This presolicitation notice provides details for the replacement of Combined Heat and Power plants and addition of thermal storage at Caserma Ederle in Vicenza, Italy. The project scope includes demolishing two 1.5 MW diesel cogeneration units that are no longer operational and installing two new 1.5 MW natural gas cogeneration units with heat recovery modules and controls. The scope also involves installing two new thermal energy storage tanks and converting fluorescent lighting to LED. The work will be completed for the Naval Facilities Engineering Command Europe Africa Central and has an estimated value between $5-10 million. Offerors should monitor SAM.gov for the full solicitation and amendments, which will be available electronically only.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE- SOLICITATION SYNOPSIS
28 February 2023 NAICS Code: 237130
NAVFAC EURAFCENT
Viale Porto Box 51
Aeroporto, Capodichino
80144 Napoli, Italia
Solicitation No. N3319123R9004 Replace Co-Gen Plants & Add Thermal Storage, Caserma Ederle, Vicenza, Italy Contact Point: James Pabon, Contract Specialist - Phone: 0039 0815687804 e-mail: james.a.pabon2.civ@us.navy.mil This is a Pre-solicitation notice only. This is not a Request for Proposal (RFP); there is not a solicitation or specifications available at this time.
This announcement is for information and planning purposes only and is not to be construed as a commitment by the Naval Facilities Engineering Systems Command Europe Africa Central (NAVFAC EURAFCENT), implied or otherwise, to issue a solicitation or ultimately award a contract. This notice does NOT constitute a request for proposal, request for quote, or invitation for bid.
This project is for the replacement of Co-Gen Plants & Thermal Storage, Caserma Ederle, Vicenza, Italy; a general summary of the work is as follows:
This project includes the demolition of two 1.5 MW Combined Heat and Power (CHP) diesel cogenerators, including containerized cogeneration units, heat recovery infrastructure, and associated appurtenances not suitable for reuse at the Central Energy Plant (CEP), and to provide for the installation of two new 1.5 MW CHP single fuel natural gas cogenerators complete with heat recovery modules, controls, and associated appurtenances necessary for integration of the units into the existing CEP trigeneration system. Both existing diesel cogenerator units are no longer operational. Additionally, this scope of work includes the installation of two new thermal energy storage tanks to improve the capacity to use the recovered CHP energy efficiently. Finally, project scope includes conversion of fluorescent lighting inside the CEP and within the plant yard to be converted to LED.
CLIN 0001, Base Bid: CHP Replacement CLIN 0002, Option Item No. 1: Thermal Water Storage Tank CLIN 0003, Option Item No. 2: Upgrade Interior Lighting to LED In accordance with FAR 36.204, the magnitude of this project is expected to be between $5,000,000 and $10,000,000.
This is a new procurement. It does not replace an existing contract. No prior contract information exists.
Offerors may view and/or download the solicitation at Opportunities https://sam.gov when it becomes available. The solicitation is available in electronic format only. CDs or hard copies of the solicitation will not be provided. All notices/amendments related to the solicitation will be posted to https://sam.gov.
All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process.
It is the responsibility of the contractor to check SAM.gov frequently for any amendments or changes to the solicitation. The Government is not responsible for any loss of internet connectivity or for an offerors inability to access the documents posted at the referenced website. No CDs or hard copies will be made available.
The information provided below is to alert the prospective offeror to items which may take some time to process. Therefore, it is recommended that a firm that intends to submit a proposal start the process at this time.
The Government has stopped using Data Universal Numbering System (DUNS) numbers, and instead require all offerors to have a current (active) Unique Entity Identifier (UEI), as the primary means of entity identification for federal awards government-wide. The Government also continues to require each offeror to have a current (active) Commercial and Governmental Entity (CAGE) Code if a United States firm, or a NATO Commercial and Governmental Entity (NCAGE) Code if a non- United States firm, and an active registration in the System for Award Management (SAM). The UEI and CAGE or NCAGE Code must be included on the proposals. It is the responsibility of the offeror to comply and register.
· Unique Entity Identifier (UEI): (https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update)
· NATO Commercial and Governmental Entity (NCAGE) Code: (https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx)
· System for Award Management (SAM): (https://www.sam.gov/SAM/)
JOINT VENTURE REQUIREMENTS
Joint Venture (JV) offerors shall provide with their proposal a notarized legal document that establishes the JV. The JV Agreement shall take effect upon the submission of the proposal and remain irrevocable until one (1) year after the work has been finally inspected and accepted by the Government. Submission of the notarized legal document that establishes the JV shall be furnished with the proposal in its original language version along with a certified English translation of the notarized JV document. The Joint Venture must be formed and valid at the time of submission of the proposal. The offeror must include the NCAGE code and DUNS number of the JV on their proposal. The validated notarized legal document must include language that each member of the JV will be jointly and severally liable for the performance of the whole contract and will be incorporated into the contract award if award is made to the JV.
(a) Name of firms that form the Joint Venture and the name of the Joint Venture
(b) Name and title of the corporate officials signing in behalf of each party
(c) Solicitation number
(d) Description of the responsibilities in terms of work category for each partner
(e) The statement "The composition and structure of the Joint Venture will remain unchanged from award to one (1) year after the work has been finally inspected and accepted by the Government.”
(f) Date of issuance of the agreement and notarized signature of the corporate officials signing in behalf of each party.
(g) Statement under oath stating that the Joint Venture(JV) is in compliance at the time of proposal submission with all applicable laws, rules, and regulations. This statement must be signed under oath by all members comprising the Joint Venture.
The U.S. Government reserves the right to review the actual JV Agreement to determine its basis and compliance with the applicable laws. Any internal agreements affecting the internal composition of the existing JV and its potential liabilities in relation to the contract (bonds, insurance, etc.) will be sent to the Contracting Officer to provide notice of the same. Any change in the composition of the JV will require the JV to formally request a Novation Agreement in accordance with FAR 42.12, which will be approved/disapproved at the discretion of the Contracting Officer.
CERTIFICATIONS, LICENSES, PERMITS, FEES, ETC.
Offerors are responsible for acquiring any required professional certifications (licensing) as required by the country the work will be performed in.
Offerors shall be responsible for determining and paying all fees associated with, and obtaining any required permits for proposed projects including, but not necessarily limited to permits for onsite and off-site hauling, demolition/disposal, storm water discharge, construction activity, temporary utilities, road improvements, communications, etc.
Offerors are responsible for complying with environmental laws, regulations and requirements.