Summary of Construction Bid Addendum No. 1
This document is a Construction Bid Addendum issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design & Construction Division, for the Gladstone Creosote Discharge Site project (File Number 761/23458.IND) in Gladstone, Delta County, Michigan. The addendum was issued on July 15, 2025, by The Mannik & Smith Group, Inc., with Project Director Sadi Rayyan overseeing the work. The bid opening is scheduled for July 23, 2025, at 2:00 PM EDT. Key project modifications include clarification that the transformer will not be removed, though the electrical supply upright and associated wiring to the control shed require removal; underground conduit between these structures shall be cut one foot below ground, capped at both ends, and left in place. The addendum establishes that builder's risk insurance is not required for this project, and eliminates Article 3.4 of Section 00700 from the contract documents. The addendum incorporates a Pre-Bid Meeting Attendance Record, responses to seven bidder questions addressing water pumping procedures, HAZWOPER certification requirements, beach access routes, concrete debris handling, and debris removal protocols from the lake.
The revised Figure 11 attachment provides detailed decommissioning plans for the beach and discharge force main, depicting two potential beach access points for equipment, including an alternate access location approximately 250 feet east of the treatment system where the hillside was previously covered with concrete slabs. Specific conditions apply to debris management and site restoration, including limitations on tree removal, requirements to restore disturbed areas to existing conditions, and specifications for the size of broken concrete materials left on-site. All bidders must acknowledge receipt of this addendum in their bid submissions; failure to do so may result in bid rejection. This addendum becomes an integral part of the contract documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
7/15/2025
PROJECT NAME
Gladstone Creosote Discharge Site
FILE NUMBER
761/23458.IND
PROFESSIONAL
The Mannik & Smith Group, Inc.
PROJECT DIRECTOR
Sadi Rayyan
BID OPENING DATE:
7/23/2025 2:00pm EDT
ADDENDUM ITEMS:
1. The Pre-Bid Meeting Attendance Record is attached (Attachment 1).
2. As indicated by the City of Gladstone during the Pre-Bid Meeting, the transformer will not be removed. The electrical supply upright will still require removal, along with wire from the upright down to the control shed. Underground conduit between the upright and the control shed, if encountered, shall be cut off 1-foot below ground, capped at both ends, and left in-place.
3. The following shall be added to Section 00800 Supplementary Conditions:
SC-5 Supplementary Conditions to Article 3.4 Builder’s Risk Insurance SC-3.4 Delete Article 3.4 of Section 00700 in its entirety. Builder’s risk insurance is not required for this project.
4. Responses to Bidder Questions are attached (Attachment 2).
5. Revised Figure 11 (Attachment 3).
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: The Mannik & Smith Group, Inc. DATE: 7/15/2025
APPROVED BY:
PROJECT DIRECTOR: DATE: Click to enter date
ATTACHMENT 1
MEETING ATTENDANCE RECORD
AAttttaacchhmmeenntt 22 PPaaggee 11 ooff 22
ATTACHMENT 2
RESPONSES TO BIDDER QUESTIONS
1.) In regards to pumping the water out of the existing catch basins. Can this water be pumped onto the ground inside the sheet piled area? We have concerns on how much head pressure would be needed to pump into the existing 4” force main.
Answer: No. As-Built information for the pump that had been used during system operation is provided on Sheet M1 in Appendix VII of the Bidding and Contract
Document.
2.) The documents state “The Contractor shall provide training certificates for OSHA 40-hour HAZWOPER and 8-hour refresher for all employees onsite.” Is this just for the
General Contractor or does every subcontractor also need to have a HAZWOPER certificates for all their employees? There will be asphalt paving and electrical onsite that wouldn’t have employees with this certificate.
Answer: The Contractor must meet the requirements of 29 CFR 1910.120 (the
HAZWOPER standards) and all other worker health and safety standards that may apply to the Work including, but not limited to, 29 CFR 1926. If bidders are unsure of the requirements contained in the OSHA standards, please seek professional consultation or guidance regarding those requirements. Note that the HAZWOPER requirements apply to the operations listed in 29 CFR 1910.120(a)(1), unless the employer can demonstrate that the operation does not involve employee exposure or the reasonable possibility for employee exposure to safety or health hazards.
3.) Can the existing gravel ramp from Lake Shore Drive down to the beach, to the east of the eroded ramp that will be re-built, be used for accessing the beach?
Answer: Yes, and driving along the beach between the two access ramps is acceptable to
EGLE as long as no fill is added to that section of beach and the turbidity curtain is extended to enclose the entire length of beach that is used for transport. Existing conditions must be thoroughly documented prior to any work occurring and all disturbed areas must be restored to existing conditions.
4.) Can we drive down the hill directly behind the treatment system?
Answer: No.
5.) Is there a different location where we can access the beach down the bluff?
Answer: Yes, at the location approximately 250 feet east of the treatment system where the hillside was covered with concrete slabs. This was the location identified toward the end of the site walk. Note that no trees may be cut down except for the small cherry tree at the bottom of the bluff at this location. The hillside and any disturbance at the top of the bluff must be stabilized and restored as part of site restoration. The attached revised Figure 11 depicts the approximate alternate access location.
AAttttaacchhmmeenntt 22 PPaaggee 22 ooff 22
6.) Can the concrete manhole and vault lids be broken up and left on-site instead of being removed from the site?
Answer: Yes, with the following conditions:
a) All metal must be removed, including the access doors and rebar in the concrete.
b) Broken concrete left along the bluff above the ordinary high water mark must be broken to be no larger than 3-feet in length along the largest dimension.
c) Broken concrete used in lieu of stone for temporary haul road improvement must be no larger than 6-inches in length along the largest dimension.
7.) How much looking around are we going to have to do to remove debris from out in the lake?
Answer: The debris that is visible from the shoreline shall be removed. In addition, if a portion of the former haul road materials are inundated in the lake at the time the work occurs due to current water levels at that time, those shall also be removed.
ATTACHMENT 3
REVISED FIGURE 11
4-inch Dia. HDPE Sanitary Sewer Force Main
Row of Gabion Baskets
P at h:
W
:\P ro je ct s\
\4
-5
\2
\E
N G
A P
P S
\G
IS
\P ro
\2
_G
IS
\2
_G
IS
.a pr x D at e
S av ed : 3
/1 /2
:5
A
M
DATE PROJECT NO.DESIGNED BYDRAWN BY
Gladstone Creosote Discharge Site, Lake Shore Drive Gladstone, Delta County, Michigan
7/14/2025 ASBJWW
0 20 40
Feet
2300540
Row of Gabion Baskets Piping
Map Extent
Little Bay de Noc
Access Road
POTENTIAL BEACH ACCESS
POINTS FOR EQUIPMENT
REMOVE REMNANT GABION
BASKETS, GEOWEB, AND
GEOTEXTILE. LEAVE STONE
ALONG BEACH.
CUT AND CAP BOTH SIDES OF DRAINED
4-INCH DIA. HDPE DR17 SEWER LINE
CAP/PLUG END OF 4-INCH DIA. HDPE
DR17 SEWER LINE INSIDE MANHOLE
Notes:
• *Refer to Figure 12 for Treatment Vessel Decommissioning Plans.
• Site Features approximated from pdf figure sheets C2 and C2A from STS Consultants titled Site Plan Sheetpile Wall & Collection System and Discharge Force Main, dated October 11, 2024.
• Parcel boundaries approximated from City of Gladstone online GIS parcel viewer
• Basemap Source: Michigan Imagery Solution, Delta County (2021)
FIGURE 11
Decommissioning Plans
Beach and Discharge Force Main
Manhole
Lake Shore Drive
Marb le A ven ue
T
ALTERNATE BEACH
ACCESS LOCATION
VIEWED DURING SITE
WALK