About this file

This document is a comprehensive Mechanical, Electrical, and Plumbing (MEP) drawing set for the Collin County Adult Detention Facility Housing Washer and Dryer project, issued by MD Engineering on February 18, 2024, with project number 231648. The drawing set includes multiple sheets detailing the installation of washers and dryers across five distinct clusters (Clusters 1-5), with each cluster containing multiple pods (A-D). The project involves retrofitting existing staff areas with new electrical, plumbing, and mechanical infrastructure to accommodate washer and dryer units, including electrical outlet reconfigurations, dryer vent installations, and plumbing connections. The drawings provide detailed specifications for electrical receptacles, circuit breaker modifications, dryer vent routing, and washer box placements, with specific notes on installation requirements, existing condition verification, and coordination between trades.

The project's estimated construction cost is $175,000.00, and the drawings indicate a comprehensive approach to integrating new equipment into the existing detention facility infrastructure. The electrical specifications include detailed requirements for receptacle types (including GFCI and 14-30R dryer receptacles), circuit breaker replacements, and conduit routing. Mechanical notes specify precise requirements for dryer vent installations, including galvanized steel ductwork, wall penetrations, and roof extensions. Plumbing notes outline washer box installations, sanitary line connections, and water line modifications. The drawings emphasize the importance of coordinating with existing building systems, maintaining fire and security ratings, and minimizing disruption to facility operations during the installation process.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF DRAWINGS

B I D D O C U M E N T S

COVER SHEET

PROJECT LOCATION KEY PLAN

TRUE NORTH

CC ADF

HOUSING WASHER AND DRYER

ELECTRICAL/PLUMBING

MEP0.0 GENERAL NOTES, LEGEND & DETAILS - MECHANICAL / ELECTRICAL / PLUMBING

MEP1.1 CLUSTER 1 - OVERALL FLOOR PLAN - MEP

MEP1.2 CLUSTER 3 - OVERALL FLOOR PLAN - MEP

MEP1.3 CLUSTER 4 - OVERALL FLOOR PLAN - MEP

MEP1.4 CLUSTER 5 - OVERALL FLOOR PLAN - MEP

MEP2.1 ENLARGED FLOOR PLAN - CLUSTER 1 - MEP

MEP2.2 ENLARGED FLOOR PLAN - CLUSTER 3 - MEP

MEP2.3 ENLARGED FLOOR PLAN - CLUSTER 4 - MEP

MEP2.4 ENLARGED FLOOR PLAN - CLUSTER 5 - MEP

MEP4.1 DETAILS - MECHANICAL / ELECTRICAL / AND PLUMBING

PRIME CONSULTANT

PROJECT

LOCATION

PROJECT NUMBER: 231648

Texas Registered Firm No. F-7489 1255 West 15th Street, Suite 300 Plano, TX 75075 469.467.0200 Email: mdengca@md-eng.com Project Number: 231648

ISSUE DATE:

FEBRUARY 18, 2024

DELTA

NUMBER

GENERAL NOTES APPLY TO ELECTRICAL DRAWING SET.

DRAWING NOTES APPLY TO DRAWING ON WHICH NOTE APPEARS.

NOTES BY SYMBOL APPLY TO DRAWING ON WHICH AND WHERE

SYMBOL APPEARS.

WIRE SIZES ARE INDICATED BY AMERICAN WIRE GAGE OR

CIRCULAR MILS.

CENTER LINE

LB-3,5 PANELBOARD, SWITCHBOARD OR MOTOR CONTROL

CENTER CIRCUIT DESIGNATION

S

DUPLEX RECEPTACLE; NEMA 5-20R AT 18"

ABOVE FINISHED FLOOR UNO.

DUPLEX RECEPTACLE WITH DETENTION PLATE

RECEPTACLE MOUNTED n INCHES ABOVE

FINISHED FLOOR OR GRADE; NEMA 5-20R UNO

SPECIAL-PURPOSE RECEPTACLE WITH NEMA

CONFIGURATION AS NOTED ON PLAN; PROVIDE

WITH DETENTION COVER PLATE

J JUNCTION BOX

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR

REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEM AS

INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY ALL

NATIONAL, STATE AND LOCAL CODES.

2. CONTRACT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND

FIRE PROTECTION) ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY

SCOPE AND GENERAL ARRANGEMENT ONLY. IT IS THE CONTRACTORS

RESPONSIBILITY FOR INSTALLING ALL MATERIALS PER SMACNA STANDARDS

AND THE MANUFACTURER'S STANDARDS.

3. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS

ARE PROVIDED BY THE OWNER OR BY A 3RD PARTY.

IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ALL MEP

SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE

PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT

MATCH DESIGNED, IT IS THE CONTRACTORS RESPONSIBILITY

TO NOTIFY THE OWNER, ARCHITECT, & ENGINEER

BEFORE PROCEEDING. IF ANY DISCREPANCIES ARE NOT

IDENTIFIED AT BIDDING, THE COST SHALL BE ABSORBED BY

THE CONTRACTOR AND NOT PASSED ONTO THE OWNER OR

ENGINEER OF RECORD.

4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH

ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON

THE OTHER CONTRACT DRAWINGS.

5. WHEN TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE

REQUIRED, THE PRODUCT OF ONE MANUFACTURE SHALL BE USED.

6. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST

EDITION NATIONAL ELECTRIC CODE AND DIVISION 23 OF THE

SPECIFICATION.

7. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE

SUPPORTED FROM METAL DECK.

8. LOCATION AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE

COORDINATED WITH ALL OTHER TRADES.

17. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE

MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.

18. ALL SAW CUTTING SHALL BE PERFORMED AFTER HOURS SO THAT

OPERATION DOES NOT DISTURB NEIGHBORING TENANTS. THERE SHALL BE

NO GAS POWERED EQUIPMENT IN TENANT AREAS.

GENERAL MECHANICAL / PLUMBING NOTES:

GENERAL MECHANICAL / PLUMBING PROJECT NOTES:

1. PLUMBING CONTRACTOR IS TO PROVIDE FIRE STOPS AND SEALANTS

AT ALL PIPING FLOOR AND RATED WALL PENETRATIONS TO MAINTAIN

BOTH FIRE AND SECURITY RATINGS.

2. COORDINATE ROUTING OF ALL PIPING WITH NEW STRUCTURE,

DUCTWORK, EQUIPMENT, ETC. ALL PIPING WORK SHALL BE

COORDINATED WITH ALL TRADES INVOLVED. OFFSETS SHALL BE

PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

3. SLOPE ALL DRAIN PIPING 2-1/2" AND SMALLER @ 1/4"/FT. AND ALL

DRAIN PIPING 3" AND LARGER @ 1/8"/FT.

4. UNLESS OTHERWISE NOTED ALL PIPING SHALL BE NO LESS THAN 3/4".

5. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF ROOF DECKING, WITH SPACE FOR INSULATION

REQUIRED.

6. INSTALL PIPING SO THAT VALVES, STRAINERS, UNIONS, TRAPS,

FLANGES, AND OTHER APPURTENANCES REQUIRING ACCESS ARE

ACCESSIBLE.

7. WHEN DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A PIPE

CHASE, THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE USED TO

THE LAST FIXTURE.

8. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.

9. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING SYSTEM

BRANCHES IN WHICH BRANCH PIPING SERVES TWO OR MORE

FIXTURES.

10. ALL PIPING (DOM./FP/DRAIN/PRODUCTION) MATERIAL SHALL NOT BE

CONSTRUCTED FROM PVC IN THE AREA ABOVE THE SCHEDULED

CEILING, WHICH IS UTILIZED AS A RETURN AIR PLENUM. ALL WIRE

THAT IS NOT IN CONDUIT SHALL BE PLENUM RATED WITHIN THIS AREA.

11. WITHIN DETAINEE ACCESSIBLE AREAS, UTILIZE TAMPER RESISTANT

SECURITY SEALANT AT ANY NEW DUCT/PIPE WALL PENETRATIONS.

ANY EXISTING PIPE PENETRATIONS ASSOCIATED WITH SCOPE OF

WORK WITH GAPS OF 1/16" AND LARGER SHALL BE FILLED WITH

TAMPER RESISTANT SECURITY SEALANT. SEALANT SHALL MEET

ASTM C-920, FEDERAL SPECIFICATIONS TT-S-00230C & TT-S-00227E

AND BE INSTALLED PER ASTM C-790 AND IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATION FOR THE MATERIALS USED,

LOCATION, JOINT TYPE AND GAP SIZE.

UNDERFLOOR PIPING OR DUCTWORK

SYMBOL DESCRIPTION

SANITARY SEWER

PLUMBING VENT PIPING OR DUCTWORK

DOMESTIC COLD WATER

DOMESTIC HOT WATER (120 F)

SECTION

DETAIL SYMBOL

(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS)

DRAWING SYMBOLS

NOTE BY SYMBOL

SUBTITLE

X

XX

XX

XX

XX

XX XX

NUMBER

DESCRIPTION

SCALE

DETAIL #

DRAWING NO. TO REFER TO

DRAWING NUMBER WHERE

SECTION IS LOCATED

SECTION NUMBER

ELEVATION/ RISER DIAGRAM SYMBOL

XX

XX

DRAWING NUMBER

POINTS TO ELEVATION/ RISER AREA

ELEVATION/ RISER #

PIPING & HVAC DESIGNATIONS

TEE

TEE, UP

TEE, DOWN

SINGLE SWEEP TEE

CROSS

LATERAL

45 DEGREE ELBOW

90 DEGREE ELBOW

90 DEGREE ELBOW UP

CAP

PLUMBING VALVE

& FITTINGS SYMBOLS

SINGLE W.F. LATERAL STUB

DOUBLE W.F. LATERAL STUB

DOUBLE W.F. LAT & TRAP

FLOOR DRAIN RISER W/TRAP

SINGLE W.F. LAT. & TRAP

90 DEGREE ELBOW DOWN

S 14-30R

+n

GROUND-FAULT CIRCUIT INTERRUPTER

RECEPTACLE; DUPLEX NEMA 5-20R 18" ABOVE

FINISHED GRADE OR FLOOR UNO.

G

(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS.)

A. THE ELECTRICAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS

FROM AUTHORITY HAVING JURISDICTION AND PAY ALL ASSOCIATED FEES.

B. LOCATE JUNCTION AND PULL BOXES AS REQUIRED TO ALLOW ACCESS

AFTER EQUIPMENT AND APPURTENANCES ARE INSTALLED.

C. PROTECT PERMANENT BUILDING FIXTURES FROM DAMAGE DURING

CONSTRUCTION PERIOD. PROVIDE PLYWOOD OR SIMILAR MATERIAL

UNDER EQUIPMENT OR MATERIALS STORED ON FLOORS AND IN AREAS

WHERE CONSTRUCTION MAY DAMAGE FINISHES. SURFACES OR FINISHES

DAMAGED DURING CONSTRUCTION SHALL BE REPLACED AT THE COST OF

THE CONTRACTOR.

D. BRANCH CIRCUITS OVER 75 FEET (25 METERS) IN LENGTH (TOTAL ONE

WAY) FROM THE PANEL, THE ELECTRICAL CONTRACTOR SHALL

CALCULATE THE VOLTAGE DROP AND PROVIDE AN APPROPRIATE

CONDUCTOR SIZE TO ACHIEVE NO MORE THAN 3% MAXIMUM ALLOWABLE

VOLTAGE DROP.

E. DO NOT SCALE THE DRAWINGS. BECAUSE OF THE SCALE OF THE

DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS OR

OTHER SIMILAR ITEMS WHICH MAY BE REQUIRED TO MAKE A COMPLETE

OPERATING SYSTEM. CAREFULLY INVESTIGATE CONDITION AFFECTING

WORK AND INSTALL WORK IN SUCH A MANNER THAT INTERFERENCES

BETWEEN PIPES, CONDUIT, DUCT, EQUIPMENT, ARCHITECTURAL AND

STRUCTURAL FEATURES SHALL BE AVOIDED.

F. ALL DEVICES, EQUIPMENT, FIXTURES AND THE LIKE MUST BE GROUNDED

BY USE OF A PROPERLY SIZED GROUNDING CONDUCTOR. MECHANICAL

AND ELECTRICAL BONDS OF METALLIC RACEWAY SYSTEMS SHALL BE

MAINTAINED.

G. PROVIDE CIRCUIT, CONDUIT, WIRE, DISCONNECT SWITCH, OVERCURRENT

AND SHORT CIRCUIT PROTECTION FOR ALL EQUIPMENT, WHETHER

SHOWN ON THE DRAWINGS OR NOT, AND OTHER MISCELLANEOUS

EQUIPMENT. WITH NO ADDITIONAL COST TO THE OWNER.

H. PROVIDE 'SEAL-OFFS' WHEN CONDUIT PASSES THROUGH AREAS OF

DIFFERENT AMBIENT TEMPERATURES AND/OR HAZARDOUS AREAS.

I. IF MORE THAN THREE CURRENT-CARRYING CONDUCTORS ARE ROUTED

IN THE SAME CONDUIT, DERATING SHALL BE TAKEN INTO ACCOUNT.

INCREASING THE CONDUCTOR AMPACITY (BY INCREASING WIRE SIZE) TO

COMPENSATE AS FOLLOWS:

NO. OF CONDUCTORS AMPACITY INCREASE

4 THRU 6 125%

7 THRU 9 145%

10 THRU 20 (MAX) 200%

THE CONDUIT SIZE (CAPACITY) SHALL ALSO BE INCREASED TO CONFORM

TO N.E.C., CHAPTER 9.

J. ALL EQUIPMENT TO BE CONSIDERED 'AS-EQUAL' MUST BE SUBMITTED TO

THE ENGINEER FOR APPROVAL NO LATE THAN ONE (1) WEEK PRIOR TO

BID DATE.

K. PROVIDE PROTECTION IN FIRE RATED WALL MEMBRANE PENETRATIONS.

PROTECTION SHALL WRAP THE OUTSIDE OF THE BOX OR ENCLOSURE TO

MAINTAIN WALL FIRE RATING. DO NOT USE PENETRATION PROTECTION

ON THE INTERIOR OF BOX/ENCLOSURE OR COVER PLATE TYPE

PROTECTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

L. ALL LOW VOLTAGE CABLING (FIRE ALARM, DATA, TEMPERATURE

CONTROLS, ETC.) LOCATED IN EXPOSED STRUCTURAL AREAS SHALL BE

INSTALLED IN CONDUIT AND ROUTED TIGHT TO DECK. INSTALLATIONS

NOT IN COMPLIANCE WITH THIS REQUIREMENT SHALL BE REMOVED AND

REINSTALLED AT THE CONTRACTORS EXPENSE.

M. CONTRACTOR SHALL COMPLY WITH APPLICABLE ENERGY CODE.

N. LISTED OR LABELED EQUIPMENT SHALL BE INSTALLED AND USED IN

ACCORDANCE WITH ANY INSTRUCTION INCLUDED IN THE LISTING

OR LABELING. (110.3.B).

O. WITHIN DETAINEE ACCESSIBLE AREAS, UTILIZE TAMPER RESISTANT

SECURITY SEALANT AT ANY NEW CONDUIT WALL PENETRATIONS.

ANY EXISTING CONDUIT PENETRATIONS ASSOCIATED WITH SCOPE

OF WORK WITH GAPS OF 1/16" AND LARGER SHALL BE FILLED WITH

TAMPER RESISTANT SECURITY SEALANT. SEALANT SHALL MEET

ASTM C-920, FEDERAL SPECIFICATIONS TT-S-00230C & TT-S-00227E

AND BE INSTALLED PER ASTM C-790 AND IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATION FOR THE MATERIALS USED,

LOCATION, JOINT TYPE AND GAP SIZE.

LOW VOLTAGE PANEL

HIGH VOLTAGE PANEL

ELECTRICAL CONVENTIONS

ELECTRICAL SYMBOLS

GENERAL ELECTRICAL NOTES:

A

AC

ADA

AFF

AFC

AFG

AIC

ALT

APPROX

ARCH

AUX

AWG

BLDG

C

CB

CKT

CLG

DISC

DWG(S)

EC

EMERG

EMT

E/R

EX

F

FACP

FBO

FLA

FLEX

FS

G

GFCI

HP

HZ

IMC

JBOX

KW

KWH

KVA

AMPERE(S)

ALTERNATING CURRENT

AMERICANS WITH DISABILITIES ACT

ABOVE FINISHED FLOOR

ABOVE FINISHED CEILING

ABOVE FINISHED GRADE

AMPERE INTERRUPTING CAPACITY

(ROOT MEAN SQUARE SYMMETRICAL)

ALTERNATE

APPROXIMATE OR APPROXIMATELY

ARCHITECT

AUXILIARY

AMERICAN WIRE GAGE

BUILDING

CONDUIT OR TUBING

CIRCUIT BREAKER

CIRCUIT

CEILING

DISCONNECT

DRAWING(S)

EMPTY CONDUIT OR TUBING

EMERGENCY

ELECTRICAL METALLIC TUBING

EXISTING TO BE REMOVED AND

REINSTALLED AFTER MODIFICATION

EXISTING

FUSE(S)

FIRE ALARM CONTROL PANEL

FURNISHED BY OWNER

FULL LOAD AMPERE(S)

FLEXIBLE

FUSIBLE SAFETY SWITCH OR FUSIBLE

SWITCH

GROUND

GROUND FAULT CIRCUIT INTERRUPT

HORSEPOWER

HERTZ

INTERMEDIATE METALLIC CONDUIT

JUNCTION BOX

KILOWATTS(S)

KILOWATT-HOUR(S)

KILOVOLT-AMPERE(S)

ELECTRICAL ABBREVIATIONS

MAX

MCA

MCB

MIN

MLO

MOCP

NEC

NEMA

NF

NFPA

NIC

NTS

P

PF

PL

PNL

PVC

RCP

RCPT()

RGS

SF

TAS

TEMP

TYP

UG

UL

UNO

V

VA

W

WP

MAXIMUM

MAXIMUM CURRENT AMPACITY

MAIN CIRCUIT BREAKER

MINIMUM

MAIN LUGS ONLY

MAXIMUM OVER-CURRENT PROTECTION

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL MANUFACTURER'S

ASSOCIATION

NON-FUSIBLE SAFETY SWITCH

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NOT TO SCALE

POLE(S)

POWER FACTOR

PILOT LIGHT

PANELBOARD

POLYVINYL CHLORIDE

REFLECTED CEILING PLAN

RECEPTACLES(S)

RIGID GALVANIZED STEEL

SQUARE FOOT OR FEET

TEXAS ACCESSIBILITY STANDARDS

TEMPORARY

TYPICAL

UNDERGROUND

UNDERWRITERS LABORATORIES, INC.

UNLESS NOTED OTHERWISE

VOLTAGE OR VOLT(S)

VOLT-AMPERE(S)

WATT(S)

WEATHERPROOF

(ALL ABBREVIATIONS MAY NOT APPEAR ON DRAWINGS.) 1. CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE

PROJECT SCOPE, EXISTING CONDITIONS, UTILITY CONNECTIONS, AND

ALL BUILDING SERVICES.

2. MECHANICAL DRAWINGS / SPECIFICATIONS ARE GENERALLY

DIAGRAMMATIC IN NATURE AND INTENDED TO DESCRIBE AND

ILLUSTRATE SYSTEMS THAT WILL NOT INTERFERE WITH THE

ARCHITECTURAL / STRUCTURAL CONDITIONS OF THE BUILDING AND

WILL FIT INTO AVAILABLE SPACES. CAREFULLY LAY OUT ALL WORK TO

CONFORM TO THE ARCHITECTURAL, STRUCTURAL, FINISH CONDITIONS,

MANUFACTURE EQUIPMENT / FIXTURE CUTSHEETS AND WITH OTHER

TRADES, TO AVOID OBSTRUCTIONS AND TO ALLOW THE PROPER

INSTALLATION OF EACH ITEM. CONTRACTOR SHALL OBTAIN ALL

ARCHITECTURAL DATA, LOCATIONS OF WALLS, PARTITIONS, FIXTURES,

CEILING HEIGHTS, FINISHES, ETC. FROM ARCHITECTURAL DRAWINGS

AND STRUCTURAL DATA, LOCATIONS OF PIERS, BEAMS, COLUMNS,

JOISTS, ETC. FROM STRUCTURAL DRAWINGS. CONTRACTOR SHALL

PROVIDE OFFSETS, RELOCATIONS, ETC. AS REQUIRED TO MEET THIS

INTENT AT NO ADDITIONAL COST TO THE CONTRACT.

3. THE LOCATIONS, ARRANGEMENT AND EXTENT OF EQUIPMENT,

DEVICES, PIPING, CONDUIT, AND OTHER APPURTENANCES RELATED TO

THE INSTALLATION OF MECHANICAL WORK SHOWN ON THE DRAWINGS

ARE APPROXIMATE AND DO NOT NECESSARILY DEPICT EXACT

CONDITIONS. THE CONTRACTOR SHALL NOT SCALE DRAWINGS AS

THEY ARE SCHEMATIC IN NATURE. SCALES ARE SHOWN FOR

REFERENCE AND APPROXIMATION ONLY. THE CONTRACTOR IS

RESPONSIBLE FOR COORDINATING EXACT ROUTING OF ALL SERVICES

WITH EXISTING CONDITIONS AND WITH ALL OTHER TRADES. SHOULD A

CONFLICT EXIST BETWEEN THE EXISTING BUILDING AND ENGINEERING

DRAWINGS REGARDING DIMENSIONS AND SCALE, THE CONTRACTOR

SHALL NOTIFY THE ENGINEER OF THE DISCREPANCY.

4. MATERIALS, EQUIPMENT OR LABOR NOT INDICATED BUT WHICH CAN BE

REASONABLY INFERRED TO BE NECESSARY FOR A COMPLETE

INSTALLATION SHALL BE PROVIDED. DRAWINGS AND SPECIFICATIONS

DO NOT UNDERTAKE TO DESIGNATE EVERY ITEM OF MATERIAL,

EQUIPMENT, LABOR OR TECHNIQUE REQUIRED TO PRODUCE A

COMPLETE AND PROPERLY OPERATING INSTALLATION. REFERENCE

THE DEFINITION OF “MEANS AND METHODS” WITHIN THE GENERAL

CONDITIONS OF THE CONTRACT.

5. WHEREVER CONFLICTS OCCUR BETWEEN DIFFERENT PARTS OF THE

CONTRACT DOCUMENTS, THE GREATER QUANTITY, THE BETTER

QUALITY SHALL PREVAIL UNLESS THE ARCHITECT INFORMS THE

CONTRACTOR OTHERWISE IN WRITING.

6. ALL MECHANICAL EQUIPMENT, MECHANICAL PIPING, DUCTWORK, ETC.

SHALL BE LOCATED APPROXIMATELY IN GENERAL LOCATIONS SHOWN,

AND CONFORM TO ALL ARCHITECTURAL AND STRUCTURAL

CONDITIONS. PROVIDE ANY ADDITIONAL SUPPORTS, HANGERS,

OPENINGS, ETC., AS REQUIRED FOR A COMPLETE INSTALLATION.

MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH

MANUFACTURER'S PUBLISHED RECOMMENDATIONS FOR SERVICE

INTENDED. EXPERIENCED CRAFTSMEN SHALL MAKE THE INSTALLATION

OF ALL EQUIPMENT IN A NEAT WORKMANSHIP-LIKE MANNER.

MECHANICAL EQUIPMENT SHALL BE AS SCHEDULED OR APPROVED

EQUAL AND INSTALLED IN FULL ACCORDANCE WITH ALL APPLICABLE

CODES HAVING JURISDICTION. COORDINATE BETWEEN ALL TRADES

PRIOR TO STARTING ANY WORK. PROVIDE ADEQUATE CLEARANCE FOR

PROPER OPERATION, SERVICE/MAINTENANCE, AIRFLOW,

ADJUSTMENTS, ETC.

7. THESE DRAWINGS DO NOT NECESSARILY SHOW ALL OFFSETS OR

ELEVATION DIFFERENCES WHICH MAY BE NECESSARY FOR THE

COMPLETE INSTALLATION. THE CONTRACTOR SHALL PROVIDE A

MECHANICAL INSTALLATION THAT IS COMPLETE AND ALL ITEMS AND

APPURTENANCES NECESSARY, REASONABLE, INCIDENTAL, OR

CUSTOMARILY INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS

NOT SPECIFICALLY CALLED OUT OR SHOWN. THE CONTRACTOR SHALL

PROVIDE ALL EQUIPMENT, MATERIALS, LABOR, SUPERVISION AND

SERVICE NECESSARY SO AS TO PROVIDE A COMPLETE, FUNCTIONING

MECHANICAL SYSTEM.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING

COORDINATION DRAWINGS TO SCALE, AS REQUIRED, USING INPUT

FROM ALL OTHER TRADES PRIOR TO FABRICATION AND INSTALLATION

OF MECHANICAL SYSTEMS. CONTRACTOR DRAWINGS SHALL INDICATE

DUCT/PIPE INSTALLATION IN CONGESTED SPACES, INDICATING

COORDINATION WITH GENERAL CONSTRUCTION, BUILDING

COMPONENTS, CEILING ELEVATIONS, AND OTHER BUILDING SERVICES.

INDICATE PROPOSED CHANGES TO DUCT/PIPING LAYOUT.

9. EQUIPMENT SIZES AND SERVICE SPACE REQUIREMENTS MAY VARY

BETWEEN DIFFERENT MANUFACTURERS. CONSULT MANUFACTURER

AS SUBMITTED AND APPROVED FOR APPLICATION WITH MECHANICAL

ROOM EQUIPMENT.

10. SHOP/RECORD DRAWINGS: CONTRACTOR SHALL PROVIDE DETAILED

AND DIMENSIONED HVAC DUCTWORK AND PIPING FABRICATION SHOP

DRAWINGS FOR APPROVAL BY THE ENGINEER. DURING THE

INSTALLATION OF THE WORK, THE CONTRACTOR SHALL KEEP

DETAILED RECORDS OF ANY AND ALL CHANGES MADE FROM THE

CONTRACT DRAWINGS. AFTER FINAL COMPLETION, REVISE A SET OF

CONTRACT DRAWINGS TO ILLUSTRATE THE WORK AS ACTUALLY

INSTALLED. THESE RECORD DRAWINGS SHALL BE NOTED “AS-BUILT”,

AND SUBMITTED TO THE ARCHITECT/OWNER FOR RECORD PURPOSES

ALONG WITH ALL O&M MANUALS.

11. PROPERLY SUPPORT ALL MECHANICAL EQUIPMENT AND PIPING WITHIN

THE BUILDING AND PROVIDE ADEQUATE PROVISIONS FOR SLOPE AND

ANCHORAGE. CONTRACTOR SHALL USE HANGERS, RODS AND INSERTS

APPROVED BY UNDERWRITERS LABORATORIES FOR THE SERVICE

INTENDED, SECURELY SUPPORTED BY STRUCTURAL MEMBERS WHICH

IN TURN ARE SUPPORTED DIRECTLY FROM THE BUILDING STRUCTURE.

SUPPORTS, ANCHOR BOLTS, AND HANGERS FOR ALL EQUIPMENT

SPECIFIED IN THIS DIVISION SHALL CONFORM TO THE SPECIFICATIONS.

MISCELLANEOUS STEEL BRACING SUPPORTS AND REINFORCING STEEL

NEEDED TO SUPPORT EQUIPMENT SPECIFIED IN DIVISION 23 SHALL BE

FURNISHED AS PART OF THE SCOPE OF WORK OF DIVISION 23.

