24-13-1001_SAM.pdf
PDF 393 KB Posted
- Attached to
- Four Horizontal Balancers
- Solicitation number
- 24-13-1001
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a detailed purchase description document for a sole source acquisition of four Horizontal Balancing Machines for Fleet Readiness Center Southwest (FRC-SW), Building 472. The document outlines comprehensive technical specifications and requirements for horizontal balancing machines capable of static and couple balancing, with a machine weight of 7,500 lbs, maximum rotor weight of 2,500 lbs at 900 RPM, and bed length of 120 inches.
The machines must include specific components such as a stress-relieved base, machine housing with high-precision balancing spindle, belt drive system with variable ramp control, and a complete electrical system operating on 480V/3-phase/60Hz power. Key requirements include CNC capabilities with specialized software packages for Electronic Zoning, Tooling Compensation, Multiple Run Averaging, and SAE ARP Testing. The contractor is responsible for installation, including removal of existing equipment, with work hours of 6:00am to 2:30pm PST Monday-Friday. Quality assurance testing includes both origin and destination inspections, with specific performance requirements including left and right rotor balancing tolerance of 10 gr-in or below and sensitivity of 0.25 gmm/kg.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24-13-1001
PURCHASE DESCRIPTION FOR THE SOLE SOURCE
ACQUISITION OF FOUR HORIZONTAL BALANCING
MACHINES
SCOPE.
Scope. The content of this specification describes the minimum requirements for four new Horizontal Balancing Machines. The contractor shall provide complete installation services to include all parts, rigging equipment, qualified personnel, materials, delivery, removal of existing equipment, performance testing, and training as described in the following specification to provide two (4) fully operational machines located at Fleet Readiness Center Southwest (FRC-SW), in Building 472.
APPLICABLE DOCUMENTS. The documents listed in this section are cited in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all requirements of documents cited in sections 3 and 4 of this specification, whether or not they are listed in section 2.
Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.
Government Documents.
Specifications, Standards, and Handbooks. The following specifications, standards and handbooks form a part of this document to the extent specified herein.
STANDARDS – FEDERAL
FED-STD-H28B: Screw Thread Standards for Federal Service
FED-STD-313F: Material Safety Data, Transportation Data, and Disposal Data for Hazardous Materials Furnished to Government Activities
U.S Department of Labor, Occupational Safety and Health Administration
(OSHA)
29 CFR 1910: General Industry, OSHA Safety and Health Standards
29 CFR 1915: OSHA Standards for Shipyard Employment
(Application for copies should be addressed to the OSHA Publications Superintendent of Documents P.O. Box 37535 Washington, D.C. 20013-7535)
Environmental Protection Agency (EPA)
40 CFR 82: Protection of Stratospheric Ozone
(Application for copies should be addressed to the EPA Ariel Rios Building 1200 Pennsylvania Avenue, N.W. Washington, DC 20460)
DEPARTMENT OF DEFENSE
U.S. NAVY
OPNAV 5100.23G w/change 1: Navy Safety and Occupational Health Program Manual
OPNAVINST 3960.16A: Navy Test, Measurement and Diagnostic Equipment (TMDE), Automatic Test Systems (ATS), and Metrology and Calibration
(METCAL)
(Application for copies of the OPNAVINST should be addressed to Office of the Chief of Naval Operations, The Pentagon, Washington, DC 20350-2000 or to Commander, Naval Safety Center 375 A Street Norfolk, VA 23511 or on the internet at http://www.public.navy.mil/navsafecen)
MILITARY STANDARDS
MIL-STD-130N w/Change 1: Identification Marking of U.S. Military Property Item Unique Identification Marking (IUID)
(Application for copies should be addressed to Air Force Product Data Systems Modernization Standards (TMSS) Office, 554 ELSG/SBP, 4375 Chidlaw Road, Bldg. 262, Room S008, Wright-Patterson AFB, OH 45433-5006, Phone (937) 257- 0870 or 0853 or https://quicksearch.dla.mil/qsSearch.aspx)
Non-Government Publications, Specifications, Standards, and Handbooks. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.
