23388 Colonial Michilimackinac Powder Magazine Redesign - Construction Drawings-1.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ - 171 - 240000000264
- Issued by
- Emmet County, Mackinac Island City, Michigan
About this file
This document contains construction drawings for the Colonial Michilimackinac Powder Magazine Redesign project being executed by the State of Michigan Department of Technology, Management and Budget on behalf of the Department of Natural Resources Mackinac Island State Park Commission. The project involves mechanical, electrical, and architectural redesign work on the Powder Magazine building located at 102 Straits Avenue, Mackinaw City, MI 49701. All onsite work cannot start until July 29, 2024, and the entire scope of work detailed in the construction documents must be substantially complete by September 30, 2024. The contractor is required to take appropriate measures to protect the historic site, artifacts, displays, and buildings during construction.
The project documents provide detailed demolition notes, mechanical/HVAC drawings, notes, abbreviations, and equipment schedules. The contractor is responsible for removing and reinstalling existing equipment and infrastructure as needed to complete the work. Pricing and funding details are not included in these technical specifications. The contract will be awarded by the State of Michigan, with the project located in Emmet County and Mackinac Island City.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL DRAWING INDEX
102 STRAITS AVENUE,
MACKINAW CITY, MI 49701
FILE NUMBER: 751/23388.ABG
MATRIX PROJECT NUMBER: 23436.00
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FOR DEPARTMENT OF NATURAL RESOURCES
MACKINAC ISLAND STATE PARK COMMISSION - COLONIAL MICHILIMACKINAC POWDER MAGAZINE REDESIGN
N SITE MAP
MECHANICAL DRAWING INDEX
MECHANICAL/ELECTRICAL ENGINEER
ARCHITECTURAL DRAWING INDEX
ARCHITECT
SOUTH - SOUTHEAST ROWHOUSE
SOUTHEAST ROWHOUSE
POWER MAGAZINE
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
23436.00
M a t r ix
751/23388.ABG
acct. template sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/9/2024 CD SET
A-000
DBP
CAT
TITLE SHEET
23436.00
M a t r ix
751/23388.ABG
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
DJS
BKO/TAA
A-100
CLARKSTON, MI
7300 DIXIE HWY.
PHONE
FAX
PHONE
248.605.2030 248.605.2030
48346 #600
WEB DSARCHITECTS.COM
A R
C H
I T
E C
T S
23436.00
M a t r ix
751/23388.ABG
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
DJS
BKO/TAA
A-200
CLARKSTON, MI
7300 DIXIE HWY.
PHONE
FAX
PHONE
248.605.2030 248.605.2030
48346 #600
WEB DSARCHITECTS.COM
A R
C H
I T
E C
T S
GENERAL HVAC NOTES
1. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION
THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.
2. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS
NEEDED.
3. PROVIDE BALANCE DAMPERS FOR EACH DIFFUSER/GRILLE
AND BRANCH DUCT.
4. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
5. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
6. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS
THAT MAY AFFECT THE WORK.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A
"NEW" CONDITION DURING CONSTRUCTION.
8. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY
LAW.
9. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,
LATEST APPLICABLE EDITION.
10. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT
FITTINGS IN ACCORDANCE WITH SMACNA. (WYES, RADIUSED
OR VANED TEES, ETC.) DUCTWORK SHALL BE GALVANIZED
SHEET METAL, MIN. 26 GA.
11. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE
FLEXIBLE DUCT CONNECTORS.
12. ALL CONDENSATE DRAIN PIPING SET @ MIN. 1% SLOPE.
13. ALL CONDENSATE DRAIN PIPING TO TERMINATE TO DRAIN VIA
AIR GAP.
14. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST
ITEM SHALL BE USED.
15. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND DUCTS AND SUGGESTED
ROUTES. IT IS NOT INTENTION OF DRAWINGS TO INDICATE
ALL NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE
HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
DO NOT SCALE FROM DRAWINGS.
16. CONTRACTORS TO WORK WITH OWNER ON THE INSTALLATION
OF NEW MECHANICAL EQUIPMENT, PIPING, AND DUCTWORK
TO ENSURE THE PROPER PROTECTION OF ALL
EXHIBITS/DISPLAYS.
17. CONTRACTOR TO FELID VERIFY EXISTING CONDENSATE
ROUTING IN SOUTH-SOUTHEAST ROWHOUSE BUILDING PRIOR
TO CONSTRUCTION AND HAVE NEW CONDENSATE ROUTING
BE SIMILAR.
18. CONTRACTOR TO REMOVE AND REINSTALL EXISTING
WOODEN PLANKING AS NEEDED TO COMPLETE THEIR WORK.
19. CONTRACTOR TO CUT, PATCH, PRIME AND PAINT EXISTING
CEILING/SOFFITS/WALLS AS REQUIRED TO COMPLETE THEIR
WORK. ALL CEILING/SOFFITS/WALLS ARE TO BE PATCHED,
PRIMED, AND PAINTED TO MATCH EXISTING.
20. CONTRACTOR TO TAKE ALL APPROPRIATE MEASURES TO
PROTECT/PRESERVE THE EXISTING HISTORICAL SITE,
HISTORICAL ARTIFACTS, HISTORICAL DISPLAYS, AND ALL
HISTORICAL BUILDINGS DURING ALL ASPECTS OF
CONSTRUCTION. CONTRACTOR TO USE TEMPORARY WALLS,
PROTECTIVE COVERINGS, AND OTHER ASSOCIATED
MEASURES TO ENSURE FULL PROTECTION OF HISTORICAL
ITEMS DURING ALL ASPECTS OF CONSTRUCTION.
CONTRACTOR TO PROVIDE A DETAILED PLAN OF
PROCEDURES AND ACTIONS THAT WILL BE USED FOR
PROTECTIVE EFFORTS TO THE MACKINAC STATE HISTORIC
PARKS TEAM FOR THEIR APPROVAL PRIOR TO STARTING
CONSTRUCTION.
21. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR
INSTALLATION OF ALL 24 VOLT CONTROL WIRING AS
REQUIRED TO LOCALLY CONTROL ALL HVAC EQUIPMENT PER
THE SEQUENCE OF OPERATIONS. REFER TO MECHANICAL
SPECIFICATIONS AND COORDINATE WITH MECHANICAL
CONTRACTOR. ELECTRICAL CONTRACTOR IS RESPONSIBLE
FOR INSTALLING WIRING AND RACEWAY PER ELECTRICAL
SPECIFICATIONS.
22. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL THERMOSTATS/SENSORS, BUT THE
ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR
INSTALLATION OF ALL THERMOSTATS.
23. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL OTHER
HARDWARE REQUIRED TO WIRING THE HVAC EQUIPMENT PER
THE SEQUENCE OF OPERATIONS.
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLS
HVAC PIPING
HVAC DUCTWORK
SD
F/S
F/S s s
TEMPERATURE CONTROL SYMBOLS
M
P
M
H
S
T P T N
T
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
SUCTION (REFRIGERANT)
LIQUID (REFRIGERANT)
SUCTION (DIRECT EXPANSION)
LIQUID (DIRECT EXPANSION)
LOW PRESSURE STEAM (0-20 LBS.)
MEDIUM PRESSURE STEAM (21-75 LBS.)
HIGH PRESSURE STEAM (76 LBS. & ABV.)
STEAM CONDENSATE (GRAVITY)
PUMPED STEAM CONDENSATE
STEAM CONDENSATE BOILER FEED
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,
PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
SCP
SC
DXS
DXL
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CWR
CWS
S
L
LPS
MPS
HPS
SC (BF)
TAG CFM
NECK REMARKS
SIZE
BT
FT
SD-1 250
8"ø ---
PROJECT PHASING PLAN
ALL ONSITE WORK CANNOT START UNTIL 7/29/2024. ALL WORK
CONTAINED IN THE CONSTRUCTION DOCUMENTS MUST BE
SUBSTANTIALLY COMPLETE BY 9/30/2024.
