230130_Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- WWYK230130
About this file
These are architectural and engineering design drawings for a roof replacement project at Tinker Air Force Base, Oklahoma. The project involves replacing roofs on five buildings (B964, B4068, B5715, B61018, and B61019) using EPDM roofing material. The drawings include detailed demolition and new roof plans for each building, aerial images of the roof locations, and technical details for roofing components such as gutters, edge metal, scuppers, and stack vents. Key specifications include removing existing built-up roofing (BUR), installing new plywood decking where needed, applying new EPDM roofing, replacing gutters and downspouts, and reinstalling or replacing existing roof penetrations like vents and exhaust fans. The project is scheduled for completion by March 25, 2025, with an estimated contract value between $500,000 and $1,000,000, and is being conducted by the Air Force Materiel Command's 72nd Civil Engineer Directorate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EAL List_CTR to Fill.xlsx | XLSX spreadsheet | |
| 230130_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT: (CEXF)
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
WWYK230130
REPLACE MULTIPLE
ROOFS, B964,B4068,
B5715,B61018, AND B61019
KEY PLAN:
GENERAL NOTES:
DISCIPLINE
PROJECT
LOCATION
1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
MACB
W W
YK
RE
PL
AC
E
MU
LT
IP
LE
RO
OF
S, B
4,B
B5
5, B6
, A
ND
B
M
AR
TE
PA
-S R
M
A
AL
AW
AD
I
G-101
S.
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
0\
0_ Su pp or t\0 _3
_D ra w in gs
GE
NE
RA
L N
OT
ES
A
ND
VI
CI
NI
TY
M
AP
S
01 08
R-101
RD-101 DEMOLITION AND NEW ROOF PLAN B964
AERIAL IMAGES OF ROOF PLANS B964, B4068, B5715, B61018, B61019
DETAILS
KEY PLAN:
KEY PLAN: KEY PLAN:
KEY PLAN:
PROJECT
LOCATION
PROJECT
LOCATION
RD-1024
RD-1035
RD-1046
RD-1057
DT-1018
DEMOLITION AND NEW ROOF PLAN B5715
DEMOLITION AND NEW ROOF PLAN B4068
DEMOLITION AND NEW ROOF PLAN B61018
DEMOLITION AND NEW ROOF PLAN B61019
Al er t R d.
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Cr ut ch o
Cr ee k
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
Arnold St.
Ea st
D r.
SE 74th St
SE 59th St.
Ai r D ep ot
Patrol Rd.
St af f D r.
Reserve Rd.
5th Ave
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
7th St.
"H " A ve
M cN ar ne y Av e.
Mitchell Ave
Al er t R d.
Co ok
A ve
W es t D r.
"E "A ve
Extender Dr.
Sentry Rd.
34th St.
Twining Dr.
5th Ave.
Jo ne s
Globemaster Dr.
To w er R d.
Vanaman Rd.
In du st ria l B lv d.
So ut h St
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
Ai r D ep ot
Ai r D ep ot
"D " A ve
Perimeter Rd.
Rapcon Rd.
Reserve Rd
"L " A ve
Mercury Rd.
1st St.
Br ow n Dr
Po nd
R d.
O ld
A ir
De po t
Airey Dr.
General Motors Dr
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Vandenberg Dr.
Hi llt op R d.
Do rm ito ry
R d.
Dormitory Rd.
"M " A ve
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
Co m m od ity D r.
Doolittle Ave
W hi te D r.
3rd Ave.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Ai r D ep ot
B lv d
Turbine Dr. Turbine Dr.
Central Plant Dr.
6th St.6th St.
Falco n Dr.
Blackb ird
Dr.
W ey la nd
L oo p
Pegasus Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Ph an to m
D r.
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
La w re nc e
M un de ll
Nabors Dr.
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ta il
Fe at he r D r.
Holden Dr.
Ai re y C ir.
Smith Ct.
Ra ve n Ct
Air Dep ot Ai r D ep ot
Vanaman Rd.
1st St.
1st St.
TAXIWAY F
Ra w li ng s A ve
Mitc he ll A ve
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
Pr op ul sio n Dr
Stratofortress Dr.
96021
Arnold St.
61018
61019
TINKER AFB, OK
VICINITY MAP
BASE
OPERATIONS
B240
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
HRUSKOCY
GATE
EAKER GATE
FIRE DEPARTMENT
B117
PROJECT
LOCATION
B964
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
VANCE
GATE
PROJECT
LOCATION
B61018
PROJECT
LOCATION
B4068
PROJECT
LOCATION
B5715
PROJECT
LOCATION
B61019
Cr ut ch o
Cr ee k
15904
15904
15904
15904
61018
Dormitory Rd.
61018
Kuhlman Creek
61019
Ai r D ep ot
61019
57025703
65672
M cN ar ne y Av e.
Ra w li ng s A ve
Mitc he ll A ve
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
RD-101
AERIAL IMAGE OF ROOF PLAN B964
NTS
MACB
W W
YK
RE
PL
AC
E
MU
LT
IP
LE
RO
OF
S, B
4,B
B5
5, B6
, A
ND
B
M
AR
TE
PA
-S R
M
A
AL
AW
AD
I
R-101
S.
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
0\
0_ Su pp or t\0 _3
_D ra w in gs
AE
RI
AL
IM
AG
ES
O F
RO
OF
PL
AN
S B9
, B
B5
5, B6
, B
02 08
RD-102
AERIAL IMAGE OF ROOF PLAN B4068
NTS
RD-103
AERIAL IMAGE OF ROOF PLAN B5715
NTS
RD-104
AERIAL IMAGE OF ROOF PLAN B61018
NTS
RD-105
AERIAL IMAGE OF ROOF PLAN B61019
NTS
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
RD-101
DEMOLITION ROOF PLAN B964
SCALE: 3/32"=15'
MACB
W W
YK
RE
PL
AC
E
MU
LT
IP
LE
RO
OF
S, B
4,B
B5
5, B6
, A
ND
B
M
AR
TE
PA
-S R
M
A
AL
AW
AD
I
RD-101
S.
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
0\
0_ Su pp or t\0 _3
_D ra w in gs
DE
MO
LIT
IO
N
AN
D
NE
W R
OO
F
PL
AN
B
03 08
RD-101
NEW ROOF PLAN B964
SCALE: 3/32"=15'
KEYED NOTES
REMOVE THE EXISTING BUR ROOFING.
REMOVE THE EXISTING GUTTER AND DOWN SPOUTS TYP.
REMOVE THE EXISTING EDGE METAL.
INSTALL NEW EPDM ROOFING PER SOW.
INSTALL NEW GUTTER AND DOWN SPOUTS PER SOW.
INSTALL NEW EDGE METAL.
INSTALL NEW WALK-PADS.
GENERAL NOTES
1 - ALL THE VENTS AND EXHAUST FLASHING TO BE REMOVED AND REINSTALLED.
2 - TWO STEAM EXHAUSTS TO REMAIN, REPLACE FLASHING AROUND VENTS ONLY.
3 - LADDER TO BE RELOCATED.
EXAUST
FAN
VENT
VENTVENT
LADDER
STEAM STEAM
VENTVENT
EXAUST
FAN
STEAM STEAM
VENT
VENT
VENT
VENT
VENT
LADDER
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
RD-102
DEMOLITION ROOF PLAN B4068
SCALE: 3/32"=15'
MACB
W W
YK
RE
PL
AC
E
MU
LT
IP
LE
RO
OF
S, B
4,B
B5
5, B6
, A
ND
B
M
AR
TE
PA
-S R
M
A
AL
AW
AD
I
RD-102
S.
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
0\
0_ Su pp or t\0 _3
_D ra w in gs
DE
MO
LIT
IO
N
AN
D
NE
W R
OO
F
PL
AN
B
04 08
RD-102
NEW ROOF PLAN B4068
SCALE: 3/32"=15'
KEYED NOTES
REMOVE THE EXISTING BUR ROOF.
REMOVE THE EXISTING COPING CAP.
THE EXISTING THROUGH WALL SCUPPER, COLLECTORS AND DOWN
SPOUTS WILL REMAIN.
INSTALL NEW EPDM ROOF PER SOW.
INSTALL NEW COPING CAP PER SOW.
INSTALL OVERFLOW THROUGH WALL SCUPPER PER SOW.
REMOVE AND REINSTALL THE VENT.
SLOPE
SLOPE
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
RD-103
DEMOLITION ROOF PLAN B5715
SCALE: 1/16"=20'
MACB
W W
YK
RE
PL
AC
E
MU
LT
IP
LE
RO
OF
S, B
4,B
B5
5, B6
, A
ND
B
M
AR
TE
PA
-S R
M
A
AL
AW
AD
I
RD-103
S.
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
0\
0_ Su pp or t\0 _3
_D ra w in gs
DE
MO
LIT
IO
N
AN
D
NE
W R
OO
F
PL
AN
B
05 08
RD-103
NEW ROOF PLAN B5715
SCALE: 1/16"=20'
KEYED NOTES
GENERAL NOTES
REMOVE TNE EXISTING BUR ROOF.
REMOVE THE GUTTERS, DOWNSPOUTS AND SPLASH BLOCKS TYP .
INSTALL NEW EPDM ROOF PER SOW.
INSTALL NEW GUTTERS, DOWNSPOUTS AND SPLASH BLOCKS PER SOW TYP.
1 - STEAM VENTS TO REMAIN, REPLACE FLASHING AROUND VENTS.
2 - ALL THE SOFFIT, FASCIA AND FLASHING TO REMAIN.
3 - VENTS AND EXHAUST FAN TO BE REMOVED AND REINSTALLED.
2 21 1
22 1
VENT
VENT
VENT
EXAUST
FAN
VENT
VENT
STEAM
3 3
VENT
VENT
VENT
VENT
VENT
STEAM
EXAUST
FAN
4 4
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
RD-104
DEMOLITION ROOF PLAN B61018
SCALE: 1"=15'
MACB
W W
YK
RE
PL
AC
E
MU
LT
IP
LE
RO
OF
S, B
4,B
B5
5, B6
, A
ND
B
M
AR
TE
PA
-S R
M
A
AL
AW
AD
I
RD-104
S.
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
0\
0_ Su pp or t\0 _3
_D ra w in gs
DE
MO
LIT
IO
N
AN
D
NE
W R
OO
F
PL
AN
B
06 08
RD-104
NEW ROOF PLAN B61018
SCALE:1"=15'
GENERAL NOTES
KEYED NOTES
1. TRIM ALL TREES AND BUSHES AROUND THE BUILDING PER SOW.
INSTALL NEW WOOD JOISTS, NAILERS, PLYWOOD ROOF DECKING AND
ATTACH AS REQUIRED. INSTALL NEW EPDM ROOF.
INSTALL NEW PERIMETER EDGE METAL, FASCIA, SOFFIT AND SOFFIT VENTS.
INSTALL NEW GUTTER AND DOWN SPOUT.
REMOVE ROOF STRUCTURE, REMOVE THE EXISTING BUR ROOF PER SOW.
REMOVE THE EXISTING EDGE METAL, FASCIA, SOFFIT AND SOFFIT VENTS.
SLOPE
SLOPE
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
RD-105
DEMOLITION ROOF PLAN B61019
SCALE: 1"=15'
MACB
W W
YK
RE
PL
AC
E
MU
LT
IP
LE
RO
OF
S, B
4,B
B5
5, B6
, A
ND
B
M
AR
TE
PA
-S R
M
A
AL
AW
AD
I
RD-105
S.
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
0\
0_ Su pp or t\0 _3
_D ra w in gs
DE
MO
LIT
IO
N
AN
D
NE
W R
OO
F
PL
AN
B
07 08
RD-105
NEW ROOF PLAN B61019
SCALE: 1"=15'
GENERAL NOTES
KEYED NOTES
1. TRIM ALL TREES AND BUSHES AROUND THE BUILDING PER S.O.W.
INSTALL NEW PLYWOOD ROOF DECKING AND ATTACH AS REQUIRED. INSTALL
NEW EPDM ROOF.
INSTALL NEW PERIMETER EDGE METAL, FASCIA, SOFFIT AND SOFFIT VENTS.
INSTALL NEW GUTTER AND DOWN SPOUT.
REMOVE AND DISPOSE OF ALL EXISTING PLYWOOD ROOF DECKING, REMOVE
THE EXISTING BUR ROOF PER SOW.
REMOVE THE EXISTING EDGE METAL, FASCIA ,SOFFIT AND SOFFIT VENTS.
2 SLOPE
SLOPE
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
MACB
W W
YK
RE
PL
AC
E
MU
LT
IP
LE
RO
OF
S, B
4,B
B5
5, B6
, A
ND
B
M
AR
TE
PA
-S R
M
A
AL
AW
AD
I
DT-101
S.
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
0\
0_ Su pp or t\0 _3
_D ra w in gs
DE
TA
ILS
08 08
WOOD NAILER
PREFABRICATED METAL CURB
2 X 6 MIN. WOOD NAILER
ATTACHED TO SUBSTRATE
OVERALL THICKNESS TO
MATCH INSULATION
REINFORCED MEMBRANE
ATTACHMENT STRIP WITH
SEAM PLATES AND FASTENERS
ADHERED 90 MIL WHITE
EPDM MEMBRANE FLASHING
FL
A
S H
IN
G
H E
IG
H
T 8"
M
IN
IM
U
M
BONDING ADHESIVE
ROOFTOP EQUIPMENT FRAME
24 GAUGE REMOVABLE
SHEET-METALCOUNTERFLASHING
GASKETED FASTENER
MIN. TWO FASTENERS
PER SIDE
CORNER FLASHING PIECE
AT EACH CORNER
SEAL ALL EXPOSED EDGES
FASTENERS
APPROX. 8" O.C.
MIN. TWO PER SIDE
SEALANT WATER BLOCK
2 X 6 MIN. WOOD NAILER
ATTACHED TO SUBSTRATE
OVERALL THICKNESS TO
MATCH INSULATION
SHEET-METAL GUTTER
THE FRONT OF THE
GUTTER SHOULD BE A
MIN. 1'' LOWER THAN
THE BACK TO ALLOW
OVERFLOW
18 GAUGE GUTTER
BRACKET SUPPORT
SEALANT ADHERED MEMBRANE FLASHING
PER THE MANUFACTURER'S
WARRANTY PER THE
MANUFACTURER'S
WARRANTY REQUIREMENTS
24 GAUGE PVDF
SHEET-METAL
EDGE FLASHING
18 GAUGE GUTTER
SPACERS INSTALLED
12" OC BETWEEN
GUTTER BRACKETS
BONDING
ADHESIVE
FIELD SHEET OR SEPARATE
MEMBRANE SHEET EXTENDED
BELOW BLOCKING
24 GAUGE PVDF
COATED SHEET
METAL GUTTER
TYP
DT-101
DETAIL BASE FLASHING AT PREFABRICATED METAL CURB
NTS
TYP
DT-101
DETAIL SHEET-METAL STACK VENT (HOT OR COLD)
NTS
TYP
DT-101
DETAIL GUTTER
NTS
BONDING ADHESIVE
PRIMER
CONTINUOUS BEAD OF AP SEALANT
9" FLASH
12" FLASH
CONT. BEAD OF WATERBLOCK
SUPPORT / PIPE
PENETRATION
METAL DECK
POURABLE SEALER
METAL PENETRATION POCKET
WOOD BLOCKING, AS REQ'D.
1-1/4" HOT DIPPED GALV. ROOF
NAILS AT 4" O.C. MAX
90 MIL WHITE EPDM
CONT. BEAD OF LAP
SEALANT
TYP
DT-101
DETAIL PITCH PAN
NTS
TYP
DT-101
ENLARGED SECTION AT OVER-FLOW THRU-WALL SCUPPER
NTS
SHEET-METAL SCUPPER
SECURED TO WALL AND DECK
TERMINATION OF MEMBRANE
FLASHING WILL VARY
BONDING
ADHESIVE
SEALANT (IF REQUIRED
FOR SPECIFIC SYSTEM)
SEALANT WATER
BLOCK
ADHERED MEMBRANE FLASHING
SEALANT (IF REQUIRED
FOR SPECIFIC SYSTEM)
WOOD BLOCKING
SHEET-METAL
SCUPPER SECURED
TO WALL AND DECK
TERMINATION OF
MEMBRANE FLASHING
WILL VARY
BONDING ADHESIVE SEALANT (IF REQUIRED
FOR SPECIFIC
SYSTEM)
BONDING ADHESIVE
SEALANT (IF REQUIRED
FOR SPECIFIC
SYSTEM)
SEALANT WATER
BLOCK
ADHERED MEMBRANE
FLASHING
WOOD BLOCKING
TYP
DT-101
ENLARGED SECTION AT THRU-WALL SCUPPER
NTS
METAL LINER AND
INSULATION
SEALANT (IF
REQUIRED FOR
SPECIFIC SYSTEM)
4'' MIN. FLANGE
SHEET-METAL RAIN
COLLAR
SHEET-METAL
FLASHING
APPROPRIATE
SEALANT (E.G.,
POLYURETHANE)
DRAWBAND
8' ' M
IN
IM
U M
FL
A
S H
IN
G
H E
IG
H
T
SEALANT
ADHERED
MEMBRANE
FLASHING
ADHESIVE
2" MIN.
| Sheets and Views |
| G101 |
| 02-230130-R101-R101.pdf |
| Sheets and Views |
| R101 |
| 08-230130-DT101-DT101.pdf |
| Sheets and Views |
| DT101 |
| 07-230130-RD105-RD105.pdf |
| Sheets and Views |
| RD105 |
| 06-230130-RD104-RD104.pdf |
| Sheets and Views |
| RD104 |
| 05-230130-RD103-RD103.pdf |
| Sheets and Views |
| RD103 |
| 04-230130-RD102-RD102.pdf |
| Sheets and Views |
| RD102 |
| 03-230130-RD101-RD101.pdf |
| Sheets and Views |
| RD101 |
File details come from the government source that posted it. Updated .