22-SMM-041_C8_SF30_N6449822R4033-0004.pdf

PDF 703 KB Posted

Attached to
Solicitation N6449822R4033 - Brushless Diesel Generator Sets for LCC 19 FY25 Availability
Solicitation number
22-SMM-041
Issued by

About this file

This is a request for proposal for brushless diesel generator sets to replace the current generators on an LCC 19 ship. The Navy seeks a contractor to provide up to three shock-qualified generator sets each capable of 2000kW continuous power output. The first generator set will undergo first article testing, while the remaining sets will be production units. All units must be delivered by April 1, 2025 to Yokosuka, Japan. The solicitation identifies technical requirements for the generator sets and engines in detail. Offerors must submit proposals addressing technical approach, shock qualification, and schedule factors, as well as past performance and small business participation. Price will also be evaluated for the firm-fixed-price contract line items. Proposals are due by November 4, 2022.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See the follow ing pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 40

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Oct-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6449822R4033

X 9B. DATED (SEE ITEM 11)

30-Mar-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Oct-2022

CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 0221, WILLIAM OTORMEY

215-897-2620, WILLIAM.OTORMEY@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

N64498 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6449822R4033

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0004

The purposes of this amendment are the following:

1. Establish a new closing date for this solicitation.

2. Revise Section C, the Statement of Work, to modify some requirements and to include minimums (“shall”) and targets (“should”).

3. Update Section J to add the Small Business Participation Commitment Document

(SBPCD) as Attachment 2 to this solicitation. This attachment was previously omitted in error.

4. Revise Section L to update instructions for Subfactor 1a and Factor 3 and include a new question and answer deadline.

5. Revise Section M to update evaluation information for Subfactor 1a and add evaluation information for Factors 3 that was previously omitted in error.

All changes to the above referenced sections have been bolded to assist in reviewing any changes.

All questions are to be asked prior to the question and answer deadline established in Section L.

No questions shall be included within an Offeror’s submission. Any exceptions to the requirements of this solicitation shall be clearly outlined and addressed in the Offeror’s cover letter, as well as, within the applicable proposal volume.

Whether or not a proposal has been previously submitted in response to this solicitation by an Offeror, a complete resubmittal of an Offeror’s entire proposal is required. Any prior submittals will not be considered for evaluation and award.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 27-May-2022 05:00 PM to 04-Nov-2022

05:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK (SOW)

Statement of Work (SOW) LCC 19 USS Blue Ridge Diesel Generator Set Procurement

1.0 Introduction

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of

Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 442, which is responsible for the steam and diesel electrical power systems on board LCC 19 USS Blue Ridge.

1.0.2 This contract is for non-personal services. It does not create employment rights with the

U.S. Government whether actual, inherent, or implied.

1.0.3 Government/Contractor Relationship

1.0.3.1 The services to be delivered under this contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.

1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.0.3.3 Contractor personnel under this contract shall not engage in any of the inherently

Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.

1.0.4 Employee Relationship:

1.0.4.1 The services to be performed under this contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government.

Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.

1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U.S. Navy and

NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.

1.0.4.3 Inapplicability of Employee Benefits: This contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.

1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.

1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.

1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:

a. Confirm the conduct is in violation and when necessary direct the mode of further performance,

b. Countermand any communication regarded as a violation,

c. Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or

d. In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.

1.1 BACKGROUND

The legacy diesel generator sets currently installed on the LCC 19 ship are undersized, high maintenance, failure prone and do not meet the 7Th Fleet requirements. NSWCPD Code 442 has been tasked with replacing them with a shock qualified brushless replacement that will give the ship a low maintenance and reliable electric plant to support the remainder of the service life for the LCC which is currently slated for 2039.

This purchase specification defines the requirements in their entirety. The system supplier shall provide all technical documentation as defined by these requirements.

1.2 SCOPE OF WORK

The Contractor shall provide a quantity of up to three (3) Ship Service Diesel Generators to serve as replacements of existing generators. Each Diesel Generator shall comply with the ABS NVR as pertaining to MIL-G-21296 and the requirements of this specification. Where there may be a conflict, this specification shall take precedence. The generator sets shall be shock qualified to the requirements of MIL-S-901E either through previous qualification testing, extension qualification, requests, partial testing, or full testing. Each new diesel generator shall be able to provide at least 2000 kW (electrical) at 450 VAC, 60 Hz, 0.8 power factor, when operating continuously as defined in Section 3.1.2.

If a generator set is not previously qualified or does not have shock testing completely waived by the Technical Code, the First Article Test (FAT) will be established as CLIN 0001, and the production units will be established as options under CLINs 0002-0004. Any generator set used as the FAT unit will be turned over to the government and will not be considered a production unit.