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
23436.00
M a t r ix
751/23388.ABG
acct. template sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/9/2024 CD SET
M-100
DBP
CAT
MECHANICAL SYMBOLS,
NOTES, ABBREVIATIONS,
AND SCHEDULES
X-DEHUMDIFIER
X-DEHUMDIFIER
X-12" SA
X-12" SA
X-3/4" CD
X-3/4"
CD
X-CONDENSATE
PUMP
X-3/4" CD
X-3/4" CD
X-3/4" CD
POWDER
MAGAZINE ROOM
OBSERVATION
ROOM
STAIRS
STAIRS
LOBBY
CLOSET
FIREARMS ROOM
STAIRS
DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING DUCTED
DEHUMIDIFIER, DUCTWORK, CONDENSATE PIPING,
CONTROLS, AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING
DEHUMIDIFIER, CONDENSATE PIPING, CONTROLS,
AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING
CONDENSATE PUMP, CONDENSATE PIPING, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING
DUCTWORK AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING
CONDENSATE PIPING AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. REUSE EXISTING
CONDENSATE PIPING EXTERIOR WALL PENETRATION
FOR NEW CONDENSATE PIPING.
GENERAL DEMOLITION NOTES
1. CONTRACTOR TO TAKE ALL APPROPRIATE MEASURES TO
PROTECT/PRESERVE THE EXISTING HISTORICAL SITE, HISTORICAL
ARTIFACTS, HISTORICAL DISPLAYS, AND ALL HISTORICAL BUILDINGS
DURING ALL ASPECTS OF CONSTRUCTION. CONTRACTOR TO USE
TEMPORARY WALLS, PROTECTIVE COVERINGS, AND OTHER ASSOCIATED
MEASURES TO ENSURE FULL PROTECTION OF HISTORICAL ITEMS
DURING ALL ASPECTS OF CONSTRUCTION. CONTRACTOR TO PROVIDE A
DETAILED PLAN OF PROCEDURES AND ACTIONS THAT WILL BE USED FOR
PROTECTIVE EFFORTS TO THE MACKINAC STATE HISTORIC PARKS TEAM
FOR THEIR APPROVAL PRIOR TO STARTING CONSTRUCTION.
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
23436.00
M a t r ix
751/23388.ABG
acct. template sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/9/2024 CD SET
M-300
DBP
CAT
SOUTH-SOUTHEAST
ROWHOUSE BELOW GRADE
FLOOR PLAN - MECHANICAL
DEMOLITION
N SOUTH-SOUTHEAST ROWHOUSE BELOW GRADE FLOOR PLAN - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
0 1 5 10
X-WINDOW1 2
DEMOLITION NOTES
DISCONNECT, REMOVE, AND SALVAGE EXISTING
WINDOW, WINDOW FRAME, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO
REMOVE GLASS FROM THE EXISTING WINDOW FRAME
AND REINSTALL EXISTING WINDOW FRAME IN
EXISTING LOCATION TO HIDE LOUVER TO MATCH
OTHER BUILDINGS AT THE FACILITY. REUSE EXISTING
WINDOW OPENING FOR NEW LOUVER AS INDICATED
ON THE NEW DRAWING.
NO MECHANICAL DEMOLITION WORK IN ATTIC SPACE.
GENERAL DEMOLITION NOTES
1. CONTRACTOR TO TAKE ALL APPROPRIATE MEASURES TO
PROTECT/PRESERVE THE EXISTING HISTORICAL SITE, HISTORICAL
ARTIFACTS, HISTORICAL DISPLAYS, AND ALL HISTORICAL BUILDINGS
DURING ALL ASPECTS OF CONSTRUCTION. CONTRACTOR TO USE
TEMPORARY WALLS, PROTECTIVE COVERINGS, AND OTHER ASSOCIATED
MEASURES TO ENSURE FULL PROTECTION OF HISTORICAL ITEMS
DURING ALL ASPECTS OF CONSTRUCTION. CONTRACTOR TO PROVIDE A
DETAILED PLAN OF PROCEDURES AND ACTIONS THAT WILL BE USED FOR
PROTECTIVE EFFORTS TO THE MACKINAC STATE HISTORIC PARKS TEAM
FOR THEIR APPROVAL PRIOR TO STARTING CONSTRUCTION.
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
23436.00
M a t r ix
751/23388.ABG
acct. template sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/9/2024 CD SET
M-301
DBP
CAT
SOUTH-SOUTHEAST
ROWHOUSE ATTIC FLOOR PLAN
- MECHANICAL DEMOLITION
N SOUTH-SOUTHEAST ROWHOUSE ATTIC FLOOR PLAN - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
0 1 5 10
| Mech |
| Sheets and Views |
| M000-2343600-M-000 |
File details come from the government source that posted it. Updated .