23B0404_Schedule of Price.xlsx
XLSX spreadsheet 57 KB Posted
- Solicitation number
- N4008423B0404
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND of 23B0404_Schedule of Price.xlsx | XLSX spreadsheet | |
| N4008423B0404_0001.pdf | ||
| PWS_AMEND_012-ELIN_ISWM-Ikego.pdf | ||
| Attachment 2-AcceptableID.pdf | ||
| 23B0404B Attachment 1.pdf | ||
| 23B0404A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Price
| SOLICITATION# N40084-23-B-0404 | ||||
| SCHEDULE OF PRICE | ||||
| NAME OF ESTIMATER: NAVFACFE PRY231, Ryuji Matsumoto | Date: | |||
| NAME OF OFFEROR OR CONTRACTOR: | ||||
| LINE ITEM | ITEM | Q'TY | UNIT | AMOUNT |
| NO. |
| Item 0001 | Recurring, Base Period | 1 | LS | ¥ |
| Provide Integrated Solid Waste Management (ISWM) Services | ||||
| for General Waste Collection & Disposal at IKEGO Housing Area | ||||
| One year, from 1 July 2023 through 30 June 2024. |
| Item 0002 | Non-Recurring, Base Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year, from 1 July 2023 through 30 June 2024. |
| Item 0003 | Recurring, First Option Period | 1 | LS | ¥ |
| Provide Integrated Solid Waste Management (ISWM) Services | ||||
| for General Waste Collection & Disposal at IKEGO Housing Area | ||||
| One year, from 1 July 2024 through 30 June 2025. |
| Item 0004 | Non-Recurring, First Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year, from 1 July 2024 through 30 June 2025. |
| Item 0005 | Recurring, Second Option Period | 1 | LS | ¥ |
| Provide Integrated Solid Waste Management (ISWM) Services | ||||
| for General Waste Collection & Disposal at IKEGO Housing Area | ||||
| One year, from 1 July 2025 through 30 June 2026. |
| Item 0006 | Non-Recurring, Second Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year, from 1 July 2025 through 30 June 2026. |
| Item 0007 | Recurring, Third Option Period | 1 | LS | ¥ |
| Provide Integrated Solid Waste Management (ISWM) Services | ||||
| for General Waste Collection & Disposal at IKEGO Housing Area | ||||
| One year, from 1 July 2026 through 30 June 2027. |
| Item 0008 | Non-Recurring, Third Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year, from 1 July 2026 through 30 June 2027. |
| Item 0009 | Recurring, Fourth Option Period | 1 | LS | ¥ |
| Provide Integrated Solid Waste Management (ISWM) Services | ||||
| for General Waste Collection & Disposal at IKEGO Housing Area | ||||
| One year, from 1 July 2027 through 30 June 2028. |
| Item 0010 | Non-Recurring, Fourth Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year, from 1 July 2027 through 30 June 2028. |
| TOTAL: (LINE ITEM 0001 through 0010) | ¥ | |
| FY22 Exchange Rate, $1 = | ¥ 106.4531 | $ - 0 |
CLIN 9000 Exhibit A (Base Period)
CLIN 9001 Exhibit B (First Option Period)
CLIN 9002 Exhibit C (Second Option Period)
CLIN 9003 Exhibit D (Third Option Period)
CLIN 9004 Exhibit E (Fourth Option Period)
| NOTE: | The number of Placeholders established depends on the maximum number of lines |
| of accounting anticipated on an individual task order. |
Detail line items for task order is located in Attachment J-0200000-07
| CLIN = CONTRACT LINE ITEM |
| LS = LUMP SUM |
| NTE = NOT-TO-EXCEED |
| Q'TY = QUANTITY |
&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] B-&P
CUI // FEDCON [when filled in]
ELIN A001-E003
| Attachment J-0200000-07 |
| SOLICITATION# N40084-23-B-0404 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Price - Base Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs A001 through A003 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| ISWM Service for IKEGO Housing annex area, Spec Item 3 | ||||||
| A001 | CNIC | 1 | LO | ¥ | ||
| A002 | DoDEA | 1 | LO | ¥ | ¥ | |
| A003 | HSG | 1 | LO | ¥ | ¥ |
| TOTAL RECURRING LINE ITEMS | ¥ | |
| ELIN = | Exhibit Line Item Number | |
| LO = | Lot | |
| Attachment J-0200000-07 | ||
| SOLICITATION# N40084-23-B-0404 | ||
| EXHIBIT B - CLIN 9001 |
| Line Item 0003 Recurring Price - First Option Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs B001 through B003 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| ISWM Service for IKEGO Housing annex area, Spec Item 3 | ||||||
| B001 | CNIC | 1 | LO | ¥ | ||
| B002 | DoDEA | 1 | LO | ¥ | ¥ | |
| B003 | HSG | 1 | LO | ¥ | ¥ |
TOTAL RECURRING LINE ITEMS ¥
| LO = | Lot |
| Attachment J-0200000-07 | |
| SOLICITATION# N40084-23-B-0404 | |
| EXHIBIT C - CLIN 9002 |
| Line Item 0005 Recurring Price - Second Option Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs C001 through C003 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| ISWM Service for IKEGO Housing annex area, Spec Item 3 | ||||||
| C001 | CNIC | 1 | LO | ¥ | ||
| C002 | DoDEA | 1 | LO | ¥ | ¥ | |
| C003 | HSG | 1 | LO | ¥ | ¥ |
TOTAL RECURRING LINE ITEMS ¥
| LO = | Lot |
| Attachment J-0200000-07 | |
| SOLICITATION# N40084-23-B-0404 | |
| EXHIBIT D - CLIN 9003 |
| Line Item 0007 Recurring Price - Third Option Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs D001 through D003 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| ISWM Service for IKEGO Housing annex area, Spec Item 3 | ||||||
| D001 | CNIC | 1 | LO | ¥ | ||
| D002 | DoDEA | 1 | LO | ¥ | ¥ | |
| D003 | HSG | 1 | LO | ¥ | ¥ |
TOTAL RECURRING LINE ITEMS ¥
| LO = | Lot |
| Attachment J-0200000-07 | |
| SOLICITATION# N40084-23-B-0404 | |
| EXHIBIT E - CLIN 9004 |
| Line Item 0009 Recurring Price - Fourth Option Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs E001 through E003 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| ISWM Service for IKEGO Housing annex area, Spec Item 3 | ||||||
| E001 | CNIC | 1 | LO | ¥ | ||
| E002 | DoDEA | 1 | LO | ¥ | ¥ | |
| E003 | HSG | 1 | LO | ¥ | ¥ |
TOTAL RECURRING LINE ITEMS ¥
LO = Lot
&"Times New Roman,Regular"&K000000CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]&U
&UAttachment J-0200000-07 Exhibit Line Item Numbers (ELINS)
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] &K00+000Page &P of &N&K000000 CUI // FEDCON [when filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELIN A700-A702
| Attachment J-0200000-07 |
| SOLICITATION/CONTRACT # |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Price - Base Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services- Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs A700 through A702 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Payment of General Waste Disposal Fees for Zushi City | Latest issue unit price of disposal Fee | |||||
| A700AA | Disposal Fee | The Contractor shall pay all disposal fees of combustible wastes as general waste for Zushi City incinerator and landfill, complies with Definition in J-1503030-01. | 1000 | TN | ¥ 43,307 | ¥ | |
| A701 | Home Appliance Disposal (These following ELINs include transportation cost and disposal fee by manufacture.) | ||||||
| A701AA | Air Conditiner | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| A701AB | Televisioin (Small: under 15 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| A701AC | Televisioin (Large: over 16 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 120 | EA | ¥ | ¥ | |
| A701AD | Refrigerator (Small: under 170 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| A701AE | Refrigerator (Large: over 171 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 40 | EA | ¥ | ¥ | |
| A701AF | Washing Machine/ Clothes Dryer | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| A702 | Set Up Solid Waste Containers and Solid Waste Collection Service | ||||||
| A702AA | Set Up 10 CM Dumpster, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 10 CM dumpster to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| A702AB | Set Up Segregation Type Bin, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) segregation type bin to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| A702AC | Set Up 50/55 Gallon Container, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 50/55 gallon container to designated locations collect and dispose of solid wastes from the container location, include plastic liner bag. The Contractor shall remove of container after designated service period. | 30 | EA | ¥ | ¥ | |
| A702AD | Collection and Disposal Solid Waste from 50/55 Gallon Containers. | The Contractor shall collect and dispose of solid wastes from designated one (1) 50/55 gallon container for empty include replacement of plastic liner bag. | 30 | EA | ¥ |
| TOTAL NON-RECUURRING PRICE | ¥ | ||||
| HR = | Hour | CM = | Cubic Meter | ||
| LS = | Lump Sum | ||||
| EA = | Each | ||||
| TN = | Ton |
&UAttachment J-0200000-07 Exhibit Line Item Numbers (ELINS)
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] &K00+000Page &P of &N&K000000 CUI // FEDCON [when filled in]
ELIN B700-B702
| Attachment J-0200000-07 |
| SOLICITATION/CONTRACT # |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 Non-Recurring Price - First Option Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services- Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs B700 through B702 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B700 | Payment of General Waste Disposal Fees for Zushi City | Latest issue unit price of disposal Fee | |||||
| B700AA | Disposal Fee | The Contractor shall pay all disposal fees of combustible wastes as general waste for Zushi City incinerator and landfill, complies with Definition in J-1503030-01. | 1000 | TN | ¥ 43,307 | ¥ | |
| B701 | Home Appliance Disposal (These following ELINs include transportation cost and disposal fee by manufacture.) | ||||||
| B701AA | Air Conditiner | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| B701AB | Televisioin (Small: under 15 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| B701AC | Televisioin (Large: over 16 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 120 | EA | ¥ | ¥ | |
| B701AD | Refrigerator (Small: under 170 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| B701AE | Refrigerator (Large: over 171 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 40 | EA | ¥ | ¥ | |