American Gear Manufacturers Association (AGMA)
AGMA ISO 1328-1-B14: Cylindrical Gears - ISO System of Flank Tolerance Classification - Part 1: Definitions and Allowable Values of Deviations Relevant to Flanks of Gear Teeth
(Address application for copies to: 500 Montgomery Street, Suite 350, Alexandria, VA 22314-1581 USA)
American National Standards Institute, Inc. (ANSI)
B11/STD B11: General Safety Requirements Common to ANSI B11 Machines http://www.public.navy.mil/navsafecen https://quicksearch.dla.mil/qsSearch.aspx
(Address application for copies to the American National Standards Institute, 11 West 42nd Street, New York, NY 10036)
American Society of Mechanical Engineers (ASME)
ASME Y14.5: Dimensioning and Tolerancing
(Applications for copies should be addressed to ASME International Three Park Avenue New York, NY 10016-5990 or www.asme.org)
International Organization for Standardization (ISO)
ISO 21940-2: Mechanical Vibration- Horizontal Balancing- Part 2: Rotor Balancing
ISO 4413: Hydraulic fluid power-General rules and safety requirements for systems and their components
ISO 4414: Pneumatic Power-General rules and safety requirements for systems and their components
(Application for copies should be addressed to the International Organization for Standardization (ISO) 1 rue de Varembé, Casepostale56, CH211Geneva 20, Switzerland)
National Electrical Manufacturers Association (NEMA)
NEMA 250: Enclosures for Electrical Equipment (1000 V Maximum)
NEMA MG 1: Motors and Generators
NEMA ICS 6: Industrial Control and Systems Enclosures
(Application for copies should be addressed to the National Electrical Manufacturers Association, 1300 N 17th Street, Rosslyn, VA 22209)
National Fire Protection Association (NFPA)
NFPA 70: National Electrical Code
NFPA 79: Electrical Standard for Industrial Machinery
(Applications for copies should be addressed to the National Fire Protection Association, ATTN: Support Services, 11 Tracy Drive, Avon, MA 02322)
Society of Aerospace Engineers (SAE) http://www.asme.org/
SAE ARP 4048: Balancing Machines- Description and Evaluation of Horizontal Two-Plane Hard Bearing Type for Gas Turbine Rotors
(Application for copies should be addressed to: Society of Automotive Engineers 400 Commonwealth Drive, Warrendale PA 15096)
Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulation unless a specific exemption has been obtained.
2.4 Acronym Definitions Not Explicitly Listed in Text. The following acronyms not explicitly listed in each section text are defined as follows:
a. JIS- Japanese Industrial Standards
b. DIN- German Institute for Standardization
c. EN- European Standard
Proposal Format. Proposal shall be submitted using the following mathematical conventions:
a. Whole numbers will be expressed where one thousand is written as 1,000.
b. Decimals will be expressed where one-tenth is written as 0.1.
c. Submission of compliance statement and descriptive literature shall be in the same units as the units listed in this document.
d. In accordance with ASME Y14.5, all values listed in parenthesis will be treated as reference units and not the official proposed value in determining acceptability. For example, 300mm (11.8 inches), the 300mm will be used in determination of acceptability, and the measurement in parenthesis will not be considered in determining acceptability.
REQUIREMENTS.
Design. The item offered shall be new and a current commercially available model. A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold or is being offered for sale through advertisements or manufacturer’s published catalogue or brochures. Products such as a prototype unit, pre-production model, or experimental unit do not qualify as meeting the requirements specified herein. The machine shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to wear, breakage or distortion shall be accessible for adjustment, replacement, and repair.
Measuring and Indicating Device Graduations. All measuring and indicating devices on the machine shall be graduated in the United States customary units. An electronic control system that demonstrates switching between manufacturer standard units to United States customary units will be found acceptable.
Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's workstation(s).
Safety and Health Requirements. All machine parts, components, mechanisms, and assemblies furnished on the machine, whether or not specifically required herein, shall comply with all of the requirements of OSHA 29 CFR 1910 or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
Safety Guarding. Covers, guards, or other safety devices shall be provided per ANSI B11 or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. The safety devices shall not interfere with the operation of the machine. The safety devices shall prevent unintentional contact with the guarded part, and shall be easily removed to facilitate inspection, maintenance, and repair of the parts.
Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the “A” weighted scale of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3) feet from the equipment. Noise generated by the work piece shall be excluded in determining compliance of the equipment with the 84 dB requirements.
Hazardous Material Exclusions. Supplies or materials being provided as part of the equipment shall be free of known hazardous materials. These materials shall not be brought on site without prior approval of the Government. Radioactive materials or instruments capable of producing ionizing radiation as well as materials which contain asbestos, mercury, lithium, methylene chloride, lead (= or >0.06%), or polychlorinated biphenyls (PCB’s) are prohibited. Definitions of hazardous materials are specified in the latest version, including revisions adopted during the term of the contract, of FED-STD-313F.
Nickel Metal Hydride and lithium batteries are permissible for memory backup. Class I Ozone Depleting Substances as defined in 40 CFR 82 shall not be used in the performance of this contract or be provided as part of the equipment. Exceptions to the prohibition of these materials must be referred to the Contracting Officer in writing, for consideration, not later than 60 calendar days after effective date of contract and prior to any work being performed.
Environmental Protection. Under the operating, service, transportation, and storage conditions described herein, the machine shall not emit materials hazardous to the ecological system as prohibited by Federal, state, or local statutes in effect at the point of installation.
Lubrication. Means shall be provided to ensure proper lubrication for all moving parts in accordance with manufacturer requirements. All oil holes, grease fittings, and filler caps shall be easily accessible.
Recirculating Lubrication. When the machine is equipped with a recirculating lubrication system, it shall include a filter that is cleanable or replaceable. Each lubricant reservoir shall have at least a 24-hour capacity. Means shall be provided to indicate a low lubrication condition. When a low lubrication condition occurs, the machine shall complete the current operation and come to a complete stop. The machine shall indicate that lubrication is required.
Replacement Parts. All parts subject to replacement shall be manufactured to definite dimensions and tolerances. Replacement parts shall be interchangeable without requiring modification. Replacement parts are those that are subject to wear or failure such as gears, bearings, shafts, feed screws, drive belts, pumps, and seals. Electrical replacement parts shall include but not be limited to, motors, relays, fuses, switches, magnetics, pushbuttons, light bulbs, braking mechanisms, and solid-state devices. Tooling and accessories normally supplied as standard items shall also be considered replacement parts.
Foreign-sourced replacement parts shall either be interchangeable with domestically supplied components or be readily available from a domestic source.
Construction. The machine shall be constructed of parts that are new, without defects, and free of repairs. The structure shall withstand all forces encountered during operation of the machine to its maximum rating and capacity without distortion.
Castings and Forgings. All castings and forgings shall be free of defects, scale, and mismatching. No processes such as welding, peening, plugging, filling with solder or paste shall be used for reclaiming any defective part.
Fastening Devices. All screws, pins, bolts, and other fasteners shall be installed to prevent unintentional loosening. Fastening devices subject to removal or adjustment shall not be permanently installed.
Threads. All threaded parts used on the machine and its related attachments and accessories shall conform to FED-STD-H28B and the applicable “Detailed Standard” section referenced therein or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
Hydraulic System. Under the condition that a machine has a hydraulic system, the system shall conform to ISO 4413. The system shall be complete, including all pumps, valves, piping, cylinders, and pressure controls. A machine that does not require a hydraulic system to operate properly shall be considered acceptable.
Pneumatic System. Under the condition that a machine has a pneumatic system, the system shall conform to ISO 4414. The system shall be complete, including all pumps, valves, piping, cylinders, and pressure controls. A machine that does not require a pneumatic system to operate properly shall be considered acceptable.
Gears. All gears of axis drive trains shall conform to or exceed all provisions of ANSI/AGMA ISO 1328-1-B14. All gears shall be of proper width and size to transmit full-rated torque and horsepower throughout the speed ranges without failure for the expected service life of the machine. Gears in drive trains shall be hardened and ground steel.
Surfaces. All surfaces shall be clean and free of harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. The condition and finish of all surfaces shall be in accordance with the manufacturer's commercial practice.
Welding, Brazing, or Soldering. Welding, brazing, or soldering shall be employed only where specified in the original design. None of these operations shall be employed as a repair measure for any defective part.
Painting. The machine shall be painted in accordance with the manufacturer’s commercial practice. All paint shall be of the lead-free type.
Workmanship. Workmanship of the machine shall meet all requirements specified herein and shall be of a quality equal to that prevailing among manufacturers producing equipment of the type covered by this purchase description.
Components. The machine shall consist of not less than the following components:
Base. The base shall be a stress relieved, heavy duty, ribbed casting or steel weldment having characteristics that minimize both thermal and vibration effects, while providing the strength and size to assure maximum rigidity and support for any load within the rated capacity of the machine. Means shall be provided for accurate, ease of leveling.
Machine Housing. The machine shall come with a machine housing that is a rigid fabricated design. It shall include a balancing spindle with high precision, a hardened mounting flange specific to SAE ARP 4048, and a force measuring transducer system for single plane unbalance measurement.
Drive System. The machine shall include an enlacing belt drive arrangement that consists of a motor bed separate from the machine bed with a traversable motor plate, a low-profile belt guide and tensioner, and a remote angle package.
Variable Ramp Drive System. The machine shall come with a variable ramp drive system within the control system to manually modify the acceleration ramp up and the deceleration ramp down of the drive motor system.
Belt Guide and Tensioner. The machine shall come with a low-profile belt guide and tensioner that is designed to operate pneumatically while being interlocked with the drive system. The pneumatic system should be mounted to the front for easier access for maintenance.
Work Support. The machine shall have one set of two work supports, with force measuring pickups fully traversable along the machine bed.
Balancing. The machine shall demonstrate a static and couple balancing process.
Electrical System. The machine shall conform to NFPA 79 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. The existing source power available at the facility is 480 volt, 3-phase, 60 Hertz (Hz), 70 Amps. The machine’s electrical system shall be tolerant of fluctuation of ± 10 percent. The electrical system shall be complete, including any electrical transformer(s) that may be required to modify the existing source voltage to the proper operating voltage of the equipment. A properly rated, and fused, single disconnect device shall be utilized on the machine with means of lockout in the off position only.
Electrical Enclosures. Construction of the electrical enclosures shall be in accordance with NEMA 250 type 12 or current equivalent ISO/EN/DIN/JIS/IEC standards and shall provide for ventilation of components and shall be designed for an indoor non-hazardous location. All electrical components shall conform to NFPA 79, NEMA ICS 6 or equivalent ISO/EN/DIN/JIS standards. The machine shall be provided with interlocks on its electronic cabinet that shall instantly remove power from the equipment when the door is opened in accordance with NFPA 79 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
Electrical Cabinet. The electrical cabinet that incorporates all the controls necessary for the machine to run efficiently. Components would include PC, keyboard, electrical power, printer, connection ports and software to run the machine. The cabinet is connected to the machine but is portable up to 8 feet.
Arc Flash Protection. The machine enclosures shall be marked for arc flash in accordance with NFPA 79 Paragraph 16.2.3 “Safety Signs for Electrical Enclosures” or current equivalent ISO/EN/DIN/JIS/IEC standards for arc flash safety. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
Solid-State Components. Electrical devices used to power electrical servo and spindle motors of control voltage delivered to solid-state electrical components shall be solid-state devices. Such devices shall be equipped to handle the electrical load imposed by operation of the machine to its maximum potential. The use of selenium in solid-state components shall be restricted to those devices that protect other solid-state components from voltage surge.
Computer Numerical Control (CNC) Features. The machine shall be equipped with a CNC control incorporating all standard features. The CNC unit shall provide programmable automatic control of machine functions, operating modes, axis movement and other part program directed functions for the machine. Movement in all axes shall be both synchronous and independent positioning. Control features shall include Manual Data Input (MDI), simultaneous control of all axes, programmable interface, part program edit, part program storage, background editing function, fixed cycles, and control diagnostics.
The CNC shall direct machine functions from command data stored in memory. The data stored in memory shall be input by the media specified herein. The control shall initiate a halt and error signal should a fault condition occur in the control. The control shall automatically shut down when internal operating temperatures exceed safe operating limits.
Software. The contractor shall provide a permanently licensed programming software package to Fleet Readiness Center Southwest. The software package shall include at a minimum the following modules:
a. Electronic Zoning
b. Tooling Compensation (Remount Indexing)
c. Multiple Run Averaging
d. Tooling Management Software
e. Index Balancing Software
f. Custom Calibration Capability
g. Component Balancing Software
h. Rotor Memories
i. Ethernet Connectivity
j. SAE ARP Testing Software
Microprocessor. The machine shall have a microprocessor based electronic measuring instrument with a high-resolution color display.
Motors. Motors shall be rated for continuous duty. Alternating-current (AC) motors shall be designed to operate on 60-Hz and each motor enclosure shall meet the requirements for a drip-proof enclosure. All motors shall meet the requirements of NEMA MG-1 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
Each motor shall have an identification plate in accordance with paragraph 3.7 to identify manufacturer, model number, serial number, voltage, amperage, horsepower, phase, frequency, and frame number. Motor horsepower shall be the manufacturer’s standard or standard optional horsepower as indicated on the manufacturer's design and construction drawing(s).
Work light. A work light, whether built-in or added on, shall be provided. The light shall have a protective shield and provide maximum light to the work area.
Facility Connections. Electrical connections made to the facility electrical system shall conform to NFPA 70.
Hour Meter. The machine shall be equipped with a non-resetting type, hour meter to display accumulated operating time of the drive motor(s), mounted on the main electrical panel visible from the outside, sealed to prevent the entrance of dust and moisture, and shall be mounted to withstand shock and vibration generated by the machine.
The meter shall have a range of 0 to 99,999.9 hours in increments of one (1) tenth of one
(1) hour. A CNC control that tracks and displays total machine on time (a non-resetting type), controller on, program runtime, and run time of the servo motor(s) shall be considered to meet this requirement. The meter shall be sealed to prevent the entrance of dust and moisture and shall be mounted to withstand shock and vibration generated by the machine.
Size and Capacity. The size and capacity of the machine shall be not less than specified in Table I.
TABLE I
Weight of Machine 7,500 lbs Max. Wt. per Pedestal 3,750 lbs Max. Wt. Of Rotor @ 900 RPM 2,500 lbs Max. Rotor Diameter over bed 69 inches Max. Length of Rotor btw. Bearing Ctr.
106 inches
Machine Bed Length 120 inches Swing Diameter 69 inches Max Dimensions for parts 51 inches x 49 inches x 49 inches Max Weight for parts 1095 lbs
BELT DRIVE
Max. Diameter of Rotor over Belt Tension
50 inches
Small Drive Pulley Diameter 5.5 inches Large Drive Pulley Diameter 7.75 inches
END DRIVE
Balancing Speed 60-1200 RPM Power of Motor 50 HP Bearing Journal Diameters 1.25 - 9.5 inches Drive Shaft 1000 Ft/lbs.
Alignment and Accuracy Tolerances. The alignment and accuracy tolerances of the machine shall be as specified in Table II.
TABLE II
Left Rotor Balancing Tolerance 10 gr-in or below Right Rotor Balancing Tolerance 10 gr-in or below Accuracy (displacement of C.G) 10 micro inch Sensitivity 0.25 gmm/kg Unbalance Reduction Ratio Up to 95%
Standard Tooling and Equipment. All standard tooling and equipment required for proper operation and maintenance of the machine shall be provided as specified in Table
III.
TABLE III
1C6831 P03 RHINESTAHL ADAPTER
1C6831 P04 RHINESTAHL ADAPTER
1C6831 P05 RHINESTAHL ADAPTER
1C6831 P06 RHINESTAHL ADAPTER
1C6831 P07 RHINESTAHL ADAPTER
1C6831 P08 RHINESTAHL ADAPTER
MS35309 – 308 RHINESTAHL ¼ SCREW
MS90725-62 RHINESTAHL ¼ SCREW
MS-90725 – 7 RHINESTAHL SCREW
MS51968 – 3 RHINESTAHL NUT
MS16998 - 46 RHINESTAHL SCREW
Marking on Instruments, Control Panels, and Plates. All words on plates shall be in the English language. Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All plates shall be corrosion resistant.
Lubrication Plate. A lubrication plate shall be permanently and securely attached to each machine. The plate shall contain the following information.
a. Points of Lubricant Application
b. Servicing Interval
c. Type of Lubricant
d. Viscosity
e. Military or Federal Specification for Each Lubricant (If available)
f. Size and Type of Each Lubricant Filter
Nameplate. A nameplate shall be permanently and securely attached to each machine. The nameplate shall contain the information listed below. If the machine is a special model, the model designation shall include the model number of the basic standard machine and a suffix identified in the manufacturer's permanent records.
a. Nomenclature
b. Manufacturer’s Name
c. Manufacturer’s Model Designation
d. Manufacturer’s Serial Number
e. Power Input (Volts, Total Amps, Phase, Frequency)
f. Contract Number
g. Date of Manufacture
Identification Marking of Military Property. An Item Unique Identification
Marking (IUID) shall be provided in accordance with MIL-STD-130N and all applicable documents within the standard with Machine Readable Information (MRI) for item identification marking and automatic data capture. The application of Human Readable Information (HRI) shall be used in combination with MRI and free text. At a minimum this tag shall contain the information listed in paragraph 3.7.2 Nameplate.
Technical Data. Two (2) hard copies and Two (2) electronic copy(s) on compact disk (CD) of technical data shall be provided with the machine via DOD Safe Website.
Technical data shall contain specifications, instructions for the operation, maintenance of the machine and recommended spare parts list in accordance with ISO 21940-2. All copies of technical data shall be legible and written in the English language.
a. All engineering drawings.
b. Factory service and operator manuals for the type and model of the machine being purchased.
c. Diagnostic procedures for isolating and correcting faults. Procedures shall be included in the service manuals for recalibrating and performing operational checks to ensure proper operation of any replaced parts, as required.
d. Preventative and predictive maintenance tasks, including oil and vibration analysis and show recommended intervals of tasks.
e. Software manuals and registration keys/codes shall be provided, along with original software installation disks.
Plan of Action and Milestones (POA&M). The contractor shall provide a POA&M to identify contractor performance dates of all major events from contract award to completion of all contract requirements. The initial POA&M shall be delivered thirty (30) calendar days After Contract Award (ACA). The milestones shall be prepared using a recognized project management technique (preferably Microsoft Project). The Government and the contractor shall review the report on a monthly basis. The contractor shall notify the Government prior to making any changes to the POA&M. All changes to the POA&M shall be approved in advance by the Government. The POA&M shall detail such items as engineering, procurement of major hardware, assembly, operational debug, factory acceptance, shipment, installation, training, and final acceptance test.
Acceptance Test Plan (ATP). The Contractor shall prepare an Acceptance Test Plan (ATP). The ATP shall be a step-by-step written instruction on how to verify compliance during Contract Quality Assurance Inspection and the Final Inspection/Acceptance Test specified in Sections 4.4 and 4.5. The Contractor shall develop and provide dimensioned drawings of the proposed test part specified in Paragraph 4.7.3. The Manufacture’s standard testing procedures shall be included in the ATP. Any procedures necessary for compliance with Section 4, which are not covered by the Manufacturer’s standard testing procedures, shall be identified and included in the ATP. The initial ATP shall be submitted thirty (30) calendar days ACA for Government review and approval. The accepted test procedures shall become part of this contract.
Installation. The contractor shall be responsible for all equipment (forklifts, man lifts, etc.) and qualified personnel for unloading, rigging, installation, anchoring, connecting machine to utilities, and leveling the machines in place. The contractor shall provide the necessary anchor bolts, leveling screws, and related hardware to secure the machines components to a foundation in accordance 29 CFR 1915 and OPNAV 5100.23 G. The contractor shall follow the customers hours of operation; 6:00am to 2:30pm PST, Monday through Friday excluding all national holidays, unless informed otherwise.
Lead and Asbestos Testing. The Contractor shall be responsible for conducting an onsite inspection for Lead Based Paint (LBP) and Asbestos Containing Material (ACM). The onsite inspection shall be completed within thirty (30) calendar days ACA, coordinate with the Contracting Officer. The facility has a known presence of LBP and ACM. A California accredited Asbestos Inspector shall perform the onsite inspection for Lead and Asbestos to identify any suspected material that appears to be involved in the project. Provide a signed report certifying the inspection. State the findings of the inspection and state if the area appears to be asbestos free or present the results of the sampling and analysis. The report shall be certified by the Asbestos Inspector and include the Inspector's certification number. Show locations of any samples taken in the report and on the Installation Plan. If either of these two substances are found in areas that will be disturbed by the Installation, and will pose a health and safety threat, the contractor must notify the contracting officer. The contractor is not required to remove or abate the lead and asbestos under this contract.
QUALITY ASSURANCE.
Responsibility for Inspection. The contractor shall be responsible for the performance of all inspection requirements specified herein and in accordance with the attached Quality Assurance Provision (QAP) The Government reserves the right to witness any inspections set forth in the purchase description where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
Responsibility for Compliance. All items must meet all requirements of sections 3 and 4.
Classification of Inspections. The inspection requirements specified herein are classified as follows:
a. Contract quality assurance inspection (Origin) (see 4.4).
b. Final Inspection/Acceptance test (Destination) (see 4.5).
