This document is an addendum to a state and local contract opportunity for Structured Cabling and Network Infrastructure services in Macomb County, Michigan and St. Louis City. The addendum addresses questions from contractors regarding the project, including the number and configuration of cable runs from the Wheat Building, responsibilities of the electrical contractor, estimated footage for cable runs, and the use of conduit at the Wheat Building. The addendum also confirms that three 24"x36" Quazite handholes will be installed by the electrical contractor, and that all underground duct will be 2" in size.
The original contract opportunity covers the provision of structured cabling and network infrastructure services for the Lakeview Public Schools district. The contract duration and any renewal options are not specified in the provided documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23-LPS SCNI-01 Advertisement for Bid.pdf | ||
| 23-LPS SCNI-01 Advertisement for Bid (1).pdf | ||
| T1.01 Network Infrastructure Plan.pdf | ||
| 23-LPS-SCNI-01 Bid Forms.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
818 West 11 Mile Road | Royal Oak, MI 48067 | Tel 248-594-5850 | Fax 248-594-5851 | http://wrighthunter.com
Addendum #1
Number: 1 W&H Project:
Structured Cabling and Network Infrastructure
Date: December 19, 2023 Project #: 23-LPS-SCNI-01
Type: Addendum Designer: Rob Richcreek
Location: Lakeview Public Schools
Contractor Questions:
1) Is each of the runs from the Wheat Building to be separate 6ct home runs from the Concessions Stand and the Press Box?
Answer: Correct. The Contractor will install (1) six-strand from the Wheat Building to the Concessions Building, and (1) six-strand from the Wheat Building to the Press Box.
2) Will the riser up to the Press Box and the entry into the Press Box be completed by the Electrical
Contractor?
Answer: Yes.
3) What is the estimated interior footage at the Concessions Stand to the Proposed Cabinet/PP location?
Answer: Assume 100ft.
4) What is the interior footage at the Wheat Building?
Answer: Assume 125ft.
5) Will there be interior conduit or raceway at the Wheat Building?
Answer: Yes. A 2” EMT will extend from the Wheat Building point of entry to the MDF room.
6) 3 handholes by E.C. are shown on drawing, are all 3 handholes 24”x36” quazite?
7) Is all underground duct to be installed by the E.C. going to be 2”?
End of Addendum #1