This document is an Addendum #2 issued by the Florida Army National Guard Construction & Facility Management Office for a project to replace a chiller compressor at the AASF #1 Cecil Field location in Jacksonville, Florida. The addendum provides clarifications on the scope of work, including that only Circuit 2 requires new filter driers, and identifies the preferred compressor remanufacturer. It also addresses questions from bidders, confirming that Exhibit 3 - Contractor Qualification FNG 5085 is not required for this project, and clarifying that an FAA permit is only needed if equipment extends beyond the hangar height. The bid opening date is April 20, 2023 at 2:00 pm local time.
The contract opportunity is for the AASF #1 Cecil Field Chiller Compressor Repair/Replacement project, located in St. Johns County and St. Petersburg City, Florida. The project involves removing the existing Circuit #2 compressor and installing a remanufactured compressor. The contract is contingent on funding from the State of Florida, and the award will go to the responsive and responsible bidder with the lowest price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Army National Guard
Construction & Facility Management Office
ISSUED ADDENDUM
Rev. 11/2018
Date March 28, 2023
ADDENDUM Number 2
Project Number and Name 230001 Chiller Compressor Replacement
Invitation to Bid Date March 10, 2023
Number of Attachments 4
Bid Opening Date and Time April 20, 2023 @ 2:00
From: Department of Military Affairs, CFMO Contracting Office
This addendum and the listed attachments forms a part of the contract documents and modifies the original bidding documents. Acknowledgement of this addendum in Exhibit 4 - Bid Proposal form is required.
Concerns with this addendum should be addressed to:
ng.fl.flarng.list.cfmo-contracting@army.mil
Answers to Questions (Q) / Clarifications (C) / Modifications (M)
C1. SOW states: 1.5. Furnish and install new filter driers on both circuits 1 and 2. To clarify, we are only replacing circuit 2, you will be furnishing and installing new filter driers (circuit 2 has two filter driers) on circuit 2.
C2. Please see attached Photos for compressor (Photo A) and filter dryer (Photo B) data plates.
C3. Remanufactured components should be manufactured by: The preferred Compressor Remanufacturer is A-1 Compressor or an equal Alternate remanufacturer(s), all must provide a minimum 1-year factory warranty.
Q1. As discussed in the Pre-Bid Site Visit Meeting Agenda, we are no longer required to submit “Exhibit 3 – Contractor Qualification FNG 5085”?
A1. No, Exhibit 3 is not required for this project. Please refer to the ITB and Non-Tech Specs for all other required documents.
Q2. Is an FAA permit required?
mailto:ng.fl.flarng.list.cfmo-contracting@army.mil
A2. An FAA permit is required only if a piece of equipment (typically crane and or hoist) used in any loading/unloading/rigging operation extends beyond the height of the hangar structure (35’).
Attachment List
1. Photo of Compressor Data Plate
2. Photo of Dryer Data Plate
3. Pre-Bid Agenda
4. Pre-Bid Sign in sheet
END OF ADDENDUM #2
Photo B - Chiller Compressor Data Plate
This is the best photo we have.
Photo B - Circuit 2 - Chiller Dryer Data Plate
This is the best photo we have..
PRE-BID SITE VISIT MEETING AGENDA
Rev. 12/2018
Date March 22, 2023 @ 10:00 a.m.
Project Number and Name 230001 Chiller Compressor Repair/Replace
Project Location AASF #1 Cecil Field, Jacksonville, Florida
Last Day for Questions April 6, 2023, by 12:00 p.m.
Date for Final Addendum April 11, 2023, by 11:00 a.m. (Tentative)
Bid Opening Date April 20, 2023 @ 2:00 p.m. (local time)
1. SIGN IN OF ATTENDEES.
2. INTRODUCTIONS.
3. GENERAL PROJECT DESCRIPTION (see bid documents for complete details).
4. SITE CONDITIONS. Prospective bidders shall examine the site for conditions under which the work is to be done before submitting their bid package. No allowance will be made for extra expenses incurred due to noncompliance with this section.
5. Work Schedule. Monday through Friday _______ to _______. All after-hours work
(including weekend and/or holidays) or schedule changes must be coordinated with and approved by the Project Manager.
The Florida National Guard works on an alternate work schedule (AWS) where every other Monday is a scheduled day off. The contractor will / will not be allowed to work on AWS Mondays.
See Non-Technical Specifications C-4 and C-5 for additional information regarding work schedules on observed Federal Holidays.
6. BID BOND. For bids in excess of $100,000.00, including base bid and alternate bid items, the bidder MUST provide a good faith deposit in the amount of 5% of the bid by way of a bid bond from a surety insurer authorized to do business in the state of Florida, a certified check, or cashier’s check with their bid package.
7. PERMITS. The contractor shall obtain all required permits necessary for completion of this project from all authorities having jurisdiction; and shall include the cost of all such permits in their bid package.
8. QUESTIONS FROM BIDDERS. All questions and requests for clarifications related to this solicitation must be submitted in writing to the CFMO at ng.fl.flarng.list.cfmo-contracting@army.mil in accordance with the timeframe shown above. All questions will be answered in an addendum and posted in the same manner as the ITB.
9. REQUIRED BID PACKAGE DOCUMENTS (in this order).
• Exhibit 4 – Bid Proposal Form (include acknowledgement of Addenda)
• Exhibit 5 – Subcontractor List (indicate if “N/A”)
• Bid Bond (if applicable)
• Exhibit 3 – Contractor Qualification FNG 5085 (if requested by the Department)
• Letter of confirmation from bonding company (if applicable)
• Contractor agreement to perform at least 15% of project work
• Florida State contractor license (if applicable)
10. BID SUBMISSION AND BID OPENING. Envelopes containing bid submission must be clearly marked:
“SEALED BID – 230001- Chiller Compressor Repair/Replacement ATTN: CFMO Contract Management Branch” and submitted to:
Robert F. Ensslin, Jr. Armory 2305 State Route 207 Saint Augustine, FL 32086 Attention: CFMO Contracting
In order to be considered, bids must:
• be submitted on DMA forms
• not be submitted electronically
• not be received after the exact time specified for receipt
• not be received at any location other than specified in the ITB
Bids must be submitted in full accordance with the requirements of this solicitation.
Please contact the CFMO Contract Management Office at 904-823-0255 or 904- 827-8544 to confirm receipt of bid.
Federal or State picture ID is required for entry into the Robert F. Ensslin, Jr.
National Guard Armory. Bids will be accepted until the time of the Bid Opening.
11. NON-TECHNICAL SPECIFICATIONS. The Non-Technical Specifications included with the ITB are incorporated into the forthcoming contract by reference.
12. BONDS AND INSURANCE. Performance and Labor and Material Bonds are required from any persons or parties entering into a formal contract with the State of Florida for contracts in total excess of $100,000.00 for construction, additions, renovations, repairs, or demolition of any public building pursuant to Florida Statute 255.05(1). The price for these bonds and their recording fees must be included with each bid package.
The contractor will provide the owner with proof of insurance within 10 days of contract award; the price of all required insurance policies must be included in each bid package. Refer to the Non-Technical Specification for insurance requirements.
All insurance policies shall be with insurers qualified and doing business in Florida through an authorized license Florida Resident Agent. Yes, OCP Insurance is required.
13. DAVIS BACON ACT. Davis Bacon Act does not apply to this solicitation.
14. DAMAGES. Damages will be assessed in accordance with the Non-Technical
Specifications.
15. CONTRACT AWARD. Per Florida Administrative Code 60D-5.004, the project will be awarded to the responsive and responsible bidder that has submitted the lowest price for the base bid or base bid plus alternate bid item.
NOTE: Award of this contract is contingent upon funding from the State of Florida.
16. MY FLORIDA MARKETPLACE VENDOR INFORMATION PORTAL “VIP”. The
MFMP VIP is the primary source of information relating to this solicitation. Any solicitation information obtained from sources other than the Vendor Information Portal should not be relied on by prospective bidders. Bid solicitations received from other sources should be validated with the official solicitation on the Vendor Information Portal.
17. UNAUTHORIZED ALIENS. The Department shall consider the employment by any contractor of unauthorized aliens a violation of Act 274A of the Immigration and Naturalization Act. Such violation shall be cause for unilateral cancellation of this contract.
18. CFMO PROJECT MANAGER COMMENTS.
19. UNIT REPRESENTATIVE COMMENTS.
20. A & E COMMENTS.
21. CONTRACTOR QUESTIONS / CONCERNS.
22. SITE VISIT.
NO VERBAL STATEMENTS MADE BY ANY STATE OF FLORIDA EMPLOYEE OR
AGENCY REPRESENTATIVE WILL SUPERSEDE INFORMATION PUBLISHED IN
THE SOLICITATION. ONLY WRITTEN ADDENDA ISSUED BY THE DEPARTMENT
OF MILITARY AFFAIRS CONSTRUCTION AND FACILITY MANAGEMENT OFFICE
WILL AMEND THIS SOLICITATION.
SIGN IN SHEET
Meeting Subject Pre-Bid Meeting
Project Number and Name 230001 Chiller Compressor Replacement
Date and Time March 22, 2023@ 10:00 a.m.
Name Firm / Directorate Email Address Phone
Kim Morgen CFMO - Contracting Kimberly.d.morgen.nfg@army.mil 904-827-8544
Fred Levinson CFMO - Contracting
C
Rev. 11/2018
File details come from the government source that posted it. Updated .