Inspection Conditions. All inspections, tests, and examinations shall be performed in an indoor facility with ambient temperature conditions in the range of 55° F to 100° F and 10% to 95% relative humidity.
Contract Quality Assurance Inspection (Origin). Contract quality assurance inspection shall be applied at the contractor’s facility prior to being offered for acceptance under the contract. The machine and all peripheral equipment added to the machine shall be fully assembled and perform all functions in accordance with this specification. Quality conformance inspection shall consist of the examination in 4.6 and the tests in 4.7. The machine shall pass the examination, all tests, and contract quality assurance inspection to be acceptable for shipment.
Final Inspection/Acceptance Test (Destination). Final Inspection and acceptance test shall be performed on the machine to ensure conformance with this purchase description.
The acceptance test shall be performed only after the machine is installed at its final location. The acceptance test shall consist of the examination in 4.6 and all tests in 4.7. The machine shall pass the examination and all tests to be accepted.
Examination. The equipment shall be examined for design, dimensions, construction, materials, components, electrical equipment and workmanship to determine compliance with the requirements of this specification.
Tests. Unless otherwise specified within this document, all programs, instruments, materials, material handling equipment, qualified personnel, and tools required to perform and evaluate the tests shall be furnished by the contractor. All measurement tools and indicating devices shall be calibrated in accordance with the attached QAP. If a malfunction occurs during the test, the test shall be restarted each time until all tests in 4.7 are completed without a malfunction. Three (3) consecutive failures without completion of the test may be considered cause for rejection of the system. For the purpose of this test, a “failure” is defined as any equipment malfunction which requires remedial action to restore the system to full operation in accordance with this specification.
Alignment and Accuracy Tests. Tests shall be conducted to ensure the machine meets the alignment and accuracy tolerances specified in paragraph 3.5, Table II. The machine repeatability and accuracy shall be checked.
Operational Test. The machine shall be operated under CNC at no-load for not less than four (4) hours. During operational testing the control functions and machine response to commands for slide motions, turret indexing, spindle speed changes, feed rate changes and auxiliary functions shall be checked. The machine shall be run in each mode of operation (Manual and Automatic) to test the machine’s response to command data. Three
(3) failures in a row to complete the run test may be cause for rejection of the entire system. After successful completion of the operational test, proper operation of all controls, motors, adjusting mechanisms, over-travel limits (programmed stops and hard stops), emergency stop devices, and accessories shall be verified. The safety limit stops shall be checked by attempting to exceed the limits of travel of each moving axis.
Performance Test. The machine shall be tested in accordance with the agreed upon ATP referenced in paragraph 3.8.2. The machine shall be tested in accordance with SAE ARP 4048 and OPNAVINST 3960.16A test to ensure that the machine can balance the components properly. The SAE Aerospace Standard test provides a general performance and capacity requirements used to measure the unbalance in gas turbine engine. The machine needs to be verified by completing several tests to ensure maximum performance.
The tests include repeatability, unbalance reduction ratio, tooling compensation, and achievable residual specific balance. The tests shall have test data recorded, calculated and charted for comparison to the standard.
INSTALLATION RESPONSIBILITIES
Government Contractor ☒ ☐ a. Provide machine foundation in accordance with the
Manufacturer’s design requirements.
☐ ☒ b. Furnish labor and material handling equipment for off-loading and placing item on foundation.
☐ ☒ c. Provide and install anchor bolts and nuts.
☐ ☒ d. Set and rough level the machine on its foundation ☐ ☒ e. Level and align machine.
☐ ☒ f. Connect machine to the provided utilities hook-up.
☐ ☒ g. Provide all necessary tools, gages, and instrumentation necessary to perform the required tests.
☐ ☒ h. Provide and charge all systems with fluids in accordance with manufacturer's instructions.
☒ ☐ i. Material for performance testing at Government facility ☐ ☒ j. Material for performance testing at Contractor's facility ☐ ☒ k. Material handling, Rigging equipment and Qualified
Personnel for performance testing.
GOVERNMENT RESPONSIBILITIES
☒ Provide utilities hook-up within 20 feet of the machine.
