Addendum 2 Summary: RFB #2326 Brighton Dale Links Red Pine Bunker, Range, and Short-Game Renovations
This is Addendum Two to a Request for Bid issued by Kenosha County, Wisconsin for golf course construction and renovation work at Brighton Dale Links Complex located at 830 248th Avenue, Kansasville, Wisconsin. The project encompasses red pine bunker, range, and short-game area renovations including site preparation and demolition, topsoil management and mass grading, solid drainage installation, feature construction for bunkers and greens, short-game green irrigation, hole #1 tee work, and finishing and grassing. The addendum, dated December 20, 2023, confirms receipt of the Department of Natural Resources permit and presents revised plan sets incorporating additional erosion control measures and a tracking pad detail. The revised bid due date is January 10, 2024, at 3:00 p.m. Bidders must confirm their ability to begin work on or about August 19, 2024, and complete work on or before November 1, 2024, or 55 days following the start date. A bid bond is required with all submissions.
The revised bid offer form requires contractors to submit base bid pricing for eight line items and three alternate bids for optional work, along with detailed unit cost pricing for potential change orders not exceeding 10% of the total project sum. Contractors must indicate whether irrigation work will be subcontracted and provide subcontractor qualifications if applicable. The project is being designed by Quitno Golf Designs, Inc., located in Park Ridge, Illinois. Kenosha County is exempt from federal excise taxes and Wisconsin sales taxes under Wisconsin Statute 77.54(9a)(b), with CES number 008-1020421892-06. The project staging area is designated in the northeast corner of the parking lot, with permanent and temporary staging locations on the golf course limited to 24-hour periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2326 Drawings.pdf | ||
| 2326 Bid Documents.pdf | ||
| 2326 Specifications.pdf | ||
| Vendor Responsibility Form Construction.pdf | ||
| 2326 Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFB #2326 Addendum Two Page 1 of 1
Yes.
Revised Bid Due Date:
Just as a reminder, addendum 1 revised the bid due date to January 10th, 2024, at 3:00pm.
Revisions:
We received the permit from DNR. We have revised the plan sets to include additional erosion control and tracking pad detail.
Please use the revised bid offer form 2.
Attachments:
Revised Bid Offer Form 2 Revised plan sets
End Addendum 2
KENOSHA COUNTY
RFB #2326 ADDENDUM TWO DATED 12/20/2023
BRIGHTON DALE LINKS RED PINE BUNKER, RANGE, AND
SHORT-GAME RENOVATIONS
KENOSHA COUNTY BID #2326
WISCONSIN PAGE 1 OF 4
ATTACHMENT C
REVISED BID OFFER FORM 2
Vendor:____________________________________________________________________________
Base Bid
General Conditions (Including mobilization, supervision, layout and general expenses)
Site Preparation and Demolition (Including site setup, silt fence, turf removal, tree removal, hardscape removal and sand removal)
Topsoil Management, Mass Grading and Shaping (Including all topsoil, excavation, hauling and feature shaping)
Solid Drainage (Including all solid N-12 tile and associated structures)
Feature Construction (Including all materials and install for bunkers and greens)
Short Game Green Irrigation and Hole #1 Tee (See appendix A in the Specifications)
Finish and Grassing (Including all finish grading, fertilizer, seed, sod and blanket, and hardscape/paths)
Tracking pad as listed on R1, R2 and tracking pad detail on R4 of the revised drawings
Total Base Bid (Sum of all lines above) $
Alternate Bids
The following alternate prices shall include all labor, material, overhead, profit, insurance, and all other incidentals required to cover the completion (or deletion) of the work. At the Owner’s discretion, any combination of these alternates along with the Base Bid may be used to determine the Bidder’s final bid price. Bidder shall honor all alternate pricing throughout the duration of the project and shall not be permitted to renegotiate pricing should the Owner choose to accept said alternates during that time.
