CHANGE ORDER NOTICE Sole Source - Unisys Maintenance and Support
Solicitation number
26-557THA-INFOT-B-52005
Issued by
Illinois

About this file

This is a Change Order Notice issued by the Chief Procurement Office for General Services on behalf of the Toll Highway Authority (THA) in Illinois for Contract 23-0037, Unisys Maintenance and Support. The change order authorizes modifications to the existing contract to include Unisys Datacenter Move Services and related project management activities. The scope of work encompasses deployment of software series on VMware infrastructure using a logical "lift and shift" approach, which includes standing up new virtual machines, installing Windows operating systems and new CSS software, performing system outages to swap virtual machine disk files, installing new CSS versions, and managing the cutover to reestablish iSCSI interface connectivity to the virtual tape library. Unisys personnel will collaborate with the client's internal staff to deliver these services, which were not reasonably foreseeable at the time of the initial contract execution. The current contract term remains unchanged with an expiration date of August 27, 2026.

The upper dollar limit of Contract 23-0037 will be increased by $49,734.00, bringing the total contract value from $455,067.17 to $504,801.17. This change order modification exceeds the $25,000 threshold requiring public posting on the Bulletin/BidBuy for a 14-day notice period. The change order qualifies for posting under Section 33E-9 of the Criminal Code, as the circumstances necessitating the change in performance were not reasonably foreseeable at the time of original contract execution and the change order remains germane to the original contract scope.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.23.2 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: THA - Toll Highway Authority
ProcurementTitle: Unisys Maintenance and Support
BBREFNO.: Bid 23-557THA-INFOT-B-37843
thedetails: The completion of this change order will provide the Tollway Unisys Datacenter Move Services (“Service”) the Project Management Services the Deployment of Software Series on VMware, performing a logical "lift and shift" approach: where the Client Team will stand up new VM, install Windows OS, install new CSS, instantiate an outage to swap the VMDKs to bring the system back up, Unisys will install and run a new CSS version and DSI engagement and management will enable and support the cutover to reestablish the iSCSI interface to the VTL. Unisys personnel will collaborate with the Client's staff to deliver this project which was not foreseeable at the time of initial purchase.

The upper dollar limit of Contract 23-0037 will be increased by $49,734.00 (from $455,067.17 to $504,801.17).

The current contract expires 08/27/2026.

CheckBox1: 1
CheckBox2: 1

File details come from the government source that posted it. Updated .