23043_240212_Rebid_Add1.pdf

PDF 146 KB Posted

Attached to
District-Wide Door Hardware Upgrades (Rebid)
Solicitation number
RFP - WBL - 240000001056
Issued by
Oakland County, Michigan

About this file

This document is an addendum to a rebid for the West Bloomfield School District's district-wide door hardware upgrades project in Oakland County, Michigan. The addendum modifies the Alternates section of the project specifications. Alternate 1 was revised to include all doors and/or hardware with panic devices, and Alternate 2 was revised to indicate that hardware sets #1 should be bid as #2 except at the Middle School. No drawings were issued with this addendum. The project involves door and/or hardware replacement on doors marked "ALTERNATE NO. 1" on the door schedules. The base bid includes no work on these doors. Pricing terms, set asides, incumbent information, funding sources, and other salient details were not provided in the addendum.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T M P A R C H I T E C T U R E I N C W W W . T M P - A R C H I T E C T U R E . C O M

O:\2023\23043\SPECS\ADDENDA\Rebid Addendum 1\23043_2402XX_Rebid_Add1.docx

Addendum Date February 12, 2024 Project Name West Bloomfield School District - District Wide Door Hardware Upgrades REBID TMP Project No(s). 23043 Addendum No. One (1)

The Bidding Documents are modified, supplemented, or augmented as follows and the Addendum is hereby made a part of the proposed Contract Documents.

The following Drawing(s) and Attachment(s) are issued with this Addendum:

Drawing No(s).: None Attachment(s): Specification Section 01 2300

Item No. Specification Changes

SC-1 Refer to Section No. 01 2300 – ALTERNATES (reissued):

A. Revised the Alternate 1 description to include all the doors and/or hardware with panic devices, which are marked “ALTERNATE NO. 1” on the door schedules.

B. Revised Alternate 2 to indicate that hardware sets #1 should be bid as #2 except at the Middle School.

***END OF REBID ADDENDUM NO. 1***

TMP Architecture, Inc. TMP23043

02-12-2024 REBID ADDENDUM NO. 1 ALTERNATES

01 2300-1

SECTION 01 2300 - ALTERNATES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Description of Alternates.

1.02 ACCEPTANCE OF ALTERNATES

A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option. Accepted Alternates will be identified in the Owner-Contractor Agreement.

B. Coordinate related work and modify surrounding work to integrate the Work of each Alternate.

1.03 SCHEDULE OF ALTERNATES

A. Alternate 1 – Hardware and/or door replacement on doors to receive panic hardware.

1. Base Bid: No work on doors marked “ALTERNATE NO. 1” on the door schedules.

2. Alternate: Door and/or hardware replacement on doors marked “ALTERNATE NO. 1” on the door schedules. **ADD4** B. Alternate 2 – Bid conversion kits as full lockset replacements, except at the Middle School.

1. Base Bid: Bid hardware sets #1 and #2 as indicated.

2. Alternate: For the High School, Doherty, Gretchko, Roosevelt, and Scotch, bid all hardware sets #1 as hardware set #2. Do not include the Middle School in this Alternate since the building has just recently been built. **REBID_ADD1**

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION