23-066 Plans
573 KB Posted
- Solicitation number
- 23-066
- Issued by
- Fulton County, Georgia
About this file
This file contains traffic signal installation plans and specifications for the City of Johns Creek, Georgia's ITB23-066 project located at Brumbelow Road at Newtown Park (referred to as County Park in the plans). The project involves the installation of a new traffic signal system including strain poles, mast arms, signal heads, pedestrian signal heads with countdown timers, control cabinets, push button stations, and associated conduit and cabling. The plans specify the installation of 3-section T-shaped signal heads with TP IX retroreflective tape backplates, LED countdown pedestrian signals (P4 type), a 2070LX controller cabinet equipped with a 336S pole-mounted unit with a 60-foot mast arm, TP 2 and TP 4 pull boxes, ADA ramps with detectable warning surfaces, and crosswalk striping and signage including stop bars and pavement markings. The sealed bid deadline is 2:00 PM on Tuesday, March 7, 2023, with a questions deadline of February 22, 2023 at 5:00 PM through the BidNet online system. The City reserves the right to reject any or all bids and award the contract in its best interest.
The project specifications require the contractor to verify quantities prior to ordering materials, obtain power service from an existing power pole and route to the cabinet, establish new power and communications services, and be responsible for all associated fees for a 30-day utility cost transfer period until satisfactory completion and testing. The contractor must perform utility location work, comply with erosion control measures per state and federal guidelines, replace any damaged infrastructure in kind at no additional cost, remove and replace existing pavement markings and striping using hydroblasting, and conduct material certification prior to beginning signal installation work. The installation must conform to the Manual on Uniform Traffic Control Devices and be checked and accepted by the City of Johns Creek Traffic Engineer prior to final acceptance. The City has indicated this is a federally-assisted program subject to Title VI of the Civil Rights Act of 1964 and Title 49 CFR Part 23, requiring affirmative action to ensure disadvantaged business enterprises are afforded full opportunity to submit bids without discrimination.
Text of this file
27-0001
TRAFFIC SIGNAL LEGENDTRAFFIC SIGNAL GENERAL NOTES
STRAIN POLE
MAST ARM
OVERHEAD SIGN
PULLBOX, TP 2
SIGN POST
PULLBOX, TP 4/4S
PEDESTRIAN SIGNAL HEAD
CONDUIT (BORED)
PROPOSED SIGNAL
STRAIN POLE
MAST ARM
OVERHEAD SIGN
PULLBOX, TP 2
SIGN POST
PULLBOX, TP 4/4S
PEDESTRIAN SIGNAL HEAD
CONDUIT (BORED)
3-SECTION T-SHPAED HEAD W/ BACKPLATE
REVISION DATES
11/16/2022 daniel.shin
GPLOT-V8
gplotborder-V8i-PO.tbl
27-0001.dgn
Design File and Plot Substitution information
4:39:26 PM
GPLN4/28/2016
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
P.I. No.
Alpharetta, Georgia 30009
Suite 600, 11720 Amber Park Dr
Engineering, Planning, and Environmental Consultants BRUMBELOW ROAD AT COUNTY PARK
TRAFFIC SIGNAL NOTES AND LEGEND
19. ALL EXISTING STRIPING IN CONFLICT WITH PROPOSED STRIPING SHALL BE REMOVED BY HYDROBLASTING.
18. CONTRACTOR TO OBTAIN POWER SERVICE; ROUTE TO CABINET.
17. ROUTE NEW 7-CONDUCTOR SIGNAL CABLE TO ALL NEW VEHICULAR AND PEDESTRIAN SIGNAL HEADS.
16. INSTALL NEW BACKPLATES WITH TP IX RETRO-REFLECTIVE TAPE ON ALL NEW VEHICULAR SIGNAL HEADS.
15. ROUTE NEW 3-PAIR LEAD-IN CABLE TO ALL NEW PEDESTRIAN PUSH BUTTONS.
UNINTERRUPTED OPERTATION. THE CONTRACTOR WILL COMPLETE A TRANSFER OF UTILITY COST TO THE CITY OF JOHNS CREEK.
AND SUPPORT DEVICES, UNTIL THE NEW TRAFFIC SIGNAL INSTALLTION HAS SATISFACTORILY COMPLETED A TEST PERIOD, 30 DAYS, OF
14. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL MONTHLY POWER AND COMMUNICATION SERVICE TO THE TRAFFIC SIGNAL INSTALLTION
UTILITY REQUIRES PAYMENT FOR INSTALLTION.
OF THE CONTRACTOR TO INCLUDE THE COST, AS PART OF THEIR BID PRICE, FOR THAT TRAFFIC SIGNAL INSTALLATION IF THE RESPECTIVE
FOR TRAFFIC SIGNALS ON THIS PROJECT. IF A UTILITY TRANSFORMER IS REQUIRED FOR TRAFFIC SIGNAL EQUIPMENT, IT IS THE RESPONSIBLITY
13. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL FEES ASSOCIATED WITH ESTABLISHING NEW POWER AND COMMUNICATIONS SERVICES
CONTROL LUMP SUM ITEM.
12. ALL TRAFFIC MARKING, SYMBOLS OR STRIPING TO BE REMOVED AND/OR REPLACED SHALL BE PAID FOR IN THE TRAFFIC
NO ADDITIONAL PAYMENTS SHALL BE MADE TO THE CONTRACTOR FOR EROSION CONTROL.
FEDERAL LAWS AND GUIDELINES, THE COST SHALL BE CONSIDERED INCIDENTAL AND BE INCLUDED IN THE OVERALL BID PRICE.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL MEASURES TO ENSURE COMPLIANCE TO ALL STATE AND
STORM DRAIN PIPES, MASONRY WALLS AND PAVING THAT IS REMOVED, DAMAGED OR DESTROYED, DUE TO CONTRACTOR’S ACTIVITY.
DITCH PAVING, CURBING, SIDEWALK, GUTTER, SLOPE PAVEMENT, SIGNS, GUARDRAILS, LANDSCAPING, GRASSINGS, UTILITY SERVICE LINES,
10. THE CONTRACTOR SHALL REPLACE IN KIND AND SIZE, AT NO SEPARATE EXPENSE TO THE CITY, ANY BARRIER WALL, FENCE,
9. SAWCUTS AND REMOVAL OF ALL CONCRETE ASSOCIATED WITH CURB CUT RAMPS SHALL BE INCLUDED IN THE SIDEWALK PAY ITEM.
ACCORDANCE WITH CURRENT CITY STANDARDS.
8. ALL EXISTING STOP BARS, WORDS, ARROWS AND CROSSWALKS THAT ARE NOT REMOVED OR RELOCATED SHALL BE REPLACED IN
NOTED PRIOR TO FINAL ACCEPTANCE.
"CLOSED LOOP" MONITORING, PER THE CITY SIGNAL ENGINEER. NETWORK ABILITIES DEMONSTRATION IS REQUIRED AT CENTRAL SITES,
7. THE INSTALLATION SHALL BE CAPABLE OF MONITORING OVER ETHERNET NETWORKS FROM EXISTING CENTRAL COMPUTERS OR VIA
PROCEDURES OUTLINED IN THE SPECIFICATION.
6. MATERIAL CERTIFICATION IS REQUIRED PRIOR TO BEGINNING ANY SIGNAL INSTALLATION WORK. THE CONTRACTOR SHALL FOLLOW
5. INSTALLATION IS TO BE CHECKED AND ACCEPTED BY THE CITY OF JOHNS CREEK TRAFFIC ENGINEER PRIOR TO FINAL ACCEPTANCE.
PLACEMENT OF THE SIGNAL HEADS MUST BE RETAINED AS SHOWN ON THE PLANS.
TO AVOID UNDERGROUND AND OVERHEAD UTILITIES. MINIMUM CLEARANCES FROM EDGE OF PAVEMENT AND UTILITIES SHALL BE MAINTAINED.
MINOR SHIFTS (UP TO A MAXIMUM OF 5 FEET) IN LOCATION OF NEW SIGNAL POLES, AT THE DISCRETION OF THE ENGINEER, ARE ACCEPTABLE
4. THE CONTRACTOR SHALL LOCATE UNDERGROUND AND OVERHEAD UTILITIES IN VICINITY OF NEW TRAFFIC SIGNAL POLES BEFORE INSTALLATION.
CONTROL CABINET.
3. SHIELDED CABLE WILL BE USED FOR DETECTOR RUNS. DETECTORS SHALL HAVE SEPARATE LEAD-INS TO THE
OF SIGNAL HEADS TO TOP OF ROAD SURFACE AND A MINIMUM OF 8 FEET MEASURED HORIZONTALLY BETWEEN CENTERS OF SIGNAL FACES.
2. SIGNAL HEADS SHALL BE ERECTED TO PROVIDE AT LEAST 17 FEET BUT NO MORE THAN 19 FEET CLEARANCE FROM BOTTOM
CONTROL DEVICES CURRENT EDITION, INCLUDING SUBSEQUENT PUBLISHED RULINGS.
1. THE COMPLETE SIGNAL INSTALLATION SHALL CONFORM TO ALL APPROPRIATE PARTS OF THE MANUAL ON UNIFORM TRAFFIC
CONTROLLER CABINET
PEDESTAL POLE
24"CURB & GUTTER
EDGE OF ASPHALT
24"CURB & GUTTER
24"CURB & GUTTER
CONCRETE SIDEWALK
CONCRETE SIDEWALK
~CONCRETE~
A S
P H
A L T
D R
IV
E
A S
P H
A L T
D R
IV
E
CONCRETE SIDEWALK
27-0002
SIGNAL HEAD
PEDESTRIAN
SIGNAL LEGEND
BRUMBELOW RD (35 MPH)
BRUMBELOW RD (35 MPH)
C O
U N T
Y
P
A R
K
M P
H
P R I
V A T E
D R I
V E
W A
Y
M O
U N T
P I S
G A
H
C
R I S T I
A N
S
C H
O O L
DARK
WALK
DON’T
YELLOW
FLASHING
RED
STEADY
WALK
FLASHING RED
ALTERNATING
DON’T WALK
FLASHING
WALK
DON’T
YELLOW
STEADY
DARK
WALK
DON’T
WALK
DON’T
12"
12"
18"
P4
CROSSWALK
STOP
ON RED
(24"X30") R10-23
(36"X36") W11-2
(24"X12") W16-7P (L)
(24"X36") R10-6 (L)
STOP
RED
HERE ON
(24"X12") W16-9P
(90"X24") R1-9A
STOP FOR PEDESTRIANS
STATE LAW
INSTALL CONDUITS, NM, TP 3, 2-2" (140 LF) IN 5" DIRECTIONAL BORE (70 LF)
INSTALL R10-6L
INSTALL 3-SECTION SIGNAL HEAD (TYP.)
INSTALL R1-9A
PEDESTRIAN SIGNS
SIGNAL DISPLAY SEQUENCE
INSTALL R1-9A
- W16-9P
- W11-2
INSTALL:
- W16-9P
- W11-2
INSTALL:
9" X 15" R10-3e(L)
9" X 15" R10-3e(R)
INSTALL R10-23
INSTALL TP B ADA RAMP AND DETECTABLE WARNING SURFACE
01/ 02/ 03/ 04/
05/ 06/ 07/ 08/
OMIT
OMIT OMIT
OMIT
W
W
OMITOMIT
PHASING DIAGRAM
2A 2B 2C
4C4B4A
REGULATORY SIGNS
AHEAD
WARNING SIGNS
TO CROSS
PUSH BUTTON
START CROSSING
DON’T START
FINISH CROSSING
IF STARTEDFLASHING
STEADY
DON’T CROSS
TIMER
TIME REMAINING08
VEHICLES
WATCH FOR
TO FINISH CROSSING
TO CROSS
PUSH BUTTON
START CROSSING
DON’T START
FINISH CROSSING
IF STARTEDFLASHING
STEADY
DON’T CROSS
TIMER
TIME REMAINING08
VEHICLES
WATCH FOR
TO FINISH CROSSING
TO CROSS
PUSH BUTTON
START CROSSING
STEADY
DON’T CROSS
DON’T START
FINISH CROSSING
IF STARTEDFLASHING
TIMER
TIME REMAINING08
VEHICLES
WATCH FOR
TO FINISH CROSSING
TO CROSS
PUSH BUTTON
START CROSSING
STEADY
DON’T CROSS
DON’T START
FINISH CROSSING
IF STARTEDFLASHING
TIMER
TIME REMAINING08
VEHICLES
WATCH FOR
TO FINISH CROSSING
EXISTING POWER POLE AND ROUTE TO CABINET
CONTRACTOR TO OBTAIN POWER SERVICE FROM
- R10-6L
INSTALL:
INSTALL R10-23
- TP 2 PULL BOX
PEDESTRIAN SIGNAL HEAD, PUSH BUTTON STATION, AND SIGN
- 10’ PEDESTRIAN PEDESTAL POLE WITH P4 LED COUNTDOWN
INSTALL:
- W16-7P(L)
- W11-2
INSTALL:
STRIPING (11 LF)
SOLID WHITE
BAR WITH 24"
INSTALL STOP
EXIST. R/W
EXIST. R/W
EXIST. R/W
EX
IS
T.
R /W
SOLID WHITE STRIPING (180 LF)
INSTALL CROSSWALK WITH 8"
EXISTING R1-1
EXISTING R1-1
R2-1
SPEED
LIMIT
WITHIN PROPOSED CROSSWALK
AND PAVEMENT MARKINGS
REMOVE EXISTING STRIPING
R1-1
STOP
- W16-7P (L)
- W11-2
INSTALL:
EXISTING R8-3
EXISTING R8-3
R8-3
EXISTING R8-3
EXISTING R8-3
EXISTING R8-3
STRIPING (23 LF)
WITH 24" SOLID WHITE
INSTALL STOP BAR
T-SHAPED SIGNAL HEAD
PROPOSED 3-SECTION
RELOCATED EXISTING R8-3
MESSAGE SIGN ASSEMBLY
R2-1 AND CHANGEABLE
RELOCATED EXISTING
"ONLY" WHITE STRIPING
REMOVE TP 1 WORD
"ONLY" WHITE STRIPING
INSTALL TP 1 WORD
RELOCATED EXISTING R8-3
ONLY
RETRO-REFLECTIVE TAPE ON BACKPLATES
LED INCANDESCENT LOOK SIGNAL HEADS WITH TP IX
- R8-3
EXISTING (TO BE RELOCATED):
- 4G CELLULAR MODEM
DISCONNECT UNIT
- POWER METER AND
AND SIGN
PUSH BUTTON STATION,
PEDESTRIAN SIGNAL HEAD,
- P4 LED COUNTDOWN
- TP 4 PULL BOX
2070LX CONTROLLER
CABINET EQUIPPED WITH
- 336S POLE-MOUNTED
IV, WITH 60’ MAST ARM
- STEEL STRAIN POLE, TP
INSTALL:
WARNING SURFACE
RAMP AND DETECTABLE
INSTALL TP B ADA
SIGN ASSEMBLY
- R2-1 AND CHANGEABLE MESSAGE
EXISTING (TO BE RELOCATED): - R8-3
EXISTING (TO BE RELOCATED):
ONL
Y
REVISION DATES
11/16/2022 daniel.shin
GPLOT-V8
gplotborder-V8i-PO.tbl
27-0002.dgn4:48:36 PM
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
SCALE IN FEET
300 60 120
Alpharetta, Georgia 30009
Suite 600, 11720 Amber Park Dr
Engineering, Planning, and Environmental Consultants
P.I. No.
SIGNAL PLANS
BRUMBELOW ROAD AT COUNTY PARK
PROPOSED SIGNAL PLAN
P4
P4
SIGNAL PLANS
27-0003
REVISION DATES
11/16/2022 daniel.shin
GPLOT-V8
gplotborder-V8i-PO.tbl
27-0003.dgn
Design File and Plot Substitution information
4:37:49 PM
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
3 4 5 6 7 8 9 10 11 13 14
C1 PIN
FUNCTION
FIELD TERM
56 39
FLASH
N/C
C1 PIN
FUNCTION
FIELD TERM N/C
1 2 12
TYPE
CARD
TBA TBA DC DC DC
DC ISO
68 81
43 70 82
STOP TIME
SLOT
DC ISODC ISO
Ph 1 Ph 2 Ph 2 PED Ph 6 PED
Ph 2
TB5 11,12
Ph 8 PED
CHANNEL
CHANNEL
LN. ASSIGN.
DET. NUMBER
DET. NUMBER
LN. ASSIGN.
1 3
Alpharetta, Georgia 30009
Suite 600, 11720 Amber Park Dr
Engineering, Planning, and Environmental Consultants
LIST OF MATERIALS:
PAY ITEMS:
Ph 4 PED
Phase 4
336S CABINET INPUT FILES ASSIGNMENT
Ph 3
DC
DC ISO
58 41 55 40 57 42 51 71 72 67
Ph 4 Ph 5 Ph 6 Ph 7 Ph 8 SE 1 EVA EVB
TB7 1,2 TB7 5,6 TB7 9,10 TB8 1,2 TB8 5,6 TB8 9,10 TB9 1,2 TB9 5,6 TB5 1,2 TB5 5,6 TB5 9,10 TB4 1,2 TB4 5,6
9 11 19 21 29 31
47 49 45 48 44 50 46 52 73 74 69
Ph 2 Call Ph 4 Call Ph 4 Ph 6 Call Ph 6 Ph 8 Call Ph 8 R/R EVC EVD
TB7 3,4 TB7 7,8 TB7 11,12 TB8 3,4 TB8 7,8 TB8 11,12 TB9 3,4 TB9 7,8 TB5 3,4 TB5 7,8 TB4 3,4 TB4 7,8
7 15 12 25 22 35 32
BRUMBELOW ROAD AT COUNTY PARK
QUANTITIES
CONTRACTOR SHALL FIELD VERIFY PRIOR TO ORDERING MATERIALS
QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY
CITY OF JOHNS CREEK
LOCATION: BRUMBELOW ROAD NORTH OF COUNTY PARK
LIST OF MATERIALS FOR TRAFFIC SIGNAL INSTALLATION
Other files
| File | Type | Posted |
|---|---|---|
| 23-066 NOIA | — | |
| 23-066 Bid Packet | — | |
| Award Information | — | |
| 23-066 Published Bids | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .