237_N_GorhamFURNACE_-_REPLACE__(4).docx
DOCX document 40 KB Posted
- Attached to
- 237 N GORHAM ST - NEW FURNACE AND WATER HEATER
- Solicitation number
- 2026-COMMUNITY DEVELOPMENT-028
- Issued by
- Kalamazoo County, Huntington Woods City, Michigan
About this file
This is a Work Write-Up document for a furnace and water heater replacement project prepared by the City of Jackson Community Development Department for a residential property located at 237 N Gorham Street, Jackson, Michigan. The project scope includes two primary work items: (1) replacement of the existing furnace with a new 95% efficient forced air, gas-fired furnace bearing an AGA label, with installation complying with current Michigan Mechanical Code and NWAHA standards, including new ductwork in the basement, thermostat installation, and filter rack installation; and (2) replacement of the existing water heater with a new high-efficiency unit installed according to manufacturer specifications and applicable codes including the Michigan Plumbing Code, International Fuel Gas Code, and NFPA 70. Both work items require permits. The document was prepared on June 11, 2026, for customer Stefanie Amburgey. The project is awarded to qualified, lowest bidders participating in competitive sealed bidding.
The work write-up does not specify pricing, contract term, renewal options, or funding sources within the document itself. However, the related contract opportunity indicates that all participants must have Sam.gov registration completed prior to bid solicitation and possess proper licensing. Specific response dates, due dates, site visit requirements, and bidder's conference information are not detailed in this work write-up; such information would be contained in the formal solicitation documents. The document requires signature acceptance from both the property owner and contractor upon review and approval of the scope of work and bid amounts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 237_N_GORHAM_ST_-_NEW_FURNACE_AND_WATER_HEATER.pdf | ||
| Maintenance_and_Guarantee_Bond.pdf | ||
| All_Services_Sample_Contract_.docx | DOCX document | |
| Labor_and_Material_Payment_Bond.pdf | ||
| CDBG_Additional_Forms.pdf | ||
| Performance_Bond.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Write-Up
F19 - FURNACE - REPLACE
* EXHIBIT 1 *
Dated: 6/11/2026
CUSTOMER INFORMATION
Stefanie Amburgey 237 N Gorham St, 237 N Gorham St, Jackson, MI 49202
PREPARED BY
sharrison@cityofjackson.org
* NOTE *
THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF
1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT
2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP
Location: Unassigned
| General Requirements |
| Quantity |
| Units |
| Total |
1 - F19 - FURNACE, AC - Replacement (Specification ID:1.19000 )
* PERMIT REQUIRED *
Replace existing furnace with new 95% efficient forced air, gas fired furnace bearing AGA label. Furnace output capacity shall be sufficient to heat the structure according to NWAHA standards. Installations shall comply with the current Michigan Mechanical Code. All habitable rooms, as designated by the Building Inspector, shall be supplied with warm air sufficient to maintain temperatures according to NWAHA standards. All new register installations shall be located in floor or low wall with the exception of bathrooms, which shall be wall mounted. Provide an adequate means of return air for these new supply runs. The use of ceiling diffuser outlets will be allowed only with prior approval. When new supply or returns are required and duct is run through any habitable room, it shall be enclosed in new or existing walls. Any new enclosure shall match existing surfaces. Installation shall include a register in the warm air plenum or trunkline to provide heat to the cellar and a new thermostat. A filter rack with cover shall be installed in the return air duct outside of the furnace cabinet. Whenever possible, insulate new supply and return ducts in unheated attic spaces, ventilated crawl spaces, and other exposed locations to prevent excessive heat loss. Flexible duct shall be used only in attics or crawl spaces. If not bid as a separate part of this contract, the installation shall include repair or replacement of wiring and/or plumbing necessary to comply with local code. If the existing ductwork is not to be replaced, it must be approved by the Mechanical Inspector and. To include replacement of the AC unit, Work shall include all connections.
1) A turn damper and an adjustable maximum opening register valve is provided to control the air distribution to each outlet.
Turn dampers shall be adjustable, locking, and have an operating handle that will indicate the position of the damper blade.
2) All return and supply ductwork is in good condition, properly sized and routed to provide acceptable static pressures and adequate airflow to all register outlets.
3) No return air inlets are located in a bathroom, garage, a space used for fuel or other storage, or in a confined space in which a draft diverter or draft regulator is located. Existing ductwork in basement is to be replaced.
| Plumbing System |
| Quantity |
| Units |
| Total |
2 - WA1 - High Efficiency unit (Specification ID:75.10000 )
EA
* PERMIT REQUIRED *
Disconnect existing unit and remove from property. Installation of a new High efficiency unit.
Water heater shall be installed in accordance with the manufacturer's installation instructions. Electric water heaters shall conform to the requirements of the Michigan plumbing Code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Elevation of water heater ignition sources and mechanical damage protection requirements for water heaters shall be in accordance with the IMC and the IFG codes.
Appliances shall be provided with access for inspection, service, repair, and replacement without disabling the function of a fire-resistance-rated assembly or removing permanent construction, other appliances or any other piping or ducts not connected to the appliance being inspected, service, repaired or replaced. A level working space at least 30 inches deep and 30 inches wide shall be provided in front of the control side to service an appliance.
Total
Customer:__________________________________ Contractor:__________________________________
Prepared By: sharrison@cityofjackson.org on 6/11/2026
OWNER ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.
| x_________________________ | __________ | |
| Owner: | Date |
CONTRACTOR ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.
| x_________________________ | __________ | |
| Contractor | Date |
| x____________________________ | __________ | |
| Construction Specialist | Date |
| Prepared By: sharrison@cityofjackson.org on 6/11/2026 |
| 4 of 4 |
image1.png
File details come from the government source that posted it. Updated .