2326 Addendum 1.pdf
PDF 1 MB Posted
- Solicitation number
- 2326
- Issued by
- Kenosha County, Wisconsin
About this file
This is Addendum One to Request for Bid #2326 issued by Kenosha County, Wisconsin, for Brighton Dale Links Red Pine Bunker, Range, and Short-Game Renovations. The addendum revises the bid due date to January 10, 2024, at 3:00 p.m. and clarifies that the County will negotiate the construction schedule with the awarded contractor, eliminating the requirement for bidders to submit a draft schedule. The project involves comprehensive golf course renovations including bunker reconstruction, drainage system installation, cart path removal and replacement, turf management, and irrigation infrastructure. Punch list items must be completed on or before November 1, 2024, or no later than 55 days after the project start date. The addendum specifies that contractors may begin work on or about August 19, 2024, and includes detailed revisions to technical specifications regarding material standards, including specifications for mason sand backfill with percolation rates of 10-18 inches per hour for fairway drainage lines and recycled bunker sand requirements for catch basin and French drain applications. An additional addendum addressing erosion control plans and permit acceptance with the Wisconsin Department of Natural Resources was scheduled for December 20, 2023.
The bid form includes line items for general conditions, site preparation and demolition, topsoil management and grading, solid drainage, feature construction, short-game green irrigation and Hole #1 tee infrastructure, and finish and grassing work. Three alternate bids are offered: expansion of the putting green, finish grading and sodding of bluegrass areas in lieu of seeding, and import of 500 cubic yards of topsoil. Detailed unit pricing is required for potential change orders not exceeding 10 percent of the total project sum, with negotiation required for larger scope changes. Bidders must provide contractor qualifications and confirm their ability to begin work by the specified date and complete work by November 1, 2024, or 55 days following project start. A bid bond is required, and Kenosha County is exempt from Federal Excise and Wisconsin Sales Taxes under its CES number 008-1020421892-06. The award decision is expected 30 to 60 days after the bid opening date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2326 Drawings.pdf | ||
| 2326 Bid Documents.pdf | ||
| 2326 Specifications.pdf | ||
| Vendor Responsibility Form Construction.pdf | ||
| 2326 Addendum 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFB #2326 Addendum One Page 1 of 3
Yes.
Revised Bid Due Date:
The revised bid due date will be January 10th, 2024, at 3:00pm.
Clarifications:
Sequence/construction schedule. The County will negotiate the construction schedule with the awarded contractor. You do not need to include a draft construction schedule with the bid packet.
Revisions:
We are extending the bid due date in order to work on erosion control plans and permit acceptance with the DNR. An addendum shall be issued on December 20th, 2023, which will include any additional scope or other modifications.
Section 3 contract term. Any punch list items must be completed on or before November 1, 2024 or no later than 55 days after the project start date.
See the attached supplementary plan indicating locations where asphalt and concrete shall be removed by Contractor. These were originally illustrated as gravel paths. Contractor may utilize crushed concrete and asphalt as base material for new cart paths as long as it meets the standards for IDOT Aggregate Base Course, Type B, as indicated in section 01600-1.07B of the technical specifications.
Backfill material for all fairway 2” slit drainage lines shall be a Mason Sand (or equal) with a percolation rate between 10” - 18” per hour. This replaces the note is section 01600-1.03G of the technical specifications.
On plan sheet R4, on the 12” or 24” Catch Basin detail, change the note that currently reads “Option: Add coarse sand for better infiltration” to read “Use recycled/excavated bunker sand in the top 6” around basin.” (Note: This is no longer optional)
On plan sheet R4, on the 4” French drain section, remove the note “native soil backfill” and change the note that currently reads “Backfill last 6” with topsoil” to read “Backfill last 6” with recycled/excavated bunker sand”.
See the attached plan for Hole #1 tee irrigation layout. This item shall be included as part of the Base Bid.
KENOSHA COUNTY
RFB #2326 ADDENDUM ONE DATED 11/8/2023
BRIGHTON DALE LINKS RED PINE BUNKER, RANGE, AND
SHORT-GAME RENOVATIONS
RFB #2326 Addendum One Page 2 of 3
Subcontractor qualifications. Bidders shall provide an additional attachment B contractor qualifications if a subcontractor for irrigation is used. The irrigation subcontractor shall meet all qualification requirements in the bid specifications. The subcontractor will not need to provide a vendor responsibility form.
Questions & Answers:
Q1. Are any permits required?
A. Yes, a Notice of Intent (NOI) must be filed with Wisconsin DNR to obtain a Construction Site Stormwater Runoff General Permit.
Kenosha County will facilitate obtaining this required permit(s).
Q2. Is the 2 inch pipe called out in the specifications slit or perforated?
A. The terms “2” slit drainage ” and “2” perforated” shall be synonymous to mean 2” single-wall polyethylene knife-slot drain tile pipe and fittings.
Q3. Where do we include the cost for removal and installation of cart paths on the bid form? Which line item?
A. Recommendation is to include removal of cart paths in the Site
Preparation and Demolition section, and new cart paths in the Finish and Grassing. The bid form has been revised to reflect this.
Note, the bid review and award shall be based on the Total Base Bid, not individual line items. Thus, it shall ultimately be at the discretion of the Bidder to place items where deemed appropriate.
Q4. Where do we include clearing on the bid form?
A. Same answer as above. Recommended location is in Preparation and Demolition, the bid form has been revised to reflect this.
Q5. Will architects alterations in the grading be within the proposed grading limits shown on the plans or could additional areas be added?
A. These will most likely occur within the construction limits, however if a change is requested that extends outside of the proposed limits then a change in the contract shall be negotiated.
Q6. Can cart paths be used for haul roads?
A. In general, yes. Haul roads should be reviewed and approved by owner prior to execution of the project. There may be some areas owner does not want haul roads, but in general most areas on the Red Pines course are safe to use as haul roads. Please read the note on plan sheet R1 for further information on Contractor’s responsibility in regards to haul roads.
RFB #2326 Addendum One Page 3 of 3
Q7. Can we install new sod on drainage trenches outside of grading limits instead of replacing sod?
A. Yes, but any additional cost must be accounted for in your bid.
Q8. Can we use import topsoil from alternate three to build small tees that show little to no grading?
A. The plans do not call for import of topsoil to build the tees. This is an alternate option in the event that suitable topsoil cannot be found on site. The Contractor is responsible for placing a 6” layer of suitable topsoil on the surfaces of all new tees per the plans and specifications.
Q9. When will the project be awarded?
A. We expect an award decision 30-60 days after the bid opening date or less.
Q10. I found a local mason sand that is a little finer and has a percolation rate of 10”-15” per hour. Will this be acceptable for the slit drainage?
A. Yes, this percolation rate is acceptable, see note in “Revisions” above. Current testing must be provided with all aggregate materials.
Q11. On page 9 of 29 in the bid documents it states that “Prices must remain firm for 90 calendar days after bid opening. Prices established may be lowered due to general market conditions.” Who determines this and what happens if the general market conditions cause prices to raise?
A. Typically if materials that are part of the bid are volatile and we see a large decrease after the bid opening we negotiate a reduction in price with the lowest responsible responsive bidder. If we see a large increase we may consider negotiating an increase, but we typically require the bidder to hold their price until award. For this particular bid we do not expect 90 days to award.
Attachments:
Revised Bid Offer Form Revised irrigation drawing for #1 Tee Revised drawing for concrete and asphalt removal.
End Addendum 1
KENOSHA COUNTY BID #2326
WISCONSIN PAGE 1 OF 4
ATTACHMENT C
REVISED BID OFFER FORM
Vendor:____________________________________________________________________________
Base Bid
General Conditions (Including mobilization, supervision, layout and general expenses)
Site Preparation and Demolition (Including site setup, silt fence, turf removal, tree removal, hardscape removal and sand removal)
Topsoil Management, Mass Grading and Shaping (Including all topsoil, excavation, hauling and feature shaping)
Solid Drainage (Including all solid N-12 tile and associated structures)
Feature Construction (Including all materials and install for bunkers and greens)
Short Game Green Irrigation and Hole #1 Tee (See appendix A in the Specifications)
Finish and Grassing (Including all finish grading, fertilizer, seed, sod and blanket, and hardscape/paths)
Total Base Bid (Sum of all lines above) $
Alternate Bids
The following alternate prices shall include all labor, material, overhead, profit, insurance, and all other incidentals required to cover the completion (or deletion) of the work. At the Owner’s discretion, any combination of these alternates along with the Base Bid may be used to determine the Bidder’s final bid price. Bidder shall honor all alternate pricing throughout the duration of the project and shall not be permitted to renegotiate pricing should the Owner choose to accept said alternates during that time.
Alternate 1: Expand putting green per plan $
Alternate 2: Finish grade, fertilize and sod all bluegrass areas in lieu of the seed and blanket shown on plans
Alternate 3: Import 500 cy of topsoil from off-site and utilize where needed to supplement existing topsoil
WISCONSIN PAGE 2 OF 4
Unit Costs
In the event individual work items are added or deleted from the contract at the direction of the Owner and/or Golf Course Architect (and approved in writing by the Owner), which constitutes a distinct change in the work and does not exceed 10% of the total project sum, a change order shall be executed and the following unit prices shall apply.
Should the change in scope amount to more than 10% of the project sum, Contractor and Owner shall have the right to negotiate a fair sum above and beyond the units provided below
Furnish and install silt fence per lin. ft.
Roto-till existing turf per sq. ft.
Sod strip and dispose of existing turf per sq. ft.
Strip, replace and grade on-site topsoil per cu. yd.
Import, haul and grade topsoil per cu. yd.
Excavate, haul and grade on-site fill material per cu. yd.
Laser-grade tee surface per sq. ft.
Furnish and install 2" N-12 perforated draintile with sand backfill in fairways per lin. ft.
Furnish and install 2" N-12 perforated draintile with mix backfill in greens
Furnish and install 4" N-12 perforated draintile with pea gravel backfill
Furnish and install 4" N-12 solid draintile with soil backfill
Furnish and install 6" N-12 solid draintile with soil
Furnish and install 8" N-12 solid draintile with soil
Install 4" inspection Ts each
Install 12" plastic catch basins with grate
Install 24" plastic catch basins with grate
Install 12" gravel sumps with grate
WISCONSIN PAGE 3 OF 4
Furnish and install 7:2:1 mix in greens per ton
Furnish and install Better Billy Bunker liner in bunkers per sq. ft.
Furnish and install Fredonia sand in bunkers per ton
Finish grade, prep and seed bluegrass
Finish grade, prep and seed bentgrass on greens and tees
Finish grade, prep and install bluegrass sod
Finish grade, prep and install bentgrass sod
Per sq. ft.
Furnish and install Flexterra mulch
Furnish and install new gravel path
Toro INF54 series full circle gear driven rotor, 1 ½” Body w/1 ½” swing joint, piping, fittings and all associated equipment each
Toro INF55 series part circle gear driven rotor, 1 ½” Body w/1 ½” swing joint, piping, fittings and all associated equipment each
Toro 1” Quick coupler valve w/swing joint & stabilizer –complete each
M.J./Resilient Wedge Isolation Valve (as specified) 3”
2” Class 200 PVC Pipe (labor and material)
3” Class 200 PVC Pipe (labor and material)
#12 type Paige Electric PE single conductor wire for underground burial in pipe trench – 24 VAC per lin. ft.
#14 type Paige Electric PE single conductor wire for underground burial in pipe trench – 24 VAC
WISCONSIN PAGE 4 OF 4
Can begin work on or about August 19, 2024? Yes_____ No______
If no, please state start date _______________
Can complete work on or before November 1, 2024 or 55 days following start? Yes______ No______
If no, please state completion date _______________
Will the irrigation work be subcontracted? Yes______ No______
If yes, please provide subcontractor name. __________________________________________
Also, please include an additional attachment B contractor qualifications for the subcontractor.
Bid Bond (Required) is included? Yes_____ No______
Kenosha County is exempt from Federal Excise and Wisconsin Sales Taxes, 77.54(9a)(b) WI Stats.
Kenosha County’s CES number is 008-1020421892-06.
4"
BRIGHTONDALE RED PINE
HOLE #1 TEE IRRIGATION
10-25-23
0'
S C A L E
W
S
N
E
50' 100'
PG
4"
8"
12" 10"
12"
4"
12"
12"
10" 8"
4"
ASPHALT REMOVAL
CONCRETE REMOVAL
0'
S C A L E
100' 200'
| Brightondale - RED CDS (IRR FOR NO 1 TEE) - 10-25-23.pdf |
| Sheets and Views |
| Layout1 |
| Brightondale - DEMO ASPHALT CONCRETE - rev 11-6-23.pdf |
| Sheets and Views |
| RED PINE - DEMO - REVISE |