12. DUCTWORK AND PIPING SHALL BE RUN CONCEALED ABOVE CEILINGS,

INSIDE CHASES/WALLS, ETC. IN GENERAL LOCATIONS SHOWN, UNLESS

NOTED OTHERWISE. CONFORM TO ALL ARCHITECTURAL, STRUCTURAL,

AND FINISH CONDITIONS OF THE BUILDING. WHEREVER CONDITIONS

ARISE WHICH WILL CAUSE NORMALLY CONCEALED MATERIALS TO BE

EXPOSED, IMMEDIATELY CALL THE SITUATION TO THE ATTENTION OF

THE ENGINEER. STOP WORK IN THOSE AREAS UNTIL THE

OWNER/ENGINEER DIRECTS THE RESUMPTION OF THE WORK AND THE

PROCEDURES TO BE FOLLOWED.

13. ALL MATERIALS IN THE PLENUM SPACE SHALL BE NONCOMBUSTIBLE

AND SATISFY THE ACCEPTANCE CRITERIA AND NONCOMBUSTIBILITY

TESTS PER §703 OF THE IBC.

14. PIPING, DUCTWORK, OR EQUIPMENT CONNECTIONS OPENED BY

DEMOLITION OR RENOVATION SHALL BE TEMPORARILY SEALED TO

KEEP OUT FOREIGN MATTER UNTIL SUCH TIME AS RECONNECTIONS

ARE MADE.

15. THE OWNER SHALL HAVE THE OPTION TO DESIGNATE ANY MATERIALS

REMOVED OR DEMOLISHED DURING THIS WORK AS “RECYCLABLE” AND

SHALL HAVE FINAL DISPOSITION OVER THE DISPOSAL OF THESE

MATERIALS. ALL MATERIALS REMOVED/DEMOLISHED BY THE

CONTRACTOR FOR THIS JOB AND NOT RETAINED BY THE OWNER FOR

RECYCLING OR OTHER PURPOSES SHALL BE DISPOSED OFF-SITE BY

THE CONTRACTOR.

16. CONTRACTOR SHALL PROTECT EQUIPMENT AND THE INSIDE OF

PIPING/DUCTWORK DURING DELIVERY, STORAGE, HANDLING AND

INSTALLATION. CONTRACTOR SHALL UNDERTAKE THE APPROPRIATE

PROTECTION MEASURES DURING THE COURSE OF CONSTRUCTION AS

RECOMMENDED IN THE ANSI/SMACNA 008-2008 IAQ GUIDELINES FOR

OCCUPIED BUILDINGS UNDER CONSTRUCTION, CHAPTER 3. ENSURE

THAT DUST AND CONSTRUCTION DEBRIS ARE RESTRICTED FROM

ACCUMULATION WITHIN PIPING, DUCTWORK AND EQUIPMENT.

17. ALL CAPPED LINES FROM EQUIPMENT SHALL BE IDENTIFIED WITH

STENCILED SERVICE TYPE WITHIN 3'-0” OF CAP.

18. STANDARD DETAILS ILLUSTRATED ON THE DRAWINGS SHALL BE

APPLIED IN ALL CASES WHERE THE FEATURE OCCURS IN THE SYSTEM

DESIGN.

19. MINIMUM PIPE SIZE SHALL BE 3/4”.

20. PIPE INSULATION TYPE AND THICKNESS SHALL BE AS DESCRIBED IN

THE SPECIFICATIONS. HANGERS FOR INSULATED PIPING SHALL HAVE

INSULATION SADDLES AND SHIELDS.

21. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT

EQUIPMENT CONNECTIONS.

22. PIPING CONNECTIONS TO ALL EQUIPMENT SHALL BE FABRICATED WITH

THE ISOLATION VALVES, FLANGES AND/OR UNIONS POSITIONED TO

ALLOW REMOVAL AND SERVICE OF THE COMPONENT PARTS.

23. ROUTE PIPING IN AN ORDERLY MANNER AND MAINTAIN PROPER

GRADES. INSTALL TO CONSERVE HEADROOM AND TO CREATE

MINIMUM INTERFERENCE WITH USE OF SPACE. ROUTE EXPOSED

PIPING PARALLEL TO BUILDING LINES.

24. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION

WITHOUT STRESSING PIPE OR CONNECTED EQUIPMENT.

25. DO NOT INTERRUPT THE INTEGRITY OF THE WALL FIRE RATING.

SUBMIT PIPING SHOP DRAWINGS AND ALL OTHER PRODUCTS FOR

REVIEW AND APPROVAL PRIOR TO PURCHASE AND INSTALLATION.

26. INSTALL VALVES IN ACCESSIBLE LOCATIONS. INSTALL ACCESS PANELS

IN PARTITIONS WHERE VALVES WOULD OTHERWISE BE INACCESSIBLE.

27. COORDINATE ANY DEVICE REQUIRING AN ACCESS PANEL WITH THE

ARCHITECT. REVIEW LOCATIONS OF DEVICES REQUIRING ACCESS

PANELS WITH ENGINEER PRIOR TO INSTALLING SUCH DEVICES IN

ORDER TO MINIMIZE QUANTITY OR UNSIGHTLY ACCESS PANEL

LOCATIONS.

28. WHEN SOCKET WELD OR SOLDER END VALVES ARE INSTALLED,

SPECIAL CARE SHALL BE TAKEN TO AVOID OVERHEATING AND

DAMAGING THE VALVE BODY, TRIM OR PACKING.

29. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY THE

SPECIFICATIONS.

30. SEAL ALL MECHANICAL ROOM AND CENTRAL PLANT WALLS, ROOF, AND

FLOOR PENETRATIONS AIR TIGHT WHERE DUCTWORK, PIPING, AND

CONDUIT PENETRATE.

31. SLEEVE ALL PIPING THAT PENETRATES EXTERIOR BUILDING WALLS

AND GRADE BEAMS. SEAL PENETRATIONS WATERTIGHT.

32. EXISTING DUCTWORK, PIPING AND EQUIPMENT SHOWN ON THESE

DRAWINGS INDICATES THE GENERAL LOCATION AND ROUTING. THE

ACTUAL LOCATION SHALL BE DETERMINED BY THE CONTRACTOR WHO

SHALL COORDINATE ALL WORK WITH ALL TRADES NECESSARY TO

INSTALL NEW DUCTWORK, PIPING OR EQUIPMENT AS SHOWN ON THE

DRAWINGS.

33. NOTIFY AND COORDINATE WITH THE OWNER PRIOR TO SHUTDOWN OF

ANY EQUIPMENT OR SYSTEM. SHUTDOWN TIME TO BE MINIMAL.

34. CONTRACTOR SHALL PROVIDE TEMPORARY DUCTWORK, ELECTRICAL

SERVICE, PIPING OR OTHER BUILDING SERVICES AS REQUIRED TO

KEEP OTHER AREAS IN OPERATION DURING REMODELING. NOTIFY

OWNER PRIOR TO SHUT-DOWN FOR ANY TEMPORARY SERVICE

REQUIREMENTS.

35. CONTRACTOR SHALL COORDINATE WITH THE OWNER / ENGINEER

PRIOR TO CUTTING ANY OPENING IN THE STRUCTURE.

36. NEW HOLES THROUGH EXISTING FLOORS AND NO GREATER THAN 6” IN

DIAMETER SHALL BE CORE DRILLED. AVOID BEAMS AND JOIST LEGS.

37. INSTALL DIELECTRIC FITTINGS AT ALL FERROUS PIPE CONNECTIONS

TO NON-FERROUS METALLIC PIPE OR EQUIPMENT.

38. BULLHEAD TEES SHALL NOT BE USED TO JOIN CONVERGING (RETURN)

FLOWS, REGARDLESS OF ARRANGEMENT SHOWN ON PLANS.

39. PROVIDE ESCUTCHEON PLATES WHERE PIPES EXPOSED TO VIEW

PENETRATE FINISHED WALLS.

40. WORK SHOWN IS INTENDED TO PROVIDE THE OVERALL ENGINEERING

DESIGN CONCEPT AND DOES NOT INDICATE ALL REQUIRED

RELOCATIONS AND OFFSETS. COORDINATION OF TRADES SHALL BE

PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST.

41. MAJOR EQUIPMENT SHOWN ON THE PLANS AND ELEVATIONS

ILLUSTRATE THE GENERAL ARRANGEMENT AND SPACE ALLOCATIONS.

THE CONTRACTOR SHALL VERIFY THE SPACE REQUIREMENTS FOR

EACH SYSTEM COMPONENT USING MANUFACTURER CERTIFIED SHOP

DRAWINGS AND MAKE THE NECESSARY ADJUSTMENTS IN EQUIPMENT

PLACEMENT AND CONNECTION IN ORDER TO ACCOMMODATE THE

EXACT EQUIPMENT TO BE INSTALLED.

42. CONTRACTOR SHALL AVOID DAMAGE TO SYSTEMS WHICH ARE THE

WORK OF OTHER TRADES. ANY SYSTEM COMPONENTS WHICH ARE

DAMAGED AND ARE NOT IN THE CONTRACTOR'S SCOPE OF WORK

SHALL BE REPAIRED TO THE AS-INSTALLED CONDITION BY THE

CONTRACTOR, OR REPLACED WITH NEW MATERIALS TO MATCH

EXISTING.

43. 18. ONCE CEILINGS HAVE BEEN REMOVED IN THE BUILDING,

COORDINATE WORK WITH ALL TRADES. NOTIFY THE ARCHITECT AND

OWNER IF REMOVAL OF ADDITIONAL CEILING AREAS ARE NECESSARY

FOR ACCESS AND TO COMPLETE THE NEW WORK.

GENERAL MECHANICAL NOTES: GENERAL MECHANICAL NOTES: (CONT'D)

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N o

F

-7

W e st th S tr e e t, S u ite

Pl a no , T

X

.4

.0

Em a il:

m d e ng c a m d -e ng .c o m

Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

MEP0.0

LEGEND AND

GENERAL NOTES

- ELECTRICAL

AND PLUMBING

FE-10

FE-10

FE-10

FE-10

FE-10

FE-10

FE

FE-10

13-HALONN

759.4589

MEP2.1

MEP2.1

MEP2.1

N.I.C.

1B

1A

1C

1D

1HL

1HLA

J

PROVIDE CAULKING

AT PENETRATION AS

REQUIRED TO

MAINTAIN WALL

RATING, TYPICAL.

RUN CONDUCTORS IN SURFACE MOUNTED CONDUIT

ROUTED ABOVE EXTERIOR LOUVERS. CONDUIT SHALL BE

1" PVC COATED RIGID STEEL CONDUIT (ATKORE CALBOND

/ INTERTEK SEMKO #PV1010CT00-E OR EQUAL). PAINT

CONDUIT TO MATCH EXISTING WALL.

PROVIDE JUNCTION BOX

AND FITTINGS ARE

REQUIRED TO TRANSITION

FROM INTERIOR TO

EXTERIOR, TYPICAL.

J

GENERAL NOTES

1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.

MEP1.1

CLUSTER 1 - OVERALL FLOOR PLAN - MEP01 SCALE: 3/32"=1'-0"

CLUSTER 1 -

OVERALL

FLOOR PLAN -

MEP

NORTH

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

3 1

A

B C

DA

C

DA

B C

D

A

B C

D

B

FE-10

FE-10

FE-10 FE-10

FE-10

FE-10

FE-10

13-HALON

FE

13-HALON

FE

144.0463

96.0006

MEP2.2

MEP2.2

MEP2.2

MEP2.2

3B

3A

3C

3D

1GL

J

PROVIDE CAULKING

AT PENETRATION AS

REQUIRED TO

MAINTAIN WALL

RATING, TYPICAL.

RUN CONDUCTORS IN SURFACE MOUNTED CONDUIT

ROUTED ABOVE EXTERIOR LOUVERS. CONDUIT SHALL BE

1" PVC COATED RIGID STEEL CONDUIT (ATKORE CALBOND

/ INTERTEK SEMKO #PV1010CT00-E OR EQUAL). PAINT

CONDUIT TO MATCH EXISTING WALL.

PROVIDE JUNCTION BOX

AND FITTINGS ARE

REQUIRED TO TRANSITION

FROM INTERIOR TO

EXTERIOR, TYPICAL.

J

J

J

1HLA

GENERAL NOTES

1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.

MEP1.2

CLUSTER 3 - OVERALL FLOOR PLAN - MEP01 SCALE: 3/32"=1'-0"

CLUSTER 3 -

OVERALL

FLOOR PLAN -

MEP

NORTH

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

3 1

A

B C

DA

C

DA

B C

D

A

B C

Xref 2002168-01ws-grid-upper.dwg

MEP2.3

MEP2.3

MEP2.3

MEP2.3

1B

1A

1C

1D

1002A

ELML

UTILIZE MEZZANINE

LEVEL FOR ROUTING

OF ADDITIONAL

CONDUITS NEEDED

FOR NEW CIRCUITS

TO PANEL.

GENERAL NOTES

1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.

MEP1.3

CLUSTER 4 - OVERALL FLOOR PLAN - MEP01 SCALE: 3/32"=1'-0"

CLUSTER 4 -

OVERALL

FLOOR PLAN -

MEP

NORTH

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

3 1

A

B C

DA

C

DA

B C

D

A

B C zone #4 zone #5

FHR

zone #1

FHR

FHR

zone #2

FHR

MEP2.4

N.I.C.

MEP2.4

MEP2.4

5B

5A

5C

5D31

5 2

1FLA

1FL

ELECTRICAL NOTES BY SYMBOL " "

1. PANEL '1FHA', REPLACE CIRCUIT BREAKER FOR 15KVA 'T1FLA' WITH A

NEW 50A/3P CIRCUIT BREAKER TYPE AND AIC RATING TO MATCH

EXISTING.

2. PROVIDE NEW CIRCUIT OF 3#6, 1#10G. IN 3/4"C. AND CONNECT TO

PRIMARY OF NEW TRANSFORMER.

3. REPLACE EXISTING 15KVA TRANSFORMER WITH NEW 30KVA DRY

TYPE GENERAL PURPOSE TRANSFORMER AND #6 G. CU. TO

BUILDING STEEL.

4. PROVIDE SECONDARY CONNECTION FROM NEW TRANSFORMER TO

EXISTING 100AMP LUGS IN PANEL WITH 3#1, 1#8G. IN 1-1/2"C.

5. PROVIDE (2)TWO 30A/2P CIRCUIT BREAKERS IN EXISTING PANEL

'1FLA' FOR CONNECTION TO NEW DRYERS AS SHOWN ON PLANS.

NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC

RATING OF EXISTING.

GENERAL NOTES

1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.

MEP1.4

CLUSTER 5 - OVERALL FLOOR PLAN - MEP01 SCALE: 3/32"=1'-0"

CLUSTER 5 -

OVERALL

FLOOR PLAN -

MEP

NORTH

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

3 1

A

B C

DA

C

DA

B C

D

A

B C

GENERAL NOTES

1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.

DRYER

3 2

1HLA

1HLA27

J

(N)1HLA-35,37

3#10, 1#10G.

IN 3/4"C.

3(E)1HL-9

(N)1HL-51,53

2(N)1HLA-35,37

14-30R

S

(E)1HLA-91

(E)1HLA-91

2(E)1HLA-9

S

G

(E)1HLA-9

2"SS2

J

(E)1HLA-10

(N)1HLA-39,41

3#8, 1#8G. IN

3/4"C.

(E)1HLA-10

(N)1HLA-39,41

(E)1HLA-101

(E)1HLA-101

2(N)1HLA-39,41

14-30R

S

2(E)1HLA-10

S

G

2"SS

1HL

2 3

J

(E)1HL-9

(N)1HL-57,59

3#10, 1#10G.

IN 3/4"C.

3 (E)1HL-9

(N)1HL-51,53

2 (N)1HL-57,59

14-30R

S

(E)1HL-9 1

(E)1HL-9 1

2 (E)1HL-9

S

G

2"SS 2

MECHANICAL NOTES BY SYMBOL " "

1. 4" ROUND DRYER VENT. THE FLEXIBLE DUCTWORK (BY DRYER

INSTALLER) SHALL CONNECT THE CLOTHES DRYER TO THE RIGID

DUCTWORK UTILIZING A WORM DRIVE TYPE HOSE CLAMP.

DUCTWORK SHALL BE GALVANIZED STEEL CONSTRUCTED PER

SMACNA AND IMC REQUIREMENTS FOR THE ENTIRE LENGTH OF THE

DUCT. DRYER DUCT SHALL NOT BE SECURED WITH METAL SCREWS

AND DUCT SEAM SHALL BE SEALED WITH DUCT SEALER AND FACE

UPWARDS.

2. 4" DRYER FLUE TO BE MOUNTED TO WALL EXPOSED ABOVE 10' AFF.

BELOW 10' AFF DRYER VENT SHALL BE PROTECTED BY 18 GAUGE

WALL GUTTER ATTACHED WITH TORX HEAD SCREWS.

3. 4" DRYER FLUE SHALL PENETRATE WALL INTO MECHANICAL SPACE.

COORDINATE WITH EXISTING DUCT WORK SO THAT DRYER FLUE IS

SLOPED DOWNWARD BACK TO WALL PENETRATION.

4. 4" DRYER FLUE UP THROUGH ROOF. REFER TO DETAIL.

PLUMBING NOTES BY SYMBOL " "

1. NEW WASHER BOX TO BE PLACED ON CMU WALL. PROVIDE ACORN

M8186-E501 SURFACE MTD HOSE BOX WITH OPTIONAL DRAIN AND

VACUUM BREAKER.

2. ROUTE NEW 2" SANITARY TO EXISTING LINE AFTER SINK P-TRAP. IF

LINE IS 1-1/2" REPLACE LINE WITH 2" AND RECONNECT 1-1/2"

SERVING EXISTING SINK.

3. VERIFY EXISTING 1/2" COLD & HOT WATER LINES SERVING EXISTING

SINK. IF EXISTING SINK WILL FIT IT IS TO REMAIN, CONNECT A 1/2"

TEE TO SERVE BOTH PIECES OF EQUIPMENT ON 1/2" COLD & HOT

WATER LINES.

4. FASTEN PIPING TO CONCRETE WITH C-CLAMPS & BOLTS.

1. EXISTING RECEPTACLES ON SAME CIRCUIT. FIELD VERIFY EXISTING

ROUTING OF HOMERUN AND REFER TO SHEET E4.1 DETAILS 2 & 3

FOR WIRING AND DEVICE REQUIREMENTS.

