22R3927 Sources Sought Project Data Form.docx
DOCX document 18 KB Posted
- Attached to
- SEAWALL REPAIRS FOR FARRAGUT, ROBERT CROWN AND SANTEE BASIN, UNITED STATED NAVAL ACADEMY, ANNAPOLIS, MD
- Solicitation number
- N40080-22-R-3927
About this file
This document is a sources sought notice for a construction project to repair seawalls at the United States Naval Academy in Annapolis, Maryland. The Naval Facilities Engineering Command, Washington is seeking small businesses capable of performing repair work including constructing a new sheet pile wall outboard of existing structures at Farragut Field and utilizing an existing tieback system at Santee Basin, with a new tieback system constructed inland of existing structures at Farragut Field. Interested parties are to provide responses by January 18, 2022 including a completed contractor information form, project data forms for up to five relevant past projects demonstrating experience with similar size, scope and complexity projects, description of work self-performed, and verification of small business status. The government estimates the construction value to be between $25-100 million and anticipates awarding a contract in June 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22R3927 Sources Sought Contractor Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – CONSTRUCTION EXPERIENCE PROJECT DATA FORM
For N4008022R3927
SEAWALL REPAIRS FOR FARRAGUT, ROBERT CROWN AND SANTEE BASIN, USNA
Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.
| 1. |
| Contractor Name: |
| 2. | ||||
| Project No. (check one): | ||||
| |_| - 1 | |_| - 2 | |_| - 3 | |_| - 4 | |_| - 5 |
| 3. |
| Contract Number: |
| Delivery/Task Order No.: |
| Project Number: |
| Title: |
| Location: |
| 4. |
| Award Date (mm/dd/yy): |
| 5. |
| Final Contract Price: |
| $ |
| Completion Date (mm/dd/yy): |
| (includes all options and mods) |
| Project is % complete (as of submission due date) |
| This is the |_| total project |_| subcontract price. |
| 6. | ||
| Type of work: | ||
| |_| New Construction | |_| Repair | |_| Renovation |
| 7. |
| Customer/Owner Name: |
| Point of Contact Name/Title: (person with project knowledge) |
| POC Phone Number: |
| POC Email Address: |
| 8. | |
| Were you the Prime contractor for this project? | |
| |_| Yes | |_| No |
| Were you a subcontractor for this project? | |
| |_| Yes | |_| No |
| If subcontractor, who was the Prime contractor? |
| 9. |
| Type of Contract (check all that apply): |
|_| Design-Build |_| Design-Bid-Build (fully designed project)
| |_| Other (explain): |
| If Design-Build, provide the following information: |
| |_| Design accomplished in-house |
| Lead design firm name: |
| Years working together: |
| Address: |
10. Provide a detailed description of the project:
11. Percentage of work you self-performed on this project: %.
Provide a detailed description of the work your firm self-performed on this project:
Form may be expanded. Please DO NOT change content of the form.
File details come from the government source that posted it. Updated .