23-33_Feb_17_25_solicitation_doc.pdf
PDF 15 KB Posted
- Solicitation number
- 23-33
- Issued by
- New London County, Connecticut
About this file
This is an Invitation to Bid (ITB) document issued by the City of Norwich/Norwich Public Utilities for Insertion Flow Meters and Reservoir Monitoring Equipment (Solicitation #23-33). The bid is open to all vendors and runs from December 20, 2022 at 12:00:00 PM EST through January 11, 2023 at 2:00:00 PM EST. The project involves installing additional flow monitoring devices within Norwich's water system, which consists of approximately 200 miles of piping, five booster stations, 6 reducing stations, and eight storage tanks. Currently, flow monitoring only exists at the outlets of two water treatment plants (located in Lebanon and Montville, CT), and NPU aims to expand monitoring capabilities throughout the system and add reservoir level monitoring.
The delivery terms are specified as Free On Board Destination, with payment terms to be vendor-specified. While no estimated total value is provided in the document, the solicitation has been designated as having no line items. The primary point of contact is Robert Castronova at Norwich City Hall. No bidder's conference or site visit information is included in the document.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 23-33
Insertion Flow Meters and Reservoir Monitoring Equipment
Invitation to Bid (ITB)
Norwich, City of
December 20, 2022 - January 11, 2023
Page:2
General Header Information
This bid has no questions defined.
23-33
No. 23-33 Title: Insertion Flow Meters and Reservoir Monitoring Equipment Start Date: December 20, 2022 at 12:00:00 PM EST End Date: January 11, 2023 at 2:00:00 PM EST Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: Norwich Public Utilities water system consists of approximately 200 miles of piping, five booster stations, 6 reducing stations, and eight storage tanks. The system is supplied by two water treatment plants located in the surrounding towns of Lebanon, CT and Montville, CT. The Lebanon plant supplies roughly 75% of the water supply.
Currently, the only locations that are monitored for flow are the outlet at the two plants. It is the intent of NPU to install additional flow monitoring devices within the system as well as monitor reservoir levels.
Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: Norwich, City of
Robert Castronova 100 Broadway Room 105 Norwich CT, 06360 United States Tel: 860-823-3770 Fax:
rcastronova@cityofnorwich.org
Contact Details: If you have any questions, please contact:
Robert Castronova 100 Broadway Room 105 Norwich CT, 06360 United States Tel: 860-823-3770 Fax:
rcastronova@cityofnorwich.org
Selected Categories:
Page:3
Documents:
23-33 Insertion Flow Monitoring Equipment IFB Advertisement.pdf
Page:4
Item Specifications Solicitation has been designated as having no line items.
Page:5
File details come from the government source that posted it. Updated .