This document is a comprehensive Mechanical, Electrical, and Plumbing (MEP) drawing set for the Collin County Adult Detention Facility Housing Washer and Dryer project, issued by MD Engineering on February 18, 2024, with project number 231648. The drawing set includes multiple sheets detailing the installation of washers and dryers across five distinct clusters (Clusters 1-5), with each cluster containing multiple pods (A-D). The project involves retrofitting existing staff areas with new electrical, plumbing, and mechanical infrastructure to accommodate washer and dryer units, including electrical outlet reconfigurations, dryer vent installations, and plumbing connections. The drawings provide detailed specifications for electrical receptacles, circuit breaker modifications, dryer vent routing, and washer box placements, with specific notes on installation requirements, existing condition verification, and coordination between trades.
The project's estimated construction cost is $175,000.00, and the drawings indicate a comprehensive approach to integrating new equipment into the existing detention facility infrastructure. The electrical specifications include detailed requirements for receptacle types (including GFCI and 14-30R dryer receptacles), circuit breaker replacements, and conduit routing. Mechanical notes specify precise requirements for dryer vent installations, including galvanized steel ductwork, wall penetrations, and roof extensions. Plumbing notes outline washer box installations, sanitary line connections, and water line modifications. The drawings emphasize the importance of coordinating with existing building systems, maintaining fire and security ratings, and minimizing disruption to facility operations during the installation process.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF DRAWINGS
B I D D O C U M E N T S
COVER SHEET
PROJECT LOCATION KEY PLAN
TRUE NORTH
CC ADF
HOUSING WASHER AND DRYER
ELECTRICAL/PLUMBING
MEP0.0 GENERAL NOTES, LEGEND & DETAILS - MECHANICAL / ELECTRICAL / PLUMBING
MEP1.1 CLUSTER 1 - OVERALL FLOOR PLAN - MEP
MEP1.2 CLUSTER 3 - OVERALL FLOOR PLAN - MEP
MEP1.3 CLUSTER 4 - OVERALL FLOOR PLAN - MEP
MEP1.4 CLUSTER 5 - OVERALL FLOOR PLAN - MEP
MEP2.1 ENLARGED FLOOR PLAN - CLUSTER 1 - MEP
MEP2.2 ENLARGED FLOOR PLAN - CLUSTER 3 - MEP
MEP2.3 ENLARGED FLOOR PLAN - CLUSTER 4 - MEP
MEP2.4 ENLARGED FLOOR PLAN - CLUSTER 5 - MEP
MEP4.1 DETAILS - MECHANICAL / ELECTRICAL / AND PLUMBING
PRIME CONSULTANT
PROJECT
LOCATION
PROJECT NUMBER: 231648
Texas Registered Firm No. F-7489 1255 West 15th Street, Suite 300 Plano, TX 75075 469.467.0200 Email: mdengca@md-eng.com Project Number: 231648
ISSUE DATE:
FEBRUARY 18, 2024
DELTA
NUMBER
GENERAL NOTES APPLY TO ELECTRICAL DRAWING SET.
DRAWING NOTES APPLY TO DRAWING ON WHICH NOTE APPEARS.
NOTES BY SYMBOL APPLY TO DRAWING ON WHICH AND WHERE
SYMBOL APPEARS.
WIRE SIZES ARE INDICATED BY AMERICAN WIRE GAGE OR
CIRCULAR MILS.
CENTER LINE
LB-3,5 PANELBOARD, SWITCHBOARD OR MOTOR CONTROL
CENTER CIRCUIT DESIGNATION
S
DUPLEX RECEPTACLE; NEMA 5-20R AT 18"
ABOVE FINISHED FLOOR UNO.
DUPLEX RECEPTACLE WITH DETENTION PLATE
RECEPTACLE MOUNTED n INCHES ABOVE
FINISHED FLOOR OR GRADE; NEMA 5-20R UNO
SPECIAL-PURPOSE RECEPTACLE WITH NEMA
CONFIGURATION AS NOTED ON PLAN; PROVIDE
WITH DETENTION COVER PLATE
J JUNCTION BOX
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEM AS
INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY ALL
NATIONAL, STATE AND LOCAL CODES.
2. CONTRACT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND
FIRE PROTECTION) ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY
SCOPE AND GENERAL ARRANGEMENT ONLY. IT IS THE CONTRACTORS
RESPONSIBILITY FOR INSTALLING ALL MATERIALS PER SMACNA STANDARDS
AND THE MANUFACTURER'S STANDARDS.
3. ALL EXISTING SYSTEM INFORMATION AND/OR LOCATIONS
ARE PROVIDED BY THE OWNER OR BY A 3RD PARTY.
IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ALL MEP
SERVICES ARE LOCATED AS DESIGNED BEFORE BIDDING THE
PROJECT. IN OCCURRENCES WHERE EXISTING DOES NOT
MATCH DESIGNED, IT IS THE CONTRACTORS RESPONSIBILITY
TO NOTIFY THE OWNER, ARCHITECT, & ENGINEER
BEFORE PROCEEDING. IF ANY DISCREPANCIES ARE NOT
IDENTIFIED AT BIDDING, THE COST SHALL BE ABSORBED BY
THE CONTRACTOR AND NOT PASSED ONTO THE OWNER OR
ENGINEER OF RECORD.
4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH
ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON
THE OTHER CONTRACT DRAWINGS.
5. WHEN TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE
REQUIRED, THE PRODUCT OF ONE MANUFACTURE SHALL BE USED.
6. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE LATEST
EDITION NATIONAL ELECTRIC CODE AND DIVISION 23 OF THE
SPECIFICATION.
7. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE
SUPPORTED FROM METAL DECK.
8. LOCATION AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES.
17. ALL DEMOLITION ACTIVITIES SHALL BE PERFORMED SO AS TO PROVIDE
MINIMAL DISRUPTION TO THE NEIGHBORING TENANTS.
18. ALL SAW CUTTING SHALL BE PERFORMED AFTER HOURS SO THAT
OPERATION DOES NOT DISTURB NEIGHBORING TENANTS. THERE SHALL BE
NO GAS POWERED EQUIPMENT IN TENANT AREAS.
GENERAL MECHANICAL / PLUMBING NOTES:
GENERAL MECHANICAL / PLUMBING PROJECT NOTES:
1. PLUMBING CONTRACTOR IS TO PROVIDE FIRE STOPS AND SEALANTS
AT ALL PIPING FLOOR AND RATED WALL PENETRATIONS TO MAINTAIN
BOTH FIRE AND SECURITY RATINGS.
2. COORDINATE ROUTING OF ALL PIPING WITH NEW STRUCTURE,
DUCTWORK, EQUIPMENT, ETC. ALL PIPING WORK SHALL BE
COORDINATED WITH ALL TRADES INVOLVED. OFFSETS SHALL BE
PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
3. SLOPE ALL DRAIN PIPING 2-1/2" AND SMALLER @ 1/4"/FT. AND ALL
DRAIN PIPING 3" AND LARGER @ 1/8"/FT.
4. UNLESS OTHERWISE NOTED ALL PIPING SHALL BE NO LESS THAN 3/4".
5. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF ROOF DECKING, WITH SPACE FOR INSULATION
REQUIRED.
6. INSTALL PIPING SO THAT VALVES, STRAINERS, UNIONS, TRAPS,
FLANGES, AND OTHER APPURTENANCES REQUIRING ACCESS ARE
ACCESSIBLE.
7. WHEN DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A PIPE
CHASE, THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE USED TO
THE LAST FIXTURE.
8. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
9. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING SYSTEM
BRANCHES IN WHICH BRANCH PIPING SERVES TWO OR MORE
FIXTURES.
10. ALL PIPING (DOM./FP/DRAIN/PRODUCTION) MATERIAL SHALL NOT BE
CONSTRUCTED FROM PVC IN THE AREA ABOVE THE SCHEDULED
CEILING, WHICH IS UTILIZED AS A RETURN AIR PLENUM. ALL WIRE
THAT IS NOT IN CONDUIT SHALL BE PLENUM RATED WITHIN THIS AREA.
11. WITHIN DETAINEE ACCESSIBLE AREAS, UTILIZE TAMPER RESISTANT
SECURITY SEALANT AT ANY NEW DUCT/PIPE WALL PENETRATIONS.
ANY EXISTING PIPE PENETRATIONS ASSOCIATED WITH SCOPE OF
WORK WITH GAPS OF 1/16" AND LARGER SHALL BE FILLED WITH
TAMPER RESISTANT SECURITY SEALANT. SEALANT SHALL MEET
ASTM C-920, FEDERAL SPECIFICATIONS TT-S-00230C & TT-S-00227E
AND BE INSTALLED PER ASTM C-790 AND IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATION FOR THE MATERIALS USED,
LOCATION, JOINT TYPE AND GAP SIZE.
UNDERFLOOR PIPING OR DUCTWORK
SYMBOL DESCRIPTION
SANITARY SEWER
PLUMBING VENT PIPING OR DUCTWORK
DOMESTIC COLD WATER
DOMESTIC HOT WATER (120 F)
SECTION
DETAIL SYMBOL
(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS)
DRAWING SYMBOLS
NOTE BY SYMBOL
SUBTITLE
X
XX
XX
XX
XX
XX XX
NUMBER
DESCRIPTION
SCALE
DETAIL #
DRAWING NO. TO REFER TO
DRAWING NUMBER WHERE
SECTION IS LOCATED
SECTION NUMBER
ELEVATION/ RISER DIAGRAM SYMBOL
XX
XX
DRAWING NUMBER
POINTS TO ELEVATION/ RISER AREA
ELEVATION/ RISER #
PIPING & HVAC DESIGNATIONS
TEE
TEE, UP
TEE, DOWN
SINGLE SWEEP TEE
CROSS
LATERAL
45 DEGREE ELBOW
90 DEGREE ELBOW
90 DEGREE ELBOW UP
CAP
PLUMBING VALVE
& FITTINGS SYMBOLS
SINGLE W.F. LATERAL STUB
DOUBLE W.F. LATERAL STUB
DOUBLE W.F. LAT & TRAP
FLOOR DRAIN RISER W/TRAP
SINGLE W.F. LAT. & TRAP
90 DEGREE ELBOW DOWN
S 14-30R
+n
GROUND-FAULT CIRCUIT INTERRUPTER
RECEPTACLE; DUPLEX NEMA 5-20R 18" ABOVE
FINISHED GRADE OR FLOOR UNO.
G
(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS.)
A. THE ELECTRICAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS
FROM AUTHORITY HAVING JURISDICTION AND PAY ALL ASSOCIATED FEES.
B. LOCATE JUNCTION AND PULL BOXES AS REQUIRED TO ALLOW ACCESS
AFTER EQUIPMENT AND APPURTENANCES ARE INSTALLED.
C. PROTECT PERMANENT BUILDING FIXTURES FROM DAMAGE DURING
CONSTRUCTION PERIOD. PROVIDE PLYWOOD OR SIMILAR MATERIAL
UNDER EQUIPMENT OR MATERIALS STORED ON FLOORS AND IN AREAS
WHERE CONSTRUCTION MAY DAMAGE FINISHES. SURFACES OR FINISHES
DAMAGED DURING CONSTRUCTION SHALL BE REPLACED AT THE COST OF
THE CONTRACTOR.
D. BRANCH CIRCUITS OVER 75 FEET (25 METERS) IN LENGTH (TOTAL ONE
WAY) FROM THE PANEL, THE ELECTRICAL CONTRACTOR SHALL
CALCULATE THE VOLTAGE DROP AND PROVIDE AN APPROPRIATE
CONDUCTOR SIZE TO ACHIEVE NO MORE THAN 3% MAXIMUM ALLOWABLE
VOLTAGE DROP.
E. DO NOT SCALE THE DRAWINGS. BECAUSE OF THE SCALE OF THE
DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS OR
OTHER SIMILAR ITEMS WHICH MAY BE REQUIRED TO MAKE A COMPLETE
OPERATING SYSTEM. CAREFULLY INVESTIGATE CONDITION AFFECTING
WORK AND INSTALL WORK IN SUCH A MANNER THAT INTERFERENCES
BETWEEN PIPES, CONDUIT, DUCT, EQUIPMENT, ARCHITECTURAL AND
STRUCTURAL FEATURES SHALL BE AVOIDED.
F. ALL DEVICES, EQUIPMENT, FIXTURES AND THE LIKE MUST BE GROUNDED
BY USE OF A PROPERLY SIZED GROUNDING CONDUCTOR. MECHANICAL
AND ELECTRICAL BONDS OF METALLIC RACEWAY SYSTEMS SHALL BE
MAINTAINED.
G. PROVIDE CIRCUIT, CONDUIT, WIRE, DISCONNECT SWITCH, OVERCURRENT
AND SHORT CIRCUIT PROTECTION FOR ALL EQUIPMENT, WHETHER
SHOWN ON THE DRAWINGS OR NOT, AND OTHER MISCELLANEOUS
EQUIPMENT. WITH NO ADDITIONAL COST TO THE OWNER.
H. PROVIDE 'SEAL-OFFS' WHEN CONDUIT PASSES THROUGH AREAS OF
DIFFERENT AMBIENT TEMPERATURES AND/OR HAZARDOUS AREAS.
I. IF MORE THAN THREE CURRENT-CARRYING CONDUCTORS ARE ROUTED
IN THE SAME CONDUIT, DERATING SHALL BE TAKEN INTO ACCOUNT.
INCREASING THE CONDUCTOR AMPACITY (BY INCREASING WIRE SIZE) TO
COMPENSATE AS FOLLOWS:
NO. OF CONDUCTORS AMPACITY INCREASE
4 THRU 6 125%
7 THRU 9 145%
10 THRU 20 (MAX) 200%
THE CONDUIT SIZE (CAPACITY) SHALL ALSO BE INCREASED TO CONFORM
TO N.E.C., CHAPTER 9.
J. ALL EQUIPMENT TO BE CONSIDERED 'AS-EQUAL' MUST BE SUBMITTED TO
THE ENGINEER FOR APPROVAL NO LATE THAN ONE (1) WEEK PRIOR TO
BID DATE.
K. PROVIDE PROTECTION IN FIRE RATED WALL MEMBRANE PENETRATIONS.
PROTECTION SHALL WRAP THE OUTSIDE OF THE BOX OR ENCLOSURE TO
MAINTAIN WALL FIRE RATING. DO NOT USE PENETRATION PROTECTION
ON THE INTERIOR OF BOX/ENCLOSURE OR COVER PLATE TYPE
PROTECTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
L. ALL LOW VOLTAGE CABLING (FIRE ALARM, DATA, TEMPERATURE
CONTROLS, ETC.) LOCATED IN EXPOSED STRUCTURAL AREAS SHALL BE
INSTALLED IN CONDUIT AND ROUTED TIGHT TO DECK. INSTALLATIONS
NOT IN COMPLIANCE WITH THIS REQUIREMENT SHALL BE REMOVED AND
REINSTALLED AT THE CONTRACTORS EXPENSE.
M. CONTRACTOR SHALL COMPLY WITH APPLICABLE ENERGY CODE.
N. LISTED OR LABELED EQUIPMENT SHALL BE INSTALLED AND USED IN
ACCORDANCE WITH ANY INSTRUCTION INCLUDED IN THE LISTING
OR LABELING. (110.3.B).
O. WITHIN DETAINEE ACCESSIBLE AREAS, UTILIZE TAMPER RESISTANT
SECURITY SEALANT AT ANY NEW CONDUIT WALL PENETRATIONS.
ANY EXISTING CONDUIT PENETRATIONS ASSOCIATED WITH SCOPE
OF WORK WITH GAPS OF 1/16" AND LARGER SHALL BE FILLED WITH
TAMPER RESISTANT SECURITY SEALANT. SEALANT SHALL MEET
ASTM C-920, FEDERAL SPECIFICATIONS TT-S-00230C & TT-S-00227E
AND BE INSTALLED PER ASTM C-790 AND IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATION FOR THE MATERIALS USED,
LOCATION, JOINT TYPE AND GAP SIZE.
LOW VOLTAGE PANEL
HIGH VOLTAGE PANEL
ELECTRICAL CONVENTIONS
ELECTRICAL SYMBOLS
GENERAL ELECTRICAL NOTES:
A
AC
ADA
AFF
AFC
AFG
AIC
ALT
APPROX
ARCH
AUX
AWG
BLDG
C
CB
CKT
CLG
DISC
DWG(S)
EC
EMERG
EMT
E/R
EX
F
FACP
FBO
FLA
FLEX
FS
G
GFCI
HP
HZ
IMC
JBOX
KW
KWH
KVA
AMPERE(S)
ALTERNATING CURRENT
AMERICANS WITH DISABILITIES ACT
ABOVE FINISHED FLOOR
ABOVE FINISHED CEILING
ABOVE FINISHED GRADE
AMPERE INTERRUPTING CAPACITY
(ROOT MEAN SQUARE SYMMETRICAL)
ALTERNATE
APPROXIMATE OR APPROXIMATELY
ARCHITECT
AUXILIARY
AMERICAN WIRE GAGE
BUILDING
CONDUIT OR TUBING
CIRCUIT BREAKER
CIRCUIT
CEILING
DISCONNECT
DRAWING(S)
EMPTY CONDUIT OR TUBING
EMERGENCY
ELECTRICAL METALLIC TUBING
EXISTING TO BE REMOVED AND
REINSTALLED AFTER MODIFICATION
EXISTING
FUSE(S)
FIRE ALARM CONTROL PANEL
FURNISHED BY OWNER
FULL LOAD AMPERE(S)
FLEXIBLE
FUSIBLE SAFETY SWITCH OR FUSIBLE
SWITCH
GROUND
GROUND FAULT CIRCUIT INTERRUPT
HORSEPOWER
HERTZ
INTERMEDIATE METALLIC CONDUIT
JUNCTION BOX
KILOWATTS(S)
KILOWATT-HOUR(S)
KILOVOLT-AMPERE(S)
ELECTRICAL ABBREVIATIONS
MAX
MCA
MCB
MIN
MLO
MOCP
NEC
NEMA
NF
NFPA
NIC
NTS
P
PF
PL
PNL
PVC
RCP
RCPT()
RGS
SF
TAS
TEMP
TYP
UG
UL
UNO
V
VA
W
WP
MAXIMUM
MAXIMUM CURRENT AMPACITY
MAIN CIRCUIT BREAKER
MINIMUM
MAIN LUGS ONLY
MAXIMUM OVER-CURRENT PROTECTION
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURER'S
ASSOCIATION
NON-FUSIBLE SAFETY SWITCH
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NOT TO SCALE
POLE(S)
POWER FACTOR
PILOT LIGHT
PANELBOARD
POLYVINYL CHLORIDE
REFLECTED CEILING PLAN
RECEPTACLES(S)
RIGID GALVANIZED STEEL
SQUARE FOOT OR FEET
TEXAS ACCESSIBILITY STANDARDS
TEMPORARY
TYPICAL
UNDERGROUND
UNDERWRITERS LABORATORIES, INC.