| 1.0 SCOPE. |
| 1.1 Scope. The content of this specification describes the minimum requirements for four new Horizontal Balancing Machines. The contractor shall provide complete installation services to include all parts, rigging equipment, qualified personnel, mate... |
| 2.0 APPLICABLE DOCUMENTS. The documents listed in this section are cited in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as ... |
| 2.1 Government Documents. |
| 2.1.1 Specifications, Standards, and Handbooks. The following specifications, standards and handbooks form a part of this document to the extent specified herein. |
| 2.2 Non-Government Publications, Specifications, Standards, and Handbooks. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be ... |
| 2.3 Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulation unless a s... |
| 2.4 Acronym Definitions Not Explicitly Listed in Text. The following acronyms not explicitly listed in each section text are defined as follows: |
| 2.5 Proposal Format. Proposal shall be submitted using the following mathematical conventions: |
| 3.0 REQUIREMENTS. |
| 3.1 Design. The item offered shall be new and a current commercially available model. A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold or is ... |
| 3.1.1 Measuring and Indicating Device Graduations. All measuring and indicating devices on the machine shall be graduated in the United States customary units. An electronic control system that demonstrates switching between manufacturer standard uni... |
| 3.1.2 Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's workstation(s). |
| 3.1.3 Safety and Health Requirements. All machine parts, components, mechanisms, and assemblies furnished on the machine, whether or not specifically required herein, shall comply with all of the requirements of OSHA 29 CFR 1910 or equivalent ISO/EN/... |
| 3.1.3.1 Safety Guarding. Covers, guards, or other safety devices shall be provided per ANSI B11 or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirem... |
| 3.1.4 Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the “A” weighted scale of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3) f... |
| 3.1.5 Hazardous Material Exclusions. Supplies or materials being provided as part of the equipment shall be free of known hazardous materials. These materials shall not be brought on site without prior approval of the Government. Radioactive material... |
| 3.1.6 Environmental Protection. Under the operating, service, transportation, and storage conditions described herein, the machine shall not emit materials hazardous to the ecological system as prohibited by Federal, state, or local statutes in effec... |
| 3.1.7 Lubrication. Means shall be provided to ensure proper lubrication for all moving parts in accordance with manufacturer requirements. All oil holes, grease fittings, and filler caps shall be easily accessible. |
| 3.1.7.1 Recirculating Lubrication. When the machine is equipped with a recirculating lubrication system, it shall include a filter that is cleanable or replaceable. Each lubricant reservoir shall have at least a 24-hour capacity. Means shall be provid... |
3.1.8 Replacement Parts. All parts subject to replacement shall be manufactured to definite dimensions and tolerances. Replacement parts shall be interchangeable without requiring modification. Replacement parts are those that are subject to wear or ...
| 3.2 Construction. The machine shall be constructed of parts that are new, without defects, and free of repairs. The structure shall withstand all forces encountered during operation of the machine to its maximum rating and capacity without distortion. |
| 3.2.1 Castings and Forgings. All castings and forgings shall be free of defects, scale, and mismatching. No processes such as welding, peening, plugging, filling with solder or paste shall be used for reclaiming any defective part. |
| 3.2.2 Fastening Devices. All screws, pins, bolts, and other fasteners shall be installed to prevent unintentional loosening. Fastening devices subject to removal or adjustment shall not be permanently installed. |
| 3.2.3 Threads. All threaded parts used on the machine and its related attachments and accessories shall conform to FED-STD-H28B and the applicable “Detailed Standard” section referenced therein or equivalent ISO/EN/DIN/JIS standards. At the time of p... |
| 3.2.4 Hydraulic System. Under the condition that a machine has a hydraulic system, the system shall conform to ISO 4413. The system shall be complete, including all pumps, valves, piping, cylinders, and pressure controls. A machine that does not requ... |
| 3.2.5 Pneumatic System. Under the condition that a machine has a pneumatic system, the system shall conform to ISO 4414. The system shall be complete, including all pumps, valves, piping, cylinders, and pressure controls. A machine that does not requ... |
| 3.2.6 Gears. All gears of axis drive trains shall conform to or exceed all provisions of ANSI/AGMA ISO 1328-1-B14. All gears shall be of proper width and size to transmit full-rated torque and horsepower throughout the speed ranges without failure fo... |
| 3.2.7 Surfaces. All surfaces shall be clean and free of harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. The condition and finish of all surfaces shall be in a... |
| 3.2.8 Welding, Brazing, or Soldering. Welding, brazing, or soldering shall be employed only where specified in the original design. None of these operations shall be employed as a repair measure for any defective part. |
| 3.2.9 Painting. The machine shall be painted in accordance with the manufacturer’s commercial practice. All paint shall be of the lead-free type. |
| 3.2.10 Workmanship. Workmanship of the machine shall meet all requirements specified herein and shall be of a quality equal to that prevailing among manufacturers producing equipment of the type covered by this purchase description. |
| 3.3 Components. The machine shall consist of not less than the following components: |
| 3.3.1 Base. The base shall be a stress relieved, heavy duty, ribbed casting or steel weldment having characteristics that minimize both thermal and vibration effects, while providing the strength and size to assure maximum rigidity and support for an... |
| 3.3.2 Machine Housing. The machine shall come with a machine housing that is a rigid fabricated design. It shall include a balancing spindle with high precision, a hardened mounting flange specific to SAE ARP 4048, and a force measuring transducer sy... |
| 3.3.3 Drive System. The machine shall include an enlacing belt drive arrangement that consists of a motor bed separate from the machine bed with a traversable motor plate, a low-profile belt guide and tensioner, and a remote angle package. |
| 3.3.3.1 Variable Ramp Drive System. The machine shall come with a variable ramp drive system within the control system to manually modify the acceleration ramp up and the deceleration ramp down of the drive motor system. |
| 3.3.3.2 Belt Guide and Tensioner. The machine shall come with a low-profile belt guide and tensioner that is designed to operate pneumatically while being interlocked with the drive system. The pneumatic system should be mounted to the front for easie... |
| 3.3.4 Work Support. The machine shall have one set of two work supports, with force measuring pickups fully traversable along the machine bed. |
| 3.3.5 Balancing. The machine shall demonstrate a static and couple balancing process. |
| 3.3.6 Electrical System. The machine shall conform to NFPA 79 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. The existing sou... |
| 3.3.6.1 Electrical Enclosures. Construction of the electrical enclosures shall be in accordance with NEMA 250 type 12 or current equivalent ISO/EN/DIN/JIS/IEC standards and shall provide for ventilation of components and shall be designed for an indo... |
| 3.3.6.2 Electrical Cabinet. The electrical cabinet that incorporates all the controls necessary for the machine to run efficiently. Components would include PC, keyboard, electrical power, printer, connection ports and software to run the machine. The... |
| 3.3.6.3 Arc Flash Protection. The machine enclosures shall be marked for arc flash in accordance with NFPA 79 Paragraph 16.2.3 “Safety Signs for Electrical Enclosures” or current equivalent ISO/EN/DIN/JIS/IEC standards for arc flash safety. At the ti... |
| 3.3.6.4 Solid-State Components. Electrical devices used to power electrical servo and spindle motors of control voltage delivered to solid-state electrical components shall be solid-state devices. Such devices shall be equipped to handle the electric... |
| 3.3.7 Computer Numerical Control (CNC) Features. The machine shall be equipped with a CNC control incorporating all standard features. The CNC unit shall provide programmable automatic control of machine functions, operating modes, axis movement and ... |
| 3.3.7.1 Software. The contractor shall provide a permanently licensed programming software package to Fleet Readiness Center Southwest. The software package shall include at a minimum the following modules: |
| 3.3.7.2 Microprocessor. The machine shall have a microprocessor based electronic measuring instrument with a high-resolution color display. |
| 3.3.8 Motors. Motors shall be rated for continuous duty. Alternating-current (AC) motors shall be designed to operate on 60-Hz and each motor enclosure shall meet the requirements for a drip-proof enclosure. All motors shall meet the requirements of ... |
| 3.3.9 Work light. A work light, whether built-in or added on, shall be provided. The light shall have a protective shield and provide maximum light to the work area. |
| 3.3.10 Facility Connections. Electrical connections made to the facility electrical system shall conform to NFPA 70. |
| 3.3.11 Hour Meter. The machine shall be equipped with a non-resetting type, hour meter to display accumulated operating time of the drive motor(s), mounted on the main electrical panel visible from the outside, sealed to prevent the entrance of dust ... |
| 3.4 Size and Capacity. The size and capacity of the machine shall be not less than specified in Table I. |
| 3.5 Alignment and Accuracy Tolerances. The alignment and accuracy tolerances of the machine shall be as specified in Table II. |
| 3.6 Standard Tooling and Equipment. All standard tooling and equipment required for proper operation and maintenance of the machine shall be provided as specified in Table III. |
| 3.7 Marking on Instruments, Control Panels, and Plates. All words on plates shall be in the English language. Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All plates shall be corrosion resistant. |
| 3.7.1 Lubrication Plate. A lubrication plate shall be permanently and securely attached to each machine. The plate shall contain the following information. |
| 3.7.2 Nameplate. A nameplate shall be permanently and securely attached to each machine. The nameplate shall contain the information listed below. If the machine is a special model, the model designation shall include the model number of the basic st... |
| 3.7.3 Identification Marking of Military Property. An Item Unique Identification Marking (IUID) shall be provided in accordance with MIL-STD-130N and all applicable documents within the standard with Machine Readable Information (MRI) for item identi... |
| 3.8 Technical Data. Two (2) hard copies and Two (2) electronic copy(s) on compact disk (CD) of technical data shall be provided with the machine via DOD Safe Website. Technical data shall contain specifications, instructions for the operation, mainte... |
| 3.8.1 Plan of Action and Milestones (POA&M). The contractor shall provide a POA&M to identify contractor performance dates of all major events from contract award to completion of all contract requirements. The initial POA&M shall be delivered thirty... |
| 3.8.2 Acceptance Test Plan (ATP). The Contractor shall prepare an Acceptance Test Plan (ATP). The ATP shall be a step-by-step written instruction on how to verify compliance during Contract Quality Assurance Inspection and the Final Inspection/Accept... |
| 3.9 Installation. The contractor shall be responsible for all equipment (forklifts, man lifts, etc.) and qualified personnel for unloading, rigging, installation, anchoring, connecting machine to utilities, and leveling the machines in place. The con... |
| 3.9.1.1 Lead and Asbestos Testing. The Contractor shall be responsible for conducting an onsite inspection for Lead Based Paint (LBP) and Asbestos Containing Material (ACM). The onsite inspection shall be completed within thirty (30) calendar days AC... |
| 4.0 QUALITY ASSURANCE. |
| 4.1 Responsibility for Inspection. The contractor shall be responsible for the performance of all inspection requirements specified herein and in accordance with the attached Quality Assurance Provision (QAP) The Government reserves the right to witn... |
| 4.1.1 Responsibility for Compliance. All items must meet all requirements of sections 3 and 4. |
| 4.2 Classification of Inspections. The inspection requirements specified herein are classified as follows: |
| 4.3 Inspection Conditions. All inspections, tests, and examinations shall be performed in an indoor facility with ambient temperature conditions in the range of 55 F to 100 F and 10% to 95% relative humidity. |