Statement of Work
For MK 29 Guided Missile Launching System
Launcher Cell Covers Testing
27 MARCH 2023
1 Scope:
This task is to complete the Rainfall testing in accordance with MIL-STD-31000A on the MIN MOD Cell Cover. This is to support validation of design and functionality to keep the ESSM BLK 2 Missile protected from the environment while loaded in the launcher.
2 Applicable Documents:
Cell Cover Test Plan
2.1 Department of Defense Drawings (1):
Drawing 10706-A-001 AFT CELL COVER, BLK 2
2.2 Government Standards:
MIL-STD-31000A, TECHNICAL DATA PACKAGES
3 Requirements:
3.1 General:
The contractor shall provide all resources necessary to accomplish the tasks and deliverables described in this Statement of Work (SOW).
The standards for the test are: the launcher tube cover will need to be sealed against a flat plate and then elevated during the rainfall test. Then the cover will need to withstand, without adverse effects, rainfall rates up to 7.0 Inches per hour, with averages of 1.0 inch per hour for a 12-hour period (extreme service), and 0.5 inch per hour (normal service).
3.2 The contractor shall provide test reports for the tests conducted and provide pass/fail data.
3.3 Shipping:
NSWC PHD will provide the cell covers to be tested to the contractor as identified in section 3.8 below.
The contractor will ship the Government provided cell covers back to NSWC PHD within two weeks of submission of the test report (see section 3.6). The contractor shall furnish any necessary transportation fixture and/or crates when shipping cell covers back to Naval Surface Warfare Center PHD 4363 Missile
Way, Attn: Julian Niderost, Bldg. 1387, FL 2 Cube #2W-16A1, Port Hueneme, CA 93043,POC: Julian Niderost 805-228-6611, julian.b.niderost.civ@us.navy.mil. If shipping charges apply (FOB Destination), please add the estimated shipping cost for ground freight shipments to your quote.
3.4 Place of Performance.
Testing to be done at the vendor’s location and within the United States.
3.5 Meetings:
3.5.1 Post-award Kickoff Meeting:
Within 10 business days of contract award, the Government will conduct a post-award kickoff teleconference over the phone.
3.5.2 Intermittent Project Status Reviews:
At the sole discretion of the Government, intermittent project status reviews maybe conducted on an informal basis by telephone, teleconference, or on-site meeting.
3.6 Delivery, Deliverables and Furnished Items:
Schedules for deliverables are specified below. All deliverables shall be prepared and submitted according to format, content and schedule described in this section and section 3.7.
Cell cover(s) will be shipped by the Government to the Vendor within 1 week of Contract award.
The Vendor will conduct testing within 2-4 days of receipt of the Government furnished Cell cover(s).
The Vendor will generate and provide the Government with a formal test report in accordance with section 3.7 within 2 weeks of receipt of the Government furnished Cell cover(s).
The Vendor will return the cell cover (Government Furnished Property, Section 3.8) to PHD in accordance with section 3.3 within 2 weeks of providing the Government with a test report.
3.7 Sample Items:
Vendors must generate and provide the Government with a test report and status updates of Cell Cover P/N: 10706-A-001. Status updates will consist of vendor updates regarding receiving the cell cover, testing start date, completion and any unforeseen issues. Status updates must be completed and furnished to the Government upon request.
Test reports will be formal reports that include photographs of the unit under test during testing.
Separate test reports will be written for the MIL-STD-108E tests and the MIL-STD-202G test. Test reports must be provided in accordance with section 3.6 and 3.9.
3.8. Government Furnished Property:
10706-A-001 AFT CELL COVER, BLK 2
Part number Nomenclature
QTY
needed
3229814 Aft cell cover retainer 1 AN960C416L Flat Washer 6
AN4C7 Machine Bolt 6
3229815 Cell cover hinge 2
MS35308-
306 Cap Screw 2
AN960C416L Flat Washer 10
MS35650-
3254 Nut 2
MS35338-
139 Lock washer 2 AN4C42 Machine Bolt 2
MS24693-
C294 Machine Screw 4
3231880-1 Spacer 2
2896601 Cell cover clamp 1 AN4C15 Machine Bolt 1
AN960C416L Flat Washer 2
MS15795-
843 Flat Washer 1
MS35338-
143 Lock washer 1
MS51023-
114 Setscrew 1
2896604-1 Bracket clamp 1
MS35308-
310 Screw, cap 4 MS21044C4 Nut, self-locking 4 AN960C416L Washer, flat 8
3.9 Point of Delivery.
Test Report delivered to:
For Test Report:
Commander Naval Surface Warfare Center, Port Hueneme Division 4363 Missile Way, Bldg. 1387, FL 2 Cube #2W-16A1, POC: Julian Niderost, 805-228-6611, julian.b.niderost.civ@us.navy.mil Port Hueneme, CA 93043-4307 *Please reference contract number upon shipping*
3.10 Government Points of Contact (POCs):
3.10.1 Technical POC:
Julian Niderost, NSWC Division, Port Hueneme, Code S54, julian.niderost@navy.mil
3.10.2 Requirement Generator & Alternate Technical POC. Phil Chowdhury, Code S53, firozul.chowdhury@navy.mil.
3.10.3 Contracting POC:
Phil Chowdhury, NSWC PHD, Port Hueneme Code 0243, firozul.chowdhury@navy.mil mailto:julian.niderost@navy.mil mailto:firozul.chowdhury@navy.mil
File details come from the government source that posted it. Updated .