UNLESS NOTED OTHERWISE
VOLTAGE OR VOLT(S)
VOLT-AMPERE(S)
WATT(S)
WEATHERPROOF
(ALL ABBREVIATIONS MAY NOT APPEAR ON DRAWINGS.) 1. CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE
PROJECT SCOPE, EXISTING CONDITIONS, UTILITY CONNECTIONS, AND
ALL BUILDING SERVICES.
2. MECHANICAL DRAWINGS / SPECIFICATIONS ARE GENERALLY
DIAGRAMMATIC IN NATURE AND INTENDED TO DESCRIBE AND
ILLUSTRATE SYSTEMS THAT WILL NOT INTERFERE WITH THE
ARCHITECTURAL / STRUCTURAL CONDITIONS OF THE BUILDING AND
WILL FIT INTO AVAILABLE SPACES. CAREFULLY LAY OUT ALL WORK TO
CONFORM TO THE ARCHITECTURAL, STRUCTURAL, FINISH CONDITIONS,
MANUFACTURE EQUIPMENT / FIXTURE CUTSHEETS AND WITH OTHER
TRADES, TO AVOID OBSTRUCTIONS AND TO ALLOW THE PROPER
INSTALLATION OF EACH ITEM. CONTRACTOR SHALL OBTAIN ALL
ARCHITECTURAL DATA, LOCATIONS OF WALLS, PARTITIONS, FIXTURES,
CEILING HEIGHTS, FINISHES, ETC. FROM ARCHITECTURAL DRAWINGS
AND STRUCTURAL DATA, LOCATIONS OF PIERS, BEAMS, COLUMNS,
JOISTS, ETC. FROM STRUCTURAL DRAWINGS. CONTRACTOR SHALL
PROVIDE OFFSETS, RELOCATIONS, ETC. AS REQUIRED TO MEET THIS
INTENT AT NO ADDITIONAL COST TO THE CONTRACT.
3. THE LOCATIONS, ARRANGEMENT AND EXTENT OF EQUIPMENT,
DEVICES, PIPING, CONDUIT, AND OTHER APPURTENANCES RELATED TO
THE INSTALLATION OF MECHANICAL WORK SHOWN ON THE DRAWINGS
ARE APPROXIMATE AND DO NOT NECESSARILY DEPICT EXACT
CONDITIONS. THE CONTRACTOR SHALL NOT SCALE DRAWINGS AS
THEY ARE SCHEMATIC IN NATURE. SCALES ARE SHOWN FOR
REFERENCE AND APPROXIMATION ONLY. THE CONTRACTOR IS
RESPONSIBLE FOR COORDINATING EXACT ROUTING OF ALL SERVICES
WITH EXISTING CONDITIONS AND WITH ALL OTHER TRADES. SHOULD A
CONFLICT EXIST BETWEEN THE EXISTING BUILDING AND ENGINEERING
DRAWINGS REGARDING DIMENSIONS AND SCALE, THE CONTRACTOR
SHALL NOTIFY THE ENGINEER OF THE DISCREPANCY.
4. MATERIALS, EQUIPMENT OR LABOR NOT INDICATED BUT WHICH CAN BE
REASONABLY INFERRED TO BE NECESSARY FOR A COMPLETE
INSTALLATION SHALL BE PROVIDED. DRAWINGS AND SPECIFICATIONS
DO NOT UNDERTAKE TO DESIGNATE EVERY ITEM OF MATERIAL,
EQUIPMENT, LABOR OR TECHNIQUE REQUIRED TO PRODUCE A
COMPLETE AND PROPERLY OPERATING INSTALLATION. REFERENCE
THE DEFINITION OF “MEANS AND METHODS” WITHIN THE GENERAL
CONDITIONS OF THE CONTRACT.
5. WHEREVER CONFLICTS OCCUR BETWEEN DIFFERENT PARTS OF THE
CONTRACT DOCUMENTS, THE GREATER QUANTITY, THE BETTER
QUALITY SHALL PREVAIL UNLESS THE ARCHITECT INFORMS THE
CONTRACTOR OTHERWISE IN WRITING.
6. ALL MECHANICAL EQUIPMENT, MECHANICAL PIPING, DUCTWORK, ETC.
SHALL BE LOCATED APPROXIMATELY IN GENERAL LOCATIONS SHOWN,
AND CONFORM TO ALL ARCHITECTURAL AND STRUCTURAL
CONDITIONS. PROVIDE ANY ADDITIONAL SUPPORTS, HANGERS,
OPENINGS, ETC., AS REQUIRED FOR A COMPLETE INSTALLATION.
MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S PUBLISHED RECOMMENDATIONS FOR SERVICE
INTENDED. EXPERIENCED CRAFTSMEN SHALL MAKE THE INSTALLATION
OF ALL EQUIPMENT IN A NEAT WORKMANSHIP-LIKE MANNER.
MECHANICAL EQUIPMENT SHALL BE AS SCHEDULED OR APPROVED
EQUAL AND INSTALLED IN FULL ACCORDANCE WITH ALL APPLICABLE
CODES HAVING JURISDICTION. COORDINATE BETWEEN ALL TRADES
PRIOR TO STARTING ANY WORK. PROVIDE ADEQUATE CLEARANCE FOR
PROPER OPERATION, SERVICE/MAINTENANCE, AIRFLOW,
ADJUSTMENTS, ETC.
7. THESE DRAWINGS DO NOT NECESSARILY SHOW ALL OFFSETS OR
ELEVATION DIFFERENCES WHICH MAY BE NECESSARY FOR THE
COMPLETE INSTALLATION. THE CONTRACTOR SHALL PROVIDE A
MECHANICAL INSTALLATION THAT IS COMPLETE AND ALL ITEMS AND
APPURTENANCES NECESSARY, REASONABLE, INCIDENTAL, OR
CUSTOMARILY INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS
NOT SPECIFICALLY CALLED OUT OR SHOWN. THE CONTRACTOR SHALL
PROVIDE ALL EQUIPMENT, MATERIALS, LABOR, SUPERVISION AND
SERVICE NECESSARY SO AS TO PROVIDE A COMPLETE, FUNCTIONING
MECHANICAL SYSTEM.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING
COORDINATION DRAWINGS TO SCALE, AS REQUIRED, USING INPUT
FROM ALL OTHER TRADES PRIOR TO FABRICATION AND INSTALLATION
OF MECHANICAL SYSTEMS. CONTRACTOR DRAWINGS SHALL INDICATE
DUCT/PIPE INSTALLATION IN CONGESTED SPACES, INDICATING
COORDINATION WITH GENERAL CONSTRUCTION, BUILDING
COMPONENTS, CEILING ELEVATIONS, AND OTHER BUILDING SERVICES.
INDICATE PROPOSED CHANGES TO DUCT/PIPING LAYOUT.
9. EQUIPMENT SIZES AND SERVICE SPACE REQUIREMENTS MAY VARY
BETWEEN DIFFERENT MANUFACTURERS. CONSULT MANUFACTURER
AS SUBMITTED AND APPROVED FOR APPLICATION WITH MECHANICAL
ROOM EQUIPMENT.
10. SHOP/RECORD DRAWINGS: CONTRACTOR SHALL PROVIDE DETAILED
AND DIMENSIONED HVAC DUCTWORK AND PIPING FABRICATION SHOP
DRAWINGS FOR APPROVAL BY THE ENGINEER. DURING THE
INSTALLATION OF THE WORK, THE CONTRACTOR SHALL KEEP
DETAILED RECORDS OF ANY AND ALL CHANGES MADE FROM THE
CONTRACT DRAWINGS. AFTER FINAL COMPLETION, REVISE A SET OF
CONTRACT DRAWINGS TO ILLUSTRATE THE WORK AS ACTUALLY
INSTALLED. THESE RECORD DRAWINGS SHALL BE NOTED “AS-BUILT”,
AND SUBMITTED TO THE ARCHITECT/OWNER FOR RECORD PURPOSES
ALONG WITH ALL O&M MANUALS.
11. PROPERLY SUPPORT ALL MECHANICAL EQUIPMENT AND PIPING WITHIN
THE BUILDING AND PROVIDE ADEQUATE PROVISIONS FOR SLOPE AND
ANCHORAGE. CONTRACTOR SHALL USE HANGERS, RODS AND INSERTS
APPROVED BY UNDERWRITERS LABORATORIES FOR THE SERVICE
INTENDED, SECURELY SUPPORTED BY STRUCTURAL MEMBERS WHICH
IN TURN ARE SUPPORTED DIRECTLY FROM THE BUILDING STRUCTURE.
SUPPORTS, ANCHOR BOLTS, AND HANGERS FOR ALL EQUIPMENT
SPECIFIED IN THIS DIVISION SHALL CONFORM TO THE SPECIFICATIONS.
MISCELLANEOUS STEEL BRACING SUPPORTS AND REINFORCING STEEL
NEEDED TO SUPPORT EQUIPMENT SPECIFIED IN DIVISION 23 SHALL BE
FURNISHED AS PART OF THE SCOPE OF WORK OF DIVISION 23.
12. DUCTWORK AND PIPING SHALL BE RUN CONCEALED ABOVE CEILINGS,
INSIDE CHASES/WALLS, ETC. IN GENERAL LOCATIONS SHOWN, UNLESS
NOTED OTHERWISE. CONFORM TO ALL ARCHITECTURAL, STRUCTURAL,
AND FINISH CONDITIONS OF THE BUILDING. WHEREVER CONDITIONS
ARISE WHICH WILL CAUSE NORMALLY CONCEALED MATERIALS TO BE
EXPOSED, IMMEDIATELY CALL THE SITUATION TO THE ATTENTION OF
THE ENGINEER. STOP WORK IN THOSE AREAS UNTIL THE
OWNER/ENGINEER DIRECTS THE RESUMPTION OF THE WORK AND THE
PROCEDURES TO BE FOLLOWED.
13. ALL MATERIALS IN THE PLENUM SPACE SHALL BE NONCOMBUSTIBLE
AND SATISFY THE ACCEPTANCE CRITERIA AND NONCOMBUSTIBILITY
TESTS PER §703 OF THE IBC.
14. PIPING, DUCTWORK, OR EQUIPMENT CONNECTIONS OPENED BY
DEMOLITION OR RENOVATION SHALL BE TEMPORARILY SEALED TO
KEEP OUT FOREIGN MATTER UNTIL SUCH TIME AS RECONNECTIONS
ARE MADE.
15. THE OWNER SHALL HAVE THE OPTION TO DESIGNATE ANY MATERIALS
REMOVED OR DEMOLISHED DURING THIS WORK AS “RECYCLABLE” AND
SHALL HAVE FINAL DISPOSITION OVER THE DISPOSAL OF THESE
MATERIALS. ALL MATERIALS REMOVED/DEMOLISHED BY THE
CONTRACTOR FOR THIS JOB AND NOT RETAINED BY THE OWNER FOR
RECYCLING OR OTHER PURPOSES SHALL BE DISPOSED OFF-SITE BY
THE CONTRACTOR.
16. CONTRACTOR SHALL PROTECT EQUIPMENT AND THE INSIDE OF
PIPING/DUCTWORK DURING DELIVERY, STORAGE, HANDLING AND
INSTALLATION. CONTRACTOR SHALL UNDERTAKE THE APPROPRIATE
PROTECTION MEASURES DURING THE COURSE OF CONSTRUCTION AS
RECOMMENDED IN THE ANSI/SMACNA 008-2008 IAQ GUIDELINES FOR
OCCUPIED BUILDINGS UNDER CONSTRUCTION, CHAPTER 3. ENSURE
THAT DUST AND CONSTRUCTION DEBRIS ARE RESTRICTED FROM
ACCUMULATION WITHIN PIPING, DUCTWORK AND EQUIPMENT.
17. ALL CAPPED LINES FROM EQUIPMENT SHALL BE IDENTIFIED WITH
STENCILED SERVICE TYPE WITHIN 3'-0” OF CAP.
18. STANDARD DETAILS ILLUSTRATED ON THE DRAWINGS SHALL BE
APPLIED IN ALL CASES WHERE THE FEATURE OCCURS IN THE SYSTEM
DESIGN.
19. MINIMUM PIPE SIZE SHALL BE 3/4”.
20. PIPE INSULATION TYPE AND THICKNESS SHALL BE AS DESCRIBED IN
THE SPECIFICATIONS. HANGERS FOR INSULATED PIPING SHALL HAVE
INSULATION SADDLES AND SHIELDS.
21. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT
EQUIPMENT CONNECTIONS.
22. PIPING CONNECTIONS TO ALL EQUIPMENT SHALL BE FABRICATED WITH
THE ISOLATION VALVES, FLANGES AND/OR UNIONS POSITIONED TO
ALLOW REMOVAL AND SERVICE OF THE COMPONENT PARTS.
23. ROUTE PIPING IN AN ORDERLY MANNER AND MAINTAIN PROPER
GRADES. INSTALL TO CONSERVE HEADROOM AND TO CREATE
MINIMUM INTERFERENCE WITH USE OF SPACE. ROUTE EXPOSED
PIPING PARALLEL TO BUILDING LINES.
24. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR CONNECTED EQUIPMENT.
25. DO NOT INTERRUPT THE INTEGRITY OF THE WALL FIRE RATING.
SUBMIT PIPING SHOP DRAWINGS AND ALL OTHER PRODUCTS FOR
REVIEW AND APPROVAL PRIOR TO PURCHASE AND INSTALLATION.
26. INSTALL VALVES IN ACCESSIBLE LOCATIONS. INSTALL ACCESS PANELS
IN PARTITIONS WHERE VALVES WOULD OTHERWISE BE INACCESSIBLE.
27. COORDINATE ANY DEVICE REQUIRING AN ACCESS PANEL WITH THE
ARCHITECT. REVIEW LOCATIONS OF DEVICES REQUIRING ACCESS
PANELS WITH ENGINEER PRIOR TO INSTALLING SUCH DEVICES IN
ORDER TO MINIMIZE QUANTITY OR UNSIGHTLY ACCESS PANEL
LOCATIONS.
28. WHEN SOCKET WELD OR SOLDER END VALVES ARE INSTALLED,
SPECIAL CARE SHALL BE TAKEN TO AVOID OVERHEATING AND
DAMAGING THE VALVE BODY, TRIM OR PACKING.
29. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY THE
SPECIFICATIONS.
30. SEAL ALL MECHANICAL ROOM AND CENTRAL PLANT WALLS, ROOF, AND
FLOOR PENETRATIONS AIR TIGHT WHERE DUCTWORK, PIPING, AND
CONDUIT PENETRATE.
31. SLEEVE ALL PIPING THAT PENETRATES EXTERIOR BUILDING WALLS
AND GRADE BEAMS. SEAL PENETRATIONS WATERTIGHT.
32. EXISTING DUCTWORK, PIPING AND EQUIPMENT SHOWN ON THESE
DRAWINGS INDICATES THE GENERAL LOCATION AND ROUTING. THE
ACTUAL LOCATION SHALL BE DETERMINED BY THE CONTRACTOR WHO
SHALL COORDINATE ALL WORK WITH ALL TRADES NECESSARY TO
INSTALL NEW DUCTWORK, PIPING OR EQUIPMENT AS SHOWN ON THE
DRAWINGS.
33. NOTIFY AND COORDINATE WITH THE OWNER PRIOR TO SHUTDOWN OF
ANY EQUIPMENT OR SYSTEM. SHUTDOWN TIME TO BE MINIMAL.
34. CONTRACTOR SHALL PROVIDE TEMPORARY DUCTWORK, ELECTRICAL
SERVICE, PIPING OR OTHER BUILDING SERVICES AS REQUIRED TO
KEEP OTHER AREAS IN OPERATION DURING REMODELING. NOTIFY
OWNER PRIOR TO SHUT-DOWN FOR ANY TEMPORARY SERVICE
REQUIREMENTS.
35. CONTRACTOR SHALL COORDINATE WITH THE OWNER / ENGINEER
PRIOR TO CUTTING ANY OPENING IN THE STRUCTURE.
36. NEW HOLES THROUGH EXISTING FLOORS AND NO GREATER THAN 6” IN
DIAMETER SHALL BE CORE DRILLED. AVOID BEAMS AND JOIST LEGS.
37. INSTALL DIELECTRIC FITTINGS AT ALL FERROUS PIPE CONNECTIONS
TO NON-FERROUS METALLIC PIPE OR EQUIPMENT.
38. BULLHEAD TEES SHALL NOT BE USED TO JOIN CONVERGING (RETURN)
FLOWS, REGARDLESS OF ARRANGEMENT SHOWN ON PLANS.
39. PROVIDE ESCUTCHEON PLATES WHERE PIPES EXPOSED TO VIEW
PENETRATE FINISHED WALLS.
40. WORK SHOWN IS INTENDED TO PROVIDE THE OVERALL ENGINEERING
DESIGN CONCEPT AND DOES NOT INDICATE ALL REQUIRED
RELOCATIONS AND OFFSETS. COORDINATION OF TRADES SHALL BE
PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST.
41. MAJOR EQUIPMENT SHOWN ON THE PLANS AND ELEVATIONS
ILLUSTRATE THE GENERAL ARRANGEMENT AND SPACE ALLOCATIONS.
THE CONTRACTOR SHALL VERIFY THE SPACE REQUIREMENTS FOR
EACH SYSTEM COMPONENT USING MANUFACTURER CERTIFIED SHOP
DRAWINGS AND MAKE THE NECESSARY ADJUSTMENTS IN EQUIPMENT
PLACEMENT AND CONNECTION IN ORDER TO ACCOMMODATE THE
EXACT EQUIPMENT TO BE INSTALLED.
42. CONTRACTOR SHALL AVOID DAMAGE TO SYSTEMS WHICH ARE THE
WORK OF OTHER TRADES. ANY SYSTEM COMPONENTS WHICH ARE
DAMAGED AND ARE NOT IN THE CONTRACTOR'S SCOPE OF WORK
SHALL BE REPAIRED TO THE AS-INSTALLED CONDITION BY THE
CONTRACTOR, OR REPLACED WITH NEW MATERIALS TO MATCH
EXISTING.
43. 18. ONCE CEILINGS HAVE BEEN REMOVED IN THE BUILDING,
COORDINATE WORK WITH ALL TRADES. NOTIFY THE ARCHITECT AND
OWNER IF REMOVAL OF ADDITIONAL CEILING AREAS ARE NECESSARY
FOR ACCESS AND TO COMPLETE THE NEW WORK.
GENERAL MECHANICAL NOTES: GENERAL MECHANICAL NOTES: (CONT'D)
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N o
F
-7
W e st th S tr e e t, S u ite
Pl a no , T
X
.4
.0
Em a il:
m d e ng c a m d -e ng .c o m
Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
MEP0.0
LEGEND AND
GENERAL NOTES
- ELECTRICAL
AND PLUMBING
FE-10
FE-10
FE-10
FE-10
FE-10
FE-10
FE
FE-10
13-HALONN
759.4589
MEP2.1
MEP2.1
MEP2.1
N.I.C.
1B
1A
1C
1D
1HL
1HLA
J
PROVIDE CAULKING
AT PENETRATION AS
REQUIRED TO
MAINTAIN WALL
RATING, TYPICAL.
RUN CONDUCTORS IN SURFACE MOUNTED CONDUIT
ROUTED ABOVE EXTERIOR LOUVERS. CONDUIT SHALL BE
1" PVC COATED RIGID STEEL CONDUIT (ATKORE CALBOND
/ INTERTEK SEMKO #PV1010CT00-E OR EQUAL). PAINT
CONDUIT TO MATCH EXISTING WALL.
PROVIDE JUNCTION BOX
AND FITTINGS ARE
REQUIRED TO TRANSITION
FROM INTERIOR TO
EXTERIOR, TYPICAL.
J
GENERAL NOTES
1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.
MEP1.1
CLUSTER 1 - OVERALL FLOOR PLAN - MEP01 SCALE: 3/32"=1'-0"
CLUSTER 1 -
OVERALL
FLOOR PLAN -
MEP
NORTH
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N
W e st th S tr e e t, S u it e
Pl a no
, T X
.4
.0
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
3 1
A
B C
DA
C
DA
B C
D
A
B C
D
B
FE-10
FE-10
FE-10 FE-10
FE-10
FE-10
FE-10
13-HALON
FE
13-HALON
FE
144.0463
96.0006
MEP2.2
MEP2.2
MEP2.2
MEP2.2
3B
3A
3C
3D
1GL
J
PROVIDE CAULKING
AT PENETRATION AS
REQUIRED TO
MAINTAIN WALL
RATING, TYPICAL.
RUN CONDUCTORS IN SURFACE MOUNTED CONDUIT
ROUTED ABOVE EXTERIOR LOUVERS. CONDUIT SHALL BE
1" PVC COATED RIGID STEEL CONDUIT (ATKORE CALBOND
/ INTERTEK SEMKO #PV1010CT00-E OR EQUAL). PAINT
CONDUIT TO MATCH EXISTING WALL.
PROVIDE JUNCTION BOX
AND FITTINGS ARE
REQUIRED TO TRANSITION
FROM INTERIOR TO
EXTERIOR, TYPICAL.
J
J
J
1HLA
GENERAL NOTES
1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.
MEP1.2
CLUSTER 3 - OVERALL FLOOR PLAN - MEP01 SCALE: 3/32"=1'-0"
CLUSTER 3 -
OVERALL
FLOOR PLAN -
MEP
NORTH
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N
W e st th S tr e e t, S u it e
Pl a no
, T X
.4
.0
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
3 1
A
B C
DA
C
DA
B C
D
A
B C
Xref 2002168-01ws-grid-upper.dwg
MEP2.3
MEP2.3
MEP2.3
MEP2.3
1B
1A
1C
1D
1002A
ELML
UTILIZE MEZZANINE
LEVEL FOR ROUTING
OF ADDITIONAL
CONDUITS NEEDED
FOR NEW CIRCUITS
TO PANEL.
GENERAL NOTES
1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.
MEP1.3
CLUSTER 4 - OVERALL FLOOR PLAN - MEP01 SCALE: 3/32"=1'-0"
CLUSTER 4 -
OVERALL
FLOOR PLAN -
MEP
NORTH
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N
W e st th S tr e e t, S u it e
Pl a no
, T X
.4
.0
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
3 1
A
B C
DA
C
DA
B C
D
A
B C zone #4 zone #5
FHR
zone #1
FHR
FHR
zone #2
FHR
MEP2.4
N.I.C.
MEP2.4
MEP2.4
5B
5A
5C
5D31
5 2
1FLA
1FL
ELECTRICAL NOTES BY SYMBOL " "
1. PANEL '1FHA', REPLACE CIRCUIT BREAKER FOR 15KVA 'T1FLA' WITH A
NEW 50A/3P CIRCUIT BREAKER TYPE AND AIC RATING TO MATCH
EXISTING.
2. PROVIDE NEW CIRCUIT OF 3#6, 1#10G. IN 3/4"C. AND CONNECT TO
PRIMARY OF NEW TRANSFORMER.
3. REPLACE EXISTING 15KVA TRANSFORMER WITH NEW 30KVA DRY
TYPE GENERAL PURPOSE TRANSFORMER AND #6 G. CU. TO
BUILDING STEEL.
4. PROVIDE SECONDARY CONNECTION FROM NEW TRANSFORMER TO
EXISTING 100AMP LUGS IN PANEL WITH 3#1, 1#8G. IN 1-1/2"C.
5. PROVIDE (2)TWO 30A/2P CIRCUIT BREAKERS IN EXISTING PANEL
'1FLA' FOR CONNECTION TO NEW DRYERS AS SHOWN ON PLANS.
NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC
RATING OF EXISTING.
GENERAL NOTES
1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.
MEP1.4
CLUSTER 5 - OVERALL FLOOR PLAN - MEP01 SCALE: 3/32"=1'-0"
CLUSTER 5 -
OVERALL
FLOOR PLAN -
MEP
NORTH
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N
W e st th S tr e e t, S u it e
Pl a no
, T X
.4
.0
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
3 1
A
B C
DA
C
DA
B C
D
A
B C
GENERAL NOTES
1. REFER TO DRAWING MEP0.0 FOR GENERAL NOTES.
DRYER
3 2
1HLA
1HLA27
J
(N)1HLA-35,37
3#10, 1#10G.
IN 3/4"C.
3(E)1HL-9
(N)1HL-51,53
2(N)1HLA-35,37
14-30R
S
(E)1HLA-91
(E)1HLA-91
2(E)1HLA-9
S
G
(E)1HLA-9
2"SS2
J
(E)1HLA-10
(N)1HLA-39,41
3#8, 1#8G. IN
3/4"C.
(E)1HLA-10
(N)1HLA-39,41
(E)1HLA-101
(E)1HLA-101
2(N)1HLA-39,41
14-30R
S
2(E)1HLA-10
S
G
2"SS
1HL
2 3
J
(E)1HL-9
(N)1HL-57,59
3#10, 1#10G.
IN 3/4"C.
3 (E)1HL-9
(N)1HL-51,53
2 (N)1HL-57,59
14-30R
S
(E)1HL-9 1
(E)1HL-9 1
2 (E)1HL-9
S
G
2"SS 2
MECHANICAL NOTES BY SYMBOL " "
1. 4" ROUND DRYER VENT. THE FLEXIBLE DUCTWORK (BY DRYER
INSTALLER) SHALL CONNECT THE CLOTHES DRYER TO THE RIGID
DUCTWORK UTILIZING A WORM DRIVE TYPE HOSE CLAMP.
DUCTWORK SHALL BE GALVANIZED STEEL CONSTRUCTED PER
SMACNA AND IMC REQUIREMENTS FOR THE ENTIRE LENGTH OF THE
DUCT. DRYER DUCT SHALL NOT BE SECURED WITH METAL SCREWS
AND DUCT SEAM SHALL BE SEALED WITH DUCT SEALER AND FACE
UPWARDS.
2. 4" DRYER FLUE TO BE MOUNTED TO WALL EXPOSED ABOVE 10' AFF.
BELOW 10' AFF DRYER VENT SHALL BE PROTECTED BY 18 GAUGE
WALL GUTTER ATTACHED WITH TORX HEAD SCREWS.
3. 4" DRYER FLUE SHALL PENETRATE WALL INTO MECHANICAL SPACE.
COORDINATE WITH EXISTING DUCT WORK SO THAT DRYER FLUE IS
SLOPED DOWNWARD BACK TO WALL PENETRATION.
4. 4" DRYER FLUE UP THROUGH ROOF. REFER TO DETAIL.
PLUMBING NOTES BY SYMBOL " "
1. NEW WASHER BOX TO BE PLACED ON CMU WALL. PROVIDE ACORN
M8186-E501 SURFACE MTD HOSE BOX WITH OPTIONAL DRAIN AND
VACUUM BREAKER.
2. ROUTE NEW 2" SANITARY TO EXISTING LINE AFTER SINK P-TRAP. IF
LINE IS 1-1/2" REPLACE LINE WITH 2" AND RECONNECT 1-1/2"
SERVING EXISTING SINK.
3. VERIFY EXISTING 1/2" COLD & HOT WATER LINES SERVING EXISTING
SINK. IF EXISTING SINK WILL FIT IT IS TO REMAIN, CONNECT A 1/2"
TEE TO SERVE BOTH PIECES OF EQUIPMENT ON 1/2" COLD & HOT
WATER LINES.
4. FASTEN PIPING TO CONCRETE WITH C-CLAMPS & BOLTS.
1. EXISTING RECEPTACLES ON SAME CIRCUIT. FIELD VERIFY EXISTING
ROUTING OF HOMERUN AND REFER TO SHEET E4.1 DETAILS 2 & 3
FOR WIRING AND DEVICE REQUIREMENTS.
2. PROVIDE NEW RECEPTACLES FOR
WASHER: PROVIDE NEW GFCI RECEPTACLE AND STAINLESS STEEL
COVER PLATE AND CONNECT TO EXISTING CIRCUIT.
DRYER: PROVIDE NEW SHALLOW 14-30R RECEPTACLE, 1 INCH
EXTENDER AS NEEDED AND STAINLESS STEEL COVER.
3. PULL NEW WIRES IN EXISTING CONDUIT.
4. CONNECT TO NEW 30A/2P CIRCUIT BREAKER IN EXISTING PANEL.
NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC
RATING OF EXISTING.
5. LARGER CONDUCTOR SIZE TO COMPENSATE FOR VOLTAGE DROP.
6. RELOCATED (7)SEVEN 20A/1P CIRCUIT BREAKERS TO NEW
SUB-PANEL TO MAKE ROOM FOR THE (2)TWO 2-POLE BREAKERS
SERVING THE NEW DRYERS AND INSTALL (1)ONE NEW 60A/3P
CIRCUIT BREAKER AND CIRCUIT OF 4#4, 1#10G. IN 1-1/4"C. NEW
CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC
RATING OF EXISTING.
7. PROVIDE NEW 120/208V 3-PHASE PANEL WITH 100A BUS AND 18
SPACES AND (7)SEVEN RELOCATED 20A/1P CIRCUIT BREAKERS.
INTERCEPT EXISTING CIRCUIT TO NEW SUB-PANEL AS REQUIRED.
PROVIDE NEW TYPE WRITTEN DIRECTORY.
8. REMOVE SPARE 20A/1P CIRCUIT BREAKERS TO MAKE SPACE FOR
NEW DRYER CIRCUIT BREAKERS AS REQUIRED.
(ALL NOTES BY SYMBOL MAY NOT APPEAR ON DRAWING)
ELECTRICAL NOTES BY SYMBOL " "
MEP2.1
ENLARGED
FLOOR PLANS -
CLUSTER 1 -
MEP
NORTH
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N
W e st th S tr e e t, S u it e
Pl a no
, T X
.4
.0
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
3 1
A
B C
DA
C
DA
B C
D
A
B C
D
B
CLUSTER 1 - POD C - ENLARGED STAFF AREA02 SCALE: 1/2"=1'-0"
CLUSTER 1 - POD D - ENLARGED STAFF AREA03 SCALE: 1/2"=1'-0"
CLUSTER 1 - POD B - ENLARGED STAFF AREA01 SCALE: 1/2"=1'-0"
CLUSTER 1 - ENLARGED STAFF AREA - EXISTING OPERATIONS05 SCALE: NONE
CLUSTER 1 - PLUMBING CHASE PIPE CONNECTION04 SCALE: NONE
3 2
J
(E)1GLA-10
(N)1GLA-39,41
3#8, 1#8G. IN
3/4"C.
(E)1GLA-10
(N)1GLA-39,41
2(N)1GLA-39,41
14-30R
S
(E)1GLA-101
(E)1GLA-101
2(E)1GLA-10
S
G
2"SS2
REFER TO
MEP1.3 FOR
CONTINUATION
TO POD 3C
FROM POD 3C
1GLA
2 13
J
(N)1GLA-35,37
3#10, 1#10G.
IN 3/4"C.
3(E)1GL-9
(N)1GL-51,53
2(N)1GLA-35,37
14-30R
S
(E)1GLA-91
(E)1GLA-91
2(E)1GLA-9
S
G
1GLA2
(E)1GLA-9
2"SS2
J
(N)1GLA-39,41
3#8, 1#8G. IN
3/4"C.
4 5
J
(E)1GL-9
(N)1GL-53,55
3#10, 1#10G.
IN 3/4"C.
(E)1GL-9
(N)1GL-51,53
2 3
2 (N)1GL-53,55
14-30R
S
(E)1GL-9 1
(E)1GL-9 1
2 (E)1GL-9
S
G
2"SS 2
(N)1GL-57,59
14-30R
S
J
(N)1GL-57,59
3#8, 1#8G. IN
3/4"C.
(E)1GL-10 1
(E)1GL-10 1
(E)1GL-10
(N)1GL-57,59
2 (E)1GL-10
S
G
2"SS 2
TO POD 3B
REFER TO
MEP1.3 FOR
CONTINUATION
(E)1GL-10
FROM POD 3C
MECHANICAL NOTES BY SYMBOL " "
1. 4" ROUND DRYER VENT. THE FLEXIBLE DUCTWORK (BY DRYER
INSTALLER) SHALL CONNECT THE CLOTHES DRYER TO THE RIGID
DUCTWORK UTILIZING A WORM DRIVE TYPE HOSE CLAMP.
DUCTWORK SHALL BE GALVANIZED STEEL CONSTRUCTED PER
SMACNA AND IMC REQUIREMENTS FOR THE ENTIRE LENGTH OF THE
DUCT. DRYER DUCT SHALL NOT BE SECURED WITH METAL SCREWS
AND DUCT SEAM SHALL BE SEALED WITH DUCT SEALER AND FACE
UPWARDS.
2. 4" DRYER FLUE TO BE MOUNTED TO WALL EXPOSED ABOVE 10' AFF.
BELOW 10' AFF DRYER VENT SHALL BE PROTECTED BY 18 GAUGE
WALL GUTTER ATTACHED WITH TORX HEAD SCREWS.
3. 4" DRYER FLUE SHALL PENETRATE WALL INTO MECHANICAL SPACE.
COORDINATE WITH EXISTING DUCT WORK SO THAT DRYER FLUE IS
1. EXISTING RECEPTACLES ON SAME CIRCUIT. FIELD VERIFY EXISTING
ROUTING OF HOMERUN AND REFER TO SHEET E4.1 DETAILS 2 & 3
FOR WIRING AND DEVICE REQUIREMENTS.
2. PROVIDE NEW RECEPTACLES FOR
WASHER: PROVIDE NEW GFCI RECEPTACLE AND STAINLESS STEEL
COVER PLATE AND CONNECT TO EXISTING CIRCUIT.
DRYER: PROVIDE NEW SHALLOW 14-30R RECEPTACLE, 1 INCH
EXTENDER AS NEEDED AND STAINLESS STEEL COVER.
3. PULL NEW WIRES IN EXISTING CONDUIT.
4. CONNECT TO NEW 30A/2P CIRCUIT BREAKER IN EXISTING PANEL.
NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC
RATING OF EXISTING.
5. LARGER CONDUCTOR SIZE TO COMPENSATE FOR VOLTAGE DROP.
6. RELOCATED (7)SEVEN 20A/1P CIRCUIT BREAKERS TO NEW
SUB-PANEL TO MAKE ROOM FOR THE (2)TWO 2-POLE BREAKERS
SERVING THE NEW DRYERS AND INSTALL (1)ONE NEW 60A/3P
CIRCUIT BREAKER AND CIRCUIT OF 4#4, 1#10G. IN 1-1/4"C. NEW
CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC
RATING OF EXISTING.
7. PROVIDE NEW 120/208V 3-PHASE PANEL WITH 100A BUS AND 18
SPACES AND (7)SEVEN RELOCATED 20A/1P CIRCUIT BREAKERS.
INTERCEPT EXISTING CIRCUIT TO NEW SUB-PANEL AS REQUIRED.
PROVIDE NEW TYPE WRITTEN DIRECTORY.
8. REMOVE SPARE 20A/1P CIRCUIT BREAKERS TO MAKE SPACE FOR
NEW DRYER CIRCUIT BREAKERS AS REQUIRED.
(ALL NOTES BY SYMBOL MAY NOT APPEAR ON DRAWING)
ELECTRICAL NOTES BY SYMBOL " "PLUMBING NOTES BY SYMBOL " "
1. NEW WASHER BOX TO BE PLACED ON CMU WALL. PROVIDE ACORN
M8186-E501 SURFACE MTD HOSE BOX WITH OPTIONAL DRAIN AND
VACUUM BREAKER.
2. ROUTE NEW 2" SANITARY TO EXISTING LINE AFTER SINK P-TRAP. IF
LINE IS 1-1/2" REPLACE LINE WITH 2" AND RECONNECT 1-1/2"
SERVING EXISTING SINK.
3. VERIFY EXISTING 1/2" COLD & HOT WATER LINES SERVING EXISTING
SINK. IF EXISTING SINK WILL FIT IT IS TO REMAIN, CONNECT A 1/2"
TEE TO SERVE BOTH PIECES OF EQUIPMENT ON 1/2" COLD & HOT
WATER LINES.
4. FASTEN PIPING TO CONCRETE WITH C-CLAMPS & BOLTS.
MEP2.2
ENLARGED
FLOOR PLANS -
CLUSTER 3 -
MEP
NORTH
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N
W e st th S tr e e t, S u it e
Pl a no
, T X
.4
.0
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
3 1
A
B C
DA
C
DA
B C
D
A
B C
D
B
CLUSTER 3 - POD C - ENLARGED STAFF AREA02 SCALE: 1/2"=1'-0"
CLUSTER 3 - POD D - ENLARGED STAFF AREA04 SCALE: 1/2"=1'-0"
CLUSTER 3 - POD B - ENLARGED STAFF AREA01 SCALE: 1/2"=1'-0"
CLUSTER 3 - POD A - ENLARGED STAFF AREA03 SCALE: 1/2"=1'-0"
CLUSTER 3 - ENLARGED STAFF AREA - EXISTING OPERATIONS04 SCALE: NONE
CLUSTER 3 - PLUMBING CHASE PIPE CONNECTION05 SCALE: NONE
G
S 14-30R
4(N)2BL-54,56
3#10, 1#10G.
