2352 - CMU Monument Hall Closets - Review Set.pdf
PDF 2 MB Posted
- Attached to
- CMU 2837 Monument Hall Upgrade
- Solicitation number
- 1021-25-1 CMU 2837 Monument Hall Upgrade
- Issued by
- Larimer County, Colorado
About this file
This architectural review set, prepared by Kraai Design Architecture for Colorado Mesa University (CMU), details the design plans for Monument Hall Closets renovations at 1102 Elm Walk in Grand Junction, Colorado. The document provides comprehensive architectural drawings for a closet upgrade project targeting the 46,695 sq ft residence hall with 92 bedrooms and 2 apartments. The plans specify interior modifications including new closet construction, with detailed wall types, materials (such as 3 5/8" metal studs, gypsum board, and sound batt insulation), and specific installation requirements like heavy-duty closet rods and MDF board shelving. The project is scheduled to commence on 19 May 2025 and must be completed by 28 July 2025.
The architectural review set includes technical specifications for wall construction, floor plans, elevations, and general contractor notes that outline comprehensive requirements for material selection, installation standards, and project execution. While specific budget details are not disclosed, the documents indicate the project will be managed through Mesa County's Building Department, with the general contractor yet to be determined. The plans emphasize strict adherence to building codes, precise measurements, and coordination among various trades, with explicit instructions for submitting shop drawings, maintaining site cleanliness, and ensuring structural integrity during the renovation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sheet 015 mod.PDF | ||
| Sheet 017 mod.PDF | ||
| cmu-solicitation-instructions-rev-2021-05-07 (1).pdf | ||
| CMU 2837 Monument Hall Uprade Bid.pdf | ||
| Sheet 016 mod.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL LEGEND - ENLARGED PLAN
A1.1
A
101A
A1.1
TYP
AL HM
- GRID LINE
- DOOR TAG
- WINDOW TAG
- CENTERLINE
- WALL ABOVE OR
HIDDEN LINE
- MATCH LINE
- ROOM TAG
- ELEVATION
SYMBOL
- SECTION
SYMBOL
- KEYNOTE SYMBOL
LVT -LUXURY VINYL TILE
CLG -CEILING
WH -WATER HEATER
FURN -FURNACE
CONC -CONCRETE
MSTR -MASTER
GENERAL FLOOR PLAN NOTES
FLOOR PLAN TAG NOTES
A1.1
- CALLOUT
SYMBOL
A. REFER TO MEP FOR HVAC, LIGHTING, POWER SIZE SIZE AND
LOCATIONS
B. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL BEAMS,
WALLS, COLUMNS SIZE AND LOCATIONS
C. REFER TO SHEET A0.0 FOR PUBLIC SPACES ADA STANDARDS FOR
ACCESSIBLE DESIGN
D. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE IN QUESTION
THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
CLARIFICATION FROM THE ARCHITECT PRIOR TO CONTINUING
CONSTRUCTION.
E. ITEMS NOT NOTED ON THE DRAWINGS SHALL BE CONSIDERED
THE SAME AS NOTED ITEMS WHICH ARE GRAPHICALLY
REPRESENTED IN THE SAME MANNER.
F. PROVIDE BLOCKING FOR ALL WALL EQUIPMENT, TOILET
ACCESSORIES, MILLWORK AND OTHER WALL MOUNTED ITEMS.
SEE ELEVATIONS AND EQUIPMENT SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
G. CONTRACTOR SHALL CAULK AT THE INTERFACE OF INTERIOR
FACES OF DOOR FRAMES WITH ADJACENT MATERIALS THOUGH
JOINT MAY NOT BE VISIBLE.
H. PROVIDE TRANSITION STRIPS BETWEEN FLOOR MATERIALS OF
DISSIMILAR HEIGHTS. CENTER TRANSITION STRIPS UNDER DOORS
OR OTHER PLACES OUT OF SIGHT.
I. PROVIDE POSITIVE SLOPE ON ALL FLOOR DRAINS, MINIMUM
OF1/8” PER FOOT. SLOPE FLOOR ALL AROUND FROM ADJACENT
WALLS TO FLOOR DRAINS, DO NOT DEPRESS ONLY THE AREA
IMMEDIATELY AROUND THE DRAIN.
J. REFER TO THE MECHANICAL, ELECTRICAL, AND PLUMBING
DRAWINGS FOR THE LOCATIONS OF PIPING, VENTS, DUCTS,
CURBS, FANS AND OTHER ITEMS WHICH PENETRATE THE ROOF
PLANE.
K. DOOR JAMB LOCATION OFF FACE OF WALL IS 4", TYPICAL,
UNLESS NOTED OTHERWISE.
