRIUM

DEPARTURES TERMINALAC

D

E F

G H I

J K L

G3

G4

G1

G2

G7

G8

G5

G6

ELEVATED ROADWAY

NORTH GARAGE SOUTH GARAGE

PLAN

NORTH

Revision No. Date Description

0' 15' 60'30' 90' 1" = 30'-0"1 FIRST FLOOR REFLECTED CEILING PLAN PHASE-3

PHASE 3

BEGIN WORK ON PHASE 3 WHEN PHASE 3 AREA IS EMPTY, OR AS INDICATED BY THE OWNER. IF

PHASE 3 AREA IS NOT CLEAR OF VEHICLES, WORK IN NORTH OR SOUTH ELEVATOR LOBBY

TOWER, UNTIL VEHICLES HAVE VACATED PHASE 3 WORK AREA.

UPON COMPLETION OF PHASE 3-A, INSTALL CAUTION TAPE ALONG COLUMN LINE AS INDICATED, INSTALL ADDITIONAL BARRIERS AS INDICATED, REMOVE ALL BARRIERS WITHIN PHASE 3-A AND

OPEN TO THE PUBLIC. BEGIN WORK ON PHASE 3-B.

REPEAT THIS PROCEDURE FOR PHASE 3-B AREA.

PHASE 3 WORK CAN BE COMPLETED AT ANY TIME OF DAY.

PHASE 3 WORK MUST BE COMPLETE PRIOR TO BEGINNING PHASE 4 WORK.

PHASE DURATIONS:

PHASE 3 – (14) CALENDAR DAYS

PHASE 4 – (14) CALENDAR DAYS

NORTH AND SOUTH LOBBY TOWERS (2 TOTAL) - WORK CAN BE PERFORMED AS FILLER WORK,

BUT ALL WORK SHALL BE COMPLETED BY 11/15/2024

THE PARKING STALL CLOSURE WILL BE AS FOLLOWS:

PHASE 2A & 2B (HOURLY AND DAILY) – CLOSURE TO OCCUR AT THE SAME TIME. THE PHASED

OPENING APPROACH SHALL BE AS SHOWN IN THE PROPOSED PLAN.

PHASE 3 & 4 (DAILY) – CLOSURE TO OCCUR AT THE SAME TIME. THE PHASED OPENING

APPROACH SHALL BE AS SHOWN IN THE PROPOSED PLAN.

SYMBOLS

PLACE WATER-FILLED BARRIER

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

PHASE

4-C

PHASE

4-B

PHASE

4-A

PHASE

4-D

REMOVE AT THE

END OF PHASE 4-A

PLACE YELLOW

CAUTION TAPE

BETWEEN

COLUMNS WHEN

PHASE 4-A IS

COMPLETE AND

PRIOR TO MOVING

TO PHASE 4-B.

PLACE YELLOW

CAUTION TAPE

BETWEEN

COLUMNS WHEN

PHASE 4-B IS

COMPLETE AND

PRIOR TO MOVING

TO PHASE 4-C.

PLACE YELLOW

CAUTION TAPE

BETWEEN

COLUMNS WHEN

PHASE 4-C IS

COMPLETE AND

PRIOR TO MOVING

TO PHASE 4-D.

REMOVE AT THE

END OF PHASE 4-D

IN FILL BARRIERS

AFTER AREA HAS

BEEN VACATED

IN FILL BARRIERS

AFTER AREA HAS

BEEN VACATED

PLACE AT THE END

OF PHASE 4-A, AND

REMOVE AT THE

END OF PHASE 4-C PLACE AT THE END

OF PHASE 4-C

D ra w n

By

C he ck ed

B y:

Ap pr ov ed

B y:

919 E Main Street Suite 1200

Richmond, VA 23219 804.788.0710

This Line is 3 Inches When Printed Full Size

IF

B

N U

M

BE

R

-2

6/

/2

2:

:3

PM

Au to de sk

D oc s:

//R ic hm on d

In te rn at io na l A irp or t R

/4

.4

Ar ch

C en tra lR

.rv t

Au th or

C he ck er

Ap pr ov er

R

IC

S O

U

TH

G

AR

AG

E

LI

G

H

TI

N G

R

EP

LA

C

EM

EN

T

NOT FOR

CONSTRUCTIO

N

OVERALL PHASING

PLAN - PHASE 4

A604 45533.46

06.17.2024

R

IC

H

AR

D

E B

YR

D

T

ER

M

IN

AL

D

R

R

IC

H M

O N

D , V

A

GreshamSmith.com

B

CONCOURSE A CONCOURSE B

ATRIUM

DEPARTURES TERMINALAC

D

E F

G H I

J K L

G3

G4

G1

G2

G7

G8

G5

G6

ELEVATED ROADWAY

NORTH GARAGE SOUTH GARAGE

PLAN

NORTH

Revision No. Date Description

0' 15' 60'30' 90' 1" = 30'-0"1 FIRST FLOOR REFLECTED CEILING PLAN PHASE-4

PHASE 4

BEGIN WORK ON PHASE 4 WHEN PHASE 4 AREA IS EMPTY, OR AS INDICATED BY THE OWNER. IF

PHASE 4 AREA IS NOT CLEAR OF VEHICLES, WORK IN NORTH OR SOUTH ELEVATOR LOBBY

TOWER, UNTIL VEHICLES HAVE VACATED PHASE 4 WORK AREA.

UPON COMPLETION OF PHASE 4-A, INSTALL CAUTION TAPE ALONG COLUMN LINE AS INDICATED, INSTALL ADDITIONAL BARRIERS AS INDICATED, REMOVE ALL BARRIERS WITHIN PHASE 4-A AND

OPEN TO THE PUBLIC. BEGIN WORK ON PHASE 4-B.

REPEAT THIS PROCEDURE FOR PHASES 4-B AND 4-C AREAS.

PHASE 4 WORK CAN BE COMPLETED AT ANY TIME OF DAY.

PHASE DURATIONS:

PHASE 3 – (14) CALENDAR DAYS

PHASE 4 – (14) CALENDAR DAYS

NORTH AND SOUTH LOBBY TOWERS (2 TOTAL) - WORK CAN BE PERFORMED AS FILLER WORK,

BUT ALL WORK SHALL BE COMPLETED BY 11/15/2024

THE PARKING STALL CLOSURE WILL BE AS FOLLOWS:

PHASE 2A & 2B (HOURLY AND DAILY) – CLOSURE TO OCCUR AT THE SAME TIME. THE PHASED

OPENING APPROACH SHALL BE AS SHOWN IN THE PROPOSED PLAN.

PHASE 3 & 4 (DAILY) – CLOSURE TO OCCUR AT THE SAME TIME. THE PHASED OPENING

APPROACH SHALL BE AS SHOWN IN THE PROPOSED PLAN.

SYMBOLS

PLACE WATER-FILLED BARRIER

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

K.

K.

2 L

M N P Q R

0.

.5

.8

.8

.8

.8

.8

.5

.9

.7

.2

.5

.9

.9

.4

.2

.6

8.

6.

6.

K.

7.

.9

.5 .1

F G H H.

H.

2 J K

F G H J K

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"12'-6"25'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

/ 4

5 / 1 6"

3' 0"

5' 0"

55'-0" 55'-0" 55'-0" 55'-0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

0"

5' 0"

55'-0"55'-0"55'-0"55'-0"55'-0"

12'-6"25'-0"12'-6"

55'-0"28'-0"24'-0"55'-0"55'-0" 3'-0"

VA

N

VA

N

REMOVE LIGHTS

FROM PLANTERS

CONTRACTOR TO PROVIDE TEMP. STAIR CLOSURE SIGN.

PROVIDE 3 ADDITIONAL DETOUR SIGNS IDENTIFYING EXIT TO

STAIRS WITHIN GARAGE

ELIMINATE LOWEST

SURFACE MOUNTED

FIXTURE

CONTRACTOR TO PROVIDE TEMP. STAIR CLOSURE SIGN.

PROVIDE 3 ADDITIONAL DETOUR SIGNS IDENTIFYING EXIT TO

STAIRS WITHIN GARAGE

CONTRACTOR TO PROVIDE TEMP. STAIR CLOSURE SIGN.

PROVIDE 3 ADDITIONAL DETOUR SIGNS IDENTIFYING EXIT TO

STAIRS WITHIN GARAGE

CONTRACTOR TO PROVIDE TEMP. STAIR CLOSURE SIGN.

PROVIDE 3 ADDITIONAL DETOUR SIGNS IDENTIFYING EXIT TO

STAIRS WITHIN GARAGE

REPLACE ALL FIXTURES IN THE

UNDERSIDE OF THE ROOF

REPLACE ALL

FIXTURES IN THE

UNDERSIDE OF THE

ROOF

D ra w n

By

C he ck ed

B y:

Ap pr ov ed

B y:

919 E Main Street Suite 1200

Richmond, VA 23219 804.788.0710

This Line is 3 Inches When Printed Full Size

IF

B

N U

M

BE

R

-2

6/

/2

2:

:4

PM

Au to de sk

D oc s:

//R ic hm on d

In te rn at io na l A irp or t R

/4

.4

Ar ch

C en tra lR

.rv t

Au th or

C he ck er

Ap pr ov er

R

IC

S O

U

TH

G

AR

AG

E

LI

G

H

TI

N G

R

EP

LA

C

EM

EN

T

NOT FOR

CONSTRUCTIO

N

ELEVATOR ROOM

REFLECTED CEILING

PLANS

A606 45533.46

06.17.2024

R

IC

H

AR

D

E B

YR

D

T

ER

M

IN

AL

D

R

R

IC

H M

O N

D , V

A

GreshamSmith.com

0' 24'16'8'4' 1/8" = 1'-0"1 ELEVATOR ROOM FIRST FLOOR REFLECTED CEILING PLAN

0' 24'16'8'4' 1/8" = 1'-0"2 ELEVATOR ROOM SECOND FLOOR REFLECTED CEILING PLAN

0' 24'16'8'4' 1/8" = 1'-0"3 ELEVATOR ROOM THIRD FLOOR REFLECTED CEILING PLAN

0' 24'16'8'4' 1/8" = 1'-0"4 ELEVATOR ROOM FOURTH FLOOR REFLECTED CEILING PLAN

B

CONCOURSE A CONCOURSE B

ATRIUM

DEPARTURES TERMINALAC

D

E F

G H I

J K L

G3

G4

G1

G2

G7

G8

G5

G6

ELEVATED ROADWAY

NORTH GARAGE SOUTH GARAGE

Revision

MPS END View - Curve Lens

2.56" (65.02mm)

3.06" (77.7mm)

3.11" (79mm)

3" (76.2mm)

2.44" (62mm)

MPS END View - FLAT Lens

2.56" (65.02mm)

1.25" (31.8mm)

40.5" (1028.7mm)

46" (1168.4mm)

44" (1117.6mm)

Surface Mount Slots

48.06" (1220.7mm)

B1A

C D

B2

8" LED DOWNLIGHT RETROFITGARAGE PARKING FIXTURE

4' LED COVE STRIP EXIT LIGHTLED DOWNLIGHT

6" LED DOWNLIGHT RETROFIT

RECESSED, CEILING120-277173,500K LED

TYPE LUMENS LAMP TYPE VOLTAGE MOUNTING

2,000

INPUT WATTS

LITON LIGHTING, "CRTR8L" SERIES

LUMINAIRE DESCRIPTION:

1. PROVIDE SELF-FLANGED SATIN HAZE REFLECTOR WITH WHITE TRIM RING.

2. UTILIZES HIGH-BRIGHTNESS LEDS MOUNTED TO A METAL CORE CIRCUIT BOARD, ENSURING

COOL-RUNNING OPERATION, CRI>80.

3. HIGH-EFFICIENCY, INTEGRAL ELECTRONIC LED DRIVER. PROVIDE DIMMABLE DRIVER.

4. CERTIFICATION: CETLUS LISTED. SUITABLE FOR DRY, DAMP, AND WET LOCATIONS.

7. RETROFIT: DESIGNED FOR USE WITH EXISTING 8" ARCHITECTURAL FLOURESCENT HOUSING.

SUPPLIED WITH JUNCTION BOX AND FLEXIBLE METAL CONDUIT FOR CONNECTION TO EXISTING

8. ATTIC STOCK: CONTRACTOR SHALL PROVIDE 5 SPARE LIGHT FIXTURES IN ADDITION TO THE

QUANTITIES INDICATED ON THE PLANS FOR ATTIC STOCK.

SURFACE, CEILING120-27748.14000K LED

TYPE LUMENS LAMP TYPE VOLTAGE MOUNTING

5,502

INPUT WATTS

CURRENT LIGHTING, " BEACON SRT2 EDGE-LIT" SERIES

LUMINAIRE DESCRIPTION:

1. HOUSING: DIE-CAST ALUMINUM. ONE PIECE MOLDED SILICONE GASKET.

2. OPTICS: EDGE-LIT ACRYLIC LIGHT GUIDE.

3. FINISH: CORROSION RESISTANT POWDER COAT. WHITE GLOSS SMOOTH.

4. DISTRIBUTION: TYPE 5 WIDE.

5. CERTIFICATION: LISTED TO UL1598 FOR USE IN WET LOCATION. IP65.

6. ATTIC STOCK: CONTRACTOR SHALL PROVIDE 10 SPARE LIGHT FIXTURES IN ADDITION TO THE

QUANTITIES INDICATED ON THE PLANS FOR ATTIC STOCK.

SURFACE, COVE MOUNT120-27718.13500K LED

TYPE LUMENS LAMP TYPE VOLTAGE MOUNTING

2,544

INPUT WATTS

LUMINAIRE DESCRIPTION:

1. HOUSING: COLD ROLLED STEEL HOUSING, FLAT END CAPS.

2. PROVIDE WITH CURVED, FROSTED ACRYLIC LENS. WIDE DISTRIBUTION.

3. HIGH-EFFICIENCY, INTEGRAL ELECTRONIC LED DRIVER, 0-10V DIMMING.

4. UL LISTED AND DAMP LOCATION LISTED AND TESTED IN ACCORDANCE WITH IESNA LM-79 AND

LM-80 STANDARDS.

DETAIL BASED ON COLUMBIA LIGHTING, "MPS" SERIES

LUMINAIRE DESCRIPTION:

1. UV STABLE THERMOPLASTIC HOUSING

AND

LETTERS.

2. 6" TALL LETTERS.

3. RED ILLUMINATION PROVIDED BY LIGHT

EMITTING DIODES (LED). APPROXIMATELY

100 LED'S PER

FACE.

4. POWER FAILURE PROTECTION, BROWN

OUT PROTECTION, AND SURGE

PROTECTION.

5. SEALED, MAINTENANCE FREE, NICKEL

CADMIUM BATTERY WITH SOLID STATE

CHARGER AND OVERCHARGE

PROTECTION.

6. UNIVERSAL ARROWS AND BLANK OFF

PLATES.

7. SINGLE OR DOUBLE FACE AS INDICATED.

8. UNIVERSAL MOUNTING.

9. TEST BUTTON IN BOTTOM OF HOUSING.

10. INDICATOR LIGHTS TO INDICATE WHEN

UNIT IS ON NORMAL POWER OR ON

BATTERY

POWER.

11. WHITE FINISH.

DETAIL BASED ON DUAL-LITE LIGHTING, "EVE" SERIES

INDICATES WALL MOUNT 6" ABOVE DOOR TO BOTTOM OF FIXTURE.

INDICATES CEILING MOUNT.

11.5"

9"

UNIVERSAL MOUNT, CEILING, WALL120/2772LED

TYPE LAMP TYPE VOLTAGE MOUNTINGINPUT WATTS

LUMINAIRE DESCRIPTION:

1. LED DRIVER SHALL BE ELECTRONIC, HIGH POWER FACTOR ( > .95) WITH THD <20%, AND WITH

TRIAC: 100-5% DIMMING CAPABILITIES.

2. FIXTURE SHALL BE ALUMINUM BODY WITH ACRYLIC DIFFUSER.

3. FINISH SHALL BE WHITE.

4. FIXTURE SHALL BE 90 CRI.

5. UL LISTED AND DAMP LOCATION LISTED AND TESTED IN ACCORDANCE WITH IESNA LM-79 AND

LM-80 STANDARDS.

DETAIL BASED ON MODERN FORMS, "ARGO" SERIES

SURFACE, CEILING120-27727.53500K LED

TYPE LUMENS LAMP TYPE VOLTAGE MOUNTING

2,109

INPUT WATTS

JUNCTION BOX.

TYPE LUMENS LAMP TYPE VOLTAGE MOUNTINGINPUT WATTS

LITON LIGHTING, "CRTR6L" SERIES

LUMINAIRE DESCRIPTION:

1. PROVIDE SELF-FLANGED SATIN HAZE REFLECTOR WITH WHITE TRIM RING.

2. UTILIZES HIGH-BRIGHTNESS LEDS MOUNTED TO A METAL CORE CIRCUIT BOARD, ENSURING

COOL-RUNNING OPERATION, CRI>80.

3. HIGH-EFFICIENCY, INTEGRAL ELECTRONIC LED DRIVER. PROVIDE DIMMABLE DRIVER.

4. CERTIFICATION: CETLUS LISTED. SUITABLE FOR DRY, DAMP, AND WET LOCATIONS.

7. RETROFIT: DESIGNED FOR USE WITH EXISTING 6" ARCHITECTURAL FLOURESCENT HOUSING.

SUPPLIED WITH JUNCTION BOX AND FLEXIBLE METAL CONDUIT FOR CONNECTION TO EXISTING

8. ATTIC STOCK: CONTRACTOR SHALL PROVIDE 5 SPARE LIGHT FIXTURES IN ADDITION TO THE

QUANTITIES INDICATED ON THE PLANS FOR ATTIC STOCK.

RECESSED, CEILING120-277283,500K LED2,900

JUNCTION BOX.

LIGHTING ARRANGEMENT: ARRANGE LIGHTING FIXTURES IN

ACCORDANCE WITH THE ARCHITECTURAL REFLECTED CEILING

PLANS.

LIGHTING COORDINATION: COORDINATE LIGHTING FIXTURES WITH

GRILLES, DIFFUSERS, SPRINKLER HEADS, AND ACCESS PANELS,

ETC. PROVIDE FIXTURE MOUNTING BRACKETS, ACCESSORIES,

PLASTER FRAMES, ETC.. SUITABLE FOR THE CEILING TYPES

INDICATED ON THE ARCHITECTURAL PLANS.

LIGHTING CONTROL TESTING: UPON COMPLETION OF THE

INSTALLATION OF ALL LIGHTING SYSTEMS AND CONTROL DEVICES,

CONTRACTOR SHALL CONFIRM PROPER OPERATION OF ALL

LIGHTING CONTROLS, AND DEMONSTRATE PROPER OPERATION TO

THE OWNER AND/OR ENGINEER.

MATERIAL COORDINATION: VERIFY CEILING AND WALL

CONSTRUCTION AND MATERIAL PRIOR TO ORDERING LIGHT

FIXTURES OR OTHER DEVICES TO ENSURE PROPER FIXTURE OR

DEVICE IS FURNISHED TO MATCH CONSTRUCTION.

MOUNTING HEIGHTS: MOUNTING HEIGHTS INDICATED ARE FROM

THE FINISHED FLOOR TO THE CENTERLINE OF THE WIRING DEVICE

UNLESS OTHERWISE NOTED. MOUNTING HEIGHTS OF LIGHTING

FIXTURES ARE TO THE BOTTOM OF THE FIXTURE UNLESS

OTHERWISE NOTED.

J-BOX LABELING: LABEL ALL JUNCTION BOXES WITH PERMANENT

MARKER IDENTIFYING CIRCUIT NUMBER AND PANELBOARD OF

CIRCUITS WITHIN.

WIRING DEVICES: LABEL ALL WIRING DEVICES WITH PANELBOARD

AND CIRCUIT DESIGNATION PERMANENTLY ATTACHED WITH BLACK

TYPED DESIGNATION ON CLEAR TAPE.

GENERAL: UNLESS SPECIFICALLY INDICATED OTHERWISE, ALL WORK

SHOWN ON ELECTRICAL DRAWINGS IS NEW WORK TO BE PROVIDED

UNDER THIS CONTRACT.

COORDINATION: COORDINATE AND COOPERATE WITH ALL TRADES

ON THE PROJECT. THE CONTRACTOR SHALL REVIEW ALL CONTRACT

DOCUMENTS INCLUDING CIVIL, STRUCTURAL, ARCHITECTURAL

DRAWINGS AND SPECIFICATIONS. CONTRACTOR SHALL COORDINATE

AND ADJUST ACCORDINGLY AS DIRECTED BY THE ENGINEER.

AS-BUILT DRAWINGS: SECURE AN EXTRA SET OF ELECTRICAL

DRAWINGS TO BE KEPT ON SITE AND MARK, DAILY, THE DRAWINGS IN

RED AS THE PROJECT PROGRESSES IN ORDER TO KEEP AN

ACCURATE RECORD OF ALL DEVIATIONS BETWEEN THE WORK

SHOWN ON THE DRAWINGS AND THE WORK WHICH IS ACTUALLY

INSTALLED. THESE MARKED DRAWINGS SHALL REFLECT ANY AND ALL

CHANGES AND REVISIONS TO THE ORIGINAL DESIGN WHICH EXISTS

IN THE COMPLETED WORK. DELIVER THE MARKED DRAWINGS TO THE

OWNER AT PROJECT CLOSE-OUT.

TESTS: TEST ALL WIRING FOR CONTINUITY AND GROUNDS BEFORE

CONNECTING ANY FIXTURES OR DEVICES. PERFORM INSULATION

RESISTANCE TESTS ON ALL WIRING #6 OR LARGER TO ENSURE THAT

ALL PORTIONS ARE FREE FROM SHORT-CIRCUITS AND GROUNDS.

INSPECTIONS: ARRANGE ALL NECESSARY INSPECTIONS. DELIVER ALL

REQUIRED INSPECTION CERTIFICATES TO THE OWNER.

GROUNDING: PROVIDE GROUNDING IN ACCORDANCE WITH THE NEC

FOR THE ENTIRE ELECTRICAL SYSTEM INCLUDING EQUIPMENT

FRAMES, CONDUITS, SWITCHES, CONTROLLERS, WIRE-WAYS,

NEUTRAL CONDUCTORS, AND OTHER EQUIPMENT. PROVIDE A

GROUNDING CONDUCTOR IN ALL POWER CONDUITS.