IN 1"C.1
2 9
SG
(E)ELML-24(E)ELML-242
S G 2"SS
2"SS
S 14-30R
4(N)2BL-53,55
3#8, 1#8G. IN
3/4"C.
2 9
SG
(E)ELML-31(E)ELML-312
S G
2"SS
S14-30R
4 (N)2BL-57,59
3#8, 1#8G. IN
3/4"C.
S G
(E)ELML-17 (E)ELML-17 2
SG
3 4
S14-30R
4 (N)2BL-58,60
3#8, 1#8G. IN
3/4"C. 1
S G
(E)ELML-36 (E)ELML-36 2
SG
3 4
2"SS
MECHANICAL NOTES BY SYMBOL " "
1. 4" ROUND DRYER VENT. THE FLEXIBLE DUCTWORK (BY DRYER
INSTALLER) SHALL CONNECT THE CLOTHES DRYER TO THE RIGID
DUCTWORK UTILIZING A WORM DRIVE TYPE HOSE CLAMP.
DUCTWORK SHALL BE GALVANIZED STEEL CONSTRUCTED PER
SMACNA AND IMC REQUIREMENTS FOR THE ENTIRE LENGTH OF THE
DUCT. DRYER DUCT SHALL NOT BE SECURED WITH METAL SCREWS
AND DUCT SEAM SHALL BE SEALED WITH DUCT SEALER AND FACE
UPWARDS.
2. 4" DRYER FLUE TO BE MOUNTED TO WALL EXPOSED ABOVE 10' AFF.
BELOW 10' AFF DRYER VENT SHALL BE PROTECTED BY 18 GAUGE
WALL GUTTER ATTACHED WITH TORX HEAD SCREWS.
3. 4" DRYER FLUE SHALL PENETRATE WALL INTO MECHANICAL SPACE.
COORDINATE WITH EXISTING DUCT WORK SO THAT DRYER FLUE IS
1. EXISTING RECEPTACLES ON SAME CIRCUIT. FIELD VERIFY EXISTING
ROUTING OF HOMERUN AND REFER TO SHEET E4.1 DETAILS 2 & 3
FOR WIRING AND DEVICE REQUIREMENTS.
2. PROVIDE NEW RECEPTACLES FOR
WASHER: PROVIDE NEW GFCI RECEPTACLE AND STAINLESS STEEL
COVER PLATE AND CONNECT TO EXISTING CIRCUIT.
DRYER: PROVIDE NEW SHALLOW 14-30R RECEPTACLE, 1 INCH
EXTENDER AS NEEDED AND STAINLESS STEEL COVER.
3. PULL NEW WIRES IN EXISTING CONDUIT.
4. CONNECT TO NEW 30A/2P CIRCUIT BREAKER IN EXISTING PANEL.
NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC
RATING OF EXISTING.
5. LARGER CONDUCTOR SIZE TO COMPENSATE FOR VOLTAGE DROP.
6. RELOCATED (7)SEVEN 20A/1P CIRCUIT BREAKERS TO NEW
SUB-PANEL TO MAKE ROOM FOR THE (2)TWO 2-POLE BREAKERS
SERVING THE NEW DRYERS AND INSTALL (1)ONE NEW 60A/3P
CIRCUIT BREAKER AND CIRCUIT OF 4#4, 1#10G. IN 1-1/4"C. NEW
CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC
RATING OF EXISTING.
7. PROVIDE NEW 120/208V 3-PHASE PANEL WITH 100A BUS AND 18
SPACES AND (7)SEVEN RELOCATED 20A/1P CIRCUIT BREAKERS.
INTERCEPT EXISTING CIRCUIT TO NEW SUB-PANEL AS REQUIRED.
PROVIDE NEW TYPE WRITTEN DIRECTORY.
8. REMOVE SPARE 20A/1P CIRCUIT BREAKERS TO MAKE SPACE FOR
NEW DRYER CIRCUIT BREAKERS AS REQUIRED.
9. PROVIDE NEW SURFACE MOUNTED JUNCTION BOX WITH NEW
SURFACE MOUNTED CONDUIT HOME RUN TO VIA MEZZANINE LEVEL
ABOVE AND DOWN THRU ELECTRIC ROOM 1002A. REFER TO MEP1.3
FOR ADDITIONAL INFORMATION.
(ALL NOTES BY SYMBOL MAY NOT APPEAR ON DRAWING)
ELECTRICAL NOTES BY SYMBOL " " PLUMBING NOTES BY SYMBOL " "
1. NEW WASHER BOX TO BE PLACED ON CMU WALL. PROVIDE ACORN
M8186-E501 SURFACE MTD HOSE BOX WITH OPTIONAL DRAIN AND
VACUUM BREAKER.
2. ROUTE NEW 2" SANITARY TO EXISTING LINE AFTER SINK P-TRAP. IF
LINE IS 1-1/2" REPLACE LINE WITH 2" AND RECONNECT 1-1/2"
SERVING EXISTING SINK.
3. VERIFY EXISTING 1/2" COLD & HOT WATER LINES SERVING EXISTING
SINK. IF EXISTING SINK WILL FIT IT IS TO REMAIN, CONNECT A 1/2"
TEE TO SERVE BOTH PIECES OF EQUIPMENT ON 1/2" COLD & HOT
WATER LINES.
4. FASTEN PIPING TO CONCRETE WITH C-CLAMPS & BOLTS.
MEP2.3
ENLARGED
FLOOR PLANS -
CLUSTER 4 -
MEP
NORTH
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N
W e st th S tr e e t, S u it e
Pl a no
, T X
.4
.0
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
3 1
A
B C
DA
C
DA
B C
D
A
B C
D
B
CLUSTER 4 - POD C - ENLARGED STAFF AREA02 SCALE: 1/2"=1'-0"
CLUSTER 4 - POD D - ENLARGED STAFF AREA04 SCALE: 1/2"=1'-0"
CLUSTER 4 - POD B - ENLARGED STAFF AREA01 SCALE: 1/2"=1'-0"
CLUSTER 4 - POD A - ENLARGED STAFF AREA03 SCALE: 1/2"=1'-0"
CLUSTER 4 - ENLARGED STAFF AREA - EXISTING OPERATIONS 05 SCALE: NONE
CLUSTER 4 - PLUMBING PIPE CONNECTION04 SCALE: NONE
(D)1FLA-9
(E)1FLA-11 1
(E)1FL-34 3
S G
(N)1FLA-7,9
3#10, 1#10G.
IN EXISTING
3/4"C.
45 2
S 14-30R
J
3(N)1FL2-17,19
(D)1FL-32
(E)1FL-341
(E)1FL-343
SG
(N)1FL-1,3
3#10, 1#10G.
IN EXISTING
3/4"C.
4 52
S14-30R
J
3 (N)1FL-1,3
(D)1FLA-5
(E)1FLA-7 1
(E)1FLA-5 3
S G
(N)1FLA-46,48
3#10, 1#10G.
IN EXISTING
3/4"C.
S 14-30R
J
3(N)1FLA-7,9
6 (R)1FLA-5
(R)1FLA-5
MECHANICAL NOTES BY SYMBOL " "
1. 4” ROUND DRYER VENT. THE FLEXIBLE DUCTWORK (BY DRYER
INSTALLER) SHALL CONNECT THE CLOTHES DRYER TO THE RIGID
DUCTWORK UTILIZING A WORM DRIVE TYPE HOSE CLAMP.
DUCTWORK SHALL BE GALVANIZED STEEL CONSTRUCTED PER
SMACNA AND IMC REQUIREMENTS, FOR THE ENTIRE LENGTH OF
THE DUCT, TOWARDS THE EXTERIOR WALL. THE LAST 10 FEET OF
DUCT SHALL BE SLOPED DOWNWARD TOWARDS THE WALL CAP.
DRYER DUCT SHALL NOT BE SECURED WITH METAL SCREWS, AND
DUCT SEAM SHALL BE SEALED WITH DUCT SEALER AND FACE
UPWARDS. CONTRACTOR SHALL PROVIDE A SUBMITTAL ON THE
WALL CAP (SPRING-LOADED, POWDER-COATED 26 GAUGE STEEL
FLAT PLATE) FOR APPROVAL MEETING THE CURRENT 2021 CODES
WHICH REQUIRES THE WALL CAP TO HAVE AN UNDIMINISHED
OPENING OF NOT LESS THAN 12.5 SQUARE INCHES. PROVIDE 18
GAUGE SHEET METAL COVER OVER VENT BEHIND DRYER TO
10'A.F.F..
PLUMBING NOTES BY SYMBOL " "
1. NEW WASHER BOX TO BE PLACED ON CMU WALL. PROVIDE ACORN
M8186-E501 SURFACE MTD HOSE BOX WITH OPTIONAL DRAIN AND
VACUUM BREAKER.
2. ROUTE NEW 2" SANITARY TO EXISTING LINE AFTER SINK P-TRAP. IF
LINE IS 1-1/2" REPLACE LINE WITH 2" AND RECONNECT 1-1/2"
SERVING EXISTING SINK.
3. VERIFY EXISTING 1/2" COLD & HOT WATER LINES SERVING EXISTING
SINK. IF EXISTING SINK WILL FIT IT IS TO REMAIN, CONNECT A 1/2"
TEE TO SERVE BOTH PIECES OF EQUIPMENT ON 1/2" COLD & HOT
WATER LINES.
4. FASTEN PIPING TO CONCRETE WITH C-CLAMPS & BOLTS.
ELECTRICAL NOTES BY SYMBOL " "
1. EXISTING RECEPTACLE PROVIDING POWER TO VIDEO TELEPHONE
TO REMAIN. PROVIDE EXTENDER RING WITH 3/4" THREADED
OPENINGS FOR SURFACE MOUNTED CONDUIT. ROUTE SURFACE
MOUNTED CONDUIT ALONG PERIMETER TO NEW LOCATION..
2. CAP EXISTING RECEPTACLE WITH SURFACE MOUNTED JUNCTION
BOX WITH 3/4" THREADED OPENINGS FOR SURFACE MOUNTED
CONDUIT. ROUTE SURFACE MOUNTED CONDUIT ALONG PERIMETER
TO NEW LOCATION.
3. PROVIDE NEW RECEPTACLES FOR
WASHER: PROVIDE NEW GFCI RECEPTACLE ON SURFACE
MOUNTED JUNCTION BOX WITH AND STAINLESS STEEL
COVER PLATE.
DRYER: PROVIDE NEW SHALLOW 14-30R RECEPTACLE, 1 INCH
EXTENDER AS NEEDED AND STAINLESS STEEL COVER.
4. PULL NEW WIRES IN EXISTING CONDUIT.
5. CONNECT TO NEW 30A/2P CIRCUIT BREAKER IN EXISTING PANEL.
NEW CIRCUIT BREAKER TO MATCH MANUFACTURER, TYPE AND AIC
RATING OF EXISTING.
6. WITHIN THE PANELBOARD, MOVE WIRES FROM (E)EXISTING CIRCUIT
AND (R)RELOCATE TO CIRCUIT MADE AVAILABLE.
MEP2.4
ENLARGED
FLOOR PLANS -
CLUSTER 5 -
MEP
NORTH
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N
W e st th S tr e e t, S u it e
Pl a no
, T X
.4
.0
Em e ng c a m d
-e ng
.c o m Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
3 1
A
B C
DA
C
DA
B C
D
A
B C
D
B
CLUSTER 5 - POD C - ENLARGED STAFF AREA02 SCALE: 1/2"=1'-0"
CLUSTER 5 - POD B - ENLARGED STAFF AREA01 SCALE: 1/2"=1'-0"
CLUSTER 5 - POD D - ENLARGED STAFF AREA03 SCALE: 1/2"=1'-0"
CLUSTER 5 - ENLARGED STAFF AREA - EXISTING OPERATIONS 05 SCALE: NONE
CLUSTER 5 - PLUMBING PIPE CONNECTION04 SCALE: NONE
PHENOLIC NAMEPLATE WITH 1/4"
LETTERS INSCRIBED AS INDICATED.
PROVIDE WHITE LABELS WITH BLACK
LETTERS FOR NORMAL SYSTEM PANELS
AND RED LABELS WITH WHITE LETTERS
FOR ESSENTIAL SYSTEM PANELS.
PANEL VOLTAGE
AND PHASE
CIRCUIT THAT PANEL
IS FED FROM
PANEL NAMEPANEL 'LA'
480/277V./3Ø
DPA-3
TYPICAL FOR ALL PANELBOARDS
ISC = 42,000 AMPS
R.M.S. SYM.
(DATE)
MAXIMUM FAULT CURRENT
& DATE CALCULATED
1-GANG STAINLESS STEEL COVER
PLATE WITH 2.15" RECEPTACLE HOLE
(HUBBELL-TAYMAC WSS1-2 OR EQUAL)
SHALLOW TYPE 14-30R
RECEPTACLE WITH REAR
PROJECTION NOT TO EXCEED 1.25"
(LEVITION 278-S00 OR EQUAL).
EXISTING 1-GANG
J-BOX IN CMU WALL
FOR NEW DRYER
EXISTING CONDUIT
(MINIMUM 3/4") TO
ELECTRICAL ROOM
1-GANG STAINLESS STEEL
COVER PLATE WITH DECORA
STYLE RECEPTACLE HOLE
(HUBBELL-TAYMAC WSS1-R
OR EQUAL)
20A GFCI SLIM, OUTLTET,
SELF-TESTING, WEATHER &
TAMPER RESISTANT, GRAY
(LEVITION GFWT2-WY OR EQUAL).
1-GANG STAINLESS STEEL COVER
PLATE WITH 2.15" RECEPTACLE HOLE
(HUBBELL-TAYMAC WSS1-2 OR EQUAL)
SHALLOW TYPE 14-30R
RECEPTACLE WITH REAR
PROJECTION NOT TO EXCEED 1.25"
(LEVITION 278-S00 OR EQUAL).
1-GANG STAINLESS STEEL
COVER PLATE WITH DECORA
STYLE RECEPTACLE HOLE
(HUBBELL-TAYMAC WSS1-R
OR EQUAL)
EXISTING 1-GANG
J-BOX IN CMU WALL
FOR NEW WASHER
EXISTING CONDUIT
(MINIMUM 3/4") TO
ELECTRICAL ROOM
EXISTING DEDICATED
CIRCUIT OF 2#12, 1#12 G. CU.
NEW CIRCUIT OF
3#10, 1#10 G. CU.
IN EXISTING
CONDUIT
TWO NEW CIRCUITS
OF 2#12, & 1#12G.
CU. AND 3#10, &
1#10G. CU. IN
EXISTING CONDUIT
NEW 3#10, & 1#10G. CU.
IN EXISTING CONDUIT
NOTE:
CONTRACTOR AND FIELD VERIFY EXISTING CONDUIT SIZES
AND HOMERUN CONFIGURATION PRIOR TO START OF WORK.
1-GANG STAINLESS STEEL COVER
PLATE WITH 2.15" RECEPTACLE HOLE
(HUBBELL-TAYMAC WSS1-2 OR EQUAL)
SHALLOW TYPE 14-30R
RECEPTACLE WITH REAR
PROJECTION NOT TO EXCEED 1.25"
(LEVITION 278-S00 OR EQUAL).
1-GANG 1 INCH DEEP GASKETED
EXTENSION
1-GANG STAINLESS STEEL
COVER PLATE WITH DECORA
STYLE RECEPTACLE HOLE
(HUBBELL-TAYMAC WSS1-R
OR EQUAL)
NEW 2#12, & 1#12G. CU.
IN EXISTING CONDUIT
TWO NEW CIRCUITS
OF 2#12, & 1#12G.
CU. AND 3#10, &
1#10G. CU. IN
EXISTING CONDUIT
EXISTING 1-GANG
J-BOX IN CMU WALL
FOR NEW DRYER
EXISTING CONDUIT
(MINIMUM 3/4") TO
ELECTRICAL ROOM
EXISTING 1-GANG
J-BOX IN CMU WALL
FOR NEW WASHER
20A GFCI SLIM, OUTLTET,
SELF-TESTING, WEATHER &
TAMPER RESISTANT, GRAY
(LEVITION GFWT2-WY OR EQUAL).
20A GFCI SLIM, OUTLTET,
SELF-TESTING, WEATHER &
TAMPER RESISTANT, GRAY
(LEVITION GFWT2-WY OR EQUAL).
NOTE:
CONTRACTOR AND FIELD VERIFY EXISTING CONDUIT SIZES
AND HOMERUN CONFIGURATION PRIOR TO START OF WORK.
NOTE:
CONTRACTOR AND FIELD VERIFY
EXISTING CONDUIT SIZES AND
HOMERUN CONFIGURATION PRIOR
TO START OF WORK.
NOTE:
MANUFACTURER'S DIMENSIONAL DRAWING OF LEVITON
MODEL 278-S00 SHOWN FOR REFERENCE ONLY.
DRYER VENT GOOSENECK ROOF CAP
7 1
DETAIL NOTE:
DRYER DUCT SHALL HAVE SMOOTH INTERIOR
FINISH AND SHALL BE CONSTRUCTED OF
METAL A MINIMUM 0.016 INCH.
NOTES BY SYMBOL:
1. DRYER VENT BACK DRAFT DAMPER
2. COUNTER FLASHING
3. WATER PROOF SEALANT ALL AROUND
4. ROOFING AS PER ARCHITECTURAL DRAWINGS
5. ROOF STRUCTURE
6. DUCT THROUGH ROOF
7. G.I. GOOSENECK
LOCKNUT (NOT SHOWN) FEEDER CONDUIT
EQUIPMENT GROUNDING
CONDUCTOR INSTALLED
WITH FEEDER
INSULATED THROAT
GROUNDING BUSHING
BONDING JUMPER - SAME
SIZE AS EQUIPMENT
GROUNDING CONDUCTOR
PANELBOARD EQUIPMENT
GROUND BUS BONDED TO
CABINET
SCALE:
NTS
SCALE:
NTS
SCALE:
NTS
NTS
NTS
NTS
Project No.
231648
Sheet No.
Re vi si o ns
C O
M M
U N
IT
Y
A V E.
M cK
IN
N
EY
, T
EX
A S
Te xa s Re g is te re d F irm N
W e st th S tr e e t, S u ite
Pl a no , T
X
.4
.0
Em e ng c a m d -e ng .c o m
Pr o je c t N um b e r:
C C
A D
F H
O U
SI
N
G W
A
SH
ER
A
N D
D
RY
ER
MEP4.1
DETAILS - MEP
| Sheets and Views |
| 231648 - COVER |
File details come from the government source that posted it. Updated .