004325_Product_Substitution_Request_Form.docx

DOCX document 26 KB Posted

Attached to
Collin County Adult Detention Facility - Housing Washer and Dryer
Solicitation number
2025-129
Issued by
Collin County, Texas

About this file

The document is a Product Substitution Request Form for the Collin County Adult Detention Facility - Housing Washer and Dryer project (IFB 2025-129) in Texas. The form provides a structured process for bidders to propose alternative products to those originally specified in the contract documents, with requirements for comprehensive documentation including product specifications, drawings, photographs, and performance data. The substitution request must demonstrate that the proposed product is equal or superior to the original specification, with no adverse effects on other trades, project progress, dimensions, or functional clearances.

The project has an estimated construction cost of $175,000.00, and the substitution request form includes provisions for potential additional costs related to design changes, architectural modifications, and implementation of the proposed alternative product. The form requires detailed manufacturer information, contact details, and a comprehensive evaluation of the proposed substitution, with final approval contingent on review by the project authorities who can approve, conditionally approve, or reject the proposed product substitution.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 004325 - PRODUCT SUBSTITUTION REQUEST FORM

(Must be submitted by date specificed in solicitation)

Bidder:Project No: IFB 2025-129
Project:Collin County Adult Detention Facility - Housing Washer and Dryer

Section: Article/ Paragraph:

Proposed Substitution:

Manufacturer: Address:

Telephone: Proposed Model No.:

Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified.

Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its installation.

The undersigned warrants and represents:

· Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

· Same warranty will be furnished for proposed substitution as for specified product.

· Same maintenance service and source of replacement parts, as applicable, is available.

· Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.

· Proposed substitution does not affect dimensions and functional clearances.

· Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by substitution.

Submitted By: Signed:

Firm: Address:

Phone:

REVIEW & ACTION (Initial)

Substitution approved - Make submittals in accordance with Project Manual requirements.
Substitution approved as noted - Make submittals in accordance with Project Manual requirements.
Substitution rejected - Use specified materials.
Substitution Request received too late - Use specified materials.

Signature: Date:

Supporting Data Attached: ____Drawings ____Product Data ____Samples ____Tests ____Reports ____Other

END OF REQUEST FORM