This document contains drawings, electrical symbols, notes, and a site plan related to a state and local contract opportunity for a new educational greenhouse at the Muskegon Correctional Facility in Muskegon County, Michigan. The project involves providing and installing new electrical conduits, wiring, panels, transformers, and other electrical equipment to support the new greenhouse. Key details include a new 208/120V, 100A electrical panel (RP-1), connections to existing electrical infrastructure, installation of owner-provided grow light fixtures, and general electrical requirements for the new greenhouse.
The contract opportunity is being managed by the State of Michigan, Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division. Bids must be submitted electronically through the SIGMA VSS system by the 2:00 pm deadline. Questions should be emailed to the project manager, Richard Mann, and issues with SIGMA VSS should be directed to the SIGMA help desk. The contract has no stated term or renewal options.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCPS
V
M C
X
X
X
TVSS
VFD
TRANSIENT VOLTAGE SURGE SUPPRESSION
VARIABLE FREQUENCY DRIVEDUPLEX RECEPTACLE
CARBON MONOXIDE DETECTOR
H
DOCK LIGHT FIXTURE
CONTROL MODULE
S
TELEPHONE / DATA OUTLET
ADDENDUM NOTE
PLAN NOTE
DEMOLITION NOTE
THREE PHASE MOTOR
MONITOR MODULE
FIRE CONTROL POWER SUPPLY
VISUAL ONLY UNIT
ELECTRICAL SYMBOLS LEGEND
DH
J
SINGLE RECEPTACLE (120 VOLT)
EMERGENCY RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
FLUSH FLOOR BOX
SURFACE FLOOR BOX
SPECIAL EQUIPMENT RECEPTACLE
TELEPHONE OUTLET
DATA OUTLET
POWER POLE
JUNCTION BOX
WALL JUNCTION BOX
PULL (JUNCTION) BOX
UNDERFLOOR JUNCTION BOX
OUTLETS
LIGHT FIXTURE
STRIP FIXTURE
IN-GRADE LIGHT FIXTURE
SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)
WALL MOUNT LIGHT FIXTURE
CEILING LIGHT FIXTURE
TRACK & FIXTURE
STREET TYPE POLE FIXTURE
POLE MOUNTED LIGHT FIXTURE
EXTERIOR WALL MOUNT LIGHT FIXTURE
WALLPACK LIGHT FIXTURE
SPECIAL PURPOSE LIGHT FIXTURE
HIGH BAY LIGHT FIXTURE
EMERGENCY EGRESS LIGHT FIXTURE
(number of heads shown)
EMERGENCY LIGHT FIXTURE
FIXTURES
SWITCHES
SINGLE-POLE SWITCH
DIMMER SWITCH
TIME SWITCH
KEY SWITCH
MANUAL MOTOR SWITCH
THERMAL OVERLOAD SWITCH
SWITCH WITH PILOT LIGHT
FOUR-WAY SWITCH
THREE-WAY SWITCH
CIRCUITRY and RACEWAYS
UNDERFLOOR DUCT
BUS DUCT
PLUGMOLD AS SPECIFIED
WIREMOLD AS SPECIFIED
FLEXIBLE PIGTAILS/CONNECTIONS
"CONDUIT RUN CONTINUES" INDICATION
END OF CONDUIT RUN, CAP AND STAKE
END OF CONDUIT RUN
HOME RUN (with circuit numbers)
CONDUIT STUB DOWN
CONDUIT STUB UP
CONDUIT INSTALLED
CONDUIT INSTALLED
MECHANICAL
ELECTRIC WATER HEATER
ELECTRIC UNIT HEATER
PIPE TRACE HEATER
RESISTANCE HEATER, KW SHOWN
SINGLE PHASE MOTOR
SERVICE and EQUIPMENT
THERMOSTAT
CAPACITOR
ENCLOSED CIRCUIT BREAKER
TRANSFER SWITCH
WIREWAY
GROUND CONNECTION PER N.E.C.