| B701AF | Washing Machine/ Clothes Dryer | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| B702 | Set Up Solid Waste Containers and Solid Waste Collection Service | ||||||
| B702AA | Set Up 10 CM Dumpster, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 10 CM dumpster to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| B702AB | Set Up Segregation Type Bins, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) segregation type bin to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| B702AC | Set Up 50/55 Gallon Containers, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 50/55 gallon container to designated locations collect and dispose of solid wastes from the container location, include plastic liner bag. The Contractor shall remove of container after designated service period. | 30 | EA | ¥ | ¥ | |
| B702AD | Collection and Disposal Solid Waste from 50/55 Gallon Containers. | The Contractor shall collect and dispose of solid wastes from designated one (1) 50/55 gallon container for empty include replacement of plastic liner bag. | 30 | EA | ¥ |
| TOTAL NON-RECUURRING PRICE | ¥ | ||||
| HR = | Hour | CM = | Cubic Meter | ||
| LS = | Lump Sum | ||||
| EA = | Each | ||||
| TN = | Ton |
&UAttachment J-0200000-07 Exhibit Line Item Numbers (ELINS)
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
CUI // FEDCON [when filled in]
ELIN C700-C702
| Attachment J-0200000-07 |
| SOLICITATION/CONTRACT # |
| EXHIBIT C - CLIN 9002 |
| Line Item 0006 Non-Recurring Price - Second Option Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services- Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs C700 through C702 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| C700 | Payment of General Waste Disposal Fees for Zushi City | Latest issue unit price of disposal Fee | |||||
| C700AA | Disposal Fee | The Contractor shall pay all disposal fees of combustible wastes as general waste for Zushi City incinerator and landfill, complies with Definition in J-1503030-01. | 1000 | TN | ¥ 43,307 | ¥ | |
| C701 | Home Appliance Disposal (These following ELINs include transportation cost and disposal fee by manufacture.) | ||||||
| C701AA | Air Conditiner | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| C701AB | Televisioin (Small: under 15 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| C701AC | Televisioin (Large: over 16 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 120 | EA | ¥ | ¥ | |
| C701AD | Refrigerator (Small: under 170 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| C701AE | Refrigerator (Large: over 171 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 40 | EA | ¥ | ¥ | |
| C701AF | Washing Machine/ Clothes Dryer | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| C702 | Set Up Solid Waste Containers and Solid Waste Collection Service | ||||||
| C702AA | Set Up 10 CM Dumpster, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 10 CM dumpster to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| C702AB | Set Up Segregation Type Bins, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) segregation type bin to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| C702AC | Set Up 50/55 Gallon Containers, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 50/55 gallon container to designated locations collect and dispose of solid wastes from the container location, include plastic liner bag. The Contractor shall remove of container after designated service period. | 30 | EA | ¥ | ¥ | |
| C702AD | Collection and Disposal Solid Waste from 50/55 Gallon Containers. | The Contractor shall collect and dispose of solid wastes from designated one (1) 50/55 gallon container for empty include replacement of plastic liner bag. | 30 | EA | ¥ |
| TOTAL NON-RECUURRING PRICE | ¥ | ||||
| HR = | Hour | CM = | Cubic Meter | ||
| LS = | Lump Sum | ||||
| EA = | Each | ||||
| TN = | Ton |
&UAttachment J-0200000-07 Exhibit Line Item Numbers (ELINS)
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
CUI // FEDCON [when filled in]
ELIN D700-D702
| Attachment J-0200000-07 |
| SOLICITATION/CONTRACT # |
| EXHIBIT D - CLIN 9003 |
| Line Item 0008 Non-Recurring Price - Third Option Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services- Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs D700 through D702 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| D700 | Payment of General Waste Disposal Fees for Zushi City | Latest issue unit price of disposal Fee | |||||
| D700AA | Disposal Fee | The Contractor shall pay all disposal fees of combustible wastes as general waste for Zushi City incinerator and landfill, complies with Definition in J-1503030-01. | 1000 | TN | ¥ 43,307 | ¥ | |
| D701 | Home Appliance Disposal (These following ELINs include transportation cost and disposal fee by manufacture.) | ||||||
| D701AA | Air Conditiner | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| D701AB | Televisioin (Small: under 15 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| D701AC | Televisioin (Large: over 16 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 120 | EA | ¥ | ¥ | |
| D701AD | Refrigerator (Small: under 170 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| D701AE | Refrigerator (Large: over 171 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 40 | EA | ¥ | ¥ | |
| D701AF | Washing Machine/ Clothes Dryer | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| D702 | Set Up Solid Waste Containers and Solid Waste Collection Service | ||||||
| D702AA | Set Up 10 CM Dumpster, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 10 CM dumpster to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| D702AB | Set Up Segregation Type Bins, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) segregation type bin to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| D702AC | Set Up 50/55 Gallon Containers, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 50/55 gallon container to designated locations collect and dispose of solid wastes from the container location, include plastic liner bag. The Contractor shall remove of container after designated service period. | 30 | EA | ¥ | ¥ | |
| D702AD | Collection and Disposal Solid Waste from 50/55 Gallon Containers. | The Contractor shall collect and dispose of solid wastes from designated one (1) 50/55 gallon container for empty include replacement of plastic liner bag. | 30 | EA | ¥ |
| TOTAL NON-RECUURRING PRICE | ¥ | ||||
| HR = | Hour | CM = | Cubic Meter | ||
| LS = | Lump Sum | ||||
| EA = | Each | ||||
| TN = | Ton |
&UAttachment J-0200000-07 Exhibit Line Item Numbers (ELINS)
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
CUI // FEDCON [when filled in]
ELIN E700-E702
| Attachment J-0200000-07 |
| SOLICITATION/CONTRACT # |
| EXHIBIT E - CLIN 9004 |
| Line Item 0010 Non-Recurring Price - Fourth Option Period |
| Provide Prices For Integrated Solid Waste Management (ISWM) Services- Non-Recurring - In Accordance With Section C, Spec Item 4 |
| ELINs E700 through E702 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| E700 | Payment of General Waste Disposal Fees for Zushi City | Latest issue unit price of disposal Fee | |||||
| E700AA | Disposal Fee | The Contractor shall pay all disposal fees of combustible wastes as general waste for Zushi City incinerator and landfill, complies with Definition in J-1503030-01. | 1000 | TN | ¥ 43,307 | ¥ | |
| E701 | Home Appliance Disposal (These following ELINs include transportation cost and disposal fee by manufacture.) | ||||||
| E701AA | Air Conditiner | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| E701AB | Televisioin (Small: under 15 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| E701AC | Televisioin (Large: over 16 inch) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 120 | EA | ¥ | ¥ | |
| E701AD | Refrigerator (Small: under 170 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| E701AE | Refrigerator (Large: over 171 liter) | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 40 | EA | ¥ | ¥ | |
| E701AF | Washing Machine/ Clothes Dryer | The Contractor shall transport and dispose of segregated home appliances IAW spec item 3.2, 3.2.2 and J-1503030-03, 3.2.2 to the designated facility off Base with disposal ticket, under GOJ or Prefecture or local city laws and regulations. | 20 | EA | ¥ | ¥ | |
| E702 | Set Up Solid Waste Containers and Solid Waste Collection Service | ||||||
| E702AA | Set Up 10 CM Dumpster, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 10 CM dumpster to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| E702AB | Set Up Segregation Type Bins, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) segregation type bin to designated locations and, collect and dispose of solid wastes from the container location. The Contractor shall remove of container after designated service period. | 20 | EA | ¥ | ¥ | |
| E702AC | Set Up 50/55 Gallon Containers, Collection and Disposal Solid Waste from the Container. | The Contractor shall set up one (1) 50/55 gallon container to designated locations collect and dispose of solid wastes from the container location, include plastic liner bag. The Contractor shall remove of container after designated service period. | 30 | EA | ¥ | ¥ | |
| E702AD | Collection and Disposal Solid Waste from 50/55 Gallon Containers. | The Contractor shall collect and dispose of solid wastes from designated one (1) 50/55 gallon container for empty include replacement of plastic liner bag. | 30 | EA | ¥ |
| TOTAL NON-RECUURRING PRICE | ¥ | ||||
| HR = | Hour | CM = | Cubic Meter | ||
| LS = | Lump Sum | ||||
| EA = | Each | ||||
| TN = | Ton |
&UAttachment J-0200000-07 Exhibit Line Item Numbers (ELINS)
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
CUI // FEDCON [when filled in]
NAVFAC UOMs
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |
&"Times New Roman,Regular"&UATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .