23_034 Bid Form.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
23-034 Special Inspections - New Douglas County Fire Station #9
Solicitation number
PE-64800-NONST-2023-000000005
Issued by
Douglas County, Georgia

About this file

This document appears to be a Bid Form for the Douglas County Fire Station 9 project. It outlines the various special inspection services required for this construction project, including soils, concrete, masonry, structural steel, seismic resistance, cold-formed light-frame, designated seismic systems, MEP components, EIFS, fire-resistant penetrations and joints, and smoke control systems. The Bid Form provides detailed unit quantities and rates for each inspection service, as well as project management and administration tasks. The total project cost is provided as a Grand Total at the bottom of the document.

The Bid Form covers a comprehensive scope of special inspection services required for the construction of the Douglas County Fire Station 9 project. Contractors will need to review the detailed requirements and provide pricing for the various inspection services outlined in the document. This information will be used to evaluate bids and award the contract for this project.

View the file

Other files

File Type Posted
23_034 Advertisement for Bid.pdf PDF
23_034 Special Inspections RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Douglas County Fire Station 9UnitQuantityUnit RateTotal
Special Inspections Bid Form
Section 1705.6 - Soils
Subgrade Evaluation for Fill PlacementHR12
Foundation Inspections (Prior to Rebar)HR24
Earthwork Observation and Density TestingHR325
Utility Backfill Observation and TestingHR40
Standard ProctorEA3
Modified ProctorEA3
Sieve AnalysisEA3
Atterberg LimitsEA3
Subtotal
1705.3 - Concrete Construction
Inspection of reinforcing steelHR32
Concrete Inspections and SamplingHR80
Slab Subgrade EvaluationHR16
Concrete Curing, Prep, BreaksEA100
Subtotal
1705.4 - Masonry Construction
Masonry Rebar InspectionsHR32
Masonry InspectorHR60
Testing Masonry Grout PrismsEA20
Subtotal
1705.2- Structural Steel Construction
Welding InspectorHR12
Steel InspectorHR24
Subtotal
1705.12.1 - Struct. Steel Inspections - Seismic Resistance
InspectorHR8
1705.12.3 - Cold - Formed Light Frame Inspection
InspectorHR16
1705.12.4 - Designated Seismic Systems Verification
InspectorHR16
1705.12.6 - MEP Components - Seismic Resistance
InspectorHR16
1705.13.2 Seismic Certification Nonstructual Components
Certificate of Compliance ReviewHR4
1705.13.3 Seismic Certification Designated Seismic System
Certificate of Compliance ReviewHR4
1705.13.4 Seismic Isolation Systems
Prototype TestingLS1
1705.16 - EIFS Inspections
InspectorHR24
1705.17 - Fire Resistant Penetrations and Joints
InspectorHR16
1705.18 - Smoke Control Systems Leakage and Flow
InspectorHR8
Pavement Testing (Not in Schedule of Special Inspections)
Subgrade Evaluation prior to pavingHR16
GAB TestingHR8
Concrete Samplingand TestingHR20
Concrete Curing, Tests, BreaksEA10
Subtotal
Project Management - Assign Quantities and Add Positions as Needed
Project ManagerHR
Principal Engineer, P.E.HR
Project AdministrationHR
Project DispatcherHR

Subtotal

Allowance $5,000.00

GRAND TOTAL