2. PROVIDE NEW RECEPTACLES FOR

WASHER: PROVIDE NEW GFCI RECEPTACLE AND STAINLESS STEEL

COVER PLATE AND CONNECT TO EXISTING CIRCUIT.

DRYER: PROVIDE NEW SHALLOW 14-30R RECEPTACLE, 1 INCH

EXTENDER AS NEEDED AND STAINLESS STEEL COVER.

3. PULL NEW WIRES IN EXISTING CONDUIT.

4. CONNECT TO NEW 30A/2P CIRCUIT BREAKER IN EXISTING PANEL.

NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC

RATING OF EXISTING.

5. LARGER CONDUCTOR SIZE TO COMPENSATE FOR VOLTAGE DROP.

6. RELOCATED (7)SEVEN 20A/1P CIRCUIT BREAKERS TO NEW

SUB-PANEL TO MAKE ROOM FOR THE (2)TWO 2-POLE BREAKERS

SERVING THE NEW DRYERS AND INSTALL (1)ONE NEW 60A/3P

CIRCUIT BREAKER AND CIRCUIT OF 4#4, 1#10G. IN 1-1/4"C. NEW

CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC

RATING OF EXISTING.

7. PROVIDE NEW 120/208V 3-PHASE PANEL WITH 100A BUS AND 18

SPACES AND (7)SEVEN RELOCATED 20A/1P CIRCUIT BREAKERS.

INTERCEPT EXISTING CIRCUIT TO NEW SUB-PANEL AS REQUIRED.

PROVIDE NEW TYPE WRITTEN DIRECTORY.

8. REMOVE SPARE 20A/1P CIRCUIT BREAKERS TO MAKE SPACE FOR

NEW DRYER CIRCUIT BREAKERS AS REQUIRED.

(ALL NOTES BY SYMBOL MAY NOT APPEAR ON DRAWING)

ELECTRICAL NOTES BY SYMBOL " "

MEP2.1

ENLARGED

FLOOR PLANS -

CLUSTER 1 -

MEP

NORTH

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

3 1

A

B C

DA

C

DA

B C

D

A

B C

D

B

CLUSTER 1 - POD C - ENLARGED STAFF AREA02 SCALE: 1/2"=1'-0"

CLUSTER 1 - POD D - ENLARGED STAFF AREA03 SCALE: 1/2"=1'-0"

CLUSTER 1 - POD B - ENLARGED STAFF AREA01 SCALE: 1/2"=1'-0"

CLUSTER 1 - ENLARGED STAFF AREA - EXISTING OPERATIONS05 SCALE: NONE

CLUSTER 1 - PLUMBING CHASE PIPE CONNECTION04 SCALE: NONE

3 2

J

(E)1GLA-10

(N)1GLA-39,41

3#8, 1#8G. IN

3/4"C.

(E)1GLA-10

(N)1GLA-39,41

2(N)1GLA-39,41

14-30R

S

(E)1GLA-101

(E)1GLA-101

2(E)1GLA-10

S

G

2"SS2

REFER TO

MEP1.3 FOR

CONTINUATION

TO POD 3C

FROM POD 3C

1GLA

2 13

J

(N)1GLA-35,37

3#10, 1#10G.

IN 3/4"C.

3(E)1GL-9

(N)1GL-51,53

2(N)1GLA-35,37

14-30R

S

(E)1GLA-91

(E)1GLA-91

2(E)1GLA-9

S

G

1GLA2

(E)1GLA-9

2"SS2

J

(N)1GLA-39,41

3#8, 1#8G. IN

3/4"C.

4 5

J

(E)1GL-9

(N)1GL-53,55

3#10, 1#10G.

IN 3/4"C.

(E)1GL-9

(N)1GL-51,53

2 3

2 (N)1GL-53,55

14-30R

S

(E)1GL-9 1

(E)1GL-9 1

2 (E)1GL-9

S

G

2"SS 2

(N)1GL-57,59

14-30R

S

J

(N)1GL-57,59

3#8, 1#8G. IN

3/4"C.

(E)1GL-10 1

(E)1GL-10 1

(E)1GL-10

(N)1GL-57,59

2 (E)1GL-10

S

G

2"SS 2

TO POD 3B

REFER TO

MEP1.3 FOR

CONTINUATION

(E)1GL-10

FROM POD 3C

MECHANICAL NOTES BY SYMBOL " "

1. 4" ROUND DRYER VENT. THE FLEXIBLE DUCTWORK (BY DRYER

INSTALLER) SHALL CONNECT THE CLOTHES DRYER TO THE RIGID

DUCTWORK UTILIZING A WORM DRIVE TYPE HOSE CLAMP.

DUCTWORK SHALL BE GALVANIZED STEEL CONSTRUCTED PER

SMACNA AND IMC REQUIREMENTS FOR THE ENTIRE LENGTH OF THE

DUCT. DRYER DUCT SHALL NOT BE SECURED WITH METAL SCREWS

AND DUCT SEAM SHALL BE SEALED WITH DUCT SEALER AND FACE

UPWARDS.

2. 4" DRYER FLUE TO BE MOUNTED TO WALL EXPOSED ABOVE 10' AFF.

BELOW 10' AFF DRYER VENT SHALL BE PROTECTED BY 18 GAUGE

WALL GUTTER ATTACHED WITH TORX HEAD SCREWS.

3. 4" DRYER FLUE SHALL PENETRATE WALL INTO MECHANICAL SPACE.

COORDINATE WITH EXISTING DUCT WORK SO THAT DRYER FLUE IS

1. EXISTING RECEPTACLES ON SAME CIRCUIT. FIELD VERIFY EXISTING

ROUTING OF HOMERUN AND REFER TO SHEET E4.1 DETAILS 2 & 3

FOR WIRING AND DEVICE REQUIREMENTS.

2. PROVIDE NEW RECEPTACLES FOR

WASHER: PROVIDE NEW GFCI RECEPTACLE AND STAINLESS STEEL

COVER PLATE AND CONNECT TO EXISTING CIRCUIT.

DRYER: PROVIDE NEW SHALLOW 14-30R RECEPTACLE, 1 INCH

EXTENDER AS NEEDED AND STAINLESS STEEL COVER.

3. PULL NEW WIRES IN EXISTING CONDUIT.

4. CONNECT TO NEW 30A/2P CIRCUIT BREAKER IN EXISTING PANEL.

NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC

RATING OF EXISTING.

5. LARGER CONDUCTOR SIZE TO COMPENSATE FOR VOLTAGE DROP.

6. RELOCATED (7)SEVEN 20A/1P CIRCUIT BREAKERS TO NEW

SUB-PANEL TO MAKE ROOM FOR THE (2)TWO 2-POLE BREAKERS

SERVING THE NEW DRYERS AND INSTALL (1)ONE NEW 60A/3P

CIRCUIT BREAKER AND CIRCUIT OF 4#4, 1#10G. IN 1-1/4"C. NEW

CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC

RATING OF EXISTING.

7. PROVIDE NEW 120/208V 3-PHASE PANEL WITH 100A BUS AND 18

SPACES AND (7)SEVEN RELOCATED 20A/1P CIRCUIT BREAKERS.

INTERCEPT EXISTING CIRCUIT TO NEW SUB-PANEL AS REQUIRED.

PROVIDE NEW TYPE WRITTEN DIRECTORY.

8. REMOVE SPARE 20A/1P CIRCUIT BREAKERS TO MAKE SPACE FOR

NEW DRYER CIRCUIT BREAKERS AS REQUIRED.

(ALL NOTES BY SYMBOL MAY NOT APPEAR ON DRAWING)

ELECTRICAL NOTES BY SYMBOL " "PLUMBING NOTES BY SYMBOL " "

1. NEW WASHER BOX TO BE PLACED ON CMU WALL. PROVIDE ACORN

M8186-E501 SURFACE MTD HOSE BOX WITH OPTIONAL DRAIN AND

VACUUM BREAKER.

2. ROUTE NEW 2" SANITARY TO EXISTING LINE AFTER SINK P-TRAP. IF

LINE IS 1-1/2" REPLACE LINE WITH 2" AND RECONNECT 1-1/2"

SERVING EXISTING SINK.

3. VERIFY EXISTING 1/2" COLD & HOT WATER LINES SERVING EXISTING

SINK. IF EXISTING SINK WILL FIT IT IS TO REMAIN, CONNECT A 1/2"

TEE TO SERVE BOTH PIECES OF EQUIPMENT ON 1/2" COLD & HOT

WATER LINES.

4. FASTEN PIPING TO CONCRETE WITH C-CLAMPS & BOLTS.

MEP2.2

ENLARGED

FLOOR PLANS -

CLUSTER 3 -

MEP

NORTH

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

3 1

A

B C

DA

C

DA

B C

D

A

B C

D

B

CLUSTER 3 - POD C - ENLARGED STAFF AREA02 SCALE: 1/2"=1'-0"

CLUSTER 3 - POD D - ENLARGED STAFF AREA04 SCALE: 1/2"=1'-0"

CLUSTER 3 - POD B - ENLARGED STAFF AREA01 SCALE: 1/2"=1'-0"

CLUSTER 3 - POD A - ENLARGED STAFF AREA03 SCALE: 1/2"=1'-0"

CLUSTER 3 - ENLARGED STAFF AREA - EXISTING OPERATIONS04 SCALE: NONE

CLUSTER 3 - PLUMBING CHASE PIPE CONNECTION05 SCALE: NONE

G

S 14-30R

4(N)2BL-54,56

3#10, 1#10G.

