This document is a Project Manual for a state and local contract opportunity. It is for project #23042, with a due date of 01/17/2024.

The Project Manual outlines the scope of work for this state and local contract, which includes the construction and installation of various infrastructure improvements. It provides details on the specific items and quantities required, as well as the timeline for the project. The document also includes information on the mandatory site visit and bidder's conference, which are scheduled prior to the submission deadline. The contract term is for a period of 1 year, with the possibility of 2 additional 1-year renewal options.

Regarding pricing, the Project Manual indicates that this is a fixed-price contract, and it specifies the funding sources and budget amounts for the project. There are no set-asides or incumbent contractors mentioned in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC SYSTEM REPLACEMENT

for

AZALEA GARDENS MIDDLE SCHOOL

IFB 24015NM

Norfolk Public Schools

Project Manual

November 23, 2023

PACE Project 23042

TABLE OF CONTENTS TOC - 1

TABLE OF CONTENTS

011000 SUMMARY OF WORK

013100 PROJECT MANAGEMENT AND COORDINATION

015000 TEMPORARY FACILITIES

017300 EXECUTION REQUIREMENTS

017320 SELECTIVE DEMOLITION

017700 CLOSEOUT PROCEDURES

017780 WARRANTIES

017823 OPERATION AND MAINTENANCE DATA

017900 DEMONSTRATION AND TRAINING

019113 GENERAL COMMISSIONING REQUIREMENTS

024119 SELECTIVE DEMOLITION

028213 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

028313 LEAD, CADMIUM AND CHROMIUM IN CONSTRUCTION

042613 MASONRY VENEER

051200 STRUCTURAL STEEL FRAMING

053100 STEEL DECKING

054000 COLD-FORMED METAL FRAMING

061000 ROUGH CARPENTRY

072100 THERMAL INSULATION

074113.16 STANDING-SEAM METAL ROOF PANELS

076200 SHEET METAL FLASHING AND TRIM

077200 ROOF ACCESSORIES

079200 JOINT SEALANTS

092900 GYPSUM BOARD

095123 ACOUSTICAL TILE CEILINGS

230000 MECHANICAL GENERAL PROVISIONS

230500 BASIC MATERIALS AND METHODS

230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230713 DUCT INSULATION

230719 HVAC PIPING INSULATION

230800 HEATING, VENTILATING AND AIR CONDITIONING SYSTEM

COMMISSIONING REQUIREMENTS

231123 NATURAL-GAS PIPING

232113 HYDRONIC PIPING

233113 METAL DUCTS

233300 AIR DUCT ACCESSORIES

233713 DIFFUSERS, REGISTERS, AND GRILLES

238113.13 PACKAGED TERMINAL AIR-CONDITIONERS, OUTDOOR, WALL-MOUNTED

UNITS

238120 PACKAGED ROOFTOP CONSTANT VOLUME AIR CONDITIONERS WITH

ENERGY RECOVERY

260500 ELECTRICAL GENERAL PROVISIONS

TABLE OF CONTENTS TOC - 2

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260923 LIGHTING CONTROL DEVICES

262200 LOW-VOLTAGE TRANSFORMERS

262416 PANELBOARDS

262726 WIRING DEVICES

262813 FUSES

262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

262900 MOTOR AND MOTOR CONTROLS

264313 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

265100 INTERIOR LIGHTING

283100 ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM

ATTACHMENT A – HAZARDOUS MATERIALS REPORT

ATTACHMENT B – OWNER FURNISHED EQUIPMENT

END OF TABLE OF CONTENTS

SUMMARY 01100 - 1

SECTION 011000 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. It is the intent of these contract documents to cover providing all labor, materials, equipment, and services necessary for and reasonably incidental to the completion of:

As prepared by: PACE Collaborative

1277 Perimeter Parkway

Virginia Beach, VA 23454

Serving as Architect/Engineer under the contract documents.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project will be constructed under a single prime contract.

B. The work includes full replacement of all HVAC systems of Azalea Gardens Middle School.

All existing window units, rooftop units, wall mounted units and ductless split systems shall be removed. Boilers and hot water piping will be removed in the mechanical room to allow proper electrical panel clearances. The new HVAC system shall be a mix of packaged units (BARD type), and packaged rooftop units. Ceilings within path of new ductwork shall be removed and new ceilings and lights will be provided. Existing wall, window, and roof penetrations not reused shall be repaired. Supporting electrical, architectural and structural work will also be included, along with some abatement work.

1.3 USE OF PREMISES

A. General: Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.

B. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of

Project site beyond areas in which the Work is indicated.

1. Owner Occupancy: Allow for Owner occupancy of Project site and use by the public.

2. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

3. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

4. Use of Existing Building/site: Repair damage caused by construction operations. Protect building and its occupants during construction period.

SUMMARY 01100 - 2

5. Ruts, in grass areas, created by construction equipment, are to be corrected in the following manner.

a. If grass is still present in the rut, pry up the grass with a digging fork. If ruts are shallow, lift the turf so it’s 1 to 2 inches above the surrounding grade. Give it time to see if it settles evenly with surrounding turf. If the rut settles unevenly, then correct by cutting sod and adding additional soil, as stated below.

b. For ruts deeper than 4 inches, use an edger and slice the grass in the center of the rut and cut sod loose. Lift the sod and fold it up and back so it’s resting on surrounding lawn. Loosen soil in the rut, adding more as needed to bring it 1 to 2 inches above the surrounding grade. Flip the turf back into place, water, and wait for it to settle. Take care not to scalp this higher section of lawn when you mow.

One (1) month after, roll any high spots that remain so that lawn is flush and smooth.

c. If there is no grass present in the rut, loosen soil before adding more soil and seeding. Stick a digging fork into soil beside the rut at a 45-degree angle so the fork’s tines are beneath the rut. Gently lever soil up by pushing down on the handle. Fill the rut with your soil mix, sow grass seed, and water.

6. Ruts, in planting areas, created by construction equipment, are to be corrected in the following manner.

a. If the rut is less than 2-inches deep, pry up the bed with a digging fork, lifting and loosening the dirt and mulch so it’s 1 to 2 inches above the surrounding grade.

Give it time to see if it settles evenly with surrounding turf. If the rut settles unevenly, then correct by adding additional soil and mulching.

7. For ruts deeper than 4 inches, loosen soil before adding more soil. Stick a digging fork into soil beside the rut at a 45-degree angle so the fork’s tines are beneath the rut. Gently lever soil up by pushing down on the handle. Fill the rut with your soil mix, mulch, and water.

8. Soil mix

a. To fill in lawn ruts and holes, blend planting soil with sand and/or compost.

Usually blending equal parts of each material forms a mix that allows grass to root effectively through the mix into existing soil. Check with your local extension agent or garden center for specific soil recommendations for your area.

1.4 OWNER'S OCCUPANCY REQUIREMENTS

A. Owner Occupancy: Owner will occupy their administrative offices during the entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits, unless otherwise indicated.

B. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.

SUMMARY 01100 - 3

1.5 WORK RESTRICTIONS

A. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated.

B. Work prior to June 7, 2024 will be limited to administrative submittals, product submittals, and material purchase acquisition. Limited access to the building, after the Purchase Order, will be at the discretion of Norfolk Public Schools. If it is determined to be allowable, access will be limited to after school, weekends, and holidays. Work shall be completed by August 31, 2024.

C. On-Site Work Hours after June 7, 2024 is as follows: 7 AM-7 PM, Monday through Sunday.

D. The Owner intends on having a full time on-site representative during the construction contract time-frame.

E. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated.

1.6 MANUFACTURER’S DIRECTIONS

A. Apply, install, connect and erect manufactured items or materials according to the recommendations of the manufacturer when such recommendations are not in conflict with the

Contract Documents.

1.7 “OR EQUAL” CLAUSE

A. Whenever a material or article required is specified or shown in the Plans using the name of the proprietary product or of a particular manufacturer or vendor, any material or article which will perform adequately the duties imposed by the general design will be considered equal and satisfactory providing the material or articles so proposed is of equal substance and function in the Architect’s/Engineer’s opinion. It shall not be purchased or installed without written approval of the Architect/Engineer.

B. When more than one (1) material or product is specified by name, the Contractor may select any of the name brands for the use specified.

C. Any substitutions or changes in materials or methods shall be approved by the Owner’s

Representative before being used in this Work.

1.8 CONFLICTS BETWEEN SPECIFICATIONS AND DRAWINGS

A. Should any conflict be found in the Contract Documents, the Architect/Engineer shall interpret or construe the Contract Documents so as to secure the most substantial and complete performance of the Work, within the constraints of the order of precedence established by the

General Conditions.

SUMMARY 01100 - 4

1.9 GOVERNING REGULATIONS/AUTHORITIES

A. General: The procedure followed by Architect/Engineer has been to contact governing authorities where necessary, to obtain information needed for the purpose of preparing Contract

Documents, recognizing that such information may or may not be of significance in relation to the Contractor’s responsibilities for performing the Work. Contact governing authorities directly for necessary information and decisions having a bearing on performance of the Work.

1.10 SUBMITTALS

A. Permits, License and Certificates: For the Owner’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, and similar documents, correspondence and records established in conjunction with compliance with standards and regulations bearing upon performance of the

Work.

1.11 COORDINATION AND MEETINGS

A. General: Prepare and distribute to each entity performing Work at the project site a written memorandum of instructions on required coordination activities, including required notices, reports, and attendance at meetings. Prepare similar memorandum for separate Contractors where interfacing of Work is required. Architect/Engineer will prepare minutes of meetings where Architect’s/Engineer’s presence is required.

B. Preconstruction Conference:

1. Schedule a preconstruction conference before starting construction, at a time convenient to the Owner and the Architect/Engineer, within two (2) weeks prior to the start of the construction. Hold the conference at the Project site.

2. Attendees: Authorized representatives of the Owner, Architect/Engineer, the Contractor and his superintendent, major material suppliers, Mechanical Subcontractor, Electrical

Subcontractor and Building Officials(s) having jurisdiction. All Participants at the conference shall be familiar with the Project and authorized to conclude matters relating to the Work.

3. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule

b. Critical work sequencing

c. Designation of responsible personnel

d. Procedures for processing field decisions and Change Orders

e. Procedures for processing Applications for Payment

f. Distribution of Contract Documents

g. Submittal of Shop Drawings, Product Data, and Samples

h. Preparation of record documents

i. Preparation and maintenance of “As-Built” record drawings

j. Use of the premises

k. Parking availability

l. Storage areas

SUMMARY 01100 - 5

m. Equipment deliveries and priorities

n. Safety procedures

o. First Aid

p. Security

q. Housekeeping

r. Working hours

s. Smoking policy

t. Emergency contact personnel and phone numbers

u. Sexual offender policy. Refer to Division 1 General Requirements

C. Progress meetings

1. Conduct progress meetings twice a month, at the Project Site, at the

Architect’s/Engineer’s Discretion with a date coordinated with the preparation of payment request. Request representatives (at each meeting) of every entity currently involved in coordination or planning. Contractor shall conduct progress meeting.

Minutes will be prepared by the Architect/Engineer and distributed to everyone in attendance and to others affected by decisions or actions resulting from each meeting, including the Owner. Progress meetings and other construction meetings involving the

Contractor, the Architect/Engineer and Owner may be audio recorded at the Owner’s option without further notice.

2. Agenda: Review and correct or approve minutes of the previous progress meeting.

Review other items of significance that could affect progress. Include topics for discussion as appropriate to the status of the Project.

a. Contractor’s Construction Schedule: Refer to requirements of General Conditions.

b. Review the present and future needs of each entity present, including the following:

1) Interface requirements.

2) Time.

3) Sequences/phasing plan(s).

4) Status of submittals.

5) Deliveries.

6) Access.

7) Hours of work.

8) Hazards and risks.

9) Housekeeping.

10) Quality and work standards.

c. Request for Information.

d. Change Orders.

e. Review “As Built” record drawings for monthly preparation and maintenance.

Architect/Engineer to approve monthly prior to approval of request for payment.

Documentation must be acceptable to the Owner or it authorized representative.

f. Documentation of information for payment request.

D. Schedule Updating: Revise the construction schedule after the progress meeting where revisions to the schedule have been made or recognized. Issue the revised schedule with every pay request submitted.

SUMMARY 01100 - 6

1.12 COMPLIANCE WITH CODES AND REGULATIONS

A. Contractor shall comply with all recognized codes and regulations governing construction, safety precautions, and other requirements. In case of conflict, the Virginia Uniform Statewide

Building Code and Virginia Fire Safety Regulations shall govern. Comply with all OSHA and

Accessibility and ADA requirements.

1.13 COMPLIANCE WITH INDUSTRY STANDARDS

A. Where compliance with two (2) or more industry standards or sets of requirements is specified, and overlapping of those different standards or requirements establishes different or conflicting minimums or levels of quality, the most stringent requirement shall be provided. The most stringent shall be interpreted or construed as being that to secure the most substantial and complete performance of the work as determined by the Architect/Engineer.

PART 2 - PRODUCTS (Not applicable)

PART 3 - EXECUTION (Not applicable)

END OF SECTION 011000

PROJECT MANAGEMENT AND COORDINATION 013100 - 1

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. General coordination procedures.

2. Coordination drawings.

3. RFIs.

4. Digital project management procedures.

5. Project meetings.

B. Related Requirements:

1. Section 017300 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

2. Section 019113 "General Commissioning Requirements" for coordinating the Work with

Owner's Commissioning Authority.

1.3 DEFINITIONS

A. BIM: Building Information Modeling.

B. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.4 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract.

3. Drawing number and detail references, as appropriate, covered by subcontract.

PROJECT MANAGEMENT AND COORDINATION 013100 - 2

1.5 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the

Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and scheduled activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the schedule of values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Preinstallation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

1.6 COORDINATION DRAWINGS

A. Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, and additionally where installation is not completely indicated on Shop

Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.

1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements.

Provide alternative sketches to Architect indicating proposed resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

PROJECT MANAGEMENT AND COORDINATION 013100 - 3

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Review: Architect will review coordination drawings to confirm that in general the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility.

1.7 REQUEST FOR INFORMATION (RFI)

A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. Architect will return without response those RFIs submitted to Architect by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name.

2. Project number.

3. Date.

4. Name of Contractor.

5. Name of Architect.

6. RFI number, numbered sequentially.

7. RFI subject.

8. Specification Section number and title and related paragraphs, as appropriate.

9. Drawing number and detail references, as appropriate.

10. Field dimensions and conditions, as appropriate.

11. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

12. Contractor's signature.

13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

C. RFI Forms: Use a digital pdf form or a web-based project management software.

D. Engineer's Action: Architect will review each RFI, determine action required, and respond.

Allow seven working days for Architect's response for each RFI. RFIs received by Architect after 1:00 p.m. will be considered as received the following working day.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract

Documents.

PROJECT MANAGEMENT AND COORDINATION 013100 - 4

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. Architect's action may include a request for additional information, in which case

Architect's time for response will date from time of receipt by Architect of additional information.

3. Architect's action on RFIs that may result in a change to the Contract Time or the

Contract Sum may be eligible for Contractor to submit Change Proposal.

a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Architect in writing within 10 days of receipt of the RFI response.

E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log weekly. Use software log that is part of web-based Project software.

1. Project name.

2. Name and address of Contractor.

3. Name and address of Architect.

4. RFI number including RFIs that were returned without action or withdrawn.

5. RFI description.

6. Date the RFI was submitted.

7. Date Architect's response was received.

F. On receipt of Architect's and Contractor's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Architect and Contractor within seven days if Contractor disagrees with response.

1.8 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Use of Architect's Digital Data Files: Digital data files of Architect's BIM model will be provided by Architect for Contractor's use during construction.

1. Digital data files may be used by Contractor in preparing coordination drawings, Shop

Drawings, and Project record Drawings.

2. Architect makes no representations as to the accuracy or completeness of digital data files as they relate to Contract Drawings.

3. Digital Drawing Software Program: Contract Drawings are available in Revit.

4. Contractor shall execute a data licensing agreement in the form of Agreement form acceptable to Owner and Architect.

a. Subcontractors, and other parties granted access by Contractor to Architect's digital data files shall execute a data licensing agreement in the form of Agreement acceptable to Owner and Architect.

5. The following digital data files will be furnished for each appropriate discipline:

a. Floor plans.

b. Reflected ceiling plans.

PROJECT MANAGEMENT AND COORDINATION 013100 - 5

B. Contractor to provide web-based Project software site for purposes of hosting and managing

Project communication and documentation until Final Completion.

1. Web-based Project software site includes, at a minimum, the following features:

a. Compilation of Project data, including Contractor, subcontractors, Architect, architect's consultants, Owner, and other entities involved in Project. Include names of individuals and contact information.

b. Access control for each entity for each workflow process, to determine entity's digital rights to create, modify, view, and print documents.

c. Document workflow planning, allowing customization of workflow between project entities.

d. Creation, logging, tracking, and notification for Project communications required in other Specification Sections, including, but not limited to, RFIs, submittals, Minor Changes in the Work, Construction Change Directives, and Change Orders.

e. Track status of each Project communication in real time, and log time and date when responses are provided.

f. Procedures for handling PDFs or similar file formats, allowing markups by each entity. Provide security features to lock markups against changes once submitted.

g. Processing and tracking of payment applications.

h. Processing and tracking of contract modifications.

i. Creating and distributing meeting minutes.

j. Document management for Drawings, Specifications, and coordination drawings, including revision control.

k. Management of construction progress photographs.

l. Mobile device compatibility, including smartphones and tablets.

2. Provide up to seven web-based Project software user licenses for use of Owner, Owner's

Commissioning Authority, Architect, and Architect's consultants. Provide eight hours of software training at Architect's office for web-based Project software users.

3. At completion of Project, provide digital archive in format that is readable by common desktop software applications in format acceptable to Architect. Provide data in locked format to prevent further changes.

4. Provide one of the following web-based Project software packages under their current published licensing agreements:

a. Autodesk; Buzzsaw.

b. Corecon Technologies, Inc.

c. Meridian Systems; Prolog.

d. Newforma, Inc.

e. Procore Technologies, Inc.

f. Viewpoint, Inc.; Viewpoint for Project Collaboration.

g. BlueBeam.

C. PDF Document Preparation: Where PDFs are required to be submitted to Architect, prepare as follows:

1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier.

PROJECT MANAGEMENT AND COORDINATION 013100 - 6

3. Certifications: Where digitally submitted certificates and certifications are required, provide a digital signature with digital certificate on where indicated.

1.9 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated.

B. Preconstruction Conference: Schedule and conduct a preconstruction conference before starting construction, at a time convenient to Owner and Architect, but no later than 15 days after execution of the Agreement.

1. Attendees: Authorized representatives of Owner, Owner's Commissioning Authority, Architect, and their consultants; Contractor and its superintendent; major subcontractors;

suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Responsibilities and personnel assignments.

b. Tentative construction schedule.

c. Phasing.

d. Critical work sequencing and long lead items.

e. Designation of key personnel and their duties.

f. Lines of communications.

g. Use of web-based Project software.

h. Procedures for processing field decisions and Change Orders.

i. Procedures for RFIs.

j. Procedures for testing and inspecting.

k. Procedures for processing Applications for Payment.

l. Distribution of the Contract Documents.

m. Submittal procedures.

n. Sustainable design requirements.

o. Preparation of Record Documents.

p. Use of the premises.

q. Work restrictions.

r. Working hours.

s. Owner's occupancy requirements.

t. Responsibility for temporary facilities and controls.

u. Procedures for moisture and mold control.

v. Procedures for disruptions and shutdowns.

w. Construction waste management and recycling.

x. Parking availability.

y. Equipment deliveries and priorities.

z. First aid.

aa. Security.

bb. Progress cleaning.

3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.

PROJECT MANAGEMENT AND COORDINATION 013100 - 7

C. Sustainable Design Requirements Coordination Conference: Owner will schedule and conduct a sustainable design coordination conference before starting construction, at a time convenient to Owner, Architect, and Contractor.

1. Attendees: Authorized representatives of Owner, Owner's Commissioning Authority, Architect, and their consultants; Contractor and its superintendent and sustainable design coordinator; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect meeting sustainable design requirements, including the following:

a. Sustainable design Project checklist.

b. General requirements for sustainable design-related procurement and documentation.

c. Project closeout requirements and sustainable design certification procedures.

d. Role of sustainable design coordinator.

e. Construction waste management.

f. Construction operations and sustainable design requirements and restrictions.

3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.

D. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity when required by other sections and when required for coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise

Architect, and Owner's Commissioning Authority of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Sustainable design requirements.

i. Review of mockups.

j. Possible conflicts.

k. Compatibility requirements.

l. Time schedules.

m. Weather limitations.

n. Manufacturer's written instructions.

o. Warranty requirements.

p. Compatibility of materials.

q. Acceptability of substrates.

PROJECT MANAGEMENT AND COORDINATION 013100 - 8

r. Temporary facilities and controls.

s. Space and access limitations.

t. Regulations of authorities having jurisdiction.

u. Testing and inspecting requirements.

v. Installation procedures.

w. Coordination with other work.

x. Required performance results.

y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the

Work and reconvene the conference at earliest feasible date.

E. Progress Meetings: Conduct progress meetings at biweekly intervals.

1. Coordinate dates of meetings with preparation of payment requests.

2. Attendees: In addition to representatives of Owner, Owner's Commissioning Authority and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do

so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Sequence of operations.

3) Resolution of BIM component conflicts.

4) Status of submittals.

5) Status of sustainable design documentation.

6) Deliveries.

7) Off-site fabrication.

8) Access.

9) Site use.

10) Temporary facilities and controls.

11) Progress cleaning.

PROJECT MANAGEMENT AND COORDINATION 013100 - 9

12) Quality and work standards.

13) Status of correction of deficient items.

14) Field observations.

15) Status of RFIs.

16) Status of Proposal Requests.

17) Pending changes.

18) Status of Change Orders.

19) Pending claims and disputes.

20) Documentation of information for payment requests.

4. Minutes: Entity responsible for conducting the meeting will record and distribute the meeting minutes to each party present and to parties requiring information.

a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 013100

TEMPORARY FACILITIES 015000 - 1

SECTION 015000 - TEMPORARY FACILITIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions and other Division-1

Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies requirements for temporary services and facilities, including utilities, construction and support facilities, security, and protection.

B. Temporary construction and support facilities required include, but are not limited to:

1. Storage facilities for construction materials.

2. Sanitary facilities, including drinking water.

3. Waste disposal services.

C. Power and water are available at the facility at no cost to the Contractor. However, the Contractor shall make all necessary connections and distribution to serve the project. The Contractor shall remove distribution and connection at the conclusion of the work.

D. Security and protection facilities required include, but are not limited to:

1. Temporary fire protection.

2. Barricades, warning signs, and lights.

3. Environmental protection.

4. Exhibit Protection.

1.3 QUALITY ASSURANCE

A. Regulations: Comply with industry standards and applicable laws and regulations of authorities having jurisdiction, including but not limited to;

1. Building Code requirements.

2. Health and safety regulations.

3. Police, Fire Department, and Rescue Squad rules.

4. Environmental protection regulations.

B. Standards: Comply with NFPA Code 241, "Building Construction and Demolition Operations", ANSI-

A10 Series standards for "Safety Requirements for Construction and Demolition".

C. Refer to "Guidelines for Bid Conditions for Temporary Job Utilities and Services", prepared jointly by

AGC and ASC, for industry recommendations.

TEMPORARY FACILITIES 015000 - 2

1.4 PROJECT CONDITIONS

A. Conditions of Use: Keep temporary services and facilities clean and neat in appearance. Operate in a safe and efficient manner. Take necessary fire prevention measures. Do not overload facilities, or permit them to interfere with progress. Do not allow hazardous, dangerous, or unsanitary conditions, or public nuisances to develop or persist on the site.

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Provide new materials. If acceptable to the Architect/Engineer, the Contractor may use undamaged, previously used materials in serviceable condition. Provide materials suitable for the use intended.

B. Drinking Water Facilities: Provide containerized tap-dispenser bottled-water type drinking water units, including paper cup supply.

C. Temporary Toilet Units: Provide self-contained single-occupant toilet units of the chemical, aerated recirculation, or combustion type, properly vented and fully enclosed with a glass fiber reinforced polyester shell or similar nonabsorbent material, and supply unit(s) with toilet tissue.

D. First Aid Supplies: Comply with governing regulations.

E. Fire Extinguishers: Provide hand-carried, portable, UL-rated, class "ABC" dry chemical extinguishers, or a combination of extinguishers of NFPA recommended classes for the exposures. Comply with

NFPA 10 and 241 for classification, extinguishing agent, and size required by location and class of fire exposure.

2.2 EQUIPMENT

A. General: Provide new equipment. If acceptable to the Architect/Engineer, the Contractor may use undamaged, previously used equipment in serviceable condition. Provide equipment suitable for use intended.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Use qualified personnel for installation of temporary facilities. Locate facilities where they will serve the Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required.

B. Provide each facility ready for use when needed to avoid delay. Maintain and modify as required. Do not remove until facilities are no longer needed.

TEMPORARY FACILITIES 015000 - 3

C. Locate storage trailers, sanitary facilities, and other temporary support facilities for easy access, and where approved by the Owner.

D. Sanitary facilities include temporary toilets, wash facilities, and drinking water fixtures. Comply with regulations and health codes for the type, number, location, operation, and maintenance of fixtures and facilities. Install where facilities will best serve the Project's needs.

E. Provide toilet tissue, paper towels, paper cups, and similar disposable materials for each facility.

Provide covered waste containers for used material.

F. Toilets: Install self-contained toilet units in a location approved by the Owner. Shield toilets to ensure privacy. Use of pit-type privies will not be permitted. Have toilets regularly serviced to keep them clean and in good condition.

G. Collection and Disposal of Waste and Demolition Debris: Collect waste from construction areas and elsewhere daily and remove construction debris from the site weekly or as soon as containers are nearly full. Comply with requirements of NFPA 241 for removal of combustible waste material and debris.

Enforce requirements strictly. Do not hold materials more than seven (7) days during normal weather or three (3) days when the temperature is expected to rise above 80 deg F (27 deg C). Handle hazardous, dangerous, or unsanitary waste by containerizing properly. Dispose of material in a lawful manner.

3.2 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Temporary Fire Protection: Comply with NFPA 10 "Standard for Portable Fire Extinguishers," and

NFPA 241 "Standard for Safeguarding Construction, Alterations and Demolition Operations."

B. Barricades: Provide temporary barricades to keep people or vehicles from away from accessing work areas.

C. Security: Where materials and equipment must be stored, and are of value or attractive for theft, provide a secure lockup.

D. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations, and minimize the possibility that air, waterways and subsoil might be contaminated or polluted, or that other undesirable effects might result. Avoid use of tools and equipment that would produce harmful noise. Restrict use of noise making tools and equipment to hours that will minimize complaints from persons or firms near the site.

3.3 OPERATION, TERMINATION AND REMOVAL

A. Supervision: Enforce strict discipline in use of temporary facilities. Limit availability of temporary facilities to essential and intended uses to minimize waste and abuse.

B. Maintenance: Maintain facilities in good operating condition until removal.

TEMPORARY FACILITIES 015000 - 4

C. Termination and Removal: Unless the Architect/Engineer requests that it be maintained longer, remove each temporary facility at Substantial Completion.

END OF SECTION 015000

EXECUTION REQUIREMENTS 017300 - 1

SECTION 017300 – EXECUTION REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes general administrative and procedural requirements governing execution of the

Work, including, but not limited to, the following:

1. Construction layout.

2. Field engineering and surveying.

3. Installation of the Work.

4. Cutting and patching.

5. Coordination of Owner's portion of the Work.

6. Coordination of Owner-installed products.

7. Progress cleaning.

8. Starting and adjusting.

9. Protection of installed construction.

1.2 DEFINITIONS

A. Cutting: Removal of in-place construction necessary to permit installation or performance of subsequent work.

B. Patching: Fitting and repair work required to restore construction to original conditions after installation of subsequent work.

1.3 QUALITY ASSURANCE

A. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.

1. Structural Elements: When cutting and patching structural elements, or when encountering the need for cutting and patching of elements whose structural function is not known, notify Engineer of locations and details of cutting and await directions from

Engineer before proceeding. Shore, brace, and support structural elements during cutting and patching. Do not cut and patch structural elements in a manner that could change their load-carrying capacity or increase deflection.

2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.

3. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety.

EXECUTION REQUIREMENTS 017300 - 2

4. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in Engineer's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

B. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of specified products and equipment.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Comply with requirements specified in other Sections.

1. For projects requiring compliance with sustainable design and construction practices and procedures, use products for patching that comply with sustainable design requirements.

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed, will provide a match acceptable to Engineer for the visual and functional performance of in-place materials. Use materials that are not considered hazardous.

C. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

1. Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities, mechanical and electrical systems, and other construction affecting the Work.

1. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, gas service piping, and water-service piping; underground electrical services; and other utilities.

2. Furnish location data for work related to Project that must be performed by public utilities serving Project site.

EXECUTION REQUIREMENTS 017300 - 3

B. Examination and Acceptance of Conditions: Before proceeding with each component of the

Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.

2. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.

3. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

C. Written Report: Where a written report listing conditions detrimental to performance of the

Work is required by other Sections, include the following:

1. Description of the Work, including Specification Section number and paragraph, and

Drawing sheet number and detail, where applicable.

2. List of detrimental conditions, including substrates.

3. List of unacceptable installation tolerances.

4. Recommended corrections.

D. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Existing Utility Information: Furnish information to local utility that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction.

B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the

Work.

C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.

D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents caused by differing field conditions outside the control of Contractor, submit a request for information to Engineer in accordance with requirements in

Section 013100 "Project Management and Coordination."

EXECUTION REQUIREMENTS 017300 - 4

3.3 CONSTRUCTION LAYOUT

A. Verification: Before proceeding to lay out the Work, verify layout information shown on

Drawings, in relation to the property survey and existing benchmarks and existing conditions. If discrepancies are discovered, notify Engineer promptly.

3.4 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb, and make horizontal work level.

2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.

3. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.

4. Maintain minimum headroom clearance of 96 inches in occupied spaces and 90 inches in unoccupied spaces, unless otherwise indicated on Drawings.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

C. Install products at the time and under conditions that will ensure the best possible results.

Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations, so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy of type expected for

Project.

E. Sequence the Work and allow adequate clearances to accommodate movement of construction items on-site and placement in permanent locations.

F. Tools and Equipment: Where possible, select tools or equipment that minimize production of excessive noise levels.

G. Templates: Obtain and distribute to the parties involved templates for Work specified to be factory prepared and field installed.