2.0 APPLICABLE DOCUMENTS

2.0.1 MIL-STD-1399, Electric Power, Alternating Current

2.0.2 MIL-G-21296B, Generator Set, Diesel Engine Direct and Alternating Current, 60 Hz

(Naval Shipboard Use)

2.0.3 MIL-S-901E, Shock Tests, H.I. (High-Impact) Shipboard Machinery, equipment, And

Systems, Requirements For

2.0.4 MIL-STD-461E, DOD Interface Standard Requirements for the Control of electromagnetic Interference Characteristics of Subsystems and Equipment

2.0.5 NAVSEA 0908-LP-000-3010, Shock Design Criteria for Surface Ships, Rev. 1, dated

September 1995

2.0.6 NAVSEA T9300-AF-PRO-020, Design Practice and Criteria Manual for Surface Ships

Chapter 300

2.0.7 ABS NVR, American Bureau of Shipping, Rules for Building and Classing Naval

Vessels

2.0.8 ASNI C50.10, C50.13 or C50.14

2.0.9 Basler Tech Manual for DECS 250N

2.0.10 These documents can be referenced at https://quicksearch.dla.mil/

The Contractor shall reference and utilize the latest version available when performing tasks within this PWS.

3.0 REQUIREMENTS

3.1 SCOPE OF SUPPLY

The following components shall be furnished by the Supplier:

a. Diesel Engine– Continuous power, four (4) stroke diesel generator set.

b. Generator - Continuous power, AC generator with rotating brushless exciter, Sea-Water Cooled.

c. Permanent Magnet Alternator, three (3) phase alternator attached to the bearing end (non-drive end) of the generator for field flashing, generator excitation, and to support generator control equipment.

d. Main and Auxiliary terminal boxes

3.1.1 SCHEDULE FOR LONG LEAD TIME MATERIAL

Delivery of all Diesel Generator Sets, inclusive of all ancillaries listed in the Scope of Supply, shall be delivered to the Yokosuka, Japan area on or before April 1st, 2025. All qualification efforts must also be completed or waived with approval from the government prior to this date.

3.1.2 DESIGN STANDARDS AND CRITERIA

3.1.2.1 Generator Rating

Each generator shall be capable of the following rating: 2000 kW (electrical) at 60 Hz, 3 phase ungrounded delta or wye, 0.8 power factor and shall meet the overload ratings per section 3.1.2.5.2.

3.1.2.2 Diesel Engine Ratings

The propulsion engine shall be V16, 4-stroke-cycle diesel.

3.1.2.3 Size Requirements

3.1.2.3.1 Overall Genset Assembly

The combined dimensions of the engine and the generator, while coupled together, shall not exceed the following maximum size restrictions:

-Maximum Dimensions: 275 in. in length, 125 in. in height and 110 in. in width.

-The combined weight of the engine and generator shall not exceed 85,000 pounds.

3.1.2.3.2 Diesel Engine Only

The diesel engine (including exhaust bellows) shall be sized between the following minimum and maximum dimensions.

-Minimum Dimensions: 145 in. in length, 90 in. in height, 72 in. in width.

-Maximum Dimensions: 175 in. in length, 108 in. in height and 88 in. in width.

3.1.2.3.3 Generator Only

There are no generator-specific minimum or maximum dimensions as long as the overall generator set assembly meets the requirements of 3.1.2.3.1.

3.1.2.4 Operational Conditions

Design climatic conditions at which the Generator must operate are given in Section 3.1.3,

3.1.3.2.1 and 3.1.3.2.2.

It shall be assumed that the existing prime mover shall maintain lubrication and shall experience no loss of fluids under ship motion conditions as specified in Section 3.1.3, 3.1.3.2.1 and 3.1.3.2.2.

3.1.2.5 Generator Detailed Requirements

3.1.2.5.1 Generator Requirements

a. Minimum Continuous Power Output: 2000 KW

b. Generator Speed: 1800 RPM

c. AC Generator Specifications:

The Generator shall be a marine, three phase, synchronous generator meeting the electrical requirements defined in Table 1. The generator shall be totally enclosed water air cooled and arranged for ungrounded delta or ungrounded WYE connection. The generator shall meet the requirements of ANSI C50.10 and C50.13 or C50.14 (as applicable).

d. The generator at a minimum shall be rated for insulation Class F, but it is preferred for it to be rated Class H or higher.

Application Ship Service Voltage 450 VAC Continuous rating 2,000 KW or higher Phases 3 Frequency 60 Hz Sub-transient Reactance (Xd”) 19.2% or lower Enclosure Totally enclosed, water-air-cooled Insulation Class F or Higher Power Factor 0.8, Lagging

Table 1: Generator Electrical Requirements

3.1.2.5.2 Load and Overload

The Generator shall be capable of delivering rated kW load at rated power factor continuously at the rating conditions specified.