LIGHTING

EMERGENCY LIGHTING FIXTURE CONNECT TO LIFE SAFETY LIGHTING

CIRCUIT

DOWNLIGHT FIXTURE

EXIT LIGHTING FIXTURE, WITH DIRECTIONAL ARROWS AS INDICATED.

LIGHTING FIXTURE TYPE SYMBOL. SEE LIGHTING FIXTURE DETAILS.

ELECTRICAL CIRCUIT RUN IN CONDUIT AND CIRCUIT HOMERUN TO

PANELBOARD (PANEL AND CIRCUIT DESIGNATION AS INDICATED). AS A

MINIMUM CONDITION, EACH SINGLE PHASE CIRCUIT SHALL HAVE 1 #12

PHASE CONDUCTOR, 1 #12 NEUTRAL CONDUCTOR AND 1 #12 GROUNDING

CONDUCTOR IN 1/2" CONDUIT. PROVIDE ADDITIONAL PHASE CONDUCTORS

AS REQUIRED FOR "MULTIPLE PHASED" ELECTRICAL LOADS. PROVIDE

NEUTRAL CONDUCTOR TO ALL WALL SWITCH OUTLET BOXES WHETHER

REQUIRED OR NOT. PROVIDE ADDITIONAL "SWITCH LEG" CONDUCTORS TO

PROVIDE THE LIGHT FIXTURE CONTROL INDICATED. MULTIPLE SINGLE

PHASE CONDUCTORS MAY BE GROUPED TOGETHER IN A COMMON CONDUIT

IN ACCORDANCE WITH THE NEC AND AT THE CONTRACTOR'S DISCRETION.

GROUNDING CONDUCTORS MAY BE SHARED AS ALLOWED BY THE NEC.

NEUTRAL CONDUCTORS SHALL NOT BE SHARED. MULTI-POLE BREAKERS

SHALL BE PROVIDED IN ACCORDANCE WITH THE NEC WHERE MULTI-WIRE

BRANCH CIRCUITS ARE REQUIRED. CONDUIT LARGER THAN 1/2" AND

CONDUCTORS LARGER THAN #12 SHALL BE AS INDICATED.

AND

SUBSCRIPT 'x' INDICATES LIGHTING FIXTURE CONTROLLED AND ASSOCIATED CONTROL

DEVICE(S).

GENERAL

NEW WORK NOTE SYMBOL1

A

COVE LIGHTING FIXTURE

PARKING GARAGE LIGHTING FIXTURE

A AMPERE

AFF ABOVE FINISHED FLOOR

C CONDUIT

CFCI CONTRACTOR FURNISHED,

CONTRACTOR INSTALLED

CKT CIRCUIT

ETR EXISTING TO REMAIN

EXIST EXISTING

GND GROUND

LPW LUMENS PER WATT

LTG LIGHTING

MCB MAIN CIRCUIT BREAKER

MFR MANUFACTURER

MLO MAIN LUGS ONLY

MTD MOUNTED

NEC NATIONAL ELECTRICAL CODE

NIC NOT IN CONTRACT

OC ON CENTER

OFCI OWNER FURNISHED,

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED,

OWNER INSTALLED

P POLE

PF POWER FACTOR

PNL PANEL

Ø PHASE

PRI PRIMARY

SE SERVICE ENTRANCE

SEC SECONDARY

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

V VOLT

W WATTS/WIRE

DE DOMINION ENERGY

MOCP MAXIMUM OVER-CURRENT

PROTECTION

N NORMAL

OSP OUTSIDE PLANT

SCH SCHEDULE

GENERAL: DEMOLITION DRAWINGS ARE BASED ON EXISTING PLANS

AND FIELD INVESTIGATION PRIOR TO DEMOLITION. VISIT THE

EXISTING BUILDING PRIOR TO BID IN ORDER TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS AND IN ORDER TO AVOID

CONFLICTS.

DASHED ITEMS: ALL ITEMS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .