23018_ParnallCF BLGS 56,80,201_Roof Drwgs.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ - 171 - 240000000083
- Issued by
- Jackson County, Michigan
About this file
This document is a set of construction drawings for a roof replacement project at the Parnall Correctional Facility in Jackson, Michigan, managed by the Michigan Department of Corrections and the Michigan Department of Technology, Management and Budget. The project involves the replacement of the roofs on Buildings 56, 80, and 201 at the facility, including the removal of existing roofing materials and installation of new fully adhered EPDM roofing systems. The drawings provide detailed plans and specifications for the roof replacements, including demolition, insulation, and flashing details. The project has an estimated total square footage of approximately 63,518 square feet. Bids for this project are due by a specified deadline, and the contract may include renewal options.
The drawings outline the pricing and construction requirements for the project, including unit prices for certain repair work. The project is funded by the State of Michigan, and no set-asides or specific incumbents are mentioned. The current environment and funding sources are not explicitly stated, but the project appears to be a state-managed facility upgrade. Contractors must submit their bids through the SIGMA VSS system, with specific instructions provided for electronic submission and communication with the project team.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
AD
F
IL
E N o.
M
-P
H
AS
E
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Site Map Scale: N.T.S.
Location Map Scale: N.T.S.
STATE OF MICHIGAN
DEPARTMENT OF CORRECTIONS
PARNALL CORRECTIONAL FACILITY
ROOF REPLACEMENT
1780 E. PARNALL RD.
JACKSON, MI 49201
PROJECT SITE
PARNALL CORRECTIONAL FACILITY
COVER
RP-1
RP-2A
RP-2B
RP-3
D1 D2 D3 D4 D5
COVER SHEET
ROOF PLAN - BUILDING 56 - PROPERTY BUILDING
ROOF PLAN - BUILDING 80
ROOF PLAN - BUILDING 80 (SECTIONS 6, 7 AND 8)
ROOF PLAN - BUILDING 201
ROOF DETAILS
ROOF DETAILS
ROOF DETAILS
ROOF DETAILS
ROOF DETAILS
INDEX OF DRAWINGS
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
BLDG. 201 LEVIN SCHOOL
BLDG. 56 - PROPERTY BLDG.
BLDG. 80 - WAREHOUSE
NAME: PHONE: EMAIL:
PROJECT TEAM CONTACTS
MR. CORY DALY (MDOC) (517) 927-3326 DALYC@MICHIGAN.GOV
MS. HEATHER DEKORTE, RA (DTMB-PD) (517) 243-7248 DEKORTEH@MICHIGAN.GOV
MR. PAUL MAJKOWSKI, PE, RRC (PSC) (734) 323-7923 PAUL. MAJKOWSKI@INTERTEK.COM
A
A
C-1
C-3
C-2
C-45'-0"
25'-0"
56'-0"
16'-0"
21'-0"
21'-0"9'-6"
25'-0"
C-5
REMOVE FULLY ADHERED EPDM
REMOVE MULTI-PLY ASPHALT BUR/ORGANIC FELTS
REMOVE 1/2" WOOD FIBER BOARD
REMOVE ~ 1.5" EPS
(BEAD BOARD)
REMOVE BASE PLY
WOOD DECK (TO REMAIN)
WOOD FRAMING (TO REMAIN)
(2) LAYERS OF 2.6" RIGID
ISOCYANURATE - STAGGERED -
MECHANICALLY ATTACHED TO
WOOD DECK
WOOD DECK (TO REMAIN)
WOOD FRAMING (TO REMAIN)
NEW FULLY ADHERED 60 mil
REINFORCED EPDM
6" LAP AND 6"
SEAM TAPE
REMOVE EXISTING FULLY ADHERED EPDM
REMOVE 0.5" WOOD FIBER ISULATION
REMOVE 1.5" EPS INSULATION
ORIGINAL RIBBED METAL PANEL CANOPY ON L
ANGLES SUPPORTS 48" O.C. MIN.
12"
4" ORIGINAL RIBBED METAL PANEL CANOPY
(2) LAYERS OF 2.6" RIGID ISOCYANURATE - STAGGERED -
MECHANICALLY ATTACHED TO PANELS (1 PER 2 SQ.FT.
MIN.) MEASURE AND PLACE AT LEAST FOUR (4) SCREWS
PER BOARD INTO ANGLE SUPPORTS PER 4'x8' BOARD
NEW FULLY ADHERED 60 mil
REINFORCED EPDM
6" LAP AND 6"
SEAM TAPE
C
AD
F
IL
E N o.
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
ROOF PLAN - BLDG. 56 - PROPERTY BLDG.01
RP-1
M
-P
H
AS
E
SCALE: 1/4" = 1'-0"
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
APPROX. ROOF AREAS
1,434TOTAL
SQ. FT.ROOF
1,200MAIN (PURPLE)
234SLOPED (YELLOW)
A
RP-1 NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 56 (MAIN ROOF)
B
RP-1 NOT TO SCALE
PROPOSED CONSTRUCTION PROFILE
BLDG. 56 (MAIN ROOF)
C
RP-1 NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 56 (SLOPED ROOF) D
RP-1 NOT TO SCALE
PROPOSED CONSTRUCTION PROFILE
BLDG. 56 (SLOPED ROOF)
C-6 C-7
C-4
C-5
C-3
C-1 C-2
C-2
C-1 C-3
C-1
C-2
C-1
GUARD TOWER
(WALLS AND ROOF
TO BE REMOVED)
STONE PARAPET CAP
LOWER SECTION 6B
UPPER SECTION 6A
DROPS ~2" IN 16'
OVERHANG
HP
MASONRY STONE AND CAP AND TOP
BRICK IN POOR CONDITION. TO BE
REMOVED (SEE DETAIL No. 13)
SECTION 1
SECTION 2
N.I.C.
SECTION 3
N.I.C.
SECTION 4
SECTION 1
16'-0" 23'-0"
SECTION 7SECTION
15'-0"
SECTION
55'-0"
A
A A
A A
A A
A
A
A
A
HP
C-3
HP
METAL CANOPY
RIDGE
METAL AWNING
N.I.C.
C-1
C-2
C-4
C-6 C-5
C-9
C-7 C-8
195'-0"
122'-6" 94'-6"
80'-0"
100'-0"
98'-0"
27'-7"
HP
HP
NO AREA DIVIDER TO BE
INSTALLED AT THIS LINE
N.I.C.
NO AREA DIVIDER OR EXPANSION
JOINT TO BE INSTALLED BETWEEN
SECTION 1 AND SECTION 4
SLOPED OLD
METAL PANEL
DECK INSTALL PER
DETAIL "L"
FLAT
CONCRETE
DECK
INSTALL PER
DETAIL "N"
REMOVE PEA GRAVEL IN CTP FLOODCOAT
REMOVE MULTI-PLY ORGANIC
FELT AND CTP MEMBRANE
REMOVE (2) LAYERS OF 3/4"
FIBERGLASS RIGID INSULATION
EXISTING NARROW RIB 1.5"
STEEL DECK (TO REMAIN) -
REPAIR AS NEEDED
(SLOPE IN STEEL)
NEW FULLY ADHERED 60 mil
REINFORCED EPDM
6" LAP AND 6"
SEAM TAPE
TOP LAYER 2.6" ISOCYANURATE -
ADHERED IN BEADS OF SPECIAL
ADHESIVE
BASE LAYER 2.6" ISOCYANURATE - MECHANICALLY ATTACHED
TO EXISTING ROOF PANELS WITH A MINIMUM OF FOUR (4)
SCREWS SECURED TO THE "L" ANGLE PER 4'x8' BOARD
EXISTING NARROW RIB 1.5" STEEL DECK (TO REMAIN) -
REPAIR AS NEEDED ON A UNIT PRICE BASIS
(SLOPE IN STEEL) EXISTING SLOPED OLD METAL PANEL
ON "L" ANGLES AT 48" O.C. TYP.
REMOVE FULLY ADHERED EPDM
REMOVE MULTI-PLY SMOOTH BUR
REMOVE RECOVERY 1/2"
WOOD FIBER INSULATION
(MECHANICALLY ATTACHED)
REMOVE (2) LAYERS OF 3/4" PERLITE
EXISTING 1.5" STEEL DECK
(TO REMAIN)
NEW FULLY ADHERED 60 mil
REINFORCED EPDM
6" LAP AND 6"
SEAM TAPE
TOP LAYER 2.6" ISOCYANURATE -
ADHERED IN BEADS OF SPECIAL
ADHESIVE
BASE LAYER 2.6" ISOCYANURATE - MECHANICALLY ATTACHED
TO EXISTING ROOF PANELS WITH A MINIMUM OF FOUR (4)
SCREWS SECURED TO THE "L" ANGLE PER 4'x8' BOARD
EXISTING NARROW RIB 1.5" STEEL DECK (TO REMAIN) -
REPAIR AS NEEDED ON A UNIT PRICE BASIS
(SLOPE IN STEEL) EXISTING SLOPED OLD METAL PANEL
ON "L" ANGLES AT 48" O.C. TYP.
