Construction Solicitation Price Shedule Breakdown.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
SMOKE STACK REMOVAL Federal contract opportunity
Solicitation number
22Q0164
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

View the file

Other files for this federal contract opportunity

Other files attached to SMOKE STACK REMOVAL, newest first.
File Type Posted
22Q0164-P01.pdf PDF
22Q0164.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
Title:
Total LaborTotal MaterialTotal SubcontractorTotal Base Item
General Requirements & Facility ConstructionPrice
Division 01 General Requirements (furnish and install)$0.00
01A - Project Manager
01B - Superintendent
01C - Quality Control Manager
01D - Site Safety Officer
01E - Scheduler
01F - DESIGN
Division 2 Existing Conditions (furnish and install)$0.00
Division 3 Concrete (furnish and install)$0.00
Division 4 Masonry (furnish and install)$0.00
Division 5 Metals (furnish and install)$0.00
Division 6 Woods, Plastic and Composites (furnish and install)$0.00
Division 7 Thermal and Moisture Protection (furnish and install)$0.00
Division 8 Openings (furnish and install)$0.00
Division 9 Finishes (furnish and install)$0.00
Division 10 Specialties (furnish and install)$0.00
Division 11 Equipment (furnish and install)$0.00
Division 12 Furnishings (furnish and install)$0.00
Division 13 Special Construction (furnish and install)$0.00
Division 14 Conveying Equipment (furnish and install)$0.00
Facility Services Subgroup
Division 21 Fire Suppression (furnish and install)$0.00
Division 22 Plumbing (furnish and install)$0.00
Division 23 Heating, Ventilating and A/C (furnish and install)$0.00
Division 25 Integrated Automation$0.00
Division 26 Electric$0.00
Division 27 Communications$0.00
Division 28 Electronic Safety & Security$0.00
Site & Infrastructure Subgroup
Division 31 Earthwork$0.00
Division 32 Exterior Improvements$0.00
Division 33 Utilities$0.00
Division 34 Transportation$0.00
Division 35 Waterway & Marine Construction$0.00
Process Equipment Subgroup$0.00
Division 40 Process Interconnections$0.00
Division 41 Material Processing & Handling Equipment$0.00
Division 42 Process Heating, Cooling, & Drying Equipment$0.00
Division 43 Process Gas & Liquid Handling$0.00
Division 44 Pollution & Waste Control Equipment$0.00
Division 45 Industry Specific Mfg. Equipment$0.00
Division 46 Water & Wastewater Equipment$0.00
Division 48 Electrical Power Generation$0.00

TOTAL DIVISIONS $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
OverheadRate _______%N/A
Overhead (daily rate)Per Day $0.00N/A
SubContract Mark-UpRate _______%N/A
ProfitRate _______%N/A
* Individual rates cannot exceed 10% SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00
TOTAL$0.00

File details come from the government source that posted it. Updated .