Alternate 1: Expand putting green per plan $
Alternate 2: Finish grade, fertilize and sod all bluegrass areas in lieu of the seed and blanket shown on plans
Alternate 3: Import 500 cy of topsoil from off-site and utilize where needed to supplement existing topsoil
WISCONSIN PAGE 2 OF 4
Unit Costs
In the event individual work items are added or deleted from the contract at the direction of the Owner and/or Golf Course Architect (and approved in writing by the Owner), which constitutes a distinct change in the work and does not exceed 10% of the total project sum, a change order shall be executed and the following unit prices shall apply.
Should the change in scope amount to more than 10% of the project sum, Contractor and Owner shall have the right to negotiate a fair sum above and beyond the units provided below
Furnish and install silt fence per lin. ft.
Roto-till existing turf per sq. ft.
Sod strip and dispose of existing turf per sq. ft.
Strip, replace and grade on-site topsoil per cu. yd.
Import, haul and grade topsoil per cu. yd.
Excavate, haul and grade on-site fill material per cu. yd.
Laser-grade tee surface per sq. ft.
Furnish and install 2" N-12 perforated draintile with sand backfill in fairways per lin. ft.
Furnish and install 2" N-12 perforated draintile with mix backfill in greens
Furnish and install 4" N-12 perforated draintile with pea gravel backfill
Furnish and install 4" N-12 solid draintile with soil backfill
Furnish and install 6" N-12 solid draintile with soil
Furnish and install 8" N-12 solid draintile with soil
Install 4" inspection Ts each
Install 12" plastic catch basins with grate
Install 24" plastic catch basins with grate
WISCONSIN PAGE 3 OF 4
Install 12" gravel sumps with grate
Furnish and install 7:2:1 mix in greens per ton
Furnish and install Better Billy Bunker liner in bunkers per sq. ft.
Furnish and install Fredonia sand in bunkers per ton
Finish grade, prep and seed bluegrass
Finish grade, prep and seed bentgrass on greens and tees
Finish grade, prep and install bluegrass sod
Finish grade, prep and install bentgrass sod
Per sq. ft.
Furnish and install Flexterra mulch
Furnish and install new gravel path
Toro INF54 series full circle gear driven rotor, 1 ½” Body w/1 ½” swing joint, piping, fittings and all associated equipment each
Toro INF55 series part circle gear driven rotor, 1 ½” Body w/1 ½” swing joint, piping, fittings and all associated equipment each
Toro 1” Quick coupler valve w/swing joint & stabilizer –complete each
M.J./Resilient Wedge Isolation Valve (as specified) 3”
2” Class 200 PVC Pipe (labor and material)
3” Class 200 PVC Pipe (labor and material)
#12 type Paige Electric PE single conductor wire for underground burial in pipe trench – 24 VAC per lin. ft.
#14 type Paige Electric PE single conductor wire for underground burial in pipe trench – 24 VAC
WISCONSIN PAGE 4 OF 4
Can begin work on or about August 19, 2024? Yes_____ No______
If no, please state start date _______________
Can complete work on or before November 1, 2024 or 55 days following start? Yes______ No______
If no, please state completion date _______________
Will the irrigation work be subcontracted? Yes______ No______
If yes, please provide subcontractor name. __________________________________________
Also, please include an additional attachment B contractor qualifications for the subcontractor.
Bid Bond (Required) is included? Yes_____ No______
Kenosha County is exempt from Federal Excise and Wisconsin Sales Taxes, 77.54(9a)(b) WI Stats.
Kenosha County’s CES number is 008-1020421892-06.
RED PINE
IMPROVEMENT PLANS
BRIGHTON DALE LINKS COMPLEX
830 248TH AVENUE
KANSASVILLE, WI
RED PINE Sheet
DEMOLITION PLAN R1
GRADING & DRAINAGE PLAN R2
RESTORATION PLAN R3
CONSTRUCTION DETAILS R4GOLF COURSE ARCHITECT
QUITNO GOLF DESIGNS, INC.
245 NORTH ROSE AVENUE
PARK RIDGE, IL 60068
847.951.3051
WWW.QUITNOGOLF.COM
PROPERTY OWNER
KENOSHA COUNTY, WISCONSIN
19600 75TH STREET
WINDSOR, WI 53104-9772
WWW.KENOSHACOUNTY.ORG
WWW.GOLFBRIGHTONDALE.COM
"FOR PERMIT"
PG
NG
A
D
D
D
CC
CENTRAL, WEATHER
STATION, AND PUMP
STATION ANTENNAS -
ACTUAL LOCATION BY
OWNER
4"
4"
8"
12" 10"
12"
4"
12"
12"
10" 8"
4"
6" 8"
6"
6"
8"
6"
4"
6"
6"
8"
8"
8"
8"
8"
4" 8"
8"
4"
CONSTRUCTION
STAGING
BR
IG
HT
O
N D
AL
E
LI
N
KS
C
O M
PL
EX
KE
N
O
SH
A
CO
U N
TY
, W
I
D at e:
B y:
R em ar ks
N O
R
TH
R O
S E
A V
E P
A R
K R
ID
G
E , I
L
Q U
IT
N
O G
O
LF
.C O
M
7.
1.
0'
S C
A
L
E
In iti al P la n
S et
TA
Q
R1
W
SN
E
DEMOLITION
PLAN
0'
0'
Re d
Pi ne
De m ol iti on
P la n 6-
-2
P R
O P
E R
TY
O
W N
E R
KE
N
O
SH
A
CO
U N
TY
, W
IS
CO
N
SI
N
TH
S
TR
EE
T
W
IN
DS
O
R, W
I 5
-9
W W
W .K
EN
O
SH
AC
O U
N
TY
.O
RG
W W
W .G
O
LF
BR
IG
HT
O
N
DA
LE
.C
O M
LEGEND
EXISTING GAS LINE
EXISTING CONTOUR
EXISTING IRRIGATION
TREE REMOVAL (CONTRACTOR)
TREE REMOVAL (OWNER)
WORK LIMITS
ALTERNATE OPTION
SAND REMOVAL
TURF REMOVAL
GRAVEL PATH REMOVAL
SILT FENCE
HAUL ROAD
TRACKING PAD
NOTES
All existing turf within the construction limits shall be roto-tilled by the Contractor. Turf must be ground up in its entirety, topsoil must be completely free of turf chunks for finishing, and perimeters along existing turf tie-ins must be sod cut to properly notch in new sod.
Existing bunker sand shall be buried in the work zone and/or incorporated into the soil profile during grading and shaping. Contractor shall be responsible for creating a final medium suitable for building and compacting subgrade shapes and plating all turf areas with 6" of topsoil suitable as a growing medium.
Any existing tile or other manufactured materials (e.g. fabric liners) encountered during excavation shall be removed and disposed of off-site by the Contractor. *Note: It is unknown whether any liner materials exist, but is unlikely.
Existing topsoil shall be stripped in grading areas, temporarily stockpiled within the limits during grading operations, and replaced following grading. Any stockpile areas developed outside of the construction limits (if necessary) shall be approved by the Owner and/or Architect and must be cleaned up (and grassed) at the Contractor's expense.
Gravel from existing paths scheduled for removal may be reused for base in new paths.
All mass tree removal in driving range area to be completed by Contractor. Contractor shall grind all stumps and repair all subsequent damage outside of the construction limits. Contractor shall restore stump removal areas within the construction limits.
Owner to remove individual small trees in short game area and Hole #1.
All existing trees and vegetation scheduled to remain shall be protected against injury or damage resulting from construction in a manner approved by the Owner and Golf Course Architect. This shall include protection from injury or damage caused by cutting, breaking, or skinning of roots, trunks, or branches.
The permanent staging area for the project shall be located in the northeast corner of the parking lot.
This includes all materials, trailers, fuel and idle equipment that will be on the job for extended periods of time. Contractor shall be responsible for protecting all items in the staging area from theft and vandalism.
Temporary staging and equipment locations may be utilized on the golf course at the Owner's discretion, but equipment and material may only stay in these areas for a maximum of 24 hours and shall not be left within flood prone areas. Any spoils left from temporary material storage in either permanent or temporary staging areas must be cleaned up in their entirety once removed.
All haul road locations shall be determined prior to the start of construction by the Contractor and Owner. All haul road locations shall be clearly marked by the Contractor and shall be kept intact to direct construction traffic through the designated areas. It is the responsibility of the Contractor to note the condition of all haul road and staging locations prior to the start of construction and to monitor their use during the project. All areas must be returned to their existing condition at the completion of the job. Any turf area requiring substantial regrading and grassing may be seeded unless it is located within 75' of a green, tee, or fairway edge or otherwise determined by the Owner to be an in-play area , in which case it must be sodded. All seeded areas shall be hydromulched or covered with erosion blanket.
Locations of existing irrigation and utilities as shown on the plan are approximate. Contractor shall field locate existing irrigation lines, heads, and valves within construction limits. Contractor shall also coordinate location of all public utilities. Location markings must be preserved by the Contractor.
Contractor shall be responsible for repair of any damages caused by his crews or sub-contractors to utilities.
Fi na l P la n S et
TA
Q 9-
-2
CONSTRUCTION SEQUENCE
1. INSTALL TRACKING PAD AND SILT FENCE AS SHOWN ON
THE PLANS
2. CLEAR AND GRUB AS NEEDED
3. STRIP TOPSOIL
4. INSTALL DRAIN TILES
5. REGRADE TURF AND BUNKERS
6. MIX EXISTING BUNKER SAND INTO SOIL PROFILE FOR THE
NEWLY GRADED AREAS
7. REPAIR HAUL ROUTES BACK TO GRADE
8. RESPREAD TOPSOIL AND PLACE SEED/MULCH OR SOD
9. REMOVE & REPLACE GRAVEL PATHS
10. REMOVE TRACKING PAD, RESTORE DISTURBED AREA
FO
R
P E
R M
IT
-2 7-
PG
NG
A
D
D
D
CC
CENTRAL, WEATHER
STATION, AND PUMP
STATION ANTENNAS -
ACTUAL LOCATION BY
OWNER
4"
4"
8"
12" 10"
12"
4"
12"
12"
10" 8"
4"
6" 8"
6"
6"
8"
4" 6"
4"
6"
6"
8"
8"
8"
8"
8"
4" 8"
8"
4"
843844
3 81
6 825
9 860
840 839
9 839
829828
834837 833
831833
847845
844 84
845832
TIE INTO
EXISTING BASIN
DAYLIGHT INTO
DITCH
24" GRAVEL
SUMP
ADD NEW BASIN
ON EXISTING TILE
TIE INTO
EXISTING BASIN
4" FRENCH DRAIN
4" FRENCH DRAIN
TIE INTO EX TILE
WITH NEW BASIN
DAYLIGHT
DAYLIGHT
DAYLIGHT
12" GRAVEL
SUMP
CONSTRUCTION
STAGING
81081
82582
825825
840840
840840
840845
845 845
LEGENDNOTES
EXISTING GAS LINE
EXISTING CONTOUR
EXISTING IRRIGATION
WORK LIMITS
BR
IG
HT
O
N D
AL
E
LI
N
KS
C
O M
PL
EX
KE
N
O
SH
A
CO
U N
TY
, W
I
D at e:
B y:
R em ar ks
N O
R
TH
R O
S E
A V
E P
A R
K R
ID
G
E , I
L
Q U
IT
N
O G
O
LF
.C O
M
7.
1.
0' iti al P la n
S et
TA
Q
R2
W
SN
E
GRADING
& DRAINAGE
PLAN
0'
0'
6-
-2
P R
O P
E R
TY
O
W N
E R
KE
N
O
SH
A
CO
U N
TY
, W
IS
CO
N
SI
N
TH
S
TR
EE
T
W
IN
DS
O
R, W
I 5
-9
W W
W .K
EN
O
SH
AC
O U
N
TY
.O
RG
W W
W .G
O
LF
BR
IG
HT
O
N
DA
LE
.C
O M
Re d
Pi ne
Gr ad in g an d Dr ai na ge P la n
Tile in bunkers shall be 4" perforated N-12, backfilled with pea gravel. In select locations depicted on the plan, 4" N-12 perforated tile shall also be used as french drain applications in turf areas and shall also be backfilled with pea gravel.
See construction details and specifications for all information on 2" slit drainage in fairways and greens.
All 4" or larger tile (outside of bunkers) shall be solid N-12 pipe, backfilled with native soil, and shall be a minimum 18" deep with a minimum 0.5% pitch toward the outlet. Where necessary due to outlet limitations, pipe may be installed flatter than 0.5% and have a 12" minimum soil cover, but these areas must be approved by the Golf Course Architect.
The contractor shall be responsible for lifting and replacing of sod in locations outside of the construction limits where drainage is being installed. Where sod is not salvageable, contractor must replace with new sod.
Where new draintile lines cross existing asphalt cartpaths, Contractor shall saw cut the existing asphalt over the top of the trench, install drainage, replace 4" gravel base and install 2" asphalt cold patch. The final surface shall be rolled and blended smoothly where it meets existing asphalt.
Grass depression areas shall be graded with slopes that pitch at a minimum 2.5% (max 4%) toward the basin.
Where possible, new pipe and/or catch basins may be tied into existing draintile, however the exact location and condition of tile on the golf course is unknown. Contractor shall be responsible for testing the existing drainage system prior to any tie-ins to ensure that it is functioning properly. Where new drainage is tied into an existing tile, a new basin shall be installed or a proper fitting shall be used for the connection ("y" or "t").
All existing functional draintile encountered during construction shall remain undisturbed or shall be tied into the new drainage system. Where applicable, existing basin rims shall be adjusted to meet any new grades.
PROPOSED CONTOUR
2" SLIT DRAINAGE
4" N-12 (PERF) DRAIN PIPE
4" N-12 (SOLID) DRAIN PIPE
6" N-12 (SOLID) DRAIN PIPE
8" N-12 (SOLID) DRAIN PIPE
12" CB OR SUMP (SUMP NOTED)
24" CB OR SUMP (SUMP NOTED)
4" INSPECTION
SILT FENCE
HAUL ROAD
TRACKING PAD
Work limits shall be clearly located by the Contractor prior to start of construction. Location of golf course features to be verified in the field by the Golf Course Architect. The Golf Course Architect reserves the right to make alterations in the grading to improve playability and golf values.
A 6" layer of topsoil shall be stripped and replaced in all grading areas. Areas within work limits that are not being graded, if applicable, do not need to be stripped of topsoil. No topsoil shall be replaced until final grades are approved.
Existing bunker sand shall be buried in the work zone and/or incorporated into the soil profile during grading and shaping. Contractor shall be responsible for creating a final medium suitable for building and compacting subgrade shapes and plating all turf areas with 6" of topsoil suitable as a growing medium.
The grading as depicted on the plans has been designed to balance within individual work areas. In a few areas, excess dirt will be generated and shall be hauled by the Contractor to the proposed forward teeing areas or as otherwise needed to complete proposed fills. If any excess sand/dirt is encountered and not needed, it may be hauled to nearby out of play areas as directed by the Owner, where it will be shaped into mounds and seeded to fescue.
The Golf Course Architect's earthwork quantity estimates are available upon request, however all final earthwork calculations are the responsibility of the Contractor, who shall supply all materials and work necessary to complete the project as drawn and specified.
The short-game green shall be built with 8" of approved mix (see specs) and 2" slit drainage on 10' centers, backfilled with greensmix. *The alternate option putting green expansion shall be built the same way.
SHORT-GAME GREEN DETAIL (1"=30')
Fi na l P la n S et
TA
Q 9-
-2
FO
R P
E R
M
IT
-2
PG
NG
A
D
D
D
CC
CENTRAL, WEATHER
STATION, AND PUMP
STATION ANTENNAS -
ACTUAL LOCATION BY
OWNER
4"
4"
8"
12" 10"
12"
4"
12"
12"
10" 8"
4"
6" 8"
6"
6"
8"
6"
4"
6"
6"
8"
8"
8"
8"
8"
4" 8"
8"
4"
Fairway grassing adjustments by Owner
Fairway grassing adjustments by Owner
Fairway grassing adjustments by Owner
Fairway grassing adjustments by Owner
Fairway grassing adjustments by Owner
Fairway grassing adjustments by Owner
Fairway grassing adjustments by Owner
Fairway grassing adjustments by Owner
Fairway grassing adjustments by Owner
CONSTRUCTION
STAGING
LEGEND
EXISTING GAS LINE
EXISTING CONTOUR
EXISTING IRRIGATION
BR
IG
HT
O
N D
AL
E
LI
N
KS
C
O M
PL
EX
KE
N
O
SH
A
CO
U N
TY
, W
I
D at e:
B y:
R em ar ks
N O
R
TH
R O
S E
A V
E P
A R
K R
ID
G
E , I
L
Q U
IT
N
O G
O
LF
.C O
M
7.
1.
0' iti al P la n
S et
TA
Q
R3
W
SN
E
RESTORATION
PLAN
0'
0'
6-
-2
P R
O P
E R
TY
O
W N
E R
KE
N
O
SH
A
CO
U N
TY
, W
IS
CO
N
SI
N
TH
S
TR
EE
T
W
IN
DS
O
R, W
I 5
-9
W W
W .K
EN
O
SH
AC
O U
N
TY
.O
RG
W W
W .G
O
LF
BR
IG
HT
O
N
DA
LE
.C
O M
Re d
Pi ne
Re st or at io n Pl an
NOTES
All final bunker perimeters shall be painted by the Golf Course Architect, The Better Billy Bunker aggregate lining system shall be installed in all bunkers by a Certified BBB Installer. See specifications and detail sheet for more info on bunker construction.
All prep work, seeding, mulching and sodding shall be completed by the Contractor.
Contractor shall laser-level finish tee surfaces to a 1% slope to either the front or back depending on field conditions and as directed by the Golf Course Architect.
Synthetic tee in range shall be 15' wide x 150' long. Base for synthetic tee shall be concrete. See Details and specifications for more info.
Fairways, tees and rough areas shall be sodded using a bluegrass mixture, see specifications for preferred turf types. Those rough areas shown as seed shall use a bluegrass mixture and shall be covered with Flexterra hydromulch. See specs for all seeding and mulch rates.
Fairway adjustments shown outside of the work limits shall be completed by Owner.
Any spoil stockpile areas, if applicable, shall be shaped into mounds and seeded with a fine fescue blend then covered with Flexterra hydromulch, see specifications for preferred seed and mulch rates.
Haul roads shall be repaired to level grade and re-grassed by Contractor. See Removal Plan for all notes on haul roads.
All drain tile lines run outside of the construction limits shall be stripped and replaced with existing sod. Where sod is not salvagable, new sod shall be used. All drain tile lines crossing existing cartpaths shall be cold patched, see Drainage Plan for more information.
New gravel paths shall be installed to 5" compacted depth of CA6 stone, recycled gravel from on-site, or approved equal.
WORK LIMITS
BLUEGRASS SOD
BLUEGRASS SEED/MULCH
BENT SEED
BENT SOD
BUNKER SAND
NEW GRAVEL PATH
HAUL ROAD
TRACKING PAD
Fi na l P la n S et
TA
Q 9-
-2
FO
R P
E R
M
IT
-2
BR
IG
HT
O
N D
AL
E
LI
N
KS
C
O M
PL
EX
KE
N
O
SH
A
CO
U N
TY
, W
I
D at e:
B y:
R em ar ks
N O
R
TH
R O
S E
A V
E P
A R
K R
ID
G
E , I
L
Q U
IT
N
O G
O
LF
.C O
M
7.
1.
0' iti al P la n
S et
TA
Q
Sheet No.
R4
W
SN
E
CONSTRUCTION
DETAILS
0'
0'
6-
-2
P R
O P
E R
TY
O
W N
E R
KE
N
O
SH
A
CO
U N
TY
, W
IS
CO
N
SI
N
TH
S
TR
EE
T
W
IN
DS
O
R, W
I 5
-9
W W
W .K
EN
O
SH
AC
O U
N
TY
.O
RG
W W
W .G
O
LF
BR
IG
HT
O
N
DA
LE
.C
O M
Re d
Pi ne
Co ns tr uc tio n De ta ils
4" N-12 BUNKER INSPECTION
TYPICAL BUNKER CONSTRUCTION
6" VERTICAL EDGE
ENSURE BUNKER BOTTOM IS
PITCHED TOWARD DRAINTILE
NEW SAND TO BE PLACED AT 6" COMPACTED
6" VERTICAL EDGE
4" PERFORATED N-12 BUNKER TILE DRAIN
DEPTH IN BUNKER BOTTOM AND
2" BETTER BILLY BUNKER LINER
INSTALLED BY CERTIFIED CONTRACTOR
ARCHITECT'S RECOMMENDED EQUATION FOR
INTERIOR DRAINTILE QUANTITIES: 65 lf per 1,000 sf of bunker
4" COMPACTED DEPTH ALONG EDGES
AND FACES
(OR EQUAL)
BELOW PIPE INVERT
ALLOW 6" MINIMUM CATCH
OPTION: ADD COARSE SAND FOR
6" TOPSOIL
SET FLUSH WITH GRADE FOLLOWING
RISER LENGTH AS NEEDED
POURED CONCRETE
COMPACTED GRAVEL BASE TO EXTEND
12" OR 24" ADS N-12 PIPE, PERFORATED
2" TO 8" N-12 PIPE OR
12" OR 24" N-12 CATCH BASIN
DRAIN TILE PER PLANS
PEA GRAVEL OUT MIN. 6" FROM
CATCH BASIN EDGE
6" BELOW BOTTOM OF CATCH BASIN
EXPANDING FOAM, GROUT OR GLUE SPRAYED
AROUND PIPE TO FORM WATER TIGHT SEAL
MAX. 1"
(ENSURE TIGHT, NON-SLIP FIT)
TURF ESTABLISHMENTLEAVE 12" +/- EXPOSED SECTION DURING
CONSTRUCTION FOR ADDITIONAL SILT PROTECTION
(HEIGHT VARIES DEPENDING ON GRADE)
PILE PEA GRAVEL AROUND BASIN TO
FILTER SILT. REMOVE AFTER CUTTING
BASIN TO GRADE PRIOR TO GRASSING
PROPERLY SIZED CAST IRON GRATE FOR 12" OR 24"
FINISH GRADE
TOPSOIL
4" TO 8" N-12 DRAINTILE AS SHOWN ON PLANS
BOTTOM TO BE LEFT OPEN TO PEA GRAVEL
PEA GRAVEL SUMP MINIMUM 12" OUTSIDE EDGES OF RISER
COMPACTED BASE
DEPTH TO BE DETERMINED IN THE FIELD
INVERT OF PIPE TO BE MINIMUM OF 6" ABOVE GRAVEL
APPROVED DUCTILE IRON FRAME OR FRAME/GRATE
12" OR 24" ADS N-12 PIPE, PERFORATED
RISER LENGTH AS NEEDED
(OR EQUAL)
SET FLUSH WITH FINSH GRADE
EXPANDING FOAM, GROUT OR GLUE SPRAYED
AROUND PIPE TO FORM TIGHT SEAL
TEE SURFACE
TO HAVE 1% SLOPE
(DIRECTION PER SPOT EL.)
SUBGRADE
6" TOPSOIL
SLOPE TO TEE
TOPSOIL
TEE CONSTRUCTION
SOD SURFACES
LASER LEVEL TEE SURFACE
TIE INTO EXISTING BASIN OR TILE
2" TURF FLOW PIPE BY HANCOR (OR EQUAL)
LAYOUT T.B.D. BY INSTALLER IN FIELD)
2" TURF FLOW PERIMETER PIPE BY HANCOR (OR EQUAL)
LATERALS PLACED ON 10' CENTERS (ACTUAL
TEES AND COUPLERS BY HANCOR (OR EQUAL)
PROVIDE BLOWOUT USING TEE OR
ELBOW WITH PERFORATED CAP.
REMOVE AND REPLACE SOD ON TRENCHES
LOCATED OUTSIDE OF PROJECT LIMITS.
GREEN CONSTRUCTION AND EXPANSION
10'-0"
14" TO 16" (TYP)
8" SPECIFIED MIX TO BE PLACED IN GREEN
OVER 6" NATIVE TOPSOIL
NOTCH FOR SOD
BLUEGRASS SOD
SEE PLAN TO CONFIRM MAINLINE PIPE SIZES
GREENS SLIT DRAINAGE - PLAN VIEW
APPROVED PLASTIC GRATE
5" COMPACTED
CRUSHED LIMESTONE
PITCH 2% TOWARDS LOW GRADE
GRAVEL CARTPATH
SIZE PER PLANS (8'-12')
SET FLUSH WITH GRADE
TOPSOIL
4" N-12 DRAIN TILE
SUBGRADE
4" N-12 SOLID DRAIN TILE
FINISH GRADE
4" N-12 TEE
LENGTH VARIES
TIE INTO EXISTING BASIN OR TILE
2" TURF FLOW PIPE BY HANCOR (OR EQUAL)
LAYOUT T.B.D. BY INSTALLER IN FIELD)
LATERALS PLACED ON 12' CENTERS (ACTUAL
REMOVE AND REPLACE SOD ON TRENCHES
18" - 24" DEPTH, BACKFILL WITH COARSE SAND
FAIRWAY SLIT DRAINAGE - PLAN VIEW
MINIMIZE IRRIGATION CROSSINGS BY
RUNNING PARALLEL WHEN POSSIBLE
WHILE STILL ENSURING SEEPAGE CAPTURE
4" N-12 PERFORATED DRAINTILE
BACKFILL LAST 6" WITH TOPSOIL
NATIVE SOIL BACKFILL
4" FRENCH DRAIN SECTION
1/4" - 1/2" WASHED STONE (PEA GRAVEL)
LINE TRENCH SIDES AND BOTTOM ADJACENT
TO PEA GRAVEL WITH TENSAR / NORTH AMERICAN
4"
4"
MIN 12"
1"
6"
GREEN BIONET S75BN EROSION CONTROL BLANKET
(OR APPROVED EQUAL)
1" LAYER LOOSE STRAW (OPTIONAL)
FILTER FABRIC
EXTEND FABRIC
BELOW SURFACE IN A
WOOD POST (4.0' X 1-1/2" X 3-1/2" MIN.)FLOW
6" X 6" TRENCH
SILT FENCE DETAIL
(MAXIMUM 3 FEET ON CENTER)
BETTER INFILTRATION
12" OR 24" N-12 GRAVEL SUMP
(GREEN AND EXPANSIONS)
3" WIDE TRENCH, 14" TO
16" DEEP, 2" DRAINTILE
PLACED AT BOTTOM,
BACKFILL WITH SPECIFIED
MIX TO TOP OF TRENCH
SLIT DRAINAGE SYSTEM