REMOVE EXISTING FULLY ADHERED EPDM
REMOVE EXISTING 1.5" RIGID ISOCYANURATE
(MECHANICALLY ATTACHED)
EXISTING 3" DEEP
SPAN METAL DECK
(TO REMAIN) REPAIR
AS NEEDED
EXISTING 3" DEEP SPAN METAL DECK (TO
REMAIN) REPAIR AS NEEDED
NEW FULLY ADHERED 60 mil
REINFORCED EPDM
6" LAP AND 6"
SEAM TAPE
TOP LAYER 2.6" ISOCYANURATE - ADHERED
IN BEADS OF SPECIAL ADHESIVE
BASE LAYER 2.6" ISOCYANURATE -
MECHANICALLY ATTACHED TO
STEEL DECK
REMOVE FULLY ADHERED EPDM
REMOVE EXISTING MULTI-PLY BUR
REMOVE RECOVERY 1/2"
WOOD FIBER INSULATION
(MECHANICALLY ATTACHED)
REMOVE EXISTING WOOD
FIBER INSULATION
EXISTING STEEL DECK (TO
REMAIN) REPAIR AS
NEEDED - EXISTING
SLOPED OLD METAL
PANEL ON "L" ANGLES AT
48" O.C. TYP.
NEW FULLY ADHERED 60 mil
REINFORCED EPDM
6" LAP AND 6"
SEAM TAPE
TOP LAYER 2.6" ISOCYANURATE -
ADHERED IN BEADS OF SPECIAL
ADHESIVE
BASE LAYER 2.6" ISOCYANURATE - MECHANICALLY ATTACHED
TO EXISTING ROOF PANELS WITH A MINIMUM OF FOUR (4)
SCREWS SECURED TO THE "L" ANGLE PER 4'x8' BOARD
EXISTING NARROW RIB 1.5" STEEL DECK (TO REMAIN) -
REPAIR AS NEEDED ON A UNIT PRICE BASIS
(SLOPE IN STEEL) EXISTING SLOPED OLD METAL PANEL
ON "L" ANGLES AT 48" O.C. TYP.
C
AD
F
IL
E N o.
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
APPROX. ROOF AREAS
SECTION
52,711
TOTAL
6A
SQ. FT.
8,000
41,9781
M
-P
H
AS
E
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
ROOF PLAN - BLDG. 8001
RP-2A SCALE: 1" = 20'-0"
1,1007
4486B
E
RP-2 NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 80 (SECTION 1) F
RP-2 NOT TO SCALE
PROPOSED CONSTRUCTION PROFILE
BLDG. 80 (SECTION 1)
G
RP-2 NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 80 (SECTION 4) H
RP-2 NOT TO SCALE
PROPOSED CONSTRUCTION PROFILE
BLDG. 80 (SECTION 4)
I
RP-2 NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 80 (SECTION 6A) J
RP-2 NOT TO SCALE
PROPOSED CONSTRUCTION PROFILE
BLDG. 80 (SECTION 6A)
K
RP-2 NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 80 (SECTION 6B) L
RP-2 NOT TO SCALE
BLDG. 80 (SECTION 6B)
REMOVE MULTIPLE BUR PLIES/ASPHALT
(*SAMPLED POSITIVE FOR ASBESTOS)
REMOVE EXISTING CONCRETE DECK
AND MASONRY WALLS AND
WINDOWS
SOUTH, EAST AND NORTH SIDES
EXISTING POURED WALL TO
REMAIN
TIE INTO SECTION 8
NEW FULLY ADHERED
60 mil EPDM ROOF
SPECIAL TAPER TO FORCE
WATER TO FLOW OUT DOOR
OPENING (4" MIN. 7" MAX.)
TIE INTO SECTION 7
WEST (DOOR) SIDE
WALLS TO BE REMOVED
REMOVE EXISTING FULLY ADHERED EPDM RECOVERY ROOF
REMOVE EXISTING 1/2" WOOD FIBER RECOVERY INSULATION
REMOVE EXISTING CTP MULTI-PLY ROOF (NOT CONTAINS ASBESTOS)
REMOVE EXISTING ~1" FIBERGLASS INSULATION
EXISTING 1.5"
NARROW RIB STEEL
DECK (SLOPE IN DECK)
NEW FULLY ADHERED 60 mil
REINFORCED EPDM
6" LAP AND 6"
SEAM TAPE
(2) LAYERS OF 2.6" RIGID
ISOCYANURATE INSULATION-
STAGGERED - MECHANICALLY
ATTACHED
EXISTING 1.5" NARROW RIB STEEL DECK
TO REMAIN - REPAIR AS NEEDED
C-6 C-7
C-4
C-5
C-3
C-1 C-2
C-2
C-1 C-3
C-1
C-2
C-1
GUARD TOWER
(WALLS AND ROOF
TO BE REMOVED)
STONE PARAPET CAP
LOWER SECTION 6B
UPPER SECTION 6A
DROPS ~2" IN 16'
OVERHANG
HP
MASONRY STONE AND CAP AND TOP
BRICK IN POOR CONDITION. TO BE
REMOVED (SEE DETAIL No. 13)
16'-0" 23'-0"
SECTION 7SECTION
15'-0"
SECTION
55'-0"
A
HP
SLOPED OLD
METAL PANEL
DECK INSTALL PER
DETAIL "L"
FLAT
CONCRETE
DECK
INSTALL PER
DETAIL "N"
REMOVE ~ 2" LIGHTGUARD TRAFFIC TOPPING AND XEPS BOARD
LOOSE LAID EPDM
REMOVE 1/2" WOOD FIBER INSULATION
REMOVE MULTI-PLY BUR
REMOVE EXISTING 1.5" EPS
ASPHALT VAPOR BARRIER ON DECK
CONCRETE DECK (SLOPE IN DECK)
NEW FULLY ADHERED 60 mil
REINFORCED EPDM
6" LAP AND 6"
SEAM TAPE
(2) LAYERS OF 2.6" ISOCYANURATE -
STAGGERED - ADHERED IN BEADS OF
SPECIAL ADHESIVE
EXISTING VAPOR BARRER - ALLOWED TO
REMAIN IF DRY AND BONDED
CONCRETE DECK
C
AD
F
IL
E N o.
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M
-P
H
AS
E
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
O
RP-2B NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 80 (SECTION 7 PENTHOUSE) P
RP-2B NOT TO SCALE
PROPOSED CONSTRUCTION PROFILE
BLDG. 80 (SECTION 7 PENTHOUSE)
Q
RP-2B NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 80 (SECTION 8) R
RP-2B NOT TO SCALE
PROPOSED CONSTRUCTION PROFILE
BLDG. 80 (SECTION 8)
ROOF PLAN - BLDG. 8001
RP-2B SCALE: 1" = 20'-0"
M
RP-2B NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 80 (SECTION 7) N
RP-2B NOT TO SCALE
PROPOSED CONSTRUCTION PROFILE
BLDG. 80 (SECTION 7)
APPROX. ROOF AREAS
SECTION
52,711
TOTAL
6A
SQ. FT.
8,000
41,9781
1,1007
4486B
C-1
RIDGE
DS
C-2
~ 38'-0"
~ 18'-0"
~ 18'-0"
GUTTER OVER DOOR
REMOVE EXISTING 2-PLY GRANULAR
SURFACED MODIFIED (APPEARS NAILED AT
HIGH SIDE OF PLIES) (NOT ADHERED AT CORE)
EXISTING PLYWOOD ON 2x FRAMING
TO REMAIN (REPAIR AS NEEDED ON A
UNIT PRICE BASIS)
~ 8" FIBERGLASS BATT (TO REMAIN)
DROP CEILING TILES
NEW 1/2" DENSDECK INSULATION (FIRE BARRIER
BOARD) SECURED TO PLYWOOD AT THE
MINIMUM RATE OF TWELVE (12) SCREWS AND
EXISTING PLYWOOD ON 2x FRAMING
TO REMAIN (REPAIR AS NEEDED ON A
NEW FULLY ADHERED 60 mil REINFORCED EPDM
EXISTING 6" FIBERGLASS BATT (TO REMAIN)
DROP CEILING TILES
NEW 1/2" DENSDECK INSULATION (FIRE BARRIER
BOARD) SECURED TO PLYWOOD AT THE
MINIMUM RATE OF TWELVE (12) SCREWS AND
PLATES PER 4'x8' PLATE
EXISTING PLYWOOD ON 2x FRAMING
TO REMAIN (REPAIR AS NEEDED ON A
UNIT PRICE BASIS)
NEW FULLY ADHERED 60 mil REINFORCED EPDM
6" LAP AND
6" SEAM
TAPE
C
AD
F
IL
E N o.
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
APPROX. ROOF AREAS
1,373TOTAL
SQ. FT.
M
-P
H
AS
E
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
ROOF PLAN - BLDG. 20101
RP-3 SCALE: 1/4" = 1'-0"
S
RP-3 NOT TO SCALE
EXISTING CONSTRUCTION PROFILE
BLDG. 201
T
RP-3 NOT TO SCALE
BLDG. 201
FOR TYPICAL ROOF
CONSTRUCTION
PROFILE SEE DETAIL
R
RP3
NEW CAST IRON STRAINER, CLAMPING RING AND BOLTS
MIN. 60" TARGET PATCH AT CENTERED AT DRAIN - FULLY
ADHERED AND FASTENED 12" O.C. AT EDGES
NEW SPECIAL SUMP TAPER FROM
APPROX. 3.5" TO APPROX. 5" OVER 4'-0"
EXISTING METAL SUMP PAN
NEW
ADJUSTABLE
DRAIN
EXTENSIONS
INSTALLED
PER
MANUFACTURER
INSTRUCTIONS
SEALANT
EXISTING ROOF DRAINS TO BE
CLEANED AND PREPARED FOR
NEW DRAIN EXTENSIONS
INSTALLED ALL (6) LOCATIONS
4" MIN.
Q
A
RP1
EXISTING CAST IRON SOIL PIPE PENETRATION
NEW APPROVED SEALANT
NEW STAINLESS STEEL DRAWBAND (REQUIRED)
NEW PREFABRICATED EPDM FLASHING BOOT
3" MIN. LAP
MANUFACTURER APPROVED SEALANT
(IF REQUIRED)
4" M
IN
NEW
INSULATION
(VARIES)
FOR TYPICAL ROOF
CONSTRUCTION
PROFILE SEE DETAIL
R
RP3
A
RP1
FILL GAP BETWEEN PIPE
AND FOAM WITH SPRAY
FOAM
EXISTING BRICK WALL
~ 12"
5/8"
~ 8"
~ 3"
NEW 24 GA. PREFINISHED
METAL COPING
FASTEN INSIDE
FACE AT 24" O.C.
NEW 2x WOOD
BLOCKING - SET IN
CONSTRUCTION
ADHESIVE AND
MECHANICALLY
ATTACHED AT
18" O.C.
NEW 22 GA. CLIP -
SECURED 12"O.C.
FACE AND TOP
EXISTING STONE COPING
SEE ROOF
CONSTRUCTION
PROFILE A
FOR TYPICAL ROOF
CONSTRUCTION
PROFILE SEE
DETAIL
NEW 24 GA. PREFINISHED
GALVANIZED METAL EDGE - SET
ONTO CLIP - NAILED 3" O.C. (~8")
NEW 22 GA. GALVANIZED CLIP -
SECURED 12" O.C. TOP AND FACE
NEW STACKED 2.6 AND PLYWOOD
TO PROVIDE 5.25" OF NEW WOOD
BLOCKING (TO MATCH 5.2" NEW
INSULATION)
NEW METAL TO LAP
ONTO SIDING 2" MIN.
EXISTING METAL PANEL
SIDING (TO REMAIN)
NEW 2x PLACED VERTICALLY TO
INFILL ABOVE EXISTING SIDING
(SECURE 12" O.C. STAGGERED)
NEW MEMBRANE STRIPPING PLY
NEW EPDM - RUN DOWN AND
OVER WOOD BLOCKING
NEW FOAM CLOSURE
(TO FIT SIDING)
EXISTING METAL PANEL TO REMAIN
AND ACT AS THE ROOF "DECKING"
FOR TYPICAL ROOF
CONSTRUCTION
PROFILE SEE
DETAIL
NEW 24 GA. PREFINISHED
GALVANIZED EAVE METAL -
SECURED AT 3" O.C. (~ 5" FACE)
NEW 24 GA. CLOSURE METAL
NEW SPECIAL CUT 2x AND
PLYWOOD TO PROVIDE ~5" OF
NEW STACKED WOOD BLOCKING
(TO NEARLY MATCH NEW 5.2"
INSULATION)
EXISTING CMU
BLOCK WALL
NEW 2x10 WITH BEVEL CUT AT
TOP - SECURED TO VERTICAL FACE
12" O.C. STAGGERED
NEW MEMBRANE STRIPPING PLY
NEW EPDM - RUN DOWN AND
OVER WOOD BLOCKINGEXISTING METAL
PANEL TO REMAIN
AND ACT AS THE
ROOF "DECKING"
3"
2" MIN.
LAP
2.5"
MIN.
1"
NEW 60 mil REINFORCED EPDM BASE FLASHING
- FULLY ADHERED
6" MIN. 6" SEAM TAPE
MANUFACTURER APPROVED SEALANT
(IF REQUIRED)
NEW MANUFACTURER APPROVED MEMBRANE SECUREMENT
FASTENERS AND PLATES MIN. 12" O.C.
FOR TYPICAL ROOF
CONSTRUCTION PROFILE
SEE DETAILS
EXISTING ROOF
CURB (SEE
GENERAL NOTE
No. 2)
EXISTING
WOOD
NAILER
EXISTING UNIT FLANGE (SEE
GENERAL NOTE No. 1)
NEW WOOD NAILER AS NECESSARY TO ACHIEVE THE REQUIRED 10" FLASHING
HEIGHT - SECURED 12" O.C. WITH 16d NAILS
NEW NEOPRENE BACKED SCREWS 24" O.C.
- MIN. (1) PER SIDE
NEW
ROOFING
NAILS 12"
O.C.
4" M
IN
2" M
IN
10" MIN.
C
AD
F
IL
E N o.
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
M
-P
H
AS
E
EXISTING STANDING SEAM SIDING (TO REMAIN)
BOTTOM CLOSURE FOR SIDING (TO REMAIN)
NEW SEALANT
NEW SURFACE MOUNTED
COUNTERFLASHING - SECURED 12" O.C.
NEW TERMINATION BAR - SECURED 12" O.C. WITH
WATER CUT OFF MASTIC AND TOOLED SEALANT
NEW FOAM ROLL EXPANSION JOINT
NEW 6 mil POLY AND
FIBERGLASS BATT TO
FILL GAP BEHIND
WOOD NAILER
NEW FULLY ADHERED REINFORCED 60 mil EPDM
EXISTING WOOD NAILER (TO REMAIN)
~20" ABOVE DECK
~12" ABOVE DECK
NEW TERMINATION BAR - SECURED MIN.
12" O.C. WITH CUT OFF MASTIC AND
TOOLED SEALANT
NEW SEALANT
NEW 60 mil REINFORCED EPDM
BASE FLASHING - FULLY ADHERED
NEW 4" COUNTERFLASHING - SET INTO A SAWCUT
REGLET AND SECURED WITH LEAD WEDGES
COPING (REFER TO
DETAIL ELSEWHERE)
BRICK
NEW EPDM STRIPPING PLY
NEW EPDM FLASHING TO RUN UP
AND OVER PARAPET AND ~1"
ONTO BRICK WALL
EXISTING STONE COPING
EXISTING
BRICK WALL
REMOVE AND RESET ANY FLOODLIGHT
MOUNTED ON THE STONE COPING
EXISTING COPPER CAN
EITHER BE TRIMMED
AND REMOVED OR CAN
REMAIN BURIED
NEW NOMINAL 1/2"
PLYWOOD TO FILL
GAP BELOW STONE
COPING (OVERHANG)
NEW 22 GA.
GALVANIZED CLIP -
SECURED AT 12" O.C.
METAL TO COVER
BRICK ~2"
SLIGHT HEM AND
BEND AT BOTTOM
~14"
VERIFY IN FIELD
NEW 24 GA. PREFINISHED GALVANIZED
COPING WITH CONCEALED SPLICE PLATES
(~6" OUTSIDE FACE, ~3.5" INSIDE FACE)
NEW 3/4" PLYWOOD WITH 3/4"
PLYWOOD SHIM - SECURE AT (2)
ROWS 12" O.C. STAGGERED
SECURE INNER COPING ~24" O.C.
NEW FULLY ADHERED
EPDM UP AND OVER
PARAPET
EXISTING BRICK
EXISTING WOOD NAILER
NEW 22 GA. GALVANIZED CLIP -
SECURE 12" O.C. TOP AND FACE
NEW TERMINATION BAR - SECURED MIN.
12" O.C. WITH WATER CUT OFF MASTIC
NEW SEALANT - TOOLED SMOOTH
NEW 60 mil EPDM BASE FLASHING -
FULLY ADHERED - NEW 10" HIGH
EXISTING BRICK WALL
C
AD
F
IL
E N o.
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
M
-P
H
AS
E
NEW 24 GA. PREFINISHED GALVANIZED
COPING WITH CONCEALED SPLICE CLIPS
NEW 3/4" PLYWOOD WITH 3/4"
PLYWOOD SHIM - SECURE AT (2)
ROWS 12" O.C. STAGGERED
SECURE INNER COPING ~24" O.C.
NEW 3/4" PLYWOOD -
SECURED AT TOP AND
BOTTOM 12" O.C.
STAGGERED
EXISTING BRICK
NEW 2X NAILER SET IN (3)
BEADS OF CONSTRUCTION
ADHESIVE AND SECURED WITH
1/4" HOOK BOLTS 12" O.C.
NEW 22 GA. GALVANIZED CLIP -
SECURE 8" O.C. TOP AND FACE
NEW FULLY ADHERED 60
mil EPDM UP AND OVER
PARAPET
REMOVE ALL
"HIGHER" SECTIONS
OF MASONRY WALL
REMOVE LOWEST
STONE COPING
REMOVE (3)
ADDITIONAL
COURSE OF BRICK
BELOW LOWEST
STONE COPING
PORTION OF
EXISTING BRICK
TO REMAIN
4"
4" 4"
12" 12" 6" 6"
(NEW HOOK BOLT LAYOUT)
EXISTING PIPE (SIZE VARIES)
NEW APPROVED SEALANT
NEW STAINLESS STEEL DRAWBAND (REQUIRED)
NEW PVC FLASHING MEMBRANE
2" MIN. HOT AIR WELD
8" M
IN
FOR TYPICAL ROOF
PROFILE SEE DETAIL
CONSTRUCTION
2"
6"
SEPARATOR TAPE
PVC FLASHING MEMBRANE -
TURN MEMBRANE UP PIPE ~1"
INFILL GAPS AROUND PIPES WITH SPRAY FOAM
1-1/2"
4" NEW 60 mil PVC STRIP-IN PLY -
CONTINUOUS HEAT WELD TO FIELD
MEMBRANE AND PENETRATION
PAN FLANGE
EXISTING PIPE PENETRATION
NEW SQUARE OR ROUND PITCH
PAN FLASHING CONSTRUCTED
FROM PVC COATED METAL -
MIN. 2" HIGH
NEW PITCH PAN FILLER
CROWNED FOR SLOPE
FILLER TO PREVENT DRIPPAGE
1.)
GENERAL NOTES
IN GENERAL PITCH PANS ARE TO BE
AVOIDED. INSTALL ONLY WHERE A
STANDARD PIPE WRAP IS NOT POSSIBLE.
FOR TYPICAL ROOF
PROFILE SEE DETAIL
CONSTRUCTION
INFILL GAPS WITH SPRAY FOAM
NEW 60 mil REINFORCED PVC BASE
FLASHING - FULLY ADHERED
NEW MIN. 24 GA. PREPAINTED GALVANIZED
STEEL SLIP FLASHING - SECURED WITH
NEOPRENE BACKED SCREWS MIN. 12" O.C.
NON-REMOVABLE HVAC
ORIGINAL HVAC CURB
EXISTING CURB WOOD NAILER STRIP
NEW WATER CUTOFF MASTIC
FOR TYPICAL ROOF
PROFILE SEE DETAIL
CONSTRUCTION
NOTE: CURB CONSTRUCTION
IS SHOWN AS A TYPICAL
CONSTRUCTION AND
VARIATIONS TO THE
BLOCKING OR STEEL FROM
WHAT IS SHOWN MAY EXIST.
NEW MANUFACTURER APPROVED
MEMBRANE SECUREMENT FASTENERS
AND PLATES MIN. 12" O.C. AROUND
PENETRATION MIN. OF (4) PER
PENETRATION
APPROVED SEALANT
NEW STAINLESS STEEL DRAWBAND
NEW 24 GA. STAINLESS STEEL UMBRELLA
FLASHING
EXISTING GALVANIZED STEEL
HOT STACK
NEW NOMINAL 60 mil NON-REINFORCED
THERMOPLASTIC FLASHING MEMBRANE -
FULLY ADHERED
MANUFACTURER APPROVED BONDING
ADHESIVE
CONTINUOUS HOT AIR WELDS
MANUFACTURER APPROVED
SEALANT (IF REQUIRED)
NEW 24 GA. GALVANIZED STEEL
FLASHING SLEEVE - SECURED TO
DECK 6" O.C.
1" MIN.
CLEARANCE
1"
" M
IN
1" MIN. 2" MIN.
1" MIN.
3"
1.)
GENERAL NOTES
ILLUSTRATION DEPICTS A "ROUND" BASE AND COLLAR. HOWEVER,
SOME HOT PIPES HAVE A SQUARE CURB AND A ROUND TO SQUARE
HOOD. FOR THOSE CONDITIONS, RAISE AND RESET HOOD TO
INSTALL NEW CURB FLASHINGS. SEE DETAIL 08A..
NEW BATT FIBERGLASS INSULATION
APPROX. 4"-6"
FOR TYPICAL ROOF
PROFILE SEE DETAIL
CONSTRUCTION
~2'-3'
SQUARE
NEW 2X WOOD BLOCKING
TO RAISE CURB TO 10" MIN.
FLASHING - TOE NAIL TO
TOP OF EXISTING WOOD
CURB AT 12" O.C. MAX.
NEW MANUFACTURER
APPROVED MEMBRANE
SECUREMENT FASTENERS AND
PLATES MIN. 12" O.C.
NEW STAINLESS STEEL DRAWBAND
NEW 24 GA. STAINLESS STEEL UMBRELLA
FLASHING
EXISTING GALVANIZED STEEL
HOT STACK
APPROVED SEALANT
NEW NOMINAL 60 mil
NON-REINFORCED
THERMOPLASTIC FLASHING
MEMBRANE - FULLY ADHERED
MANUFACTURER
APPROVED SEALANT (IF
REQUIRED)
NEW BATT FIBERGLASS INSULATION
APPROX. 4"-6"
EXISTING WOOD BLOCKING
FOR TYPICAL ROOF
PROFILE SEE DETAIL
CONSTRUCTION
C
AD
F
IL
E N o.
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
M
-P
H
AS
E
1.5" + 2.0" + "X"
1.5" + "Y"
1.5" + "X"
Q
~6'
3'
POURED WALL (TO REMAIN)
FILL DECK OPENING OR
COVER WITH 5 'x 5' x 1/4"
STEEL PLATE
4" ISO 8' INTO SPACE
3" ISO 8' INTO SPACE
2" ISO AT DOORWAY
APPROX. 30"
EXISTING DOOR
OPENING
1.5" BASE LAYER
2" FILL
X
2.5"
1.5"
0.5"
Y
X
EPDM PLY RUN DOWN FACE
NEW 6" ALUMINUM FASCIA -
NAILED TOP AND BOTTOM AT
12" O.C.
NEW EPDM STRIPPING PLY -
MIN. 9" WIDE
NEW 2.5" T-SHAPED
ALUMINUM DRIP EDGE -
NAILED 3" O.C.
BUILDING WALL
SOFFIT
NEW 1/2" PLYWOOD 6" EDGE -
NAILED 6" O.C.
12" MIN
OPENING SIZE
EXISTING STEEL DECK
NEW 22 GA. RIBBED METAL DECK
TO EXTEND MINIMUM 12" ONTO ADJOINING DECK,
BUT TO EXTEND 3' OR MORE IN FLUTE DIRECTION TO
EXTEND 6" BEYOND NEAREST STRUCTURAL JOIST.
NEW SELF TAPPING SCREWS
AT 12" O.C. ALL FOUR SIDES
NEW FOAM ROLL AND
EPDM COVER STRIPNEW WOOD BLOCKING TO MATCH
INSULATION THICKNESS (~2.25")
EXISTING WOOD
NAILERS (TO
REMAIN)
NEW BATT
INSULATION
NEW 24 GA. PREFINISHED
GUTTER - SECURED 6" O.C.
ON TOP AND NEW
SPACERS AT 24" O.C.
NEW (3) 2x6 NAILERS
PLUS 1/2" PLYWOOD TO
ACHIEVE 5" OF NAILER
EXISTING BRICK
NEW 24 GA. PREFINISHED
EXTENSION TO COVER
TOP OF BRICK 3"
NEW MEMBRANE STRIPPING PLY
NEW FULLY ADHERED 60 mil
REINFORCED EPDM - TURN
DOWN WALL ONTO BRICK
FOR TYPICAL ROOF
PROFILE SEE DETAIL
CONSTRUCTION
NEW 24 GA. PREFINISHED RAKE
EDGE - LOCKED ONTO CLEAT -
NAILED 4" O.C.
NEW 22 GA. CLEAT - SECURED
12" O.C. TOP AND FACE
NEW MEMBRANE STRIPPING PLY
NEW EPDM - RUN DOWN AND
OVER WOOD BLOCKING
FOR TYPICAL ROOF
PROFILE SEE DETAIL
CONSTRUCTION
1-1/2"
~ 3/4"
~ 7.25" NEW (3) 2x6 NAILERS
PLUS 3/4" PLYWOOD TO
ACHIEVE 5.25" OF
NAILER
C
AD
F
IL
E N o.
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
M
-P
H
AS
E
1" 12"
EPDM PLY RUN DOWN FACE
NEW 6" ALUMINUM FASCIA -
NAILED TOP AND BOTTOM AT
12" O.C.
NEW EPDM STRIPPING PLY -
MIN. 9" WIDE
NEW 2.5" T-SHAPED
ALUMINUM DRIP EDGE -
NAILED 3" O.C.
BUILDING WALL
SOFFIT
NEW 1/2" x 6" PLYWOOD -
NAILED 6" O.C. TO SUPPORT
NEW METAL EDGE
1" 12"
NEW GUTTER HANGER SET
AT 24" (FIVE TOTAL) FOR 10
FOOT GUTTER
2"
4" MIN.
3" MIN.
5" MIN.
NEW GUTTER SHALL BE .040" ALUMINUM
AND SHALL BE 10 FEET LONG WITH END
CAPS - NEW .026" PREFABRICATED OUTLET
AND NEW 040 PVC DOWNSPOUT TO BE
INSTALLED TO MATCH EXISTING
DOWNSPOUT LOCATION
NOTE:
SLOPE GUTTER 1/2"
TOWARD DOWNSPOUT END.
C
AD
F
IL
E N o.
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
B U
SI
N
ES
S
SE
R
V
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
In te rc ha ng e Dr
Fa rm in gt on
H ill s · M
I ·
Te l 2
.9
.9
Bu ild in g
Sc ie nc e
So lu tio ns
Bu ild in g an d
Co ns tr uc tio n
M
-P
H
AS
E
| Sheets and Views |
| M2163-2023-OUTFORBIDSET-COVER SHEET |
| M2163-2023-OUTFORBIDSET-RP1 |
| M2163-2023-OUTFORBIDSET-RP2 |
| M2163-2023-OUTFORBIDSET-RP2 (2) |
| M2163-2023-OUTFORBIDSET-RP3 |
| M2163-2023-OUTFORBIDSET-D1 |
| M2163-2023-OUTFORBIDSET-D2 |
| M2163-2023-OUTFORBIDSET-D3 |
| M2163-2023-OUTFORBIDSET-D4 |
| M2163-2023-OUTFORBIDSET-D5 |
File details come from the government source that posted it. Updated .