IN 1"C.1

2 9

SG

(E)ELML-24(E)ELML-242

S G 2"SS

2"SS

S 14-30R

4(N)2BL-53,55

3#8, 1#8G. IN

3/4"C.

2 9

SG

(E)ELML-31(E)ELML-312

S G

2"SS

S14-30R

4 (N)2BL-57,59

3#8, 1#8G. IN

3/4"C.

S G

(E)ELML-17 (E)ELML-17 2

SG

3 4

S14-30R

4 (N)2BL-58,60

3#8, 1#8G. IN

3/4"C. 1

S G

(E)ELML-36 (E)ELML-36 2

SG

3 4

2"SS

MECHANICAL NOTES BY SYMBOL " "

1. 4" ROUND DRYER VENT. THE FLEXIBLE DUCTWORK (BY DRYER

INSTALLER) SHALL CONNECT THE CLOTHES DRYER TO THE RIGID

DUCTWORK UTILIZING A WORM DRIVE TYPE HOSE CLAMP.

DUCTWORK SHALL BE GALVANIZED STEEL CONSTRUCTED PER

SMACNA AND IMC REQUIREMENTS FOR THE ENTIRE LENGTH OF THE

DUCT. DRYER DUCT SHALL NOT BE SECURED WITH METAL SCREWS

AND DUCT SEAM SHALL BE SEALED WITH DUCT SEALER AND FACE

UPWARDS.

2. 4" DRYER FLUE TO BE MOUNTED TO WALL EXPOSED ABOVE 10' AFF.

BELOW 10' AFF DRYER VENT SHALL BE PROTECTED BY 18 GAUGE

WALL GUTTER ATTACHED WITH TORX HEAD SCREWS.

3. 4" DRYER FLUE SHALL PENETRATE WALL INTO MECHANICAL SPACE.

COORDINATE WITH EXISTING DUCT WORK SO THAT DRYER FLUE IS

1. EXISTING RECEPTACLES ON SAME CIRCUIT. FIELD VERIFY EXISTING

ROUTING OF HOMERUN AND REFER TO SHEET E4.1 DETAILS 2 & 3

FOR WIRING AND DEVICE REQUIREMENTS.

2. PROVIDE NEW RECEPTACLES FOR

WASHER: PROVIDE NEW GFCI RECEPTACLE AND STAINLESS STEEL

COVER PLATE AND CONNECT TO EXISTING CIRCUIT.

DRYER: PROVIDE NEW SHALLOW 14-30R RECEPTACLE, 1 INCH

EXTENDER AS NEEDED AND STAINLESS STEEL COVER.

3. PULL NEW WIRES IN EXISTING CONDUIT.

4. CONNECT TO NEW 30A/2P CIRCUIT BREAKER IN EXISTING PANEL.

NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC

RATING OF EXISTING.

5. LARGER CONDUCTOR SIZE TO COMPENSATE FOR VOLTAGE DROP.

6. RELOCATED (7)SEVEN 20A/1P CIRCUIT BREAKERS TO NEW

SUB-PANEL TO MAKE ROOM FOR THE (2)TWO 2-POLE BREAKERS

SERVING THE NEW DRYERS AND INSTALL (1)ONE NEW 60A/3P

CIRCUIT BREAKER AND CIRCUIT OF 4#4, 1#10G. IN 1-1/4"C. NEW

CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC

RATING OF EXISTING.

7. PROVIDE NEW 120/208V 3-PHASE PANEL WITH 100A BUS AND 18

SPACES AND (7)SEVEN RELOCATED 20A/1P CIRCUIT BREAKERS.

INTERCEPT EXISTING CIRCUIT TO NEW SUB-PANEL AS REQUIRED.

PROVIDE NEW TYPE WRITTEN DIRECTORY.

8. REMOVE SPARE 20A/1P CIRCUIT BREAKERS TO MAKE SPACE FOR

NEW DRYER CIRCUIT BREAKERS AS REQUIRED.

9. PROVIDE NEW SURFACE MOUNTED JUNCTION BOX WITH NEW

SURFACE MOUNTED CONDUIT HOME RUN TO VIA MEZZANINE LEVEL

ABOVE AND DOWN THRU ELECTRIC ROOM 1002A. REFER TO MEP1.3

FOR ADDITIONAL INFORMATION.

(ALL NOTES BY SYMBOL MAY NOT APPEAR ON DRAWING)

ELECTRICAL NOTES BY SYMBOL " " PLUMBING NOTES BY SYMBOL " "

1. NEW WASHER BOX TO BE PLACED ON CMU WALL. PROVIDE ACORN

M8186-E501 SURFACE MTD HOSE BOX WITH OPTIONAL DRAIN AND

VACUUM BREAKER.

2. ROUTE NEW 2" SANITARY TO EXISTING LINE AFTER SINK P-TRAP. IF

LINE IS 1-1/2" REPLACE LINE WITH 2" AND RECONNECT 1-1/2"

SERVING EXISTING SINK.

3. VERIFY EXISTING 1/2" COLD & HOT WATER LINES SERVING EXISTING

SINK. IF EXISTING SINK WILL FIT IT IS TO REMAIN, CONNECT A 1/2"

TEE TO SERVE BOTH PIECES OF EQUIPMENT ON 1/2" COLD & HOT

WATER LINES.

4. FASTEN PIPING TO CONCRETE WITH C-CLAMPS & BOLTS.

MEP2.3

ENLARGED

FLOOR PLANS -

CLUSTER 4 -

MEP

NORTH

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

3 1

A

B C

DA

C

DA

B C

D

A

B C

D

B

CLUSTER 4 - POD C - ENLARGED STAFF AREA02 SCALE: 1/2"=1'-0"

CLUSTER 4 - POD D - ENLARGED STAFF AREA04 SCALE: 1/2"=1'-0"

CLUSTER 4 - POD B - ENLARGED STAFF AREA01 SCALE: 1/2"=1'-0"

CLUSTER 4 - POD A - ENLARGED STAFF AREA03 SCALE: 1/2"=1'-0"

CLUSTER 4 - ENLARGED STAFF AREA - EXISTING OPERATIONS 05 SCALE: NONE

CLUSTER 4 - PLUMBING PIPE CONNECTION04 SCALE: NONE

(D)1FLA-9

(E)1FLA-11 1

(E)1FL-34 3

S G

(N)1FLA-7,9

3#10, 1#10G.

IN EXISTING

3/4"C.

45 2

S 14-30R

J

3(N)1FL2-17,19

(D)1FL-32

(E)1FL-341

(E)1FL-343

SG

(N)1FL-1,3

3#10, 1#10G.

IN EXISTING

3/4"C.

4 52

S14-30R

J

3 (N)1FL-1,3

(D)1FLA-5

(E)1FLA-7 1

(E)1FLA-5 3

S G

(N)1FLA-46,48

3#10, 1#10G.

IN EXISTING

3/4"C.

S 14-30R

J

3(N)1FLA-7,9

6 (R)1FLA-5

(R)1FLA-5

MECHANICAL NOTES BY SYMBOL " "

1. 4” ROUND DRYER VENT. THE FLEXIBLE DUCTWORK (BY DRYER

INSTALLER) SHALL CONNECT THE CLOTHES DRYER TO THE RIGID

DUCTWORK UTILIZING A WORM DRIVE TYPE HOSE CLAMP.

DUCTWORK SHALL BE GALVANIZED STEEL CONSTRUCTED PER

SMACNA AND IMC REQUIREMENTS, FOR THE ENTIRE LENGTH OF

THE DUCT, TOWARDS THE EXTERIOR WALL. THE LAST 10 FEET OF

DUCT SHALL BE SLOPED DOWNWARD TOWARDS THE WALL CAP.

DRYER DUCT SHALL NOT BE SECURED WITH METAL SCREWS, AND

DUCT SEAM SHALL BE SEALED WITH DUCT SEALER AND FACE

UPWARDS. CONTRACTOR SHALL PROVIDE A SUBMITTAL ON THE

WALL CAP (SPRING-LOADED, POWDER-COATED 26 GAUGE STEEL

FLAT PLATE) FOR APPROVAL MEETING THE CURRENT 2021 CODES

WHICH REQUIRES THE WALL CAP TO HAVE AN UNDIMINISHED

OPENING OF NOT LESS THAN 12.5 SQUARE INCHES. PROVIDE 18

GAUGE SHEET METAL COVER OVER VENT BEHIND DRYER TO

10'A.F.F..

PLUMBING NOTES BY SYMBOL " "

1. NEW WASHER BOX TO BE PLACED ON CMU WALL. PROVIDE ACORN

M8186-E501 SURFACE MTD HOSE BOX WITH OPTIONAL DRAIN AND

VACUUM BREAKER.

2. ROUTE NEW 2" SANITARY TO EXISTING LINE AFTER SINK P-TRAP. IF

LINE IS 1-1/2" REPLACE LINE WITH 2" AND RECONNECT 1-1/2"

SERVING EXISTING SINK.

3. VERIFY EXISTING 1/2" COLD & HOT WATER LINES SERVING EXISTING

SINK. IF EXISTING SINK WILL FIT IT IS TO REMAIN, CONNECT A 1/2"

TEE TO SERVE BOTH PIECES OF EQUIPMENT ON 1/2" COLD & HOT

WATER LINES.

4. FASTEN PIPING TO CONCRETE WITH C-CLAMPS & BOLTS.

ELECTRICAL NOTES BY SYMBOL " "

1. EXISTING RECEPTACLE PROVIDING POWER TO VIDEO TELEPHONE

TO REMAIN. PROVIDE EXTENDER RING WITH 3/4" THREADED

OPENINGS FOR SURFACE MOUNTED CONDUIT. ROUTE SURFACE

MOUNTED CONDUIT ALONG PERIMETER TO NEW LOCATION..

2. CAP EXISTING RECEPTACLE WITH SURFACE MOUNTED JUNCTION

BOX WITH 3/4" THREADED OPENINGS FOR SURFACE MOUNTED

CONDUIT. ROUTE SURFACE MOUNTED CONDUIT ALONG PERIMETER

TO NEW LOCATION.

3. PROVIDE NEW RECEPTACLES FOR

WASHER: PROVIDE NEW GFCI RECEPTACLE ON SURFACE

MOUNTED JUNCTION BOX WITH AND STAINLESS STEEL

COVER PLATE.

DRYER: PROVIDE NEW SHALLOW 14-30R RECEPTACLE, 1 INCH

EXTENDER AS NEEDED AND STAINLESS STEEL COVER.

4. PULL NEW WIRES IN EXISTING CONDUIT.

5. CONNECT TO NEW 30A/2P CIRCUIT BREAKER IN EXISTING PANEL.

NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC

RATING OF EXISTING.

6. WITHIN THE PANELBOARD, MOVE WIRES FROM (E)EXISTING CIRCUIT

AND (R)RELOCATE TO CIRCUIT MADE AVAILABLE.

MEP2.4

ENLARGED

FLOOR PLANS -

CLUSTER 5 -

MEP

NORTH

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u it e

Pl a no

, T X

.4

.0

Em e ng c a m d

-e ng

.c o m Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

3 1

A

B C

DA

C

DA

B C

D

A

B C

D

B

CLUSTER 5 - POD C - ENLARGED STAFF AREA02 SCALE: 1/2"=1'-0"

CLUSTER 5 - POD B - ENLARGED STAFF AREA01 SCALE: 1/2"=1'-0"

CLUSTER 5 - POD D - ENLARGED STAFF AREA03 SCALE: 1/2"=1'-0"

CLUSTER 5 - ENLARGED STAFF AREA - EXISTING OPERATIONS 05 SCALE: NONE

CLUSTER 5 - PLUMBING PIPE CONNECTION04 SCALE: NONE

PHENOLIC NAMEPLATE WITH 1/4"

LETTERS INSCRIBED AS INDICATED.

PROVIDE WHITE LABELS WITH BLACK

LETTERS FOR NORMAL SYSTEM PANELS

AND RED LABELS WITH WHITE LETTERS

FOR ESSENTIAL SYSTEM PANELS.

PANEL VOLTAGE

AND PHASE

CIRCUIT THAT PANEL

IS FED FROM

PANEL NAMEPANEL 'LA'

480/277V./3Ø

DPA-3

TYPICAL FOR ALL PANELBOARDS

ISC = 42,000 AMPS

R.M.S. SYM.

(DATE)

MAXIMUM FAULT CURRENT

& DATE CALCULATED

1-GANG STAINLESS STEEL COVER

PLATE WITH 2.15" RECEPTACLE HOLE

(HUBBELL-TAYMAC WSS1-2 OR EQUAL)

SHALLOW TYPE 14-30R

RECEPTACLE WITH REAR

PROJECTION NOT TO EXCEED 1.25"

(LEVITION 278-S00 OR EQUAL).

EXISTING 1-GANG

J-BOX IN CMU WALL

FOR NEW DRYER

EXISTING CONDUIT

(MINIMUM 3/4") TO

ELECTRICAL ROOM

1-GANG STAINLESS STEEL

COVER PLATE WITH DECORA

STYLE RECEPTACLE HOLE

(HUBBELL-TAYMAC WSS1-R

OR EQUAL)

20A GFCI SLIM, OUTLTET,

SELF-TESTING, WEATHER &

TAMPER RESISTANT, GRAY

(LEVITION GFWT2-WY OR EQUAL).

1-GANG STAINLESS STEEL COVER

PLATE WITH 2.15" RECEPTACLE HOLE

(HUBBELL-TAYMAC WSS1-2 OR EQUAL)

SHALLOW TYPE 14-30R

RECEPTACLE WITH REAR

PROJECTION NOT TO EXCEED 1.25"

(LEVITION 278-S00 OR EQUAL).

1-GANG STAINLESS STEEL

COVER PLATE WITH DECORA

STYLE RECEPTACLE HOLE

(HUBBELL-TAYMAC WSS1-R

OR EQUAL)

EXISTING 1-GANG

J-BOX IN CMU WALL

FOR NEW WASHER

EXISTING CONDUIT

(MINIMUM 3/4") TO

ELECTRICAL ROOM

EXISTING DEDICATED

CIRCUIT OF 2#12, 1#12 G. CU.

NEW CIRCUIT OF

3#10, 1#10 G. CU.

IN EXISTING

CONDUIT

TWO NEW CIRCUITS

OF 2#12, & 1#12G.

CU. AND 3#10, &

1#10G. CU. IN

EXISTING CONDUIT

NEW 3#10, & 1#10G. CU.

IN EXISTING CONDUIT

NOTE:

CONTRACTOR AND FIELD VERIFY EXISTING CONDUIT SIZES

AND HOMERUN CONFIGURATION PRIOR TO START OF WORK.

1-GANG STAINLESS STEEL COVER

PLATE WITH 2.15" RECEPTACLE HOLE

(HUBBELL-TAYMAC WSS1-2 OR EQUAL)

SHALLOW TYPE 14-30R

RECEPTACLE WITH REAR

PROJECTION NOT TO EXCEED 1.25"

(LEVITION 278-S00 OR EQUAL).

1-GANG 1 INCH DEEP GASKETED

EXTENSION

1-GANG STAINLESS STEEL

COVER PLATE WITH DECORA

STYLE RECEPTACLE HOLE

(HUBBELL-TAYMAC WSS1-R

OR EQUAL)

NEW 2#12, & 1#12G. CU.

IN EXISTING CONDUIT

TWO NEW CIRCUITS

OF 2#12, & 1#12G.

CU. AND 3#10, &

1#10G. CU. IN

EXISTING CONDUIT

EXISTING 1-GANG

J-BOX IN CMU WALL

FOR NEW DRYER

EXISTING CONDUIT

(MINIMUM 3/4") TO

ELECTRICAL ROOM

EXISTING 1-GANG

J-BOX IN CMU WALL

FOR NEW WASHER

20A GFCI SLIM, OUTLTET,

SELF-TESTING, WEATHER &

TAMPER RESISTANT, GRAY

(LEVITION GFWT2-WY OR EQUAL).

20A GFCI SLIM, OUTLTET,

SELF-TESTING, WEATHER &

TAMPER RESISTANT, GRAY

(LEVITION GFWT2-WY OR EQUAL).

NOTE:

CONTRACTOR AND FIELD VERIFY EXISTING CONDUIT SIZES

AND HOMERUN CONFIGURATION PRIOR TO START OF WORK.

NOTE:

CONTRACTOR AND FIELD VERIFY

EXISTING CONDUIT SIZES AND

HOMERUN CONFIGURATION PRIOR

TO START OF WORK.

NOTE:

MANUFACTURER'S DIMENSIONAL DRAWING OF LEVITON

MODEL 278-S00 SHOWN FOR REFERENCE ONLY.

DRYER VENT GOOSENECK ROOF CAP

7 1

DETAIL NOTE:

DRYER DUCT SHALL HAVE SMOOTH INTERIOR

FINISH AND SHALL BE CONSTRUCTED OF

METAL A MINIMUM 0.016 INCH.

NOTES BY SYMBOL:

1. DRYER VENT BACK DRAFT DAMPER

2. COUNTER FLASHING

3. WATER PROOF SEALANT ALL AROUND

4. ROOFING AS PER ARCHITECTURAL DRAWINGS

5. ROOF STRUCTURE

6. DUCT THROUGH ROOF

7. G.I. GOOSENECK

LOCKNUT (NOT SHOWN) FEEDER CONDUIT

EQUIPMENT GROUNDING

CONDUCTOR INSTALLED

WITH FEEDER

INSULATED THROAT

GROUNDING BUSHING

BONDING JUMPER - SAME

SIZE AS EQUIPMENT

GROUNDING CONDUCTOR

PANELBOARD EQUIPMENT

GROUND BUS BONDED TO

CABINET

SCALE:

NTS

SCALE:

NTS

SCALE:

NTS

NTS

NTS

NTS

Project No.

231648

Sheet No.

Re vi si o ns

C O

M M

U N

IT

Y

A V E.

M cK

IN

N

EY

, T

EX

A S

Te xa s Re g is te re d F irm N

W e st th S tr e e t, S u ite

Pl a no , T

X

.4

.0

Em e ng c a m d -e ng .c o m

Pr o je c t N um b e r:

C C

A D

F H

O U

SI

N

G W

A

SH

ER

A

N D

D

RY

ER

MEP4.1

DETAILS - MEP

Sheets and Views
231648 - COVER

File details come from the government source that posted it. Updated .