24-0148_Cost_proposal.xls
XLS spreadsheet 31 KB Posted
- Attached to
- 24-0148 Long valley Inspection Booth
- Solicitation number
- 0000034482
- Issued by
- Los Angeles County, California
About this file
This is a cost proposal template spreadsheet for IFB 24-0148 that provides a structured format for bidders to submit their pricing. The spreadsheet is organized into three main cost categories: Labor, Materials, and Other/Miscellaneous. The labor section includes line items for concrete work, booth installation, bollard installation, and electrical work. The materials section includes items such as inspection booth, bollards, and concrete.
The pricing structure requires bidders to input hours and rates for labor components, quantities and unit costs for materials (with tax to be included in unit costs), and quantities and unit costs for other items such as equipment rental and mobilization. The spreadsheet automatically calculates subtotals for each section and provides a grand total for the entire project. No pre-filled amounts or estimated costs are provided in the template.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24-0148_Attachment_1,_LABOR_CODE_CERTIFICATIONS.pdf | ||
| 24-0148_IFB.pdf | ||
| 24-0148_Attachment_2,_Noncollusion_Affidavit.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Cost Proposal Sheet | |||
| IFB 24-0148 | |||
| Labor: | |||
| Classification | Hours | Rate | Total |
| Concrete Work | $0.00 | ||
| Booth installation | $0.00 | ||
| Bollard Installation | $0.00 | ||
| Electrical Work | $0.00 | ||
| $0.00 | |||
| $0.00 | |||
| Total Labor: | $0.00 | ||
| Materials*: | |||
| Description | Quantity | Unit Cost | Total |
| Inspection Booth | $0.00 | ||
| Bollards | $0.00 | ||
| Concrete | $0.00 | ||
| $0.00 | |||
| $0.00 | |||
| $0.00 | |||
| Total Materials: | $0.00 | ||
| Other/Miscellaneous: | |||
| Description | Quantity | Unit Cost | |
| equipment rental costs | $0.00 | ||
| mobilization | $0.00 | ||
| $0.00 | |||
| $0.00 | |||
| Total Other/Miscellaneous: | $0.00 | ||
| GRAND TOTAL: | $0.00 | ||
| * Tax on materials must be included in unit cost |
File details come from the government source that posted it. Updated .