The Generator shall be capable of delivering 110 percent of rated kW load at rated power factor for 30 minutes of each 8 hour period without part failure or deterioration of the Generator life.

The generator set shall be capable of accepting full rated load a maximum of 20 seconds after engine cranking is initiated.

The rated power conditions should be based on the ambient conditions and be in accordance with ABS NVR, American Bureau of Shipping, Rules for Building and Classing Naval Vessels, Part 4, Chapter 2, Section 1 Diesel Engines.

3.1.2.5.3 Short Circuit

Each Generator shall be capable of withstanding, without damage to the unit, a single phase or three phase short circuit fault at the generator terminals for a period of time determined by I2t=180, where I is the sustained value of line current on a per unit basis and t is time in seconds.

The sustained value of current during a short circuit should not be less than 3.2 times greater than rated levels.

3.1.2.5.4 Voltage Balance

Under any condition from no load to rated load, the variation in output voltage between phases shall not exceed 5%.

3.1.2.5.5 Waveform

The deviation factor of the open-circuit terminal voltage on any phase shall not exceed 5%. The total harmonic distortion of the output voltage waveform shall not exceed 1% over the operating range from no load to rated load (assuming linear load condition only), nor shall any single component of the output voltage harmonic distortion exceed 0.3%.

3.1.2.5.6 Windings

The armature windings should be secured by slot wedges. Field coils should be secured so that they cannot become loose or damaged by vibration or produce vibration due to shifting of the coil position.

The generator windings should be impregnated with solventless resin under vacuum and pressure to provide the windings with the required mechanical strength, dielectric insulation and imperviousness to humidity, oil, fuel-oil, diesel fumes and industrial chemicals.

Damper bars (amortisseur windings) should be interconnected between poles. All winding connections should be silver or tin brazed; silver brazed is preferred.

Details of the insulation system (slot liners, individual wire insulation, turn insulation, Vacuum Pressure Impregnation (VPI) insulation of formed coils or assembled windings, etc.) should be provided.

Slot pitch should be such that the machines will be compatible with all Ship Service/Emergency Diesel Generator (SS/EDGs).

3.1.2.5.7 Terminal Boxes

Terminal box(es) will be mounted on the generator frame/enclosure to facilitate shipboard installation of interconnecting cabling.

3.1.2.5.7.1 Main Power Terminal Box(es)

a. The generator should be provided with one or more main terminal boxes meeting the following requirements:

b. Each terminal box should be located in accordance with Mechanical interface specification reference and should accommodate all main power cables and cable terminations.

c. Phases shall be separated from ground and each other by barriers of insulating material.

Identification of phase ends shall be provided.

d. Terminal boxes should be provided with a removable access cover having reusable gaskets and removable non-magnetic plates to accommodate cable transits or stuffing tubes.

e. Three sets of three current transformers (three on each phase for a total of nine), complete with protective devices, mounted on the generator and located in each main generator terminal box. The current transformers will be required to set to a ratio of 5000:5.

f. A,B,C Phase labelling/stamping properly labelled in both main and auxiliary terminal boxes for buswork and Current Transformers (CTs).

3.1.2.5.7.2 Auxiliary Terminal Boxes

The generator should be provided with one or more auxiliary terminal boxes that are used as a connection termination point for all incoming auxiliary cables associated with the generator, including, but not limited to: the exciter leads, PMA leads, main voltage sensing leads, CT connections, stator RTD connections, speed sensor (magnetic pickup) connections, bearing and air temperature alarms, and generator heater connections. CT protection devices and any relays, fuses/fuse holders etc. necessary to facilitate any of the above requirements in this section shall be housed in one or more auxiliary terminal boxes. Auxiliary terminal boxes shall be electrically isolated from the main power terminal box. Wherever possible, auxiliary terminal boxes should be segregated by <30V and >30V to allow easier servicing of low voltage components.

The auxiliary terminal boxes should be provided with a removable access cover having reusable gaskets and removable non-magnetic plates to accommodate cable transits or stuffing tubes.

Terminal boxes with greater than ten (10) cables should use a multi-cable transit.

3.1.2.5.8 Rotor Construction

A salient pole rotor shall be provided with keys in conjunction with a shrink fit to prevent movement of the spider on the shaft. A pin through the shaft or welding shall not be used to prevent axial displacement. Spiders constructed of individual flutes welded to the shaft may be used if pre-heat and stress-relieving procedures are employed in accordance with NAVSEA Publication S9074-AR-GIB-010/278.

Field poles and pole shoes of a salient pole rotor should not be secured by dowels or in such a manner as to prevent removal and replacement. The stress resulting from the method of securing poles to the spider should be less than half the elastic limit of the material at rated speed.

Generators shall be integral shaft-field pole (cylindrical rotor) synchronous generators. The assembled rotor (with field windings, brushless exciter, and permanent magnet alternator installed) should be dynamically balanced in accordance with the requirements of MIL-STD- 167-1.

3.1.2.5.9 Bus Assemblies

Bus bars and bus connections shall be of copper, silver surfaced at the contact areas up to 1 inch past the joint area. The entire bus shall be silver plated. Silver surfacing shall be accomplished by plating using 99.9 percent pure silver and shall conform to the requirements of QQ-S-365 except that the silver plate shall be not less than 0.005 mm (0.0002-inch) thick. Threaded surfaces shall have silver thickness of at least 0.005 mm (0.0002 inch).

3.1.2.5.10 Generator Bearing

Generator bearing shall be force-fed, sleeve-type, journal bearing, split through the horizontal with liners. The design should permit removal and replacement of the bearing liners without removing the rotor from the frame or removing the coupling from the drive end. Free-end bearings shall be self-aligning and mounted/secured to generator frame vice foundation.

The lubrication system should prevent oil or oil-laden vapor from leaking or migrating from the oil seal, bearing housing, or split lines into the generator under normal conditions or the inclined operating conditions described in sections 3.1.3.2.1 and 3.1.3.2.2. Measuring of shaft currents during first article testing will be performed to determine if grounding is necessary.

The generator should have a separate oil circuit from the prime mover.

3.1.2.5.11 Generator Cooling

The generator shall be cooled by double wall, air-to-water heat exchangers in accordance with MIL-C-19836. Coolers will be designed for seawater with temperatures of 100 degrees Fahrenheit and should assume a fouling factor of 1.10. Protective zincs should be used. Ship service coolant system design pressure range of 69 kPA (10 lbs/in2) to 758 kPA (110 lbs/in2) should be assumed. The equipment cooling system should be capable of withstanding a hydrostatic pressure test of 1137 kPA (165 psig). Operation of cooler at design flow should be possible over the specified range of coolant inlet temperature.

Condensation from the cooler should drain to outside of the machine without contacting the electrical windings.

3.1.2.5.12 Generator Cooler Connections

Water connections to cooler heads or water boxes should be integral to the heads or welded.

Brazed pipe connections are prohibited. Connecting flanges should be edge drilled and tapped for threaded pressure tap connections. Flanges must be associated in a manner that places them, with respect to the prime mover, in a general location such that existing generator cooler piping will require minimal changes for all applications. Connections to and from cooler should be properly and visibly labelled inlet and outlet.

3.1.2.5.13 Generator Anti-Condensation Heaters

Electric heaters should be installed in the generator enclosure in sufficient quantity and size to prevent condensation of moisture on the generator windings when the Generator is secured. The heaters should be thermostatically controlled and protected to prevent damage to windings due to excessive heating. The heaters should be replaceable without requiring the removal of more than access covers. The heaters must accept 120V, 1 Phase, 60Hz power.

3.1.2.5.14 Generator Frame and Enclosure

The generator frame should have feet large enough to accommodate holding-down bolts, dowel pins, and jackscrews (where used) for attachment to the sub-base. The Generator should be constructed so that the frame of the generator should not extend below the lower face of the sub base. Mounting/foundation requirements are per the Mechanical Interface Specification.

Enclosure access should be by removable sections, panels or hinged doors permitting access to both ends of the rotor and to the anti-condensation heaters. Access openings shall permit air cooling of the generators (at a reduced power level of 80%) in case of a failure in the water cooling-system. All access openings should be provided with drip shields at their upper edges and should have re-usable watertight gaskets. A sound enclosure is not required.

3.1.2.5.15 Lifting Means

Eyebolts, lugs, holes or equivalent means shall be provided to permit lifting of the generator and attached accessories as a unit. These lifting means should be appropriate for the rigging of the generator through ship for installation.

3.1.2.5.16 Nameplate Data

Nameplate details should conform to all aspects of ABS NVR.

3.1.2.5.17 Cooler Condensation Baffles

The generator frame shall be constructed or fitted with baffles so that condensation from the water-to-air heat exchanger will not drop on the generator windings. The condensation should be drained to the outside of enclosures.

3.1.2.5.18 Temperature Gauges and Monitors

Platinum resistance temperature detectors (RTDs) shall be provided for remote indication and monitoring of generator bearings, stator winding, and cooling air temperatures (100 ohms at 0 degrees C). Additionally, four (4) removable probe type RTDs shall be provided; this total quantity is comprised of each generator bearing having an installed RTD and a spare RTD.

Thermostatically controlled DP/DT switches shall be provided for remote indication of over temperature conditions of the generator bearing and cooling air temperature.

Installed dial type thermometers should be provided for local continuous readings of air-box temperature.

3.1.2.5.19 Journal and Thrust Bearings

All bearings should be outfitted with Resistance Temperature elements as required by ABS 3-3- 2/6.

3.1.2.5.20 Generator Stator Windings

Stator winding temperature indication shall be provided by means of two (2) platinum embedded RTDs per phase. The second RTD in each phase should serve as a reserve in the event that the first RTD fails.

3.1.2.5.21 Generator Air Temperature

RTDs and continuous reading dial type thermometers shall be located so as to measure the temperature of air into and out of the generator heat exchanger. Gauges of the dial type thermometers should be mounted on the generator enclosure in a location that is easily read from a position adjacent to the generator sub-base.

3.1.2.5.22 Parallel Generator Operation

The Generator shall be capable of operating continuously in parallel with any combination of other Generator Sets as defined in this specification. The Generator Set shall be capable of operating in parallel with shore power for purposes of load transfer. When operated in parallel with other generators, the Generator shall be capable of maintaining its share of the total load within ±5% of a value that is proportional to the ratio of the Generator rating to the total of all paralleled generator ratings.

3.1.2.5.23 Permanent Magnet Alternator (PMA)

A permanent magnet alternator (PMA) shall be supplied. The PMA should be mounted so it does not interfere with accessibility to the main generator windings for inspection and cleaning.

The PMA assembly should be mounted opposite the drive end of the generator, and should be accessible for maintenance through removable covers in the end shield. The PMA will have electrical characteristics to support the Government provided Basler, DECS 250N type, digital voltage regulator. Specific details of Basler, DECS 250N Digital Excitation Control System can be found in the Basler Tech Manual for DECS 250N.

3.1.2.5.24 Voltage Regulation

Excitation/Voltage Regulation Requirements The Generator shall utilize a brushless excitation system compatible with redundant automatic voltage regulators, see the Basler Tech Manual for DECS 250N. The provided PMA shall provide the power for the exciter field, voltage regulators, and respective control equipment.

A rotating rectifier assembly shall be used to provide direct current excitation to the generator field. The rectifier assembly should be mounted on the end of the exciter opposite the drive end of the generator, and should be accessible for maintenance through removable covers in the end shield to facilitate diode replacement. The output of the rotating rectifier assembly shall be directly connected to the main generator field by leads that run through the shaft.

3.1.2.5.25 Short Circuit Capability

The excitation and voltage regulation system shall provide sufficient excitation to the generator under both single phase and three phase short circuit conditions to meet the requirements specified herein. Normal voltage should be restored upon removal of the short.

3.1.2.5.26 Design and Construction

The overall dimensions of the Generator shall be in accordance with section 3.1.2.3. The design and construction should be such that the generator can be used in multiple applications, using necessary peripherals and/or adapters as specified in the Mechanical interface specification reference.

3.1.2.5.27 Accessibility

The Contractor should include in the reliability and maintainability program the procedures to be used to assure accessibility and adequate pull spaces for equipment maintenance after equipment installation.

3.1.2.5.28 Operating Life

The Generator shall have an operating life not less than 160,000 hours over a period of not less than 35 years. This life shall be predicated on the following:

a. Hours at rated load 20,000

b. Hours at 60 percent load 95,000

c. Hours at 40 percent load 45,000

The Generator shall withstand not less than 100,000 starts/stops during its operating life.

3.1.2.5.29 Electrostatic Discharge (ESD) Control Program

The contractor should establish an ESD program in accordance with MIL-STD-1686 and DOD-HDBK 263. This program is applicable to ESD sensitive parts listed in MIL-STD-1686 and is applicable from contract award date.

The program includes all procured electrical/electronic equipment, parts and assemblies that were certified and qualified using the electrostatic discharge sensitivity (ESDS) classifications 1, 2 and 3 designators and testing requirements specified under MIL-M-38510 and MIL-STD-883.

3.1.2.6 Diesel Engine Detailed Requirements

The diesel engine shall be a 4-cycle, turbocharged, V16 configuration. Engine driven fuel, lubricating oil and cooling water pumps shall be provided. The engine shall be supplied with regulating and overspeed governors.

The system shall include the engine with interface connections; combustion air inlet/exhaust gas connections; engine base and subbase with resilient mount system for noise isolation;

turbocharger(s) jet assist system, piping, wiring, conduit and fittings attached to engine; and mating electrical connectors.

3.1.2.6.1 Combustion Air Inlet Filter System

3.1.2.6.1.1 Emergency Stop Air Shutoff Device

The engine combustion air intake system should be modified to provide an emergency stop air shutoff device. This device should also have a contact available for control system status.

3.1.2.6.1.2 Ducted Connections to turbocharger

The combustion air intake system shall be modified to allow for directly ducted connections to the turbochargers.

There should be two (2) options for consideration.

3.1.2.6.1.2.1 Modify the Air Intake housing to facilitate use of Continuous Rated engine intake filters and a direct connection to the combustion air intake system.

3.1.2.6.1.2.2 Remove the Air Intake housing and provide an inlet connection in the vertical direction to interface with the combustion air intake system. In this option, the Government would be responsible for the intake filters.

3.1.2.6.1.3 For each of the options as described in 3.1.2.6.1.2, there should be a detailed parts list, and illustration provided. In addition if either of the proposed options were used on prior shock qualified Grade A installations per MIL-STD-901D, the Contractor shall notify the Government of such qualification, as well as the original shock test procedures and resultant reports.

3.1.2.6.2 Exhaust Expansion Joint

Exhaust expansion joint should be sufficiently flexible to accommodate thermal growth and the shock excursion of the SSDG on its mounts.

3.1.2.6.3 Engine Fuel Service System

The engine fuel system shall be complete and self-contained within the generator set package requiring no additional shipyard supply other than the interconnecting piping and valves between the engine and the fuel day tank.

The system shall include the fuel control system, engine mounted pump(s), duplex strainer, duplex filter-water separator, control valves, manifold, nozzles, piping, piping components, instrumentation and wiring, and relief valves.

3.1.2.6.4 Engine Cooling System

The engine cooling system shall be a freshwater type, closed circulation type complete with on skid heat exchanger.

The system shall include all prime mover jacket water and Separate Circuit After Cooler cooling systems components including engine mounted pump, pre-heat unit, control valves, cooler, piping, expansion tanks, instrumentation, and mating electrical connectors.

Jacket water heater and generator heaters should have the same voltage.

3.1.2.6.5 Engine Lubricating Oil Service System

The engine lubricating oil system, including any oil pre-lube system required prior to starting, should be complete and self-contained within the generator set package requiring no additional shipyard supply.

The system shall include sumps, pumps, heat exchangers, prelubrication system, relief valves, pressure and temperature regulating valves, ventilation system to dissipate crankcase fumes, oil mist separator, centrifugal oil filters, and fill and drain connections.

3.1.2.6.6 Starting System

The starting system shall use an electrically actuated starting system. Two (2) starters shall be provided interfacing with the engine. Each starter shall use 24VDC and be capable of providing eight (8) consecutive starts.

The Contractor should provide a written description of the planned mounting configuration, as well as drawings detailing the mounting plan. Controls shall be provided for remote and local starting.

3.1.2.6.7 Lubrication System

An engine Prelubrication System should be included on the engine subbase. The system shall include at a minimum all the pump(s), piping and foundations necessary. The system shall be capable of providing lubrication to the engine on an intermittent basis.

The Contractor should provide cable mounts and hold downs as necessary, prior to shipment, thus allowing the Government to secure cabling during engine installations. The Contractor should provide the Government a detailed parts list, description, and illustration, including location, of the Prelubrication System.

3.1.2.6.8 Electrical Enclosures

The Contractor shall provide functionally equivalent items to the following:

(i) Instrument Panel

(ii) Auxiliary Panel

(iii) Prelube Motor Control

(iv) AC Power Distribution Box

(v) Jacket Water Heater Control Box

The Contractor shall provide interfacing cable connections as well as cable ways and cable supports for each of the items mentioned above. All connections of the items mentioned above should be located at a central location for interface with off unit items. The Contractor should provide the Government a detailed parts list, description, and illustration of the intended cabling connections and location.

3.1.2.6.9 Crankcase Ventilation System

The Contractor shall modify the on engine Crankcase Ventilation System to provide for crankcase pressure balancing and oil fume removal as a self-contained system.

The Contractor should provide the Government a detailed parts list, description and illustration to the Government.

3.1.2.6.10 Combustion Air Intake System

The engine combustion air intake system shall provide an emergency stop air shutoff device.

The combustions air intake system shall be modified to allow for directly ducted connections to the turbochargers. The Contractor should provide, at a minimum, the Government two options for consideration (see section 3.1.2.6.1.2 for details). For each option, the Contractor should provide the Government with a written description, detailed parts list, and illustration.

3.1.2.6.11 Cylinder Temperature Monitoring System

The Contractor should provide outfitting the Cylinder Temperature Monitoring System and provide details of vibration monitoring locations and available sensor options for use with the engine.

3.1.2.6.12 Vibration Monitoring System

The Contractor should provide outfitting for installation of a Vibration Monitoring System and provide details of vibration monitoring locations and available sensor options for use with the engine and generator.

3.1.2.6.13 Serviceability

The Contractor should provide easily accessible means for the serviceability of the engine.

3.1.2.7 Environmental Qualifications

The Supplier is required to provide previously completed documentation (if applicable) or a schedule and timeline for accomplishing testing or qualification extension requests.

3.1.2.7.1 Shock

The equipment shall meet shock Grade A, hull mounted, Class II, heavy weight, type A requirements of MIL-S-901D. The Contractor shall submit a test plan for government approval (CDRL A002) prior to testing, notification of testing before testing occurs (CDRL A010) and test report (CDRL A003) after testing is completed. If testing has previously been completed, documentation of shock qualification shall be provided to the government to waive this testing requirement. If applicable, a shock qualification extension request may be provided to the government for approval (including the previously completed test report and government approval) to potentially waive or reduce the testing requirement.

3.1.2.7.2 Vibration-Externally Generated

The equipment shall be designed to meet requirements of MIL-STD-167-1 and MIL-STD-740-2.

3.1.2.7.3 Vibration-Internally Generated

Each rotating equipment shall be designed to meet requirements of MIL-STD-167-1.

3.1.2.7.4 Vibration-Torsional

The unit shall be designed in accordance with MIL-STD-167-2A.

3.1.2.7.5 Electromagnetic Qualification Status

The Contractor should provide the electromagnetic qualification status of all electrical, electronic and electromechanical equipment (CDRL A004). The status shall cover electromagnetic interference (EMI) per MIL-STD-461E, and electromagnetic pulse (EMP).

Testing is required if it has not previously been completed. Additional EMI testing is only required if previous testing resulted in the equipment not passing all testing.

3.1.2.7.5.1 Electromagnetic Interference (EMI)

The equipment shall be designed in accordance with MIL-STD-461E.

3.1.2.7.5.2 Direct Current Magnetic Field Environment

The equipment shall be designed in accordance with MIL-STD-1399.

3.1.2.8 Testing

All tests shall be performed as required by ABS NVR for the generator and the following paragraphs also apply. If there are conflicts between these cited requirements, they shall be identified in writing to the Government; however, the more stringent requirement shall prevail.

3.1.2.8.1 General Requirements

All tests or inspections should be described in detailed test procedures to be prepared by the Supplier and approved by the Government and should be documented in reports to be prepared by the Supplier and approved by the Government. The Supplier should notify the Government at least 25 days prior to the commencement of any test. The Government may elect to witness any or all tests.

3.1.2.8.2 Responsibility for Inspection

The Supplier is responsible for the performance of all inspection and testing requirements as specified herein. Except as otherwise specified in the contract or order, the Supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

3.1.3 GENERAL REQUIREMENTS FOR DESIGN AND CONSTRUCTION

3.1.3.1 General

This section covers standards of design, materials, workmanship, installation, and inspection procedures.

Requirements of other sections of these specifications, or of referenced documents which are in excess of the requirements of this section, shall have precedence over the requirements of this section.

3.1.3.2 Principles of design and construction

3.1.3.2.1 Environmental conditions

3.1.3.2.1.1 Climatic conditions

Equipment shall be installed in machinery spaces, refer to ABS 3-3-1/9 for ambient temperature.

Electric plant machinery shall be designed to operate with seawater cooling temperature of 28 degrees F minimum and 89.6 degrees F maximum. In addition, those electric plant components taking air from the weather should be designed to operate satisfactorily in any weather air ambient temperature between minus 20 degrees F and 125 degrees F with a relative humidity of zero to 100 percent.

3.1.3.2.2 Ship motion

Equipment and machinery should be designed and installed to operate and to maintain satisfactory lubrication, without loss of oil from machinery or hydraulic systems, under the following conditions:

a. When the ship is permanently trimmed down by the bow or stern as much as 5 degrees from the normal horizontal plane.

b. When the ship is permanently listed up to 15 degrees to either side of the vertical.

c. When the ship is pitching 10 degrees up or down from its normal horizontal plane.

d. When the ship is rolling up to 45 degrees to either side of the vertical.

3.1.3.2.3 Protection of personnel

Protection of personnel against operating hazards shall be provided. Shafting, couplings, gears, flexible shafts, automatic stanchion operating mechanisms, hot equipment surfaces (125 degrees F or higher), and similar items should have adequate guards installed for protection of personnel.

Such protective guards should be removable without dismantling the machinery surrounded.

Guards should be constructed of sheet or expanded metal as light as is consistent with required protection. Guards fitted on parts requiring frequent attention should have doors, covers, or other ready means for access, secured by wing nuts or other simple fastenings.

Protective guards should also be installed as barriers to prevent personnel from inadvertently contacting energized and exposed electrical circuits, components, and terminals which present shock and high voltage hazards.

The following warning sign should be used where voltages between 20 and 500VDAC or VAC are present:

DANGER SHOCK HAZARD (in accordance with drawing, NAVSHIPS No. RE-2699757, where AC or DC voltages are between 30 volts and 500 volts).

3.1.3.2.4 Protection of equipment

Equipment shall be protected against the hazard of personnel brushing against or being thrown against the equipment, particularly under heavy sea conditions, and inadvertently causing damage to exposed components or resulting in maladjustment of exposed functional controls such as push buttons, knobs, and switches. Equipment and electric cables should also be protected against similar hazards from accidental movement or shifting of equipment and material in exposed locations. Protection should be provided by equipment arrangement to afford such protection or by installation of enclosures, screens, or guard rails. Such enclosures, screens, or guard rails should be designed to withstand a static load of 500 pounds and of being used safely as handholds if so configured. The protective method utilized should not inhibit access to the equipment as required for normal operational and maintenance procedures.

3.1.3.2.5 Electromagnetic Interference (EMI) reduction

All Contractor-furnished electrical and electronic equipment should meet the applicable EMI requirements of Sect. 406. All low frequency system cables shall be installed in conformance to the requirements of publication, S9407-AB-HBK-010. Equipment shall be installed in accordance with the EMI and IMI requirements of MIL-STD-1310, as modified by Sect. 406.

3.1.3.2.6 Electromagnetic Pulse (EMP) protection

Any equipment, structures, or systems which are located in EMP exposed areas, as defined in Sect. 407, should conform to requirements specified in Sect. 407.

Electromagnetic environment safety.- Protection from electromagnetic radiation to ordnance (HERO), personnel (HERP), and fuel (HERF) shall be provided in accordance with the criteria in publication, NAVSEA OP3565, as modified to the limits of OPNAVINST 5100.23B dated 3 Jan 1991 (for personnel protection).

3.1.3.2.7 Preservation and preventive maintenance program

The Supplier should establish a preventive maintenance program and should prepare a preventive maintenance plan for all machinery and equipment to be installed on a ship. The program should encompass the preventive maintenance to be performed from the time of receipt of the machinery and equipment until delivery to the ship, including inactive equipment maintenance required pending installation and activation of an item of machinery or equipment aboard the ship. Specific preventive maintenance requirements for each piece of machinery and equipment should be obtained or developed by the supplier. Specific maintenance requirements should include, but not be limited to, a simple but complete description of the action to be taken and the schedule (periodicity) and other circumstances relating to when it should be accomplished. Utilization of existing Navy Planned Maintenance System (PMS) documentation is authorized and encouraged where applicable in the preparation of these requirements. The initial preventive maintenance plan should include the Suppliers planned approach to and organization for the total preventive maintenance program, a listing of machinery and equipment that the program will be applicable to and the specific preventive maintenance requirements.

3.1.3.2.8 Electrostatic Discharge (ESD) Control

The Supplier should implement the electrostatic discharge control requirements in accordance with MIL-STD-1686A dated 8 August 1988 and DOD-HDBK-263 for ESD sensitive parts listed therein. For GFE, the ESD program should commence at the receipt inspection of equipment;

for CFE, the program should start at contract award.

The Contractor's ESD control program should cover the requirements as specified in Table 1 of MIL-STD-1686A dated 8 August 1988 including, all CFE procured electrical/electronic equipment, parts and assemblies that were certified and qualified using the Electrostatic Discharge Sensitivity (ESDS)Classifications 1, 2, and 3 designators and testing requirements specified under Mil. Spec. MIL-M-38510H dated 31 August 1989 and MIL-STD-883C dated 29 November 1989.

The Contractor should maintain and abide by all ESD labeling or markings that the manufacturer has applied for the identification of ESD sensitive parts/assemblies.

3.2 Commonality of Systems, Subsystems, and Components

N/A.

3.3 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components

The Contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The Contractor may recommend a solution to include the impact on the contract price and delivery. The Contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.

3.4 Diminishing Manufacturing Sources and Material Shortages Management

(DMSMS) Contract Requirements

3.5 Parts Obsolescence

4.0 DATA REQUIREMENTS

4.0.1 Exhibit A – CDRL A001, Engineering Manual

4.0.2 Exhibit B – CDRL A002, Shock Test Plan

4.0.3 Exhibit C – CDRL A003 Shock Test Report

4.0.4 Exhibit D – CDRL A004, Electromagnetic Qualification Status

4.0.5 Exhibit E – CDRL A005, Counterfeit Prevention Plan

4.0.6 Exhibit F – CDRL A006, Request for Variance

4.0.7 Exhibit G – CDRL A007, Request for Waiver

4.0.8 Exhibit H – CDRL A008, Material Certification

4.0.9 Exhibit J – CDRL A009, Small Business Utilization Report

4.0.10 Exhibit K – CDRL A010, Notification of Test Trials

4.0.11 Exhibit L – CDRL A011 Monthly Status Report

4.0.12 Exhibit M – CDRL A012 Installation Control Drawings

5.0 SECURITY REQUIREMENTS

5.1 OPERATIONS SECURITY (OPSEC)

5.1.1 The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted. Performance under this contract requires the Contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NSWCPD approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI.

NSWCPD’s CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI).

5.1.2 CUI correspondence transmitted internally on the Contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.

As…

This is the start of the file's text. The full file is on GovTribe.