1. FURNITURE BY OTHERS
2. 16" X 48" X 3/4" MDF BOARD, PNT. WHITE
3. 1X4 BLOCKING, PNT. WHITE
4. HEAVY DUTY CLOSET ROD W/ HEAVY-DUTY
POLE SOCKETS. PRE-FINISHED WHITE.
Room name
- NEW CLOSET LOCATION
8' - 1"
4' - 0" 1" 4' - 0"
A1.1
2A
2B
* MIRRORED UNITS THROUGHOUT *
0' - 0"
LEVEL
6' - 0"
T.O. SHELF
7' - 0 3/4"
T.O. SHELF
32 44
* MIRRORED UNITS THROUGHOUT *
2A
IN
TE
R
IO
R
IN
TE
R
IO
R
5/8" GYP. BD
3 5/8" MTL. STUDS
@ 16" O.C.
SOUND BATT
INSULATION
5/8" GYP. BD
2B
IN
TE
R
IO
R
IN
TE
R
IO
R
3/4" MDF BOARD, PNT.
WHITE OR PER CMU
DIRECTION
NOT FOR CONSTRUCTION
SCALE:
SHEET NO:
DATE:
2394 PATTERSON ROAD, SUITE 201
GRAND JUNCTION, CO 81505
126 ELK AVENUE, UNIT 1
CRESTED BUTTE, CO 81224
T: 970.712.5045
REVISION(S):
PROJECT NO:
SHEET NAME:
KRAAI DESIGN
ARCHITECTURE
As indicated
A1.1
04/08/2025
M O
N U
M E N
T H
A
LL
C
LO
S E
TS
E
LM
W A
LK
G
R A
N D
J U
N C
TI
O
N C
O
REVIEW SET
MAIN LEVEL PLAN,
ELEVATIONS,
SCHEDULES
1/4" = 1'-0"A1.1
1 TYPICAL CLOSET LAYOUT
3/8" = 1'-0"A1.1
2 I.E. CLOSET - FRONT
WALL TYPES
# DATE COMMENTS
ARCHITECT
2394 Patterson RD, Suite 201
Grand Junction, CO 81505
T: 970.712.5045 www.kraaidesign.com
CONSULTANTS
GOVERNMENT
MESA COUNTY
BUILDING DEPARTMENT
200 S. SPRUCE ST.
GRAND JUNCTION, CO 81501
T: 970.244.1631
KRAAI DESIGN ARCHITECTURE
VICINITY MAP
SHEET INDEX
REVISION
ELEVATION
COLUMN GRID LOCATION
CENTER LINE
LINE OF WALL ABOVE
OR HIDDEN LINE
BREAK LINE
MATCH LINE
ROOM NAME
ROOM NUMBER
INTERIOR WALL ELEVATION
REFERENCE DRAWING
REFERENCED SECTION
NUMBER SHEET NUMBER
REFERENCED DETAIL
NUMBER SHEET NUMBER
A101
A
101A
Room
A101
TYP
A101
TYP
ANGLE
DIAMETER
PERPENDICULAR
PLATE
PLUS OR MINUS
FLOOR DRAIN
FIRE EXTINGUISHERFE
FD
100' 0"
TOP OF WALL
AL HM
LEGEND ABBREVIATION SYMBOL
GENERAL NOTES
ABV above
ACC accessories
ADJ adjacent
AFF above finished floor
ALT alternate
AL aluminum
APC acoustical panel ceiling
ARCH architect (ural)
ASPH asphalt
A/C air conditioning
BCS baby changing station
BD board
BLDG building
BLKG blocking
B.O. bottom of
BRG bearing
CBU cemetitious backer unit
CG corner guard
CJ control joint
CLG ceiling
CLR clear (ance)
CMU concrete masonry unit
COL column
CONC concrete
CONT continuous or continue
CORR corridor
CPT carpet (ed)
CSMT casement
CT ceramic tile
CTR center
CWOG center wall on grid
DBL double
DEMO demolish / demolition
DF drinking fountain
DIM dimension (s)
DIR direction
DISP dispenser
DN down
DR door
DS downspout
DTL detail
DWG drawing
DWR drawer
E east
EA each
EC evaporative cooler
EG etched glass/glazing
EIFS exterior insul finish sys
EJ expansion joint
EL elevation
ELEC electric (al)
EM emergency
EWC electric water cooler
EWG end wall corner guard
EQ equal
EXG existing
EXH exhaust
EXP exposed
EXT exterior
FBO furnished by owner
FD floor drain
FDN foundation
FE fire extinguisher
FEC fire extinguisher cabinet
FEP finished end panel
FFE finished floor elevation
FIN finish
FLG flashing
FLR floor (ing)
FLUR fluorescent
FO face of
FOF face of finish
FRMG framing
FRP fiber reinforced plastic
FT foot (feet)
FTG footing
GA gage, gauge
GAL gallon
GALV galvanized
GB grab bar
PTN partition
PVC polyvinyl cholride
PVMT pavement
PWD plywood
QT quarry tile
R riser, radius
RB rubber base
REC recycling
RCMD recommend (ed) (ations)
RE reference
REF refrigerator