TELEPHONE TERMINAL BOARD
GENERATOR, KW SHOWN
CURRENT TRANSFORMERS
UTILITY METER, AS REQUIRED
WEATHERHEAD
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
COMB. STARTER
MAGNETIC STARTER
FUSED DISCONNECT SWITCH
TRANSFORMER
CONTROL
xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt
LIGHTING CONTACTOR
CONTROL TRANSFORMER
buttons indicated) PUSHBUTTON STATION (number of TIME CLOCK (24 hour U.O.N.)
PHOTOCELL (voltage as required)
HUMIDISTAT
FIRE ALARM
TAMPER SWITCH (furnished by FP/C) FLOW SWITCH (furnished by FP/C)
FIREFIGHTER COMMUNICATION JACK
MAGNETIC DOOR HOLDER
REMOTE INDICATING LIGHT, CLG. MTD.
REMOTE INDICATING LIGHT, WALL MTD.
END OF LINE DEVICE
ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
PULL STATION
SPEAKER & LIGHT
SPEAKER
HORN
DUCT SMOKE DETECTOR
HEAT DETECTOR
SMOKE DETECTOR
HORN & LIGHT
DESIGNATIONS
(by E.C.)
(by others)
TT
FACP
ANN
EOL
G
WW
PC
CT
TS
T
H
TC
IC
F
FC
F
T
1,3
OR
PM
WM
BD
UFD
F S
J
J
D
WH
PP
J
SWITCH STYLE OCCUPANCY SENSOROC
POWER PACK
DUAL TECHNOLOGY SENSOR - 360° - 500 SQ FT
DUAL TECHNOLOGY SENSOR - 360° - 1000 SQ FT
ULTRASONIC SENSOR - 360° - 2 CIRCUIT
OCCUPANCY SENSOR / PHOTOCELL
WALL MOUNT DUAL TECHNOLOGY SENSOR
OS5
OS4
OS2
OS3
OS1
PP
DUCT SMOKE DETECTORF/S
CEILING MOUNTED WIFI
DIGITAL EQUIPMENT METER, AS REQUIRED
POLE
PUMP
PANEL
P
PNL
PVC
PRV-
P-
PB
POLY VINYL CLORIDE
POWER ROOF VENTILATOR
PULL BOX
GENERAL CONTRACTOR
GROUND
HUMIDIFIERH-
GND
GFI
GC
GROUND FAULT INTERUPTER
ABBREVIATIONS LEGEND
POWER
SWITCH
RECEPT
SF-
SWBD
TCC
SPEC
SW
RGC
RTU-
PWR
VOLTS
WATTS
UF
V
W
UL
VL
UNO
UH-
TS
TYP
TR
ROOF TOP UNIT
RECEPTACLE
SWITCHBOARD
UNDER FLOOR
SPECIFICATIONS
RIGID GALVANIZED STEEL CONDUIT
UNLESS NOTED OTHERWISE
UNDERWRITERS' LABORATORIES, INC.
TAMPER PROOF RECEPTACLE
TAMPER PROOF SWITCH
TEMPERATURE CONTROL CONTRACTOR
VERIFY LOCATION WITH OWNER
TYPICAL
UNIT HEATER
SUPPLY FAN
WITH
WITHOUT
W/
XFMR
W/O
WP
TRANSFORMER
WEATHER PROOF
HOUR
LIGHT
JUNCTION BOX
LIGHT CONTROL
ISOLATED GROUND
HORSEPOWER
MINIMUM
MOUNT
MAKE-UP AIR UNIT
MOTOR CONTROL CENTER
MAIN LUG ONLY
MOUNTED
MOUNTING
MAXIMUM
LIGHTING
LT FLEX
MTD
MUAU-
MTG
MLO
MIN
MT
MC
MAX
MCC
LTG
IG
LC
LT
IMC
JB
HR
HVAC
HOA
HP
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
NIGHT LIGHTNL
NTS
NO
NIC
NC
HAND-OFF-AUTO SELECTOR SWITCH
HEATING/VENTILATING/AIR CONDITIONING
INTERMEDIATE METAL CONDUIT
LIQUID TIGHT FLEXIBLE METAL CONDUIT
MECHANICAL CONTRACTOR
HID HIGH INTENSITY DISCHARGE
A
AC
AFF
ACU-
AHJ
AHU-
AS
B-
BC
AIC
ATS
BLDG
CHLR-
CND (C)
CKT BKR
CKT
CUH-
CU-
DISC
DFU-
EF-
EC
DWH-
EBB-
DWG
CT-
EXIST (E)
EWC
FLEX
FLA
FLR
FSES
FLUOR
EMT
ABOVE FINISHED FLOOR
AIR CONDITIONING UNIT
AMPS
ABOVE COUNTER
AIR HANDLING UNIT
AUTOMATIC TRANSFER SWITCH
AMPS INTERUPTING CAPACITY
AUTHORITY HAVING JURISDICTION
ABOVE SHELF
BOILER
BUILDING
BELOW COUNTER
CHILLER
DOMESTIC WATER HEATER
CABINET UNIT HEATER
CIRCUIT
CIRCUIT BREAKER
CONDUIT
CONDENSING UNIT
COOLING TOWER
DUCT FURNACE
DRAWING
DISCONNECT
FOOD SERVICE EQUIP. SUPPLIER
ELECTRIC WATER COOLER
ELECTRICAL CONTRACTOR
ELECTRIC BASEBOARD
ELECTRICAL METALLIC TUBING
EXISTING
EXHAUST FAN
FLOOR
FLUORESCENT
FLEXIBLE CONDUIT
FULL LOAD AMPS
EM EMERGENCY
F/S FIRE/SMOKE
FU- FURNACE
LED - 1X4 VAPOR TIGHT VANDAL RESISTANT LIGHT FIXTURE.
FIXTURE
MOUNTING
HEIGHT
DRIVERDESCRIPTION AND COMMENTSTYPE MANUFACTURER CATALOG NO.
LIGHTING FIXTURE SCHEDULE
FAIL-SAFE OR EQUAL VRVT4SP-9-DRF--UNV-L850-CD-1-WL-SSL-U
VRVT4SP-9-DRF--UNV-L850-EL10W-CD-1-WL-SSL-U
ISS-PA1-C-750-U-T4W-BK-TR-BPCMCGRAW-EDISON OR
EQUAL
EXL-7-1-RW-WH-VRSDFAIL-SAFE OR EQUALXA
LBEM
LAEM
LA
LED - 1X4 VAPOR TIGHT VANDAL RESISTANT LIGHT FIXTURE WITH EMERGENCY BATTERY
PACK.
LED - VANDAL RESISTANT WALL PACK WITH INTEGRAL PHOTOCELL.
LED - VANDAL RESISTANT EXIT SIGN.
CEILING 9959 LUMENS
62W, 5000K
DIMMING INFO
0-10V
GENERAL ELECTRICAL NOTES
1. ALL NON-FIRE RATED SURFACES ARE TO BE PATCHED WITH LIKE MATERIAL TO
MAINTAIN ORIGINAL RATING.
2. ALL PENETRATIONS THROUGH FIRE RATED SURFACES ARE TO BE SEALED WITH FIRE
CAULK TO MAINTAIN ORIGINAL RATING.
3. CONTRACTORS SHALL VISIT THE PROJECT SITE DURING PRE-BID WALK THROUGH TO
DETERMINE THE EXACT EXTENT OF THE WORK REQUIRED BEFORE BIDDING THE
PROJECT.
4. REMOVE ALL EXISTING EXPOSED CONDUIT, WIRE, AND EQUIPMENT NOT TO BE
RE-USED WHERE WORK IS BEING DONE EXCEPT ITEMS NOTED OTHERWISE.
5. EXISTING WORK WHICH IS PRESENTLY CONCEALED AND WHICH WILL REMAIN
CONCEALED AND DOES NOT INTERFERE WITH ANY NEW WORK OF ANY TRADE NEED
NOT BE REMOVED. HOWEVER, ALL CONDUIT SHALL BE CAPPED BELOW FINISH
SURFACE AND THEN PATCHED AND PAINTED TO MATCH, OR AS NOTED.
6. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF OLD WORK,
SURFACES SHALL BE PATCHED AND PAINTED TO MATCH ADJACENT.
7. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE MODIFIED OR ENLARGED
TO SUIT THE NEW SYSTEMS AS REQUIRED. PROVIDE ALL REQUIRED CUTTING AND
PATCHING.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE EXISTING WALLS TO
MATCH THE ADJACENT SURFACES BEHIND ALL SURFACE MOUNTED EQUIPMENT.
9. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENTS AND CASUAL FIELD
OBSERVATION. REPORT ANY DISCREPANCIES TO ENGINEER FOR CLARIFICATION.
10. MINIMUM RACEWAY SIZE; 3/4" TRADE SIZE. ALL FLEXIBLE CONDUIT RACEWAYS SHALL
BE LIQUID TITE, MAXIMUM 36" LENGTH. REFER TO SPECIFICATION 260533 - RACEWAY
AND BOXES FOR ELECTRICAL SYSTEMS.
11. ALL CONDUIT ABOVE 10 FOOT SHALL MEET THE FOLLOWING REQUIREMENTS:
11.1. STRAP DISTANCE: 5 FEET.
11.2. FASTENERS: 2 HOLE WITH SECURITY SCREWS.
11.3. CONDUIT: INTERIOR EMT, EXTERIOR EXPOSED/ CONCEALED- GRC.
11.4. FITTINGS: COMPRESSION.
11.5. BELL BOXES: FS TYPE.
11.6. NO KNOCKOUTS.
11.7. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND ENCLOSURES.
12. ALL CONDUIT BELOW 10 FOOT SHALL MEET THE FOLLOWING REQUIREMENTS:
12.1. STRAP DISTANCE: 3 FEET.
12.2. FASTENERS: 2 HOLE WITH SECURITY SCREWS.
12.3. CONDUIT: INTERIOR EMT, EXTERIOR EXPOSED/ CONCEALED - GRC.
12.4. FITTINGS: COMPRESSION.
12.5. BELL BOXES: FS TYPE.
12.6. NO KNOCKOUTS.
12.7. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND ENCLOSURES
13. ALL EXPOSED WIRING SHALL BE IN CONDUIT. OPEN LOW VOLTAGE WIRING ABOVE
CEILINGS IS ACCEPTABLE.
14. ALL NEW CONDUITS AND WIRES SHALL BE INSTALLED STRAIGHT AND LEVEL AND
SHALL BE PARALLEL OR PERPENDICULAR TO THE BUILDING LINES.
15. ALL NEW CONDUITS SHALL BE FIELD ROUTED ALONG EXISTING PIPING AND
STRUCTURAL STEEL.
16. ALL LOCATIONS WHERE THE WALLS CAN'T BE FISHED SHALL BE SURFACE MOUNTED
CONDUIT FOLLOWING NOTES 10 THROUGH 12 ABOVE.
17. ALL WALLS THAT ARE ACCESSIBLE SHALL BE FISHED AND DEVICE CUT INTO WALL.
18. ALL EXTERIOR CONCEALED CONDUIT UNDERGROUND SHALL BE RNC, TYPE
EPC-40-PVC
19. ALL ELECTRICAL OUTAGES SHALL NOT LAST OVER 2-HOURS. PORTABLE GENERATORS
SHALL BE USED TO REPLACE ANY ELECTRICAL SERVICE EXCEEDING THAT DURATION.
20. IN RELATION TO RELOCATING ANY ELECTRICAL DEVICE, CONTRACTOR SHALL
COMPLETE THE RELOCATION IN ONE DAY AND VERIFY THAT ALL DEVICES RELOCATED
ARE WORKING PROPERLY PRIOR TO LEAVING THE SITE.
21. CONTRACTOR SHALL PROVIDE AND INSTALL ALL REQUIRED COMPONENTS,
RACEWAYS, WIRE, AND HARDWARE AS INDICATED ON DRAWINGS.
22. ALL WORK DONE WITHOUT APPROVED SHOP DRAWINGS IS AT CONTRACTORS RISK.
23. CONTRACTOR SHALL CONTACT COMMTECH FOR SPECIFICATIONS FOR CAT6 AND
OTHER LOW VOLTAGE REQUIREMENTS.
24. CONTRACTOR SHALL PERFORM GROUND PENETRATION RADAR (GPR) SURVEY TO
LOCATE SUB-SURFACE UTILITIES AND OBSTACLES PRIOR TO EXCAVATION.
CONTRACTOR IS RESPONSIBLE FOR REPAIRS TO ITEMS DAMAGED DURING
EXCAVATION AND BORING. FACILITY SHALL BE INFORMED IMMEDIATELY WHENEVER
AN INCIDENT OCCURS. CONTRACTOR SHALL PROVIDE A REPORT PER SPECIFICATION
SECTION 023123 - ELECTROMAGNETIC INVESTIGATIONS.
25. ALL DIGGING DONE WITHIN THE SECURE PERIMETER SHALL BE HYDRO-EXCAVATED
PER SPECIFICATION SECTION - 023200.
CEILING 9959 LUMENS
62W, 5000K0-10VFAIL-SAFE OR EQUAL
18" ABOVE DOOR 6796 LUMENS
49W, 5000K0-10V
M
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
MUSKEGON CORRECTIONAL
FACILITY
GREENHOUSE
M A
T R
I X
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
E-100
ELECTRICAL NOTES,
SYMBOLS, ABBREVIATIONS, &
PANEL SCHEDULES
NEW PANEL RP-1
208/120V-3PH, 100A
NEW CONDUIT AND WIRE
FOR POWER AND DATA
GREENHOUSE
EXIST. PANEL J
480/277V-3PH, 225A
TEXIST. PANEL JJ
208/120V-3PH, 100A
EXIST. 30KVA XFRM
TG
NEW 30KVA XFRM
NEW XFRM
DISCONNECTING
MEANS
ELECTRICAL KEY NOTES
HYROVAC NEW ELECTRICAL CONDUIT AND WIRE PER SPECIFICATION.
PROVIDE TRACER WIRE FOR FUTURE IDENTIFICATION.
CONTRACTOR SHALL SEAL WALL PENETRATION(S) AS REQUIRED TO
MAINTAIN EXISTING WALL RATING(S).
CONTRACTOR SHALL PROVIDE NEW CONDUIT, WIRE, AND BREAKER IN
EXISTING 208/120V PANEL JJ LOCATED IN THE ELECTRICAL ROOM IN THE
EDUCATION BUILDING.
CONTRACTOR SHALL PROVIDE AND INSTALL NEW 2" CONDUIT FOR DATA.
REFER TO SHEET E-600 FOR POWER REQUIREMENTS.
CONTRACTOR SHALL PROVIDE AND INSTALL NEW CONDUIT AND WIRE.
REFER TO SHEET E-600 FOR CONDUIT AND WIRE SIZE.
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
MUSKEGON CORRECTIONAL
FACILITY
GREENHOUSE
M A
T R
I X
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
N ELECTRICAL - SITE PLAN
SCALE: 1/16" = 1'-0"
10510 4020
E-200
ELECTRICAL SITE PLAN
WP
LAEM
LA
LBEM
RP1-23
RP1-23
XA
LAEM LAEM
LAEMLAEM
LA LA
LA LA
GENERAL ELECTRICAL NOTES
1. PER NEC, SECTION 410.10(A) - LUMINAIRES IN WET OR DAMP
LOCATIONS SHALL BE MARKED “SUITABLE FOR WET LOCATIONS.”
2. ELECTRICAL CONTRACTOR SHALL INSTALL OWNER PROVIDED GROW
LIGHT FIXTURES AT OWNER PROVIDED RACKS. CONTRACTOR SHALL
COORDINATE LOCATIONS WITH ARCHITECT AND OWNER. REFER TO
SHEET E-500 FOR POWER LOCATIONS.
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781
248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
MUSKEGON CORRECTIONAL
FACILITY
GREENHOUSE
M A
T R
I X
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
N ELECTRICAL - FLOOR PLAN - LIGHTING
SCALE: 1/4" = 1'-0"
0 1 5 10
E-400
ELECTRICAL - FLOOR PLAN -
LIGHTING
UH-1
120V-1PH, 7.2A
UH-2
120V-1PH, 7.2A
HAF-2
48"
AFF
48" AFF
48" AFF48" AFF
48" AFF
48" AFF
GERMINATION
CHAMBER
WP WP
WP
WP
WP
WEATHERPROOF
GUTTER POWER
NEW PANEL RP1
208/120V-3PH, 100A
NEW GREENHOUSE
CONTROL PANEL
WEATHERPROOF
GUTTER POWER2
EF-2
120V-1PH, 13.8A
HAF-2
120V-1PH, 1A
DWH-1
208V-1PH, 40A
WP
WP
EF-1
120V-1PH, 13.8ARP1-1
RP1-3
HAF-1
120V-1PH, 1A
HAF-3
120V-1PH, 1A
HAF-4
120V-1PH, 1A
RP1-4
RP1-8
RP1-6
RP1-2
RP1-5
RP1-7
RP1-9,11
WP
J
STRATASCREEN
RP1-10
HUNTER PRO-C
IRRIGATION CONTROLLER
RAINBIRD ESP-ME
IRRIGATION CONTROLLER
RP1-17RP1-15
RP1-13
RP1-12
RP1-14
48" AFF
RP1-16
RP1-18
RP1-20RP1-22
RP1-19
RP1-21
RP1-21
C
C
RP1-25
RP1-29
C
C
RP1-31 C
C
RP1-24 C
C
C
CRP1-35 RP1-28
RP1-31
RP1-35
RP1-25
RP1-29
RP1-30
48" AFF48" AFF48" AFF48" AFF
J
SKYLIGHT
RP1-32
J C
RV-1
(ON ROOF)5
RP1-10
J C
J
WP
ELECTRICAL KEY NOTES
COORDINATE FINAL LOCATION WITH OWNER.
WEATHERPROOF GFI RECEPTACLE. COORDINATE MOUNTING LOCATION
WITH GREENHOUSE MANUFACTURER.
PROVIDE AND INSTALL NEMA 4X PANEL PER NEC TABLE 110.28 ENCLOSURE
SELECTION.
MANUFACTURER PROVIDED DISCONNECT. CONTRACTOR SHALL HARDWIRE
SKYLIGHT PER NEC REQUIREMENTS.
INSTALLATION OF NEW ROOF MOUNTED RIDGE VENT BY OTHERS.
CONTRACTOR PROVIDE AND INSTALL CONDUIT AND WIRE FOR NEW
EQUIPMENT, NEW EQUIPMENT SHALL BE HARDWIRED. CONTRACTOR SHALL
COORDINATE POWER TERMINATION LOCATION WITH APPROVED SHOP
DRAWING.
CONTRACTOR SHALL PROVIDE AND INSTALL WEATHERPROOF JUNCTION
BOX, CONDUIT AND WIRE FOR NEW EXTERIOR IRRIGATION CONTROL BOX.
GENERAL ELECTRICAL NOTES
1. ALL RECEPTACLES SHALL BE PROVIDED AND INSTALLED PER NEC
SECTION 406.9.
2. ALL RECEPTACLES SHALL HAVE IN-USE SPRAY DOWN RATED
WEATHERPROOF COVERS.
3. ALL RECEPTACLES SHALL BE GFCI.
4. PROVIDE AND INSTALL INSULATED CONDUCTORS AND CABLES PER
NEC 310.10(C).
5. CONTRACTOR SHALL INSTALL NEW PANEL AND VARIOUS EQUIPMENT
PER NEC SECTIONS SECTIONS 250.4, 250.32, 250.50, 250.52, 250.53, AND
TABLE 250.66. GREENHOUSE SHALL HAVE A GROUNDING ELECTRODE
SYSTEM INSTALLED AND CONNECTED AT THE DISCONNECTING MEANS
TO THE EQUIPMENT GROUNDING CONDUCTOR ROUTED WITH THE
SUPPLY CONDUCTORS. PROVIDE AND INSTALL GROUND RODS AS
REQUIRED.
6. ALL ELECTRICAL POWER REQUIREMENTS TO BE COORDINATED WITH
APPROVED GREENHOUSE MANUFACTURER SUBMITTAL TO VERIFY
PROPER VOLTAGE AND AMPERAGE.
7. EQUIPMENT SIZE, TYPE, AND MANUFACTURER MAY CHANGE BASED ON
GREENHOUSE VENDOR. CONTRACTOR SHALL VERIFY POWER
REQUIREMENTS AND ROUGH-IN PRIOR TO INSTALLATION.
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
MUSKEGON CORRECTIONAL
FACILITY
GREENHOUSE
M A
T R
I X
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
N ELECTRICAL - FLOOR PLAN - POWER
SCALE: 1/4" = 1'-0"
0 1 5 10
E-500
ELECTRICAL - FLOOR PLAN -
POWER
9 KV 9 KV
MCGRAW EDISON
NX 25 C FUSES
15KV MAX
MCGRAW EDISON
NX 25 C FUSES
15KV MAX
277/480V
7.2/12.47KV
300KVA
277/480V
7.2/12.47KV
300KVA
450A/3P 52-A
450A/3P 52-B
52-T 450A/3P
A/
3P
0A
/3P
0A
/3P
A/
3P
0A
/3P
A/
3P
100A/3P 100A/3P 100A/3P100A/3P
480V
AUTOMATIC
CHANGEOVER
480V TO 208/120V
SQUARD "D"
SWITCHBOARD
480V TO 208/120V
SQUARD "D"
SWITCHBOARDS
ADMINISTRATION BUILDING
800A BUS 800A BUS
9 KV 9 KV
208/120V
7.2/12.47KV
300KVA
208/120V
7.2/12.47KV
300KVA
1000A/3P 52-A
1000A/3P 52-B
52-T 1000A/3P22
5A /3P
5A
/3P
100A/3P
208/120V AUTOMATIC
CHANGEOVER
1200A BUS 1200A BUS
5A
/3P
A/
3P
5A
/3P
100A/3P100A/3P
5A
/3P
5A
/3P
5A
/3P
5A
/3P
MCC PNL A PNL B PNL C PNL D PNL E PNL F PNL G PNL H
EMER. PNL
480V TO 208/120V
SQUARD "D"
SWITCHBOARDS
9 KV 9 KV
480/277V
7.2/12.47KV
300KVA
480/277V
7.2/12.47KV
300KVA
600A/3P 52-A
600A/3P 52-B
52-T 600A/3P
A/
3P
5A
/3P
480V AUTOMATIC
CHANGEOVER
600A BUS 600A BUS
5A
/3P
A/
3P
5A
/3P
5A
/3P
PNL A PNL E PNL D PNL C PNL B
100A/3P
0A
/3P
PNL HH
9 KV 9 KV
480/277V
7.2/12.47KV
300KVA
480/277V
7.2/12.47KV
300KVA
600A/3P 52-A
600A/3P 52-B
52-T 600A/3P 20
0A /3P
480V AUTOMATIC
CHANGEOVER
600A BUS 600A BUS
0A
/3P
100A/3P
MCGRAW EDISON
NX 25 C FUSES
15KV MAX
MCGRAW EDISON
NX 25 C FUSES
15KV MAX
A/
3P
A/
3P
0A
/3P
0A
/3P
A/
3P
100A/3P 100A/3P
480V TO 208/120V
WESTINGHOUSE
SWITCHBOARD
480V TO 208/120V
WESTINGHOUSE
SWITCHBOARD
480V TO 208/120V
WESTINGHOUSE
SWITCHBOARD
HOUSING UNIT #1 FOOD SERVICE BUILDING LEISURE TIME ACTIVITY BUILDING
HOUSING UNIT #3 HOUSING UNIT #4 HOUSING UNIT #5
BY EC
NEW ASCO 300 DUAL
PURPOSE QUICK CONNECT
PANEL WITH BREAKERS
1MW DIESEL
GENERATOR
G
PP-MDP
480/277V-3Ø, 1200A
400A/3P
1200A/3P
1200A/3P
BLOCK HEATER,
BATTERY CHARGER
AND REMOTE
ANNUNCIATOR
SECONDARY:
277Y480V 3PH 4W
750KVA
TRANSFORMER
PRIMARY:
12,470V
MCC
100A/3P
PERIMETER LIGHTS
CC-UPS
225A/3P
STORAGE &
MAINTENANCE BLDG
250A/3P
HOUSE PANELS
800A/3P
20A/3P
SITE LIGHTING
PENTHOUSE
TEMP GENERATOR
1200A/3P
N.C.
GFI
NEW
PTE-EM 1000KVA
480Y/277V DELTA INPUT
12,470V DELTA OUTPUT
STEP-UP RATED
0A
/3PEXISTING
BY EC
TBDA/3P
CHILLER NO. 3
250A/3P
800A/3P
1000A/3P
MDP-CH
CHILLER NO. 2
CHILLER NO. 1
60A/3P
SPARE
SPARE
SPARE
HOUSING UNIT #2
M
M M
SPARE
0A
F
AT
M
M
SPARE
SPARE
0A
F
0A
FM
M
PP-MDP
0A
F
AT
0A F
AT
0A
F
0A
T HOUSING
UNIT 1&2
PP-MDP
HOUSING
UNIT 1&2
0A
F
MAIN
PRIMARY SWITCHGEAR CONDUIT & WIRE SCHEDULE
-#8 THHN / THWN75
TAG KCMIL
AWG °C TEMP.
SIZE
CONDUIT GND RATED TYPE REMARKS
A (3) #8 AWG 3/4"
EXIST. PULL BOX
EXIST. PULL BOX
GENERAL ELECTRICAL NOTES
1. CONTRACTOR SHALL HYDROVAC ALL UNDERGROUND CONDUITS
REQUIRED FOR PROJECT.
2. FOR REFERENCE ONLY EXISTING PANEL J AND EXISTING PANEL JJ ARE
FEDERAL PACIFIC.
3. CONTRACTOR SHALL PROVIDE AND INSTALL RAYCAP RAYVOSS SURGE
PROTECTION DEVICE IN NEW PANEL RP-1.
SPD
ASCO
ATS (3-POLE)
15KV RATED
CONCRETE PAD
N E
EXIST. CONSUMERS ENERGY CO.
7.4/12.47KV, 3Ø, 4 WIRE
M
UTILITY LINE #1
EXIST. PRIMARY SWITCH
POWER PLANT
POWER PLANT UNIT SUBSTATION
PANEL
NEW
RP1
208/120V
3PH, 4W
100A / MCB
B
KVA
T
EX
PANEL
EXIST.
JJ
208/120V
3PH, 4W
MCB
PANEL
EXIST.
J 480/277V
3PH, 4W
225 / MCB
A
-#8 THHN / THWN75B (4) #1 AWG 1-1/4"
T #6
G
NEW 30KVA
TRANSFORMER
SPD
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
MUSKEGON CORRECTIONAL
FACILITY
GREENHOUSE
M A
T R
I X
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
E-600
ELECTRICAL RISER DIAGRAM
| Sheets and Views |
| E100-2339900-24x36 |
| E200-2339900-24x36 |
| E400-2339900-24x36 |
| E500-2339900-24x36 |
| E600-2339900-24x36 |
File details come from the government source that posted it. Updated .