2311 Project Manual - Specifications.pdf

PDF 962 KB Posted

Attached to
Brookside Care Center Fire Protection Piping Modifications
Solicitation number
2311
Issued by
Kenosha County, Kellnersville Village, Wisconsin

About this file

This is a Project Manual and Specifications document issued by the County of Kenosha, Wisconsin for professional consulting and design services related to fire protection piping modifications at Brookside Care Center. The project (Bid #2311) encompasses selective demolition and disposal of existing dry fire protection piping, fittings, and couplings, with replacement of new piping systems; removal and replacement of ceiling materials as required; and patching and painting of wall penetrations. The work is located at 3506 Washington Road, Kenosha, Wisconsin 53144. Construction is scheduled for a 60-day period, with anticipated dates from May 5, 2023 through July 7, 2023, or alternatively between September 1, 2023 and December 1, 2023 if required. Work hours are restricted to 7:00 a.m. to 3:00 p.m., coordinated with the Owner, and all operational interruptions must be coordinated at least 48 to 72 hours prior to commencement. The project manual includes comprehensive specifications for fire protection piping systems, acoustical ceiling panels, gypsum board, selective demolition, and general requirements sections addressing administrative procedures, quality assurance, submittals, and project closeout requirements.

The specifications establish that the Contractor must obtain Schedule 40 black steel pipe for dry-pipe sprinkler systems in accordance with ASTM A795 and NFPA 13 standards, with gate, globe, ball, butterfly, check, and drain valves of specified grades. The existing water supply is rated at 1000 gpm at 60 psi, though the Contractor is required to obtain a new flow test to confirm pressure and flow information and revise design accordingly if differences exist. All submittals, including shop drawings, product data, and design calculations, must be submitted within 15 days after Notice to Proceed and reviewed within 15 days excluding delivery time. Payment procedures require submission of three executed copies of payment applications with waivers of lien and sworn statements from all subcontractors and suppliers for entities exceeding $1,000. The Contractor is responsible for all temporary electrical, communications, and sanitary facilities necessary to maintain Owner operations during construction, and must maintain the facility in a clean, orderly condition with daily removal of all debris and waste materials at the Contractor's expense. No dumpsters are permitted on site; all removed items must be hauled away daily.

View the file

Other files

File Type Posted
2311 Drawings.pdf PDF
2311 Addendum 1.pdf PDF
2311 Addendum 2.pdf PDF
2311 Bid Documents.pdf PDF
Vendor Responsibility Form Construction.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Professional Consulting and Design Services

County of Kenosha

3506 Washington Rd.

Kenosha, WI 53144

Brookside Care Center Fire Protection

Piping Modifications

Bid # 2311

Date: March 31, 2023

Issued for Bid

Clark Dietz: Project No. K0450160

Clark Dietz, Inc.

625 57th Street, 6th Floor

Kenosha, WI 53140

P - 262.650.1550

PROJECT MANUAL

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Table of Contents

Clark Dietz, Inc. 00 00 10 - 1

SECTION 00 00 10

TABLE OF CONTENTS

COUNTY OF KENOSHA

BCC FIRE PROTECTION PIPING MODIFICATIONS

KENOSHA, WI

DIVISION 00 – BIDDING AND CONTRACT REQUIREMENTS

00 10 00 Table of Contents 00 10 00-1

DIVISION 01 – GENERAL REQUIREMENTS

01 10 00 Summary 01 10 00-1-3 01 29 76 Payment Procedures 01 29 76-1-3 01 30 00 Administrative Requirements 01 30 00-1-4 01 33 00 Submittal Procedures 01 33 00-1-6 01 40 00 Quality Procedures 01 40 00-1-3 01 42 16 Definitions 01 42 16-1-2 01 42 19 Reference Standards 01 42 19-1-3 01 50 00 Temporary Facilities and Controls 01 50 00-1-3 01 60 00 Product Requirements 01 60 00-1-3 01 70 00 Execution and Closeout Procedures 01 70 00-1-6

DIVISION 02 – DEMOLITION

02 41 19 Selective Demolition 02 41 19-1-3

DIVISION 09 – ARCHITECTURAL

09 05 11 Acoustic Panel Ceiling 09 05 11-1-5 09 29 00 Gypsum Board 09 29 00-1-3

DIVISION 21 FIRE PROTECTION

21 05 00 Common Work Results for Fire Suppression 21 05 00 1-5 21 13 16 Dry-Pipe Sprinkler Systems 21 13 16 1-4

END OF SECTION

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Summary

Clark Dietz, Inc. 01 10 00 - 1

SECTION 01 10 00

SUMMARY

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Related Documents.

B. Contract Description.

C. Scheduling of Work.

D. Construction Schedule.

E. Construction Sequence.

F. Contractor's Use of Site.

G. Owner Occupancy.

H. Specification Conventions.

1.2 RELATED DOCUMENTS

A. Documents related to the Work include:

1. Contract Drawings

2. General Provisions of the Contract including General and Supplementary Conditions

3. All other Sections included herein as part of the Project Manual

4. Addendum to the Drawings and Project Manual issued during Bidding

1.3 CONTRACT DESCRIPTION

A. Work of the Project includes the following:

1. Selective demolition and disposal.

2. Replace existing dry fire protection piping, fittings and couplings with new.

3. Remove and replace any ceiling as required for contracted work.

4. Patch and paint any wall penetrations that are required for contracted work.

B. The Contract Documents indicate the Work of the contract and related requirements and conditions that have an impact on the Work. Related requirements and conditions that are indicated on the Contract

Documents include, but are not necessarily limited to the following:

1. Existing site conditions and restrictions on use of the Site.

1.4 SCHEDULING OF WORK

A. Scheduling of Work

1. With the exception of work listed in this Section, the Contractor may schedule his work in any manner he deems appropriate to complete the contract within the time allowed. The Contractor is cautioned that some of the work may have to be performed during other than normal working hours and that the

Owner may revise the schedule whenever the Owner finds it necessary to maintain work progression, or to protect the Owner’s facility, or to maintain continuous, satisfactory operation of existing facilities.

2. The Contractor shall submit a Construction Progress Schedule as required in Section 01 30 00.

3. Anticipated schedule dates are listed below. Construction shall be completed within 60 days from start date. Contractor shall inform the Owner the expected construction time if it exceeds 60 days:

a. Construction Period: May 5th, 2023 through July 7th, 2023.

b. Alternative Construction Period if required: 60 day period between September 1st, 2023 through

December 1st, 2023. Contractor shall inform Owner expected construction start date.

4. The Contractor is responsible for the means and methods necessary to accomplish the work in compliance with the specified criteria. Access must be maintained for personnel and equipment to enter and maintain the facility at all times. All shutdowns must be coordinated with the Owner a

Clark Dietz, Inc. 01 10 00 - 2 minimum of 72 hours prior. All shutdowns must occur during low flow periods as defined by the

Owner.

B. Coordination with Others

1. The Owner will attempt to keep the Contractor informed of changes to existing contracts and award of subsequent contracts that may affect the Contractor. Schedules of operations for other contractors working will be made available to the Contractor upon request.

1.5 CONSTRUCTION SCHEDULE

A. The work described in this Section shall be shown in the Construction Progress Schedule. All construction steps, procedures and temporary facilities shall be approved by the Owner prior to implementation by the

Contractor. The monthly updates of the Schedule of Construction shall show any changes in the proposed work, including proposed shutdown work.

B. The completion schedule for this contract requires timely transmittal of contract submittals for review by the Engineer. The identification and transmittal of all submittals required for completion of the phase of work described above is the Contractor’s responsibility.

C. The Contractor shall be held responsible for all direct and indirect delays resulting from the Contractor’s failure to identify and transmit the submittals required to successfully complete the contract work within the time specified.

D. The following early submittals shall be submitted within ten days after Notice to Proceed:

1. Construction Schedule

2. Health and Safety Plan

1.6 CONSTRUCTION SEQUENCE

A. To be determined

1.7 CONTRACTOR'S USE OF SITE

A. Limit use of site and premises to allow Owner occupancy.

B. Construction Operations: Construction operations to be coordinated with the Owner.

C. Time Restrictions for Performing Work: 7am-3pm shall be the construction work hours. Work hours are to be coordinated with the Owner.

D. Utility Outages and Shutdown are to be coordinated with the Owner.

1.8 OWNER OCCUPANCY

A. The Owner will occupy the premises during the entire period of construction for the conduct of normal operations.

B. Cooperate with Owner to minimize conflict, and to facilitate Owner's operations.

C. Schedule the Work to accommodate Owner occupancy.

1.9 SPECIFICATION CONVENTIONS

A. These specifications are written in imperative mood and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise. The words “shall be” are included by inference where a colon (:) is used within sentences or phrases.

Clark Dietz, Inc. 01 10 00 - 3

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Payment Procedure

Clark Dietz, Inc. 01 29 76 - 1

SECTION 01 29 76

PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Related documents

B. Payment requests

1.2 PAYMENT REQUESTS

A. General: Except as otherwise indicated, the progress payment cycle is to be regular. Each application must be consistent with previous applications and payments. Certain applications for payment, such as the initial application, the application at substantial completion, and the final payment application involve additional requirements.

1. Waivers of Lien: For each payment application, submit waivers of lien from every entity

(including Contractor) who could lawfully and possibly file a lien in excess of $1,000 arising out of the Contract, and related to work covered by the payment. Submit partial waivers for the amount requested, prior to deduction or retainage, on each item. When the application shows completion of an item, submit final or full waivers. The Owner reserves the right to designate which entities involved in the work must submit waivers.

2. Waiver Delays: Each progress payment must be submitted with Contractor's waiver for the period of construction covered by the application. At the Contractor's option, each progress payment may be submitted with waivers from the subcontractors or sub-subcontractors and suppliers for the previous period of construction covered by the previous application. The final payment application must be submitted together with or preceded by final or complete waivers from every entity involved with performance of the work covered by the payment request.

3. Waiver Forms: Submit waivers on forms, and executed in a manner, acceptable to Owner.

4. Sworn Statement: Each progress payment must be submitted with a sworn statement showing subcontractors and material suppliers and the payment status of each. Form of the sworn statement shall be subject to approval of the Owner.

B. Payment Application Times: The "date" for each progress "payment" is as indicated in Owner-Contractor Agreement or, if none is indicated therein, it is the 15th day of each month. The period of construction work covered by each payment request is period indicated in Owner-Contractor Agreement or, if none is indicated therein, it is period ending 15 days prior to date for each progress payment, and starting day following end of preceding period. Dates shall be confirmed at the preconstruction meeting.

C. Application Preparation: Except as otherwise indicated, complete every entry provided for on the form, including notarization and execution by authorized persons. Incomplete applications will be returned by Owner without action. Listing must include amounts of change orders issued prior to last day of the "period of construction" covered by application.

D. Initial Payment Application: The principal administrative actions and submittals which must precede or coincide with submittal of contractor's first payment application can be summarized as follows, but not necessarily by way of limitation:

1. Schedule of Values

2. Schedule of Submittals (Section 01 33 00).

3. Listing of Contractor's staff assignments.

4. Waiver of Lien and Sworn Statement.

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Payment Procedure

Clark Dietz, Inc. 01 29 76 - 2

E. Monthly Payment Application: The principal administrative actions and submittals which must precede or coincide with submittal of contractor's first payment application can be summarized as follows, but not necessarily by way of limitation:

1. Updated Network Diagram Schedule (Section 01 32 16).

2. Revised Schedule of Submittals (Section 01 33 00), if applicable.

3. Updated listing of Contractor's staff assignments, if applicable.

4. Waiver of Lien, Including Subcontractor Lien Waivers, and Sworn Statement.

F. Application at Time of Final Completion: Following issuance of Owner's final "certificate of substantial completion", and also in part as applicable to prior certificates on portions of completed work as designated, a "special" payment application may be prepared and submitted by Contractor. The principal administrative actions and submittals which must proceed or coincide with such special applications can be summarized as follows, but not necessarily by way of limitation:

1. Warranties (guarantees), maintenance agreements and similar provisions of contract documents.

2. Test records, maintenance instructions, start-up performance reports, and similar change-over information germane to Owner's occupancy, use, operation and maintenance of completed work.

3. Final cleaning of the work.

4. Application for reduction (if any) of retainage, and consent of surety.

5. Advice to Owner on coordination of shifting insurance coverages, including proof of extended coverages as required.

6. Listing of Contractor's incomplete work, recognized as exceptions to Engineer's certificate of substantial completion.

7. Compact disc with project photos.

G. Final Payment Application: The administrative actions and submittals which must precede or coincide with submittal of contractor's final payment application can be summarized as follows, but not necessarily by way of limitation:

1. Completion of project closeout requirements.

2. Completion of items specified for completion beyond time of substantial completion

(regardless of whether special payment application was previously made).

3. Assurance, satisfactory to Owner, that unsettled claims will be settled and that work not actually completed and accepted will be completed without undue delay.

4. Transmittal of required project construction records to Owner.

5. Proof, satisfactory to Owner, taxes, fees and similar obligations of Contractor have been paid.

6. Removal of temporary facilities, services, surplus materials, rubbish and similar elements.

7. Consent of surety for final payment.

H. Application Transmittal: Submit 3 executed copies of each payment application, one copy of which is completed with waivers of lien, sworn statement and similar attachments. Transmit each copy with a transmittal form listing those attachments, and recording appropriate information related to application in a manner acceptable to Owner. Transmit to Owner by means ensuring receipt within 24 hours.

PART 2 PRODUCTS – Not Used

PART 3 EXECUTION – Not Used

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Administrative Requirements

Clark Dietz, Inc. 01 30 00 - 1

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Coordinating interruptions in Owner’s operations.

B. Coordination and project conditions.

C. Special reports.

D. Preconstruction meeting.

E. Progress meetings.

F. Weekly report.

G. Cutting and patching.

H. Special procedures.

I. Cleaning and protection.

J. Conservation.

1.2 COORDINATING INTERRUPTIONS IN OWNER’S OPERATIONS

A. Show all anticipated operational interruptions of the Owner’s facilities on the progress schedule.

B. Coordinate all operational interruptions with the Owner at least 48 hours prior to commencing with the work. The Owner may require that the Contractor reschedule work as required to maintain the operation of their facilities.

C. Except as specified herein, all operations must be maintained during construction. The Contractor is responsible for all, temporary electrical, and temporary communications that are necessary to continue the

Owner’s operation of their facilities.

1.3 COORDINATION AND PROJECT CONDITIONS

A. Coordinate scheduling, submittals, and Work of various sections of Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements.

B. Verify utility requirements and characteristics of operating equipment are compatible with utilities.

Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, operating equipment.

C. Coordinate space requirements, supports, and installation of mechanical and electrical Work indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable;

place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

Clark Dietz, Inc. 01 30 00 - 2

D. In finished areas except as otherwise indicated conceal pipes within construction.

E. Coordinate completion and clean-up of Work of separate sections in preparation for Substantial Completion and for portions of Work designated for Owner's occupancy.

F. During Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner's activities.

G. Limitations on construction area usage as well as specific requirements that impact utilization are indicated by Contract Documents. Schedule deliveries so as to minimize space and time requirements for storage of materials and equipment on construction area.

1.4 SPECIAL REPORTS

A. Accident Reports: Prepare and submit reports of significant accidents, at site and anywhere else work is in progress. Record and document data and actions. For this purpose, a significant accident is defined to include events where personal injury is sustained, or property loss of substance is sustained, or where the event posed a significant threat of loss or personal injury.

1.5 PRECONSTRUCTION MEETING

A. Engineer will schedule an initial progress meeting with the Contractor and Owner, recognized as the preconstruction meeting, after Notice of Award.

B. The preconstruction meeting will be an organizational meeting. Agenda items may include:

1. Execution of Owner-Contractor Agreement.

2. Submission of executed bonds and insurance certificates.

3. Distribution of Contract Documents.

4. Submission of list of Subcontractors, list of products, schedule of values, and progress schedule.

5. Designation of personnel representing parties in Contract and Engineer.

6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.

7. Scheduling.

8. Use of premises by Owner and Contractor.

9. Owner's requirements.

10. Survey and layout.

11. Security and housekeeping procedures.

12. Application for payment procedures.

13. Procedures for testing.

14. Procedures for maintaining record documents.

15. Requirements for start-up of equipment.

16. Inspection and acceptance of equipment put into service during construction period.

1.6 PROGRESS MEETINGS

A. In addition to other project meetings held for other purposes, hold a general progress meeting with the

Engineer and Owner throughout progress of the Work at monthly intervals.

B. The schedule of the progress meetings will be determined during the preconstruction meeting. In general, progress meetings will be coordinated with preparation of the payment request.

C. Review each entity's present and future needs including interface requirements, time, sequences, deliveries, access, site utilization, temporary facilities and services, hours of work, hazards and risks, housekeeping, change orders, and documentation of information for payment requests. Discuss whether each element of current work is ahead of schedule, on time, or behind schedule in relation with updated progress schedule. Determine how behind-schedule work will be expedited, and secure commitments from

Clark Dietz, Inc. 01 30 00 - 3 entities involved in doing so. Discuss whether schedule revisions are required to ensure that current work and subsequent work will be completed within Contract Time. Review everything of significance which could affect progress of the work.

D. Updating Schedules: Immediately following each progress meeting, where revisions to progress schedule have been made or recognized, revise and reissue progress schedule as described in Section 01 33 00.

E. Attendance Required: Job superintendent, major subcontractors and suppliers, and others as appropriate to agenda topics for each meeting.

F. Agenda:

1. Review minutes of previous meetings, if applicable.

2. Review of Work progress.

3. Field observations, problems, and decisions.

4. Identification of problems impeding planned progress.

5. Review of submittals schedule and status of submittals.

6. Review of off-site fabrication and delivery schedules.

7. Maintenance of progress schedule.

8. Corrective measures to regain projected schedules.

9. Planned progress during succeeding work period.

10. Coordination of projected progress.

11. Maintenance of quality and work standards.

12. Effect of proposed changes on progress schedule and coordination.

13. Other business relating to Work.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION

3.1 SPECIAL PROCEDURES

A. Materials: As specified in product sections, match existing with new products for patching and extending work.

B. Employ skilled and experienced installers to perform work.

C. Cut, move, or remove items as necessary for access to alterations and renovation Work. Replace and restore at completion.

D. Remove unsuitable material not marked for salvage. Replace materials as specified for finished Work.

E. Remove debris and abandoned items from area and from concealed spaces.

F. Prepare surface and remove surface finishes to permit installation of new work and finishes.

G. Remove, cut, and patch Work in manner to minimize damage and to permit restoring products and finishes to original or specified condition.

H. Refinish existing visible surfaces to remain in renovated rooms and spaces, to specified condition for each material, with neat transition to adjacent finishes.

I. Patch or replace portions of existing surfaces which are damaged, lifted, discolored, or showing other imperfections.

Clark Dietz, Inc. 01 30 00 - 4

J. Finish surfaces as specified in individual product sections.

3.2 CLEANING AND PROTECTION

A. General: During handling and installation of work at the project site, clean and protect work in progress and adjoining work on the basis of continuous maintenance.

B. Limiting Exposures of Work: To the extent possible through reasonable control and protection methods, supervise performance of the work in such a manner and by such means which will ensure that none of the work, whether completed or in progress, will be subjected to harmful, dangerous, damaging or otherwise deleterious exposure during the construction period. Such exposures include, where applicable, but not by way of limitation the following:

1. Water or ice.

2. Solvents.

3. Chemicals.

4. Light.

5. Puncture.

6. Abrasion.

7. Heavy traffic.

8. Misalignment.

9. Excessive weathering.

10. Unprotected storage.

11. Improper shipping or handling.

12. Theft.

13. Vandalism.

3.3 CONSERVATION

A. It is a requirement for supervision and administration of the work that construction operations be carried out with the maximum possible consideration given to conservation of energy, water and materials.

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Submittal Procedures

Clark Dietz, Inc. 01 33 00 - 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Submittal procedures.

B. Owner’s/Engineer’s Action.

C. Proposed products list.

D. Product data.

E. Shop drawings.

F. Design data.

G. Test reports.

H. Certificates.

I. Manufacturer's instructions.

J. Operation and Maintenance manuals.

K. Manufacturer's field reports.

L. Construction photographs.

1.2 SUBMITTAL PROCEDURES

A. Transmit each submittal with Engineer accepted form.

B. Sequentially number transmittal forms. Mark revised submittals with original number and sequential alphabetic suffix.

C. Identify Project, Contractor, subcontractor and supplier; pertinent drawing and detail number, and specification section number, appropriate to submittal.

D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with requirements of the Work and Contract Documents.

E. Schedule submittals to expedite Project and deliver to Engineer as directed below for electronic submittals.

Coordinate submission of related items.

F. For each submittal review, allow 15 days excluding delivery time to and from Contractor. Where the submittal must be held for coordination, the Engineer will so advise the Contractor.

G. Identify variations from Contract Documents and product or system limitations which may be detrimental to successful performance of completed Work.

Clark Dietz, Inc. 01 33 00 - 2

H. Allow space on submittals for Contractor and Engineer review stamps.

I. When revised for resubmission, identify changes made since previous submission.

J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements.

K. Submittals not requested will not be recognized or processed.

L. Except for samples, electronic submittals are required.

M. Electronic submittals are required to conform to all of the submittal requirements listed above.

N. Email electronic submittals to the Engineer.

O. Submit electronic documents as a single portable electronic file (.pdf). Contractor should request an exception for documents that are not sent in pdf format or are sent as multiple files. Electronic files will be rejected if they are not clearly legible.

P. Submittals delivered electronically will be returned to the Contractor as electronic files. Engineer will return:

1. Engineer’s review form and comments

2. Contractor’s transmittal form

3. Submittal materials only if comments on the materials are required.

1.3 OWNER’S/ENGINEER’S ACTION

A. Unless otherwise noted, the Owner/Engineer will review each submittal and mark with appropriate "Action".

B. Action Stamp: The Owner/Engineer will stamp each submittal to be returned with a uniform, self-explanatory action stamp, appropriately marked and executed to indicate whether the submittal returned is for unrestricted use, final-but-restricted use (as marked), must be revised and resubmitted (use not permitted) or without action (as explained on the transmittal form).

C. Final Unrestricted Release: Where the submittals are marked as follows, the work covered by the submittal may proceed provided it complies with the requirements of the contract documents; acceptance of the work will depend upon that compliance.

1. Marking: "No Exception Taken".

D. Final-But-Restricted Release: When the submittals are marked as follows, the work covered by the submittal may proceed provided it complies with the Owner/Engineer's notations, corrections marked on the submittal, and with the requirements of the contract documents; acceptance of the work will depend on that compliance.

1. Marking: "Make Corrections Noted".

E. Returned to Resubmittal: When the submittal is marked as follows, do not proceed with the work covered by the submittal, including purchasing, fabrication, delivery, or other activity. Revise the submittal or prepare a new submittal in accordance with the Owner/Engineer's notations stating the reasons for returning the submittal. Repeat if necessary to obtain a different action marking. Do not permit submittals with the following marking to be used at the project site, or elsewhere where work is in progress.

1. Marking:

a. "Rejected".

b. "Revise and Resubmit".

c. "Submit Specified Item."

Clark Dietz, Inc. 01 33 00 - 3

1.4 PROPOSED PRODUCTS LIST

A. Within 15 days after date of Notice to Proceed, submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.

B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards.

1.5 PRODUCT DATA

A. Information required specifically as product date includes manufacturer's standard printed recommendations for application and use, compliance with recognized standards of trade associations and testing agencies, and the application of their labels and seals (if any), special notation of dimensions which have been verified by way of field measurement, and special coordination requirements for interfacing the material, product or system with other work.

B. Collect required product data into a single submittal for each unit of work or system. Mark each copy to show which choices and options are applicable to the project. Where product data has been printed to include information on several similar products, some of which are not required for use on the project, or are not included in this submittal, mark the copies to show clearly that such information is not applicable.

C. Submit to Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents. Product data submittal is required for information and record and to determine that the products, materials and systems comply with the provisions of the contract documents. Therefore, the initial submittal is also the final submittal, except where the Engineer observes that there is non-compliance with the provisions of the contract documents and returns the submittal to the Contractor marked with the appropriate "Action".

D. Unless submitted electronically, submit number of copies Contractor requires, plus three copies Engineer will retain.

E. Identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

F. Where product data must be specially prepared for required products, materials or systems, because standard printed data is not suitable for use, submit data as "shop drawings" and not as "product data".

G. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

H. After review, produce copies and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents described in Section 01 70 00 - Execution and Closeout Requirements.

1.6 SHOP DRAWINGS

A. Shop Drawings: Submit to Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.

B. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

C. When required by individual specification sections, provide shop drawings signed and sealed by professional engineer responsible for designing components shown on shop drawings.

1. Include signed and sealed calculations to support design.

2. Submit drawings and calculations in form suitable for submission to and approval by authorities having jurisdiction.

Clark Dietz, Inc. 01 33 00 - 4

D. Make revisions and provide additional information when required by authorities having jurisdiction.

E. Information required on shop drawings includes, dimensions, identification of specific products and materials which are included in the work, compliance with specified standards and notations of coordination requirements with other work. Provide special notation of dimensions that have been established by field measurement. Highlight, encircle or otherwise indicate deviations from the contract documents on the shop drawings.

F. Do not permit shop drawing copies without an appropriate final "Action" marking by the Engineer to be used in connection with the work.

G. Unless submitted electronically, submit number of opaque reproductions Contractor requires, plus three copies Engineer will retain.

H. After review, produce copies and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents described in Section 01 70 00 - Execution and Closeout Requirements.

1.7 DESIGN DATA

A. Submit for Engineer's knowledge as contract administrator or for Owner.

B. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

C. Unless submitted electronically, submit number of opaque reproductions Contractor requires, plus three copies Engineer will retain.

1.8 TEST REPORTS

A. Submit for Engineer's knowledge as contract administrator or for Owner.

B. Submit test reports for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

C. Unless submitted electronically, submit number of opaque reproductions Contractor requires, plus three copies Engineer will retain.

1.9 CERTIFICATES

A. When specified in individual specification sections, submit certification by manufacturer, installation/application subcontractor, or Contractor to Engineer, in quantities specified for Product Data.

B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

C. Certificates may be recent or previous test results on material or Product, but must be acceptable to

Engineer.

D. Unless submitted electronically, submit number of opaque reproductions Contractor requires, plus three copies Engineer will retain.

1.10 MANUFACTURER'S INSTRUCTIONS

A. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Engineer for delivery to Owner in quantities specified for Product Data.

Clark Dietz, Inc. 01 33 00 - 5

B. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

1.11 MANUFACTURER’S OPERATION AND MAINTENANCE MANUALS

A. Obtain installation, operation, and maintenance manuals from manufacturers and suppliers for each item of equipment furnished under the Contract. Submit three copies of each complete manual to the Owner within 90 days after approval of shop drawings, product data, and samples and not later than the date of shipment of each item of equipment to the project site.

B. Manuals shall be provided for each piece of equipment including individual components and subsystems of complete assemblies. The section of the manual on operation shall describe the function of each component and its relationship to the system of which it is a part. Where several models, options, or styles are described, the manual shall identify the items actually provided.

C. The manual shall contain the following:

1. An 8-1/2 x 11 inch typewritten sheet listing the manufacturer's identification, including order number, model, and serial number and location of parts and service centers.

2. A separate 8-1/2 x 11 inch typewritten list of recommended stock of parts, including part number and quantity.

3. Complete replacement parts list and drawings.

4. Performance data and rating tables.

5. Specific instructions for installation, operation, adjustment, and maintenance.

D. Each manual shall be bound in a folder and labeled to identify the contents and project to which it applies.

E. Operation and maintenance manuals specified herein are in addition to any operation, maintenance, or installation instructions required by the Contractor to install, test, and start up equipment.

1.12 MANUFACTURER'S FIELD REPORTS

A. Submit reports for Engineer's benefit as contract administrator or for Owner.

B. Unless submitted electronically, submit two copies of the report within 5 days of observation to Engineer for information.

C. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

1.13 CONSTRUCTION PHOTOGRAPHS

A. Take pre-construction digital photos as evidence of existing project. The photos shall be submitted prior to working in each room.

B. With the application at time of Final Completion: Deliver compact discs with .jpg files to Owner with project record documents. Catalog and index files by room number.

1.14 SUBMITTAL SCHDULE

A. A proposed preliminary submittal schedule is attached to this Section.

B. Contractor shall submit his own Schedule of Submittals with the Initial Payment Application.

Clark Dietz, Inc. 01 33 00 - 6

PART 2 PRODUCTS - Not Used

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Quality Procedures

Clark Dietz, Inc. 01 40 00 - 1

SECTION 01 40 00

QUALITY REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Quality control and control of installation.

B. Tolerances.

C. References.

D. Source and quality of materials and equipment.

E. Examination.

F. Preparation.

1.2 QUALITY CONTROL AND CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. When manufacturers' instructions conflict with Contract Documents, request clarification from Engineer before proceeding.

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Perform Work by persons qualified to produce required and specified quality.

F. Verify field measurements are as indicated on Shop Drawings or as instructed by manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.

1.3 TOLERANCES

A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.

B. Comply with manufacturers' tolerances. When manufacturers' tolerances conflict with Contract Documents, request clarification from Engineer before proceeding.

C. Adjust products to appropriate dimensions; position before securing products in place.

1.4 REFERENCES

A. For products or workmanship specified by association, trade, or other consensus standards, complies with requirements of standard, except when more rigid requirements are specified or are required by applicable codes.

B. Conform to reference standard by date of issue current on date for receiving bids, except where specific date is established by code.

C. Obtain copies of standards where required by product specification sections.

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Quality Procedures

Clark Dietz, Inc. 01 40 00 - 2

D. When specified reference standards conflict with Contract Documents, request clarification from Engineer before proceeding.

E. Neither contractual relationships, duties, responsibilities of parties in Contract, nor those of Engineer shall be altered from Contract Documents by mention or inference otherwise in reference documents.

1.5 SOURCE AND QUALITY OF MATERIALS AND EQUIPMENT

A. The source of materials to be used shall be in accordance with the Contract Documents and as approved by the Engineer before delivery. The approval of the source of any material shall continue as long as the material conforms to the Specifications.

B. All material not conforming to the requirements of the Specifications shall be considered as defective and shall be removed from the Work. If in place, faulty materials shall be removed by the Contractor at his expense and replaced with acceptable material unless permitted otherwise by the Owner. No defective materials which have been subsequently corrected shall be reused until approval has been given.

C. Upon failure of the Contractor to comply immediately with any order of the Engineer to remove and replace defective material, the Owner shall have authority to remove and replace defective materials, and to deduct the cost of removal and replacement from any monies due or to become due to the Contractor. Failure to reject any defective materials or work at the time of installation shall in no way prevent later rejection when such defects are discovered, nor obligate the Owner to final acceptance.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.

B. Verify existing substrate is capable of structural support or attachment of new Work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Verify utility services are available, of correct characteristics, and in correct locations.

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Definitions

Clark Dietz, Inc. 01 42 16 - 1

SECTION 01 42 16

DEFINITIONS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Description of requirements.

B. Definitions.

1.2 DESCRIPTION OF REQUIREMENTS

A. This section specifies procedural and administrative requirements for compliance with governing regulations and codes and standards imposed upon the Work. These requirements include obtaining permits, licenses, inspections, releases and similar documentation, as well as payments, statements and similar requirements associated with regulations, codes and standards.

1. The term "Regulations" is defined to include laws, statutes, ordinances and lawful orders issued by governing authorities, as well as those rules, conventions and agreements within the construction industry which effectively control the performance of the Work regardless of whether they are lawfully imposed by governing authority or not.

B. Governing Regulations: Refer to General and Supplementary Conditions for requirements related to compliance with governing regulations.

1.3 DEFINITIONS

A. General Explanation: Certain terms used in contract documents are defined in this article. Definitions and explanations contained in this section are not necessarily complete but are general for the Work to the extent that they are not stated more explicitly in another element of the contract documents.

B. General Requirements: Provisions and requirements of other Division 01 sections apply to the entire work of the Contract and, where so indicated, to other elements which are included in the project.

C. Indicated: The term "indicated" is a cross-reference to graphic representations, notes or schedules on the drawings, to other paragraphs or schedules in the specifications, and to similar means of recording requirements in contract documents. Where terms such as "shown", "noted", "scheduled", and "specified" are used in lieu of "indicated", it is for the purpose of helping the reader locate the cross-reference, and no limitation of location is intended except as specifically noted.

D. Directed, Requested, etc.: Terms such as "directed", "requested", "authorized", "selected", "approved", "required", "accepted", and "permitted" mean "directed by the Owner", "requested by the Owner", and similar phrases. However, no such implied meaning will be interpreted to extend the Owner's responsibility into the Contractor's area of construction supervision.

E. Approve: Where used in conjunction with the Engineer's response to submittals, requests, applications, inquiries, reports and claims by the Contractor, the term "approved" will be held to limitations of the Engineer's responsibilities and duties as specified in General and Supplementary Conditions. In no case will the Engineer's approval be interpreted as a release of the Contractor from responsibilities to fulfill requirements of contract documents or acceptance of the Work, unless otherwise provided by requirements of the contract documents.

F. Project Site: The term "project site" means the space available to the Contractor for performance of the Work, either exclusively or in conjunction with others performing other construction as part of the project or

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Definitions

Clark Dietz, Inc. 01 42 16 - 2 other projects. The extent of the project site is shown on the drawings and may or may not be identical with the description of the land upon which the project is to be built.

G. Furnish: The term "furnish" is used to mean "supply and deliver to the project site, ready for unloading, unpacking, assembly, installation, and similar operations."

H. Install: The term "install" is used to describe operations at project site including the actual "unloading, unpacking, assembly, erection, placing, applying, working to dimension, protecting, cleaning and similar operations."

I. Provide: The term "provide" means "to furnish and install, complete and ready for the intended use."

J. Installer: The "installer" is "the entity" (person or firm) engaged by the Contractor, its subcontractor or sub-subcontractor for performance of a particular element of construction at the project site, including installation, erection, application and similar required operations. It is a requirement that installers are experienced in the operations they are engaged to perform.

K. Testing Laboratories: A "testing laboratory" is an independent entity engaged to perform specific inspections or tests of the Work, either at the project site or elsewhere, and to report, and (if required) interpret results of those inspections or tests.

PART 2 PRODUCTS - Not Used

County of Kenosha – BCC FIRE PROTECTION PIPING MODIFICATIONS Reference Standards

Clark Dietz, Inc. 01 42 19 - 1

SECTION 01 42 19

REFERENCE STANDARDS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Description of requirements.

B. Specification format and content explanation.

C. Drawing symbols.

D. Industry standards.

E. Governing regulations/authorities.

1.2 DESCRIPTION OF REQUIREMENTS

A. This section specifies procedural and administrative requirements for compliance with governing regulations and codes and standards imposed upon the Work. These requirements include obtaining permits, licenses, inspections, releases and similar documentation, as well as payments, statements and similar requirements associated with regulations, codes and standards.

1. The term "Regulations" is defined to include laws, statutes, ordinances and lawful orders issued by governing authorities, as well as those rules, conventions and agreements within the construction industry which effectively control the performance of the Work regardless of whether they are lawfully imposed by governing authority or not.

B. Governing Regulations: Refer to General and Supplementary Conditions for requirements related to compliance with governing regulations.

1.3 SPECIFICATION FORMAT AND CONTENT EXPLANATION

A. General: This article is provided to help the user of these specifications more readily understand the format, language, implied requirements and similar conventions of content. None of the following explanations shall be interpreted to modify the substance of contract requirements.

1. Production Methods: Portions of these specifications have been produced by editing master specifications and the standard specifications covenants applicable to construction; they may contain minor deviations from traditional writing formats. Such deviations are a natural result of this production technique, and no other meaning shall be implied.

B. Specification Format: These specifications are organized based upon the Construction Specifications Institute's 48-Division format. The organization of these specifications into Divisions, Sections or Trade Headings conforms generally to recognized industry practice.

C. Specification Content: This project specification has been produced employing certain conventions in the use of language as well as conventions regarding the intended meaning of certain terms, words, and phrases when used in particular situations or circumstances. These conventions are explained as follows:

1. In certain circumstances, language used in specifications and other contract documents is of the abbreviated type. Implied words and meanings will be appropriately interpreted. Singular words will be interpreted as plural and plural words will be interpreted as singular where applicable and where the full context of the contract documents so indicates.

2. Imperative Language is used generally in the specifications. Requirements expressed imperatively are to be performed by the Contractor. At certain locations in the text, for clarity, contrasting subjective language is used to describe responsibilities which must be fulfilled indirectly by the Contractor, or by others when so noted.

D. Methods of Specifying: Techniques or methods of specifying requirements vary throughout the text. The method used for specifying one element of the Work has no bearing on requirements for another element of the Work.

Clark Dietz, Inc. 01 42 19 - 2

E. Assignment of Specialists: In certain circumstances, the specification requires or implies that specific elements of the Work are to be assigned to specialists who must be engaged to perform that element of the Work. Such assignments are special requirements over which the Contractor has no choice or option. They are intended to establish which party or entity involved in a specific element of the Work is considered as being sufficiently experienced in the indicated construction processes or operations to be recognized as "expert" in those processes or operations. Nevertheless, the ultimate responsibility for fulfilling all contract requirements remains with the Contractor.

1. These requirements should not be interpreted to conflict with the enforcement of building codes and similar regulations governing the Work. They are also not intended to interfere with local trade union jurisdictional settlements and similar conventions.

F. Trades: The use of certain titles such as "carpentry" in the specification, is not intended to imply that the Work must be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter". It also is not intended to imply that the requirements specified apply exclusively to tradespersons of that corresponding generic name.

1.4 DRAWING SYMBOLS

A. General: Except as otherwise indicated, graphic symbols used on the drawings are those symbols recognized in the construction industry for purposes indicated. Where not otherwise noted, symbols are defined by "Architectural Graphic Standards", published by John Wiley & Sons, Inc., seventh edition.

1.5 INDUSTRY STANDARDS

A. Applicability of Standards: Except where more explicit or stringent requirements are written into the contract documents, applicable construction industry standards have the same force and effect as if bound into or copied directly into the contract documents. Such industry standards are made a part of the contract documents by reference. Individual specification sections indicate which codes and standards the Contractor must keep available at the project site for reference.

1. Referenced standards (standards referenced directly in the contract documents) take precedence over standards that are not referenced but generally recognized in the industry for applicability to the Work.

2. Unreferenced Standards: Except as otherwise limited by the contract documents, standards not referenced but recognized in the construction industry as having direct applicability will be enforced for performance of the Work. The decision as to whether an industry code or standard is applicable, or as to which of several standards are applicable, is the sole responsibility of the Engineer.

B. Publication Dates: Except as otherwise indicated, where compliance with an…

This is the start of the file's text. The full file is on GovTribe.