REIN reinforce (d) (ing)
REQ'D required
RQMT(S) requirement(s)
REV revision (s), revised
RD roof drain
RFG roofing
RH robe hook
RM room
RO rough opening
ROW right of way
RR restroom
RTU roof top unit
RUB rubber
S south
SAG susp acoustic grid
SC shower curtain rod & hooks
SCH schedule
SD soap dispenser
SHT sheet
SHTG sheathing
SIM similar
SND sanitary napkin dispenser
SNV sanitary napkin vendor
SPEC specification
SPKR speaker
SQ square
SS solid surface
SST stainless steel
STD standard
STL steel
STOR storage
STR structural
SUSP suspended
T tread
TB towel bar
TBD to be determined
TEL telephone
T.O. top of
TOC top of concrete
TOS top of steel
TOW top of wall
TPD toilet paper dispenser
TS tube steel
TYP typical
T&G tongue and groove
UNO unless noted otherwise
VB vapor barrier
VCT vinyl composition tile
VERT vertical
VIF verify in field
VM vending machine
VNL vinyl sheet
VTR vent through roof
W west, wide, width
W/ with
WB wood base
WC watercloset
WD wood
WDW window
WF wide flange
WG wire glass
W/O without
WP waterproof (ing)
WR waste receptacle
WRB weather resistive barrier
WWM welded wire mesh
ABBREVIATIONS
PROJECT LOCATION
GC general contractor
GL glass, glazing
GWB gypsum wallboard
GYP gypsum
HAS headed anchor stud
HB hose bibb
HCP handicap (ed)
HDR header
HDW hardware
HM hollow metal
HOR horizontal
HSS hollow structural sections
HT height
HVAC heating /ventilation / air conditioning
HWD hardwood
INCL include (d) (ing)
INSUL insulate (d) (ing)
INT interior
INV invert
JST joist
JT joint
L length, angle
LAM laminate (d)
LAV lavatory
LB pound
LF lineal foot
LG laminated glass, glazing
LIN linoleum
LT light
MA match
MAS masonry
MATL material
MAX maximum
MB marker board
MDF medium density fiberboard
MECH mechanic (al)
MFR manufacture (r) (d)
MH manhole
MIN minimum
MISC miscellaneous
MLD molding, moulding
MO masonry opening
MT mount (ed) (ing)
MTL metal
N north
N/A not applicable
NIC not in contract
NOM nominal
NTS not to scale
NECY necessary
OC on center (s)
OD outside diameter
OFCI owner furnished, contractor installed
OFD overflow drain
OFOI owner furnished, owner installed
OH overhead
OPG opening
OPH opposite hand
OPP opposite
OSB oriented strand board
OTS open to structure
PB particle board
PERF perforate (d)
PERIM perimeter
PLAM plastic laminate
PLT plate
PNL panel
PNT paint (ed)
PR pair
PROJ projector, projection
PSF pounds per square foot
PSI pounds per square inch
PT pressure treated
PTD paper towel dispenser
DOOR NUMBER
WINDOW TYPE
BASIC WALL TYPE
TAG NOTE
1. CONTRACTOR SHALL BE GOVERNED BY THE CURRENT EDITION OF
ALL CODES AND REGULATIONS HAVING JURISDICTION OVER
ASPECTS OF THIS CONSTRUCTION PROJECT.
2. WRITTEN DIMENSIONS AND EXISTING CONDITIONS SHALL BE
VERIFIED IN THE FIELD BY THE CONTRACTOR AND/OR THE SUB-
CONTRACTORS. DO NOT SCALE DRAWINGS. IF FURTHER
CLARIFICATION IS REQUIRED, CONTACT KDA AND PROVIDE FIELD
DIMENSIONS AS REQUIRED TO ASSIST WITH CLARFICATION.
3. ANY DISCREPANCY IN DIMENSIONS AND/OR DRAWINGS AND/OR
GRAPHIC REPRESENTATION AND/OR FIELD MEASUREMENTS SHALL
BE BROUGHT TO THE ATTENTION OF KDA PRIOR TO THE
COMMENCEMENT OF WORK.
4. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND
COPYRIGHT © OF KDA AND SHALL NOT BE USED ON OTHER WORK
EXCEPT BY WRITTEN AGREEMENT WITH KDA.
5. DUTY OF COOPERATION: RELEASE OF THESE PLANS ANTICIPATES
FURTHER COOPERATION AMONG THE OWNER, CONTRACTOR, AND
KDA. ALTHOUGH KDA AND ITS CONSULTANTS HAVE PERFORMED
THEIR SERVICES WITH DUE CARE AND DILIGENCE, THEY CANNOT
GUARANTEE PERFECTION. ANY AMBIGUITY OR DISCREPANCY
DISCOVERED SHALL BE REPORTED IN WRITING TO KDA WITHIN TEN
(10) WORKING DAYS FROM THE ISSUANCE OF PLANS. FAILURE TO
COOPERATE BY SIMPLE NOTICE TO KDA SHALL NOT RELIEVE THE
CONTRACTOR FROM RESPONSIBILITY FOR ALL CONSEQUENCES.
CHANGES MADE FROM THE PLANS WITHOUT THE CONSENT OF KDA
ARE UNAUTHORIZED, AND SHALL RELIEVE KDA OF RESPONSIBILITY
FOR ALL CONSEQUENCES ARISING OUT OF SUCH CHANGES.
6. IF KDA, AS A CLAIMANT OR A DEFENDING PARTY, IS AT ANYTIME A
PARTY TO LITIGATION INVOLVING ANY CLAIM RELATED TO WORK
CONTAINED IN THESE DRAWINGS, AND SHOULD CLAIMANT NOT
PREVAIL SUBSTANTIALLY AGAINST DEFENDING PARTY IN SUCH
LITIGATION, ALL LITIGATION EXPENSES, WITNESS FEES, COURT COSTS
AND ATTORNEYS FEES INCURRED BY THE DEFENDING PARTY IN
DEFENDING AGAINST SUCH A CLAIM, SHALL BE PAID BY THE
CLAIMANT.
7. ALL PRODUCTS SHALL BE INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS.
8. THE CONTRACTOR SHALL INCLUDE ANY WORK REQUIRED TO MAKE
THE END RESULT BUILDING OPERATIVE AND OCCUPIABLE. IF
EQUIPMENT, MATERIAL, AND/OR INTENT ARE NOT DETAILED IN
DRAWINGS OR SPECIFICATIONS BUT ARE OBVIOUSLY REQUIRED AS
INDUSTRY STANDARD FOR OPERATIVE CONDITIONS, THIS WORK
SHALL BE INCLUDED IN BASE BID. IF THE OWNER DOES NOT ACCEPT
THE CONTRACTOR'S SELECTION, THE ADDITIONAL COST (TO THE
CONTRACTOR) OF THAT EQUIPMENT OR MATERIALS CHOSEN BY THE
OWNER OR KDA WILL BE OFFSET BY A CHANGE ORDER.
9. TYPOGRAPHICAL ERRORS OR ERRORS OF SPELLING SHALL BE
BROUGHT TO THE ATTENTION OF KDA FOR CLARIFICATION.
INTERPRETATION OF THE MEANING OF MIS-TYPED OR MISSPELLED
WORDS WITHOUT CLARIfiCATION FROM KDA WILL BE DONE BY THE
CONTRACTOR WITH ACCEPTANCE OF RESPONSIBILITY FOR THAT
INTERPRETATION AND ALL CONSEQUENCES ARISING THEREFROM.
10. NOTES: ALL DIMENSIONS ARE TO FACE OF STUD OR CONCRETE
WALL OR CENTER LINE OF CONSTRUCTION AS INDICATED (TYPICAL
UNLESS OTHERWISE INDICATED).
11. THE TERM "PROVIDE" AS USED HEREIN SHALL MEAN THAT
CONTRACTOR SHALL FURNISH AND INSTALL SAID ITEM,
CONSTRUCTION, EQUIPMENT, MATERIALS, ETC. FOR A COMPLETE
FINISHED INSTALLATION.
12. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATION OF ALL TRADES DOING WORK FOR THE PURPOSE
OF COORDINATION WITH OWNER AND OWNER'S SUB-
CONTRACTORS REGARDING INSTALLATION AND PROVISIONS FOR
ALL EQUIPMENT, MATERIALS, AND CONSTRUCTION INDICATED BY
"OWNER" OR BY "OTHERS" ON THESE DOCUMENTS.
13. KDA ACCEPTS NO RESPONSIBILITY FOR ANY STRUCTURAL
INFORMATION CONTAINED IN THESE PLANS. CONTRACTOR SHALL,
PRIOR TO CONSTRUCTION, VERIFY ALL STRUCTURAL ENGINEERING
INFORMATION AND REQUIREMENTS WITH A LICENSED STRUCTURAL
ENGINEER. FAILURE TO DO SO INDICATES THE CONTRACTORS
ACCEPTANCE OF RESPONSIBILITY FOR ALL CONSEQUENCES
ARISING THEREFROM. CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING THE STRUCTURAL ENGINEER OF RECORD WITH ALL
STRUCTURAL DESIGNS DONE BY TRUSS MANUFACTURERS,
ENGINEERED FLOOR JOIST DESIGNERS AND OTHER SPECIALIZED
ENGINEERING SERVICES. THE STRUCTURAL ENGINEER OF RECORD
SHALL BE RESPONSIBLE FOR REVIEWING AND APPROVING SUCH
INFORMATION AND FOR NOTIFYING DESIGNER OF ANY REQUIRED
MODFICATIONS.
14. THE CONTRACTOR WARRANTS TO KDA THAT THEY POSSES THE
PARTICULAR COMPETENCE AND SKILL IN CONSTRUCTION
NECESSARY TO BUILD THIS PROJECT WITH THE PLANS AND
SPECIFICATIONS CONTAINED HEREIN. IN THE EVENT ADDITIONAL
DETAIL OR GUIDANCE IS NEEDED BY THE CONTRACTOR, HE SHALL
IMMEDIATELY NOTIFY KDA. FAILURE TO GIVE A SIMPLE NOTICE
SHALL RELIEVE THE DESIGNER OF RESPONSIBILITY FOR THE
CONSEQUENCES.
15. ANY CORRESPONDENCE BETWEEN OWNER/ CONTRACTOR/ AGENT
AND ANY PERMITTING AGENCY (CITY, COUNTY, ETC.) MUST BE
BROUGHT TO THE ATTENTION OF KDA IMMEDIATELY. CHANGES TO
THE CONSTRUCTION SETS MAY BE REQUIRED. FAILURE TO DO SO
RELEASES KDA FROM ANY RESPONSIBILITY OR LIABILITY.
16. CONTRACTOR OR OWNER SHALL CONFIRM, WITH A LICENSED
SURVEYOR, PRIOR TO CONSTRUCTION THAT PLANS AND
ELEVATIONS COMPLY WITH ALL APPLICABLE SETBACKS, ALLOWABLE
MAXIMUM HEIGHT AND DRAINAGE STANDARDS AS OUTLINED IN
THE SOILS REPORT AND/OR SUBDIVISION GUIDELINES, ETC.
CONTRACTOR/ OWNER SHALL COFIRM THAT PERMITTING AGENCY
IS INFORMED OF ALL SUCH INFORMATION OR ADDITIONAL
INFORMATION CONTAINED IN CONSTRUCTION PLANS OR ANY
SUBSEQUENT REVISIONS. FAILURE TO DO SO RELEASES KDA FROM
ANY RESPONSIBILITY OR LIABILITY. ANY LOCATION (SETBACK) OR
HEIGHT SURVEY REQUIRED BY THE PERMITTING AGENCY SHALL BE
PERFORMED IMMEDIATELY AFTER CONSTRUCTION OF THE ELEMENT
IN QUESTION (FOUNDATION OR FRAMING HEIGHT AND
LOCATION). SAID SURVEY SHALL BE DELIVERED TO THE PERMITTING
AGENCY PRIOR TO PROCEEDING WITH CONSTRUCTION.
17. DELIVERY AND STORAGE OF MATERIALS AND EQUIPMENT STAGING
AREAS ARE TO BE COORDINATED WITH OWNER.
18. THE CONSTRUCTION SITE IS TO BE KEPT FREE OF DEBRIS.
19. CONTRACTOR SHALL PROVIDE ELECTROLYTIC PROTECTION
BETWEEN DISSIMILAR METALS WHERE THEY OCCUR TO PREVENT
ELECTROLYSIS/ CORROSION.
20. CONTRACTOR SHALL TAKE CARE TO PROVIDE PROTECTION FOR
NEWLY INSTALLED AND EXISTINGWORK AND FINISHES.
21. THE GENERAL BUILDING PERMITS SHALL BE PAID FOR BY THE OWNER
AND SECURED BY THE GENERAL CONTRACTOR. ALL OTHER
REQUIRED PERMITS SHALL BE SECURED AND PAID FOR BY THE
CONTRACTOR OR SUBCONTRACTOR DIRECTLY RESPONSIBLE. ALL
REQUIRED CITY AND COUNTY LICENSES SHALL BE ACQUIRED AND
PAID FOR BY THE INDIVIDUAL TRADES.
22. ALL CONTRACTORS SHALL HAVE VALID CERTIFICATES OF
WORKMAN'S COMPENSATION ON FILE WITH THE APPROPRIATE
AGENCIES. INSURANCE REQUIREMENT MUST BE MET PER LEASE
AGREEMENT.
23. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE
ALL EXISTING UTILITIES, WHETHER SHOWN HEREIN OR NOT, AND TO
PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR
ALL EXPENSE FOR THE REPAIR OR REPLACEMENT OF UTILITIES AND
ALL OTHER PROPERTY DAMAGED BY OPERATIONS IN
CONJUNCTION WITH EXECUTION OF WORK.
24. CONTRACTOR SHALL PROVIDE TEMPORARY FIELD OFFICE,
TELEPHONES, FAX MACHINE, TEMPORARY SECURITY FENCE, WATER,
POWER, AND TOILET FACILITIES. COORDINATE LOCATIONS WITH ALL
APPROPRIATE AGENCIES. FIELD OFFICE SHALL ALSO CONTAIN
CURRENT COPIES OF ALL GOVERNING BUILDING CODES AND
AMENDMENTS.
25. CITY APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL
NOT BE USED BY WORKMEN. ALL CONSTRUCTION SETS SHALL
REFLECT THE SAME INFORMATION. THE CONTRACTOR SHALL ALSO
MAINTAIN, IN GOOD CONDITION, ONE (1) COMPLETE SET OF
PLANS WITH ALL REVISIONS, ADDENDA, AND CHANGE ORDERS ON
THE PREMISES AT ALL TIMES. THESE ARE TO BE UNDER THE CARE OF
THE JOB SUPERINTENDENT.
26. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY
OF THE SITE WHILE JOB IS IN PROGRESS UNTIL WORK IS COMPLETE.
27. CONTRACTOR SHALL MAINTAIN THE JOB SITE IN A CLEAN AND
ORDERLY MANNER. ALL DEBRIS SHALL BE REMOVED FROM
PREMISES AND ALL AREAS SHALL BE LEFT IN BROOM-CLEAN
CONDITION AT ALL TIMES. CONTRACTOR SHALL LOCATE AND
MAINTAIN A TRASH BIN AT THE SITE. SUCH BIN SHALL BE OF
ADEQUATE DIMENSION TO KEEP SITE CLEAN AT ALL TIMES. DUST
RESULTING FROM SALVAGE, DEMOLITION AND REMOVAL WORK
SHALL BE CONTROLLED TO PREVENT THE IMPOSITION OF A
NUISANCE OR HAZARDOUS CONDITION TO THE ADJOINING
PORTION OF THE PROJECT. THE USE OF WATER WILL NOT BE
PERMITTED WHEN SUCH USE WOULD RESULT IN HAZARDOUS, OR
OTHERWISE OBJECTIONABLE CONDITIONS.
28. CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION IN
ACCORDANCE WITH ALL APPLICABLE BUILDING CODES.
29. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO
ENSURE THE SAFETY OF THE OCCUPANTS AND WORKERS AT ALL
TIMES.
30. CONTRACTOR SHALL PROVIDE REQUIRED PROTECTION INCLUDING,
BUT NOT LIMITED TO, SHORING, BRACING, AND ALL OTHER
SUPPORTS (INCLUDING ENGINEERING OF SYSTEMS) NECESSARY TO
MAINTAIN OVERALL STRUCTURAL INTEGRITY OF THE BUILDING. ALL
DEMOLITION AND CUTTING SHALL BE PERFORMED IN A MANNER
AND BY METHODS WHICH ENSURE AGAINST DAMAGE TO EXISTING
WORK.
31. INTERIOR WALL AND CEILING FINISHES FOR DINING, AND WAITING
AREAS SHALL NOT EXCEED FLAME SPREAD CLASSIFICATIONS
DICTATED BY ALL APPLICABLE BUILDING CODES.
32. NO STRUCTURAL MEMBERS SHALL BE CUT TO ACCEPT PIPES, VENTS,
DUCTS, OR OTHER PENETRATIONS, EXCEPT AS DETAILED OR
SPECIFIED HEREIN.
33. GYPSUM BOARD AND SUSPENDED CEILING SYSTEMS SHALL
CONFORM TO ALL LOCAL GOVERNING BUILDING CODES AND
ORDINANCES.
34. ALL GLASS AND GLAZING SHALL COMPLY WITH ALL APPLICABLE
BUILDING CODES AS WELL AS THE U.S. CONSUMER PRODUCT
SAFETY COMMISSION, SAFETY STANDARDS FOR ARCHITECTURAL
GLAZING MATERIALS (47 FR, 13516 TITLE NO. 16, CHAPTER 11, PART
1201).
35. CONTRACTOR SHALL ASSIST OWNER IN OBTAINING FINAL
APPROVAL OF LOCAL HEALTH DEPARTMENT AND THE TEMPORARY
AND FINAL CERTIFICATES OF OCCUPANCY.
36. CONTRACTOR SHALL BE RESPONSIBLE FOR, AND SHALL REMEDY,
REPAIR, OR REPLACE ANY FAULTY, IMPROPER OR INFERIOR
WORKMANSHIP OR MATERIALS AND ANY RELATED DAMAGE
CAUSED BY THESE WHICH SHALL APPEAR WITHIN ONE (1) YEAR
AFTER THE COMPLETION AND ACCEPTANCE OF THE WORK UNDER
THIS CONTRACT. REFER TO SPECIFICATIONS FOR WARRANTY
REQUIREMENTS IN EXCESS OF ONE (1) YEAR. IN ADDITION TO
EQUIPMENT WARRANTIES, FURNISH OWNER A WRITTEN GUARANTEE
AGAINST LATENT AND PATENT DEFECTS IN MATERIALS AND
WORKMANSHIP FOR ONE (1) YEAR. GUARANTEE SHALL INCLUDE
REPAIR, DAMAGE TO, OR REPLACEMENT OF, ANY PART OF
EQUIPMENT PROVIDED.
37. PIPES, CONDUITS, OR DUCTS EXCEEDING ONE THIRD OF THE SLAB
OR MEMBER THICKNESS SHALL NOT BE PLACED IN STRUCTURAL
CONCRETE UNLESS SPECIFICALLY DETAILED. REFER TO
MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL
DRAWINGS FOR LOCATION OF SLEEVES AND OTHER ACCESSORIES.
38. ALL ELECTRICAL, MECHANICAL, AND PLUMBING WORK SHALL
CONFORM TO THE REQUIREMENTS OF ALL THE LEGALLY
CONSTITUTED AUTHORITIES HAVING JURISDICTION.
39. ALL EQUIPMENT ON THE FOOD SERVICE DRAWINGS IS TO BE
EXCLUDED FROM THE GENERAL CONTRACT UNLESS OTHERWISE
STATED. BACKING, ROUGH-INS, AND FINAL HOOK-UPS ARE A PART
OF THE GENERAL CONTRACT. ALL PLUMBING FIXTURE VACUUM
BREAKERS NECESSARY, PER LOCAL CODE REQUIREMENTS, ARE TO
BE SUPPLIED WITH KITCHEN EQUIPMENT. ELECTRICAL
CONNECTIONS AND DISCONNECTS NECESSARY TO MEET LOCAL
CODE REQUIREMENTS WILL BE SUPPLIED WITH KITCHEN EQUIPMENT
WITH FINAL HOOK-UPS ONLY BY CONTRACTOR.
40. CONTRACTOR SHALL PROVIDE BACKING FOR SUPPORT OF ALL
WALL, CEILING, AND PARTITION MOUNTED ITEMS SUCH AS TABLE
BRACKETS, LIGHT FIXTURES, ARTIFACTS, SHELVING, EQUIPMENT, AND
TELEVISIONS. COORDINATE LOCATIONS AND REQUIREMENTS WITH
THE PLUMBING, MECHANICAL, ELECTRICAL, AND FOOD SERVICE
DRAWINGS AS WELL AS INTERIOR DESIGN CONSULTANT AND
OWNER.
41. CONTRACTOR SHALL VERIFY LOCATIONS OF FOOD SERVICE
EQUIPMENT AND COORDINATE LOCATIONS OF FLOOR SINKS,
FLOOR DRAINS, TROUGH DRAINS, SLAB DEPRESSIONS, RAISED
CURBS, ELECTRICAL STUB-OUTS, PLUMBING STUB-OUTS, AND ALL
OTHER WORK UNDER THE SCOPE OF RESPONSIBILITIES RELATED TO
THIS EQUIPMENT. REFER TO THE FOOD SERVICE DRAWINGS FOR
ADDITIONAL INFORMATION.
42. PROVIDE ATTIC DRAFT STOPS AND VENTILATION IN
CONFORMANCE WITH ALL APPLICABLE BUILDING CODES.
43. ALL PAINT COLOR AND/OR MATERIAL TRANSITIONS ARE TO OCCUR
AT INSIDE CORNERS (UNLESS NOTED OTHERWISE).
44. COMPLETE SHOP DRAWINGS AND EQUIPMENT SUBMITTALS SHALL
BE PROVIDED TO THE ARCHITECT FOR REVIEW AND COMMENT
PRIOR TO FABRICATION OR ORDERING OF ANY EQUIPMENT,
FIXTURES, MATERIALS, OR ASSEMBLIES.
45. OWNER'S REPRESENTATIVE OR ARCHITECT WILL REVIEW AND
COMMENT ON ALL SHOP DRAWINGS AND SAMPLES FOR
CONFORMANCE WITH THE DESIGN INTENT OF THE PROJECT ONLY.
THE APPROVAL OF A SINGLE COMPONENT SHALL NOT INDICATE
THE APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS.
46. ALL SHOP DRAWINGS AND SUBMITTALS SHALL BE ROUTED THROUGH
THE CONTRACTOR. NO DOCUMENTS SHALL BE SUBMITTED
DIRECTLY TO THE ARCHITECT, OR TO THE ARCHITECT'S
CONSULTANTS. SUBMIT ALL SHOP DRAWINGS IN THE FORM OF ONE
(1) 30" X 42" TRANSPARENCY (SEPIA) OF EACH SHEET. BLUELINES OR
BLACKLINES ARE NOT ACCEPTABLE. WHEN SHOP DRAWINGS
INVOLVE MANUFACTURER'S DATA OR MATERIAL LIST, SUBMIT A
MINIMUM OF FIVE (5) COPIES FOR REVIEW AND COMMENT.
47. EXTERIOR OPENINGS SHALL COMPLY WITH ALL SECURITY
REQUIREMENTS AS OUTLINED IN ALL LOCAL BUILDING CODES AND
ORDINANCES.
48. ACCURATE AS-BUILT DRAWINGS SHALL BE GENERATED BY
CONTRACTOR DURING CONSTRUCTION AND SUBMITTED TO
OWNER UPON COMPLETION OF FINAL PUNCH LIST, BUT PRIOR TO
REQUEST FOR FINAL PAYMENT. WITHIN TWO WEEKS AFTER C.O. IS
ACQUIRED.
49. FOUR (4) SETS OF EQUIPMENT OPERATING AND MAINTENANCE
MANUALS SHALL BE SUBMITTED TO THE OWNER UPON COMPLETION
OF PROJECT, BUT PRIOR TO REQUEST FOR FINAL PAYMENT. WITHIN
TWO WEEKS AFTER C.O. IS ACQUIRED.
50. CONTRACTOR SHALL NOT ALLOW ANY PERSON TO DESCEND INTO
ANY TRENCH OR HOLE, OR CREATE ANY SUCH EXCAVATIONS,
WITHOUT THE PRIOR APPROVAL OF BUILDING DEPARTMENT AS
WELL AS ALL OTHER AGENCIES HAVING JURISDICTION.
51. VERIFY FIRE EXTINGUISHER REQUIREMENTS AND LOCATIONS WITH
FIRE MARSHAL AND OWNER'S REPRESENTATIVE.
52. CONTRACTOR SHALL SEAL ALL GAPS, HOLES, AND CRACKS IN
BUILDING CONSTRUCTION AS REQUIRED TO CONTROL
INFILTRATION OF INSECTS.
53. CONTRACTOR SHALL INSTRUCT SUBCONTRACTORS TO CAREFULLY
REVIEW THE CONSTRUCTION DOCUMENTS IN THEIR ENTIRETY.
INFORMATION REGARDING COMPLETE WORK OF SPECIFIC TRADES
AND SUB-TRADES IS DISPERSED THROUGHOUT THE DRAWINGS AND
SPECIFICATIONS AND CANNOT BE DETERMINED BY REFERENCE TO
ANYTHING OTHER THAN COMPLETE SETS OF DOCUMENTS.
54. NOTHING IN THESE DOCUMENTS IS TO BE INTERPRETED AS
RELIEVING THE CONTRACTOR OF SOLE RESPONSIBILITY FOR THE
METHODS AND MEANS OF CONSTRUCTION, AS WELL AS SAFETY AT
THE JOB SITE.
55. THE LIFE SAFETY INSPECTOR WILL MAKE FINAL
DETERMINATION OF FIRE LANES BEFORE FINAL INSPECTION
IS MADE. SEE SITE PLAN FOR REQUIREMENTS.
CONTRACTOR
TBD
MONUMENT HALL CLOSETS
1102 ELM WALK
GRAND JUNCTION, CO
NOT FOR CONSTRUCTION
SCALE:
SHEET NO:
DATE:
2394 PATTERSON ROAD, SUITE 201
GRAND JUNCTION, CO 81505
126 ELK AVENUE, UNIT 1
CRESTED BUTTE, CO 81224
T: 970.712.5045
REVISION(S):
PROJECT NO:
SHEET NAME:
KRAAI DESIGN
ARCHITECTURE
T1.0
04/08/2025
M O
N U
M E N
T H
A
LL
C
LO
S E
TS
E
LM
W A
LK
G
R A
N D
J U
N C
TI
O
N C
O
REVIEW SET
TITLE SHEET
SHEET INDEX
SHEET NUMBER SHEET NAME
COVER
T1.0 TITLE SHEET
ARCHITECTURAL
A1.1 MAIN LEVEL PLAN, ELEVATIONS, SCHEDULES
# DATE COMMENTS
| Sheets |
| A1.1 - MAIN LEVEL PLAN, ELEVATIONS, SCHEDULES |
| T1.0 - TITLE SHEET |
File details come from the